CN201162373Y - Vehicle highroad midair field - Google Patents
Vehicle highroad midair field Download PDFInfo
- Publication number
- CN201162373Y CN201162373Y CNU200820007602XU CN200820007602U CN201162373Y CN 201162373 Y CN201162373 Y CN 201162373Y CN U200820007602X U CNU200820007602X U CN U200820007602XU CN 200820007602 U CN200820007602 U CN 200820007602U CN 201162373 Y CN201162373 Y CN 201162373Y
- Authority
- CN
- China
- Prior art keywords
- water
- overhead
- water source
- top layer
- layer plane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to an automobile road mid-air farmland overhead creel (1) is arranged over the automobile road in a three-dimensional way; pedestals (2) of the overhead creel (1) are supported by cement reinforced concrete and piled and built along both sides of the automobile road; a plane on the top layer (4) is provided with a warehouse rest room (7) and a water pool (8); the water pool (8) is provided with a mountain water source pipe (16) and a river water source pipe (17) as water inlet pipes; the lower part of the water pool (8) is provided with a water outlet pipe connected with water source pipes distributed in a field ridge (6) and entering into the farmland and water level drainage pipes on the farmland; the outer side of the overhead creel (1) is provided with an electric elevator (9), stairs (15) and up and down channels (13) for mini agricultural machinery vehicles and farm cattle to enter and exit. The overhead creel can not only supplement farmland planting area for the human beings, but also solve the losses produced by the abnormal traffic transportation because the automobile road suffers from snow disaster and other natural disasters and is blocked off.
Description
(1) technical field
The utility model relates to the flame-out in flight storehouse and improves invention.
(2) background technology
In the prior art, most countries proportion of crop planting in the world's only limits to field, ground area.Though countries in the world are strict control field exploitation in evolution,, some object of construction production must be to lean on field area infrastructure.Along with the needs of China's development, build engineerings such as speedway, automobile main road and must take the farmland area exploitation, particularly development of real estate and site for industrial development are constantly expanded, and the field area is reduced gradually.On the contrary, China's population improves constantly living condition, sanitation of environment, medical level, aspects such as the average life span and fecundity has been created the basis of increased population.But, can plant the field area now along with development and developing cause fewer and feweri.And, world industry development fast, environment pollution is serious gradually, global climate warms day by day, the terrestrial pole glacier has been subjected to very big influence and has caused dissolving, the part coastal area is subjected to water level and goes up and influence the field and normally plant.From now on, field, ground cultivated area faces and reduces day by day and influence human lives's problem.
(3) technical scheme
In view of the defective of prior art, the utility model aims to provide a kind of road traffic route sky the field is set, and this project can reach replenishes the field area, can solve the automobile main road again and meet natural calamity such as snow disaster and sealed and influence the traffic normal transport and cause damage.
The utility model is finished as follows; The aerial field of a kind of road traffic route comprises overhead, top layer plane; Institute's art overhead taked three-dimensional design, and in the overhead setting of road traffic route, overhead suspension column adopts the cement steel concrete for riding in the road traffic route dual-side along the piling building, end floor beam adopts cement steel concrete disjunctor cast-in-place fixing on the suspension column, outer both sides are provided with longeron on the crossbeam, longeron adopts the mutual hook of reinforcing bar to prick and be connected and fixed with electric welding, again with cement concrete cast-in-place solidify fixing, enclosure wall is set above the longeron to be protected and blocks, enclosure wall protects and blocks reinforcing bar and the welding of longeron Reinforced hook bundle and offer the ventilation window opening, then with cement concrete cast-in-place solidify fixing, raising tension strength and the fracture of tolerance suspension column that major traffic accidents cause can not influence the top layer plane yet and collapse, the top layer plane is adopted cement steel net concrete cast-in-situ or is adopted built on stilts connection of bridge plate to pave, the warehouse resting room is set on the top layer plane, on the warehouse resting room flat-top pond is set again, the mountain range water source tube is installed in the pond and the river water source tube is an inlet channel, the river water source tube is installed water pump and is drawn water, the mountain range water source tube is connected the scenery with hills and waters water source, and bottom, pond installation water outlet water pipe and connection are distributed in ridge and enter field waterpipe and water level gutter; Described top layer plane channel inboard is provided with ridge, fills field earth in ridge encloses and blocks for the plantation crops; The described overhead outside is installed electrical lift (elevator) and stair and gone up lower channel is Vomitory.
