CN201172979Y - Aerial field for factory building - Google Patents
Aerial field for factory building Download PDFInfo
- Publication number
- CN201172979Y CN201172979Y CNU200820009046XU CN200820009046U CN201172979Y CN 201172979 Y CN201172979 Y CN 201172979Y CN U200820009046X U CNU200820009046X U CN U200820009046XU CN 200820009046 U CN200820009046 U CN 200820009046U CN 201172979 Y CN201172979 Y CN 201172979Y
- Authority
- CN
- China
- Prior art keywords
- field
- basic unit
- factory building
- field basic
- suspension column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
A factory building air field comprises a factory building (1), column feet (2) and field bases (5), wherein the field bases (5) are arranged over the factory building (1), the column feet (2) of the field base (5) adopt armoured concrete to drive piles and build through connecting with the column feet (2) of the factory building (1) into a whole, bridging beams and longitudinal beams which are arranged on the upper portions of the column feet (2) are provided with the field base (5) and are spread in a cast-in-place mode through adopting the armoured concrete, an upper platform bridge (15) of the field bases (5) is connected with each of the field bases (5), the lower portions of plane surface pools (7) of the field bases (5) are provided with water outtake pipes and are connected and distributed on a ridge (6) pipeline and are used for the farmland farming. The air field can solve the future troubles of the human normal life and the pains of a villager when losing a field, and also can embody the important policy of the government that the farmland capital construction is implemented.
Description
(1) technical field
The utility model relates to the flame-out in flight storehouse, the food and drink building improves invention.
(2) background technology
In the prior art, China and world's most countries proportion of crop planting only limit to field, ground area.Though countries in the world are strict control field exploitation in evolution,, some object of construction production must be to lean on field area infrastructure.Along with the needs of China's development, build engineerings such as speedway, automobile main road and must take the continuous scale expansion of farmland area exploitation, particularly development of real estate and site for industrial development, the field cultivated area is reduced gradually.On the contrary, China's population improves constantly living condition, sanitation of environment, medical level, aspects such as the average life span and fecundity has been created the basis of increased population.But, can plant the field area now along with development and developing cause fewer and feweri.Majority state utilizes polder to build up fields now, and the field area that additional quilt is opened up increases field, ground cultivated area.Along with the world industry fast development, environment pollution is serious gradually, and global climate warms day by day, and the terrestrial pole glacier has been subjected to very big influence and has caused dissolving, and the part coastal area is subjected to water level and goes up and influence the field and normally plant.From now on, field, ground cultivated area is faced with and reduces day by day and influence human normal life problem.
(3) technical scheme
Defective in view of prior art, the utility model aims to provide a kind of factory building the field is set in the air, this project can be examined the practicable also field second ploughing measure of enterprise that the field constructs the factory buildings by government, and require cultivated area to reach set quota, can also implement the existing factory building sky and build the field task, fill up the field by the factory building area occupied.
The utility model is finished as follows; The aerial field of a kind of factory building comprises factory building, suspension column, field basic unit; The sky, described factory building roof is provided with field basic unit, field basic unit suspension column adopts cement steel concrete and factory building suspension column disjunctor piling building, suspension column upper beam and longeron adopt the cement steel concrete cast-in-situ to fix, field basic unit is set on crossbeam and the longeron and adopts the cement steel concrete cast-in-situ to pave, overline bridge is set in the basic unit of field and is connected with each field basic unit, interface channel is set again in the basic unit of field to be connected current with the overhead field of other factory building basic unit, each field basic unit periphery is provided with reinforced concrete earthen wall guardrail and offers the ventilation window opening, bottom, pond, field basic unit plane is installed the water outlet water pipe and is connected and is distributed in the ridge pipeline, and underground water vein of waste water storage pool water source collection and water in field and river are for main water source, field; Fill field earth in the inboard ridge fence of described field basic unit's upper channel and be used for proportion of crop planting; The outer wide location of described factory building is provided with the storehouse management room and electrical lift (elevator) or elevator and last lower channel are installed in the room provides the rural migrant worker to transport and the agriculture machine Vomitory, at place, entrance and exit of the passage up and down security door is installed again and is the safety precaution of management on-site property.
The aerial field of a kind of factory building of the utility model theme design, rational in infrastructure, building exploitation easily, cost of investment is low, really realized China's factory building unified planning construction, this technology can solve the sorrow of the consequence in the human normal life and the misery that the villager loses the field, can embody the important decision that country implements farmland capital construction again.
(4) description of drawings
The present invention has following accompanying drawing
The aerial field of Fig. 1 the utility model factory building front section view
The aerial field of Fig. 2 the utility model factory building plan view
Further describe the component sign below in conjunction with accompanying drawing; Factory building (1), suspension column (2), roof (3), office block (4), field basic unit (5), ridge (6), pond (7), enclosure wall guardrail (8), passage (9), water pipe (10), waste water water source tube (11), last lower channel (12), security door (13), storehouse management room (14), overline bridge (15), electrical lift (elevator) or elevator (16), field earth (17), interface channel (18), waste water storage pool (19).
