CN201180311Y - 一种预留结构柱纵向钢筋的节点结构 - Google Patents
一种预留结构柱纵向钢筋的节点结构 Download PDFInfo
- Publication number
- CN201180311Y CN201180311Y CNU2008200569648U CN200820056964U CN201180311Y CN 201180311 Y CN201180311 Y CN 201180311Y CN U2008200569648 U CNU2008200569648 U CN U2008200569648U CN 200820056964 U CN200820056964 U CN 200820056964U CN 201180311 Y CN201180311 Y CN 201180311Y
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- steel
- steel bar
- node structure
- structural
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本实用新型公开了一种预留结构柱纵向钢筋的节点结构,钢管混凝土柱侧面设有钢牛腿与结构梁内水平钢筋连接,上部结构柱钢筋穿过钢牛腿的预留孔,其特征在于上部结构柱钢筋下端通过钢筋接驳器与下部结构柱钢筋的上端连接。钢筋接驳器外设有保护套。本实用新型节点具有结构简单、操作方便、提高施工效率等优点。
Description
技术领域
本实用新型涉及建筑领域,具体涉及一种用于建筑工程逆作法施工工艺中的预留结构柱纵向钢筋的节点结构。
背景技术
逆作法施工技术工艺是指利用地下室或地下构筑物的水平构件(梁板)来代替围护体水平支撑,以实现地上工程与地下工程同时施工的一种新的施工工艺。这种施工工艺具有缩短施工工期,减小基坑围护体变形,降低对周边环境的影响等优点,带来很大的社会经济效益;其在高层建筑以及市政工程项目中得以广泛应用,且技术也日趋成熟。在逆作法施工过程中,先施工围护结构和内部竖向支撑结构,然后施工地面一层的梁板楼面结构,竖向向上向下同时施工;而施工过程中,如何保证结构柱中纵向钢筋的贯通是一个关键的工艺。为此,在施工地面一层水平构件时需要在梁柱节点处预留结构柱的纵向钢筋,以保证上下结构柱的竖向钢筋的贯通。当地面一层梁由于施工荷载需要采取叠合梁(临时增大截面)时,柱节点处一般设有三~四块水平钢牛腿钢板。目前大量工程实践中,一般采取对各水平钢板进行预先打孔,将上下孔准确地对齐,然后将结构柱钢筋从孔中穿至规定的位置。这样的施工工艺既减缓了施工速度,也降低了施工效率,施工难度大。
实用新型内容
本实用新型的目的在于提供一种克服上述缺陷的预留结构柱纵向钢筋的节点结构,既可以提高施工效率,又能保证施工质量。
为了实现这一目的,本实用新型的技术方案如下:一种预留结构柱纵向钢筋的节点结构,钢管混凝土柱侧面设有钢牛腿与结构梁内水平钢筋连接,上部结构柱钢筋穿过钢牛腿的预留孔,其特征在于上部结构柱钢筋下端通过钢筋接驳器与下部结构柱钢筋的上端连接。钢筋接驳器外设有保护套。
根据上海市标准《钢筋镦粗直螺纹连接技术规程》DBJ/CT007-2006的相关规定,采用AS级钢筋接驳器时,接头百分率可不受限制。将上部结构柱钢筋穿过钢牛腿的预留孔至结构梁临时增大截面的范围内,在上部结构柱钢筋下端安装上钢筋接驳器,在钢筋接驳器外设置保护套;待浇筑地下结构柱混凝土时,将结构梁临时增大部分混凝土进行凿除,露出钢筋接驳器,并清理干净,同时将结构梁临时增大截面内的钢牛腿及水平钢托盘、竖向加劲肋进行割除;然后将下层结构柱钢筋与钢筋接驳器进行连接,浇筑结构柱混凝土。本实用新型节点具有结构简单、操作方便、提高施工效率等优点。
附图说明
图1为施工地面一层结构梁板时的节点结构的剖面示意图
图2为节点最终完成时节点结构的剖面示意图
具体实施方式
如图1、图2所示,本实用新型节点构造包括上部结构柱钢筋1、下部结构柱钢筋8、钢筋接驳器2、钢牛腿3、水平钢托盘4、竖向加劲肋5、栓钉6、保护套7。
所述水平钢托盘4、竖向加劲肋5与钢管混凝土柱11焊接连接,栓钉6与钢管柱混凝土柱11焊接连接,钢牛腿3与钢管混凝土柱11焊接连接。
在结构梁中部的钢牛腿3上预先根据钢筋放置位置预留孔洞,将上部结构柱竖向钢筋1穿过孔洞伸到结构梁12的临时增大范围9内,在上部结构柱钢筋1下端安装钢筋接驳器2。
所述保护套7置于钢筋接驳器2的外部,对钢筋接驳器2进行保护。
钢筋连接完成,浇筑地上结构的混凝土。(如图1)
将结构梁临时增大部分的混凝土凿除,同时割除水平钢托板4、竖向加劲肋5,以及结构梁增大范围9内的钢牛腿3,露出钢筋接驳器2,并清理干净。
将下部结构柱钢筋8与钢筋接驳器2连接,且与箍筋绑扎,浇筑地下结构的混凝土。(如图2)
所述钢筋接驳器2为AS级钢筋接驳器,用于连接上部部结构柱钢筋1和下部结构柱钢筋8。所述钢牛腿3为连接结构梁内水平钢筋10与钢管混凝土柱11的连接构件。所述水平钢托盘4为在施工过程中可靠有效均匀的传递梁柱节点处竖向内力的结构构件。竖向加劲肋5为在施工过程中有效抵抗梁柱节点处剪力的结构构件。栓钉6为在正常使用过程中有效抵抗梁柱节点处剪力的结构构件。保护套7为保护钢筋接驳器被浇筑的混凝土堵塞。
Claims (3)
1、一种预留结构柱纵向钢筋的节点结构,钢管混凝土柱侧面设有钢牛腿与结构梁内水平钢筋连接,上部结构柱钢筋穿过钢牛腿的预留孔,其特征在于上部结构柱钢筋下端通过钢筋接驳器与下部结构柱钢筋的上端连接。
2、如权利要求1所述的预留结构柱纵向钢筋的节点结构,其特征在于钢筋接驳器外设有保护套。