The aerial field of a kind of road traffic route of the utility model theme design, rational in infrastructure, building is developed easily, can solve the sorrow of the consequence in the human normal life, can realize the effect of anti-floods again.
(4) description of drawings
The utility model has following accompanying drawing
The aerial field of Fig. 1 the utility model road traffic route front section view
The aerial field of Fig. 2 the utility model road traffic route side view
The aerial field of Fig. 3 the utility model road traffic route plan view
Further describe the component sign below in conjunction with accompanying drawing; Overhead (1), suspension column (2), crossbeam (3), top layer plane (4), ditch (5), ridge (6), rest room (7), warehouse, pond (8), electrical lift (elevator) (9), ventilation window opening (10), longeron (11), enclosure wall protect and block (12) upward lower channel (13), passage (14), stair (15) mountain range water source tube (16), river water source tube (17), field earth (18).
(5) embodiment
Accompanying drawing discloses the utility model technical pattern, and embodiment is described in further detail below more in conjunction with the accompanying drawings; Comprise overhead (1), top layer plane (4); Three-dimensional design is taked in overhead (1) of institute's art, and in the overhead setting of road traffic route, the suspension column of overhead (1) (2) adopts the cement steel concrete for relying on and building along position piling at the road traffic route dual-side, suspension column (2) is gone up end floor beam (3) and is adopted cement steel concrete disjunctor cast-in-place fixing, crossbeam (3) is gone up the outside longeron (11) is set, longeron (11) adopts the mutual hook of reinforcing bar to prick and be connected and fixed with electric welding, then with cement concrete cast-in-place solidify fixing, enclosure wall is set above the longeron (11) to be protected and blocks (12), enclosure wall protects and blocks (12) reinforcing bar hook that links to each other with longeron (11) reinforcing bar and prick welding and offer ventilation window opening (10), adopt then cement concrete cast-in-place solidify fixing, improving tension strength and tolerance major traffic accidents causes suspension column (2) fracture also can not influence top layer plane (4) to collapse, top layer plane (4) is adopted cement steel net concrete cast-in-situ or is adopted built on stilts connection of bridge plate to pave, warehouse resting room (7) is set on the top layer plane (4), on warehouse resting room (7) flat-top pond (8) is set again, mountain range water source tube (16) is installed in pond (8) and river water source tube (17) is an inlet channel, river water source tube (17) is installed water pump and is drawn water, mountain range water source tube (16) is connected scenery with hills and waters water source and natural pump water, bottom, pond (8) the water outlet water pipe is installed and connect be distributed in ridge (6) enter the farmland waterpipe, at ridge (6) water level discharging water pipe is installed again, (5) also give off overhead (1) by ditch (5) to field discharge water afflux in the ditch; Described top layer plane (4) is provided with passage (14), and ridge (6) is set in the passage, and ridge (6) adopts cast-in-place the enclosing of cement concrete to block, and fills field earth (18) in ridge (6) encloses and blocks and is used to plant crops; Described overhead (1) arranged outside is installed by electrical lift (elevator) (9) and stair (15) provide transportation and Vomitory; Described overhead (1) outside is provided with lower channel (11) again and is used for miniature agricultural machine vehicle and farm cattle access way.
