CN106677189A - Inclined pile wall bearing type foundation pit support structure and construction method thereof - Google Patents

Inclined pile wall bearing type foundation pit support structure and construction method thereof Download PDF

Info

Publication number
CN106677189A
CN106677189A CN201611169748.XA CN201611169748A CN106677189A CN 106677189 A CN106677189 A CN 106677189A CN 201611169748 A CN201611169748 A CN 201611169748A CN 106677189 A CN106677189 A CN 106677189A
Authority
CN
China
Prior art keywords
stake
pile wall
pile
taper pile
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611169748.XA
Other languages
Chinese (zh)
Other versions
CN106677189B (en
Inventor
束冬青
蔡敏
李彪
胡萍
张晓波
周阳
刘贵强
张龙飞
丁俊恩
单灿灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Urban Construction Design Institute Co Ltd
Original Assignee
Anhui Urban Construction Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Urban Construction Design Institute Co Ltd filed Critical Anhui Urban Construction Design Institute Co Ltd
Priority to CN201611169748.XA priority Critical patent/CN106677189B/en
Publication of CN106677189A publication Critical patent/CN106677189A/en
Application granted granted Critical
Publication of CN106677189B publication Critical patent/CN106677189B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention discloses an inclined pile wall bearing type foundation pit support structure. The inclined pile wall bearing type foundation pit support structure is characterized by comprising an inclined pile wall, a bearing pile and a crown beam, the inclined pile wall is obliquely arranged, the top of the inclined pile wall is inclined towards the interior of a foundation pit, the bottom of the inclined pile wall obliquely enters a soil body outside the foundation pit, the bearing pile is vertically arranged below the top of the inclined pile wall, the top of the bearing pile and the top of the inclined pile wall are connected, and the bottom of the bearing pile is arranged in the soil body at the bottom of the foundation pit. Compared with the prior art, the inclined pile wall bearing type foundation pit support structure has the following beneficial effects that a horizontal diagonal brace system in the pit is eliminated, a good plane operation space is provided for foundation pit earth excavation and basement structure construction, the construction efficiency is greatly improved, and the manufacturing cost is saved; and a horizontal anchor cable anchored in the soil body outside the pit is eliminated, and the problem that the anchor cable exceeds the property line and infringes rights is solved.

Description

A kind of taper pile wall supporting type foundation pit supporting construction and its construction method
Technical field
The invention belongs to Geotechnical Engineering field, is related to a kind of taper pile wall supporting type foundation ditch in construction pit method for protecting support Supporting construction and its construction method.
Background technology
The deep big foundation pit larger for planar dimension and cutting depth, at present the domestic foundation pit supporting method for adopting is main For:Inner support supporting construction, anchored pile supporting, Retaining Structure with Double-row Piles.
The periphery building enclosure of inner support supporting construction and anchored pile supporting is typically prolonged foundation ditch periphery and arranges vertical post Column campshed, diaphram wall, stiffening cement cob wall or interlocking pile etc..
The inner support horizontal layout form of inner support supporting construction mainly has:Grid type, to support truss, angle brace truss, side Truss, annular brace etc..Supporting member is divided into horizontal shore and vertical support column, and column is arranged on Liang Liang and crosses node position Put, material is steel pipe or shaped steel lattice, and per root post a pile base is divided into, and is primarily subjected to vertical load, while being also subjected to support The part of horizontal load being delivered on column.Column spacing is generally 8~12 meters, for planar dimension is more than 100x100 rice Deep big foundation pit, hole inner column can reach tens of even up to a hundred.When basement construction is planned to build, column is needed through basement Base plate and floor.
In the stable soil body of the anchorage cable anchoring of anchored pile supporting outside foundation ditch, it is locked in and is arranged at building enclosure surface On waist rail, anchor cable total length is located in the soil body, and freedom length is not less than 5 meters, and anchoring section is according to soil condition and design value of thrust Size be not quite similar, common anchor cable length be 15~40 meters.
The double-row pile of Retaining Structure with Double-row Piles is connected as by front two rows piling wall by being arranged on the Guan Liang and coupling beam at top Entirety, front two rows piling wall and inter-pile soil collective effect, form " gate-type " soil-baffling structure.
At present there are the following problems for technology:
1. for inner support supporting construction:
Due to a large amount of columns are distributed with foundation ditch, when foundation ditch carries out every layer of earth excavation, excavator operation and the earthwork are transported outward When need avoid column, greatly reduce shoveling work efficiency, in addition the synergistic effect such as weather and appearance of the city control so that pit earthwork is opened Degree of digging into is slow, so as to extend foundation ditch use time and overall duration, deep pit monitor, project progress is adversely affected.
Due to there is a large amount of supporting members and column in foundation ditch so that working space office when planning to build basement structure construction Promote, work efficiency is reduced.
Because column spacing is less, and for steel construction, various equipment easily cause to damage to it during earth excavation, from And affect deep pit monitor.
A large amount of columns are needed through basement bottom board, although column is worn and be respectively provided with base plate steel plate for sealing water, but due to underground The waterproof layer of room base plate is worn out by column, and waterproof slab effect is difficult to ensure that.
Because every root post has pile foundation, the cost of inner support support engineering is significantly increased, especially in soft clay area.
2. for anchored pile supporting:
Anchor cable total length in pile-anchor retaining is arranged in the soil body beyond foundation ditch, often surmounts land red-line, to red line outside Adjacent engineering construction forms obstacle, or even invades opposite field ground property rights.
3. for Retaining Structure with Double-row Piles:
Although Retaining Structure with Double-row Piles significantly enhances the rigidity of building enclosure by " gate-type " structure, cantilever is increased Shield height, eliminates the adverse effect of inner support or anchor cable, but remain as cantilever beam because it accepts mechanism, when foundation depth compared with When depth or poor soil property, lateral pressure is very big, then the diameter of double-row pile needs very greatly, and cost is very high, and is difficult to strict control Deformation.
Further, since front two rows stake is set, and it is larger to plane site demand, it is difficult to when excavation face is close to construction of structures Implement.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art, there is provided a kind of taper pile wall brace type foundation pit supporting construction And its construction method.
The present invention is achieved by the following technical solutions:
A kind of taper pile wall brace type foundation pit supporting construction, it is characterised in that:Taper pile wall brace type foundation pit supporting construction includes Taper pile wall, supporting pile and Guan Liang, taper pile wall is obliquely installed, and taper pile wall top is towards foundation ditch inner inclination, and the bottom of taper pile wall is oblique To in the soil body outside foundation ditch, supporting pile is vertically arranged at taper pile wall top lower section, supporting pile top and taper pile wall top phase Even, supporting pile bottom is arranged in the soil body of bottom of foundation ditch.
As further improvement of these options, the continuous body of wall that taper pile wall is made up of the taper pile for being mutually twisted overlap joint, Taper pile includes meat or fish stake and plain stake, wherein meat or fish stake configuration reinforcement cage, is reinforced concrete pile, and plain stake does not configure steel reinforcement cage, is that element is mixed The stake of solidifying soil.
Used as further improvement of these options, the length of meat or fish stake is more than the length of plain stake, and meat or fish passes through obliquely downwards latent In slip-crack surface, in anchoring into the stable soil body below Foundation Pit bottom, plain stake is arranged in the interval between meat or fish stake, is engaged with meat or fish stake and is taken Connect.
As further improvement of these options, taper pile coping is provided with Guan Liang, Guan Liang connects all meat or fish stakes With the top of plain stake, supporting pile is connected with the meat or fish stake in taper pile wall at Guan Liang.
Used as further improvement of these options, taper pile wall lower section is additionally provided with the second taper pile wall, the second taper pile wall Structure is identical with the structure of taper pile wall, and the second taper pile coping arranges waist rail, and waist rail is connected with the waist of supporting pile.For depth The larger foundation ditch of degree, can adopt the scheme of multilamellar taper pile wall supporting.
The present invention also provides a kind of construction method of taper pile wall brace type foundation pit supporting construction, it is characterised in that step is such as Under:
Step one, form taper pile wall, and while supporting pile of constructing in the stake of natural ground construction meat or fish and plain stake;
Step 2, after meat or fish stake, plain stake and supporting pile driving construction are finished, in the top construction hat of meat or fish stake, plain stake and supporting pile Supporting pile and taper pile wall are connected as entirety by beam;
Step 3, overall excavation pit all complete to bottom, pattern foundation pit supporting structure and earth excavation is cheated, and transfer civil engineering unit Carry out basement structure construction.
The present invention also provides the construction method of Double-layer oblique piling wall brace type foundation pit supporting construction, it is characterised in that step is such as Under:
Step one, taper pile wall, and supporting pile of constructing are formed in the stake of natural ground construction meat or fish and plain stake, while construction second is oblique Piling wall, bear is set to staying between natural ground in the stake top of meat or fish stake and the plain stake of the second taper pile wall;
Step 2, after step one construction is finished, meat or fish stake, plain stake and supporting pile top construction Guan Liang by supporting pile and Taper pile wall is connected as entirety;
Step 3, excavation pit to middle excavation face, the height of middle excavation face are flushed with the position height of waist rail, applied Work waist rail, by the second taper pile wall and supporting pile entirety is connected as;
Step 4, foundation ditch bottom is excavated to, pattern foundation pit supporting structure and earth excavation all complete, transferring civil engineering unit carries out ground Lower cell structure construction.
The present invention has compared to existing technology advantages below:Present invention eliminates column of the level to support and below, only One row's Vertical Pile and taper pile are set in margin of foundation pit, taper pile pile body inclining is entered in the outer soil body of foundation ditch, is not take up earth's surface place, nothing Horizontal support and anchor cable, excavate for pit earthwork and basement structure construction provide good plane operation space, carry significantly High efficiency of construction, so as to reduce foundation ditch open-assembly time, shortens the duration.Taper pile is significantly smaller than anchor into the size outside foundation ditch Rope, solves anchor cable and surmounts land red-line infringement problem.The present invention will act at the level in traditional building enclosure by taper pile Soil pressure load major part is changed into vertical gravity laod, then is undertaken by vertical supporting pile, changes the stress of building enclosure Pattern, effect is better than conventional boom-mounted double-row pile, is significantly reduced building enclosure sectional dimension, saving construction cost.
Description of the drawings
Fig. 1 is sectional view of the present invention for monolayer taper pile wall.
Fig. 2 is sectional view of the present invention for two-layer taper pile wall.
Fig. 3 is the top view of the present invention.
Fig. 4 present invention is used for the construction process schematic diagram one of monolayer taper pile wall.
Fig. 5 present invention is used for the construction process schematic diagram two of monolayer taper pile wall.
Fig. 6 present invention is used for the construction process schematic diagram one of two-layer taper pile wall.
Fig. 7 present invention is used for the construction process schematic diagram two of two-layer taper pile wall.
Fig. 8 present invention is used for the construction process schematic diagram three of two-layer taper pile wall.
Specific embodiment
Embodiments of the invention are elaborated below, the present embodiment is carried out under premised on technical solution of the present invention Implement, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to following enforcements Example.
Embodiment 1
The brace type foundation pit supporting construction of monolayer taper pile wall 2, it is characterised in that:The brace type foundation pit supporting construction bag of taper pile wall 2 Taper pile wall 2, supporting pile 3 and Guan Liang 4 are included, taper pile wall 2 is obliquely installed, the top of taper pile wall 2 is towards foundation ditch inner inclination, taper pile wall 2 The oblique entrance foundation ditch in bottom outside the soil body in, supporting pile 3 is vertically arranged at the top of taper pile wall 2 lower section, the top of supporting pile 3 with it is oblique The top of piling wall 2 is connected, and the bottom of supporting pile 3 is arranged in the soil body at 6, foundation ditch bottom.Generally the angle of inclination of taper pile wall is 10~30 Degree, depending on the depth profile according to soil property situation and foundation ditch.
Conventional foundation pit supporting construction needs to arrange widely distributed supporting construction in foundation ditch, makes the space quilt in foundation ditch Segmentation is taken, efficiency of construction is substantially reduced;Common anchored pile supporting, the restriction that