3、如权利要求1或2所述的预留结构柱纵向钢筋的节点结构,其特征在于所述钢筋接驳器为AS级钢筋接驳器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200569648U CN201180311Y (zh) | 2008-04-03 | 2008-04-03 | 一种预留结构柱纵向钢筋的节点结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200569648U CN201180311Y (zh) | 2008-04-03 | 2008-04-03 | 一种预留结构柱纵向钢筋的节点结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201180311Y true CN201180311Y (zh) | 2009-01-14 |
Family
ID=40249811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200569648U Expired - Fee Related CN201180311Y (zh) | 2008-04-03 | 2008-04-03 | 一种预留结构柱纵向钢筋的节点结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201180311Y (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013433A (zh) * | 2016-05-25 | 2016-10-12 | 中建钢构有限公司 | 用于混凝土柱与钢管混凝土柱过渡段的连接限位器 |
CN106223492A (zh) * | 2016-07-18 | 2016-12-14 | 中国建筑第八工程局有限公司 | 钢柱和混凝土梁钢筋的连接结构及连接方法 |
-
2008
- 2008-04-03 CN CNU2008200569648U patent/CN201180311Y/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013433A (zh) * | 2016-05-25 | 2016-10-12 | 中建钢构有限公司 | 用于混凝土柱与钢管混凝土柱过渡段的连接限位器 |
CN106013433B (zh) * | 2016-05-25 | 2018-06-26 | 中建钢构有限公司 | 用于混凝土柱与钢管混凝土柱过渡段的连接限位器 |
CN106223492A (zh) * | 2016-07-18 | 2016-12-14 | 中国建筑第八工程局有限公司 | 钢柱和混凝土梁钢筋的连接结构及连接方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926669B (zh) | 一种地铁车站施工方法 | |
CN201176598Y (zh) | 地铁隧道正上方基础底板钢筋笼 | |
CN107975059A (zh) | 一种装配式桩基码头结构及其施工方法 | |
CN103215894B (zh) | 移动式临时预应力张拉锚块 | |
CN108035438A (zh) | 一种高强高延性混凝土装配式框架结构体系及连接方法 | |
CN103866693B (zh) | 一种钢筋混凝土系杆拱桥拱肋的安装方法 | |
CN101550723A (zh) | 预留结构柱纵向钢筋节点施工方法 | |
CN103669866A (zh) | 地下室钢筋混凝土柱节点连接结构的施工方法 | |
CN105525753A (zh) | 一种构造柱与主体结构同时施工的方法及结构 | |
CN205712590U (zh) | 一种装配式剪力墙与预制钢管混凝土柱的连接结构 | |
CN203200745U (zh) | 一种逆作法施工中地下连续墙的加固支撑 | |
CN103122691A (zh) | 塔吊标准节支承高空支模钢平台结构及施工方法 | |
CN201180311Y (zh) | 一种预留结构柱纵向钢筋的节点结构 | |
CN114319977A (zh) | 一种钢管混凝土排柱式连接预制剪力墙结构及施工方法 | |
CN203640061U (zh) | 地下室钢筋混凝土柱节点连接结构 | |
CN103790176A (zh) | 一种预埋短肢柱结构及其施工方法 | |
CN102936953B (zh) | “大”字型劲钢结构模板施工方法 | |
CN203034799U (zh) | 塔吊标准节支承高空支模钢平台结构 | |
CN204311457U (zh) | 一种地铁车站基坑开挖施工用组合式支护体系 | |
CN102108783A (zh) | 一种塔台悬挑结构操作平台及其施工方法 | |
CN104675138A (zh) | 一种用于隔声降噪改造的板式阳台加固方法与加固结构 | |
KR20090070398A (ko) | 선조립철근을 이용한 cft기둥과 rc부재의 접합부시공방법 | |
CN110792282B (zh) | 一种无支撑托换的框架柱的改造方法 | |
CN202954577U (zh) | 大吨位自爬升塔吊附墙预埋件的承重梁加固结构 | |
CN203022193U (zh) | 井式框架梁加强无梁楼盖连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090114 |