Claims (1)
- The aerial field of a kind of road traffic route comprises overhead (1), top layer plane (4); Three-dimensional design is taked in overhead (1) of institute's art, and in the overhead setting of road traffic route, the suspension column of overhead (1) (2) adopts the cement steel concrete for riding in the road traffic route dual-side along the piling building, suspension column (2) is gone up end floor beam (3) and is adopted cement steel concrete disjunctor cast-in-place fixing, crossbeam (3) is gone up outer both sides longeron (11) is set, longeron (11) adopts the mutual hook of reinforcing bar to prick and be connected and fixed with electric welding, again with cement concrete cast-in-place solidify fixing, enclosure wall is set above the longeron (11) to be protected and blocks (12), enclosure wall protects and blocks (12) reinforcing bar and the welding of longeron (11) Reinforced hook bundle and offer ventilation window opening (10), then with cement concrete cast-in-place solidify fixing, raising tension strength and tolerance suspension column that major traffic accidents cause (2) fracture can not influence top layer plane (4) yet and collapse, top layer plane (4) is adopted cement steel net concrete cast-in-situ or bridge plate to make somebody a mere figurehead and is paved, warehouse resting room (7) is set on the top layer plane (4), warehouse resting room (7) is provided with pond (8) again on putting down in advance, mountain range water source tube (16) is installed in pond (8) and river water source tube (17) is an inlet channel, river water source tube (17) is installed water pump and is drawn water, mountain range water source tube (16) is connected the scenery with hills and waters water source, and bottom, pond (8) installation water outlet water pipe and connection are distributed in ridge (6) and enter farmland waterpipe and water level gutter; Described top layer plane (4) passage (14) inboard is provided with ridge (6), fills field earth (18) in ridge (6) encloses and blocks for the plantation crops; Described overhead (1) outside is installed electrical lift (elevator) (9) and stair (15) and is gone up lower channel (13) and confess into passage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820007602XU CN201162373Y (en) | 2008-03-09 | 2008-03-09 | Vehicle highroad midair field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820007602XU CN201162373Y (en) | 2008-03-09 | 2008-03-09 | Vehicle highroad midair field |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201162373Y true CN201162373Y (en) | 2008-12-10 |
Family
ID=40183311
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU200820007602XU Expired - Fee Related CN201162373Y (en) | 2008-03-09 | 2008-03-09 | Vehicle highroad midair field |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201162373Y (en) |
-
2008
- 2008-03-09 CN CNU200820007602XU patent/CN201162373Y/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES2808178T3 (en) | Module and set to manage water flow | |
US8297014B2 (en) | Architectural structure and method thereof | |
CN102296843B (en) | Multi-arch multilayer plant-separation type parking device | |
JP2012251343A (en) | Pc artificial ground with disaster preventing function, and apartment house block system with self-governing function as settlement | |
US8407956B2 (en) | Wall panel with extended integral post | |
CN101255774B (en) | Midair field | |
CN101245670A (en) | Vehicle highroad midair field | |
CN201180389Y (en) | Midair field of freeway | |
CN201162373Y (en) | Vehicle highroad midair field | |
CN201221216Y (en) | Village aerial field | |
WO2015087249A1 (en) | Embankment support | |
CN101250953A (en) | Railway midair field | |
CN102071696B (en) | Steep slope protective soft frame and construction method thereof | |
KR101083255B1 (en) | Environmental steel bridge type eco-bridge | |
CN201187173Y (en) | Railway aerial field land | |
BR112021011511A2 (en) | MODULE AND SET FOR UNDERGROUND FLUID MANAGEMENT FOR SHALLOW DEPTH APPLICATIONS. | |
CN201158962Y (en) | Midair field | |
US8607518B2 (en) | Wall panel with extended integral post | |
CN214302989U (en) | Build assembled garage parking on ground additional | |
JP2015025253A (en) | Tsunami evacuation stage | |
CN101240672A (en) | Village aerial field | |
CN201172979Y (en) | Aerial field for factory building | |
KR20070105950A (en) | Floting land by wire | |
CN101250948B (en) | Workshop midair field | |
CN104895353A (en) | A floating net type building group characterized by city and countryside integration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081210 |