(5) embodiment
Accompanying drawing discloses the utility model technical pattern, and embodiment is described in further detail below more in conjunction with the accompanying drawings; Comprise factory building (1), suspension column (2), field basic unit (5); The sky, described factory building (1) roof (3) is provided with field basic unit (5), field basic unit (5) suspension column (2) adopts cement steel concrete and factory building (1) suspension column (2) disjunctor piling building, suspension column (2) top is provided with crossbeam and longeron, crossbeam and longeron adopt the cement steel concrete cast-in-situ to fix, field basic unit (5) is set on crossbeam and the longeron and adopts the cement steel concrete cast-in-situ to pave, control is leaked, overline bridge (15) is set again in the field basic unit (5) and is connected with field basic unit (5) on each building factory building (1) roof (3), interface channel (18) is set in the field basic unit (5) to be connected with field basic unit (5) on other factory building, each field basic unit (5) periphery is provided with enclosure wall guardrail (8), enclosure wall guardrail (8) adopts the cement steel concrete cast-in-situ to fix and offer the ventilation window opening, field basic unit (5) is provided with pond (7) on the plane, water pipe (10) is installed in pond (7) and waste water source capsule (11) is an inlet channel, bottom, pond (7) is installed the water outlet water pipe and is connected the pipeline that is distributed in ridge (6) and supplies water to the field, ridge is offered the water level floss hole on (6), water in field discharging is also concentrated by the ditch and to be discharged into pipeline and to enter waste water storage pool (19), each waste water storage pool (19) is interconnected, and waste water storage pool (19) water source is that the underground water vein of collection and water in field and river etc. are main water source; Described field basic unit (5) is provided with passage (9), and the passage inboard is provided with ridge (6), and ridge (6) adopts the cast-in-place fence of cement concrete, fills field earth (17) in ridge (6) fence and is used for proportion of crop planting; The wide outside location of described factory building (1) plant area is provided with storehouse management room (14), electrical lift (elevator) or elevator (16) and last lower channel (12) are installed in the storehouse management room (14) provides the rural migrant worker to transport and the agriculture machine Vomitory, and security door (13) is set for managing safety precautions such as on-site stolen property or destruction at place, last lower channel (12) access.
Claims (1)
1. the aerial field of factory building comprises factory building (1), suspension column (2), field basic unit (5); The sky, described factory building (1) roof (3) is provided with field basic unit (5), field basic unit (5) suspension column (2) adopts cement steel concrete and factory building (1) suspension column (2) disjunctor piling building, suspension column (2) upper beam and longeron adopt the cement steel concrete cast-in-situ to fix, field basic unit (5) is set on crossbeam and the longeron and adopts the cement steel concrete cast-in-situ to pave, overline bridge (15) is set in the field basic unit (5) and is connected with each field basic unit (5), interface channel (18) is set again in the field basic unit (5) to be connected current with the overhead field basic unit of other factory building (5), each field basic unit (5) periphery is provided with reinforced concrete earthen wall guardrail (8) and offers the ventilation window opening, bottom, field basic unit (5) pond, plane (7) is installed the water outlet water pipe and is connected and is distributed in ridge (6) pipeline, and waste water storage pool (19) underground water vein of water source collection and water in field and river are for main water source, field; Fill field earth (17) in the inboard ridge of described field basic unit (5) upper channel (9) (6) fence and be used for proportion of crop planting; The outer wide location of described factory building (1) is provided with storehouse management room (14) and electrical lift (elevator) or elevator (16) and last lower channel (12) are installed in the room provides the rural migrant worker to transport and the agriculture machine Vomitory, security door (13) is installed at place, last lower channel (12) access again is the safety precaution of management on-site property.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820009046XU CN201172979Y (en) | 2008-04-05 | 2008-04-05 | Aerial field for factory building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820009046XU CN201172979Y (en) | 2008-04-05 | 2008-04-05 | Aerial field for factory building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201172979Y true CN201172979Y (en) | 2008-12-31 |
Family
ID=40200094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU200820009046XU Expired - Fee Related CN201172979Y (en) | 2008-04-05 | 2008-04-05 | Aerial field for factory building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201172979Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102146738A (en) * | 2011-02-08 | 2011-08-10 | 林章建 | Novel building capable of increasing agricultural acreage and manufacturing method thereof |
-
2008
- 2008-04-05 CN CNU200820009046XU patent/CN201172979Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102146738A (en) * | 2011-02-08 | 2011-08-10 | 林章建 | Novel building capable of increasing agricultural acreage and manufacturing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106836275B (en) | Landscape eco-friendly retaining wall for rapidly protecting tillite slope and implementation method | |
CN109811776B (en) | Assembled lattice frame roof beam | |
CN106677189A (en) | Inclined pile wall bearing type foundation pit support structure and construction method thereof | |
CN112211199A (en) | Large deep foundation pit supporting construction structure and method thereof | |
CN101255774B (en) | Midair field | |
CN201172979Y (en) | Aerial field for factory building | |
CN201221216Y (en) | Village aerial field | |
CN101250948B (en) | Workshop midair field | |
CN208701700U (en) | A kind of pile foundation protective device close near deep basal pit | |
CN213173766U (en) | Side slope drainage system | |
CN101240672A (en) | Village aerial field | |
CN101250953A (en) | Railway midair field | |
Orton | Heritage impact assessment for a proposed photovoltaic energy plant on the farm Klipgats Pan near Copperton, Northern Cape | |
CN203374046U (en) | House with land regeneration function | |
CN201180389Y (en) | Midair field of freeway | |
CN101245670A (en) | Vehicle highroad midair field | |
CN201187173Y (en) | Railway aerial field land | |
CN201158962Y (en) | Midair field | |
KR20070104111A (en) | Bridge with pile and construction method thereof | |
CN213448524U (en) | Yuanyang terrace type ecological landscape slope protection | |
CN106193745B (en) | A kind of stepped prefabricated assembled rectangular underground granary of interior encased steel plate | |
US20230193616A1 (en) | Border Security Barrier | |
Webley et al. | Heritage impact assessment: proposed West Coast One Wind Energy Facility, Vredenburg District, Western Cape | |
CN201162373Y (en) | Vehicle highroad midair field | |
CN106013910B (en) | A kind of stepped prefabricated assembled rectangular underground granary of encased steel plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081231 Termination date: 20100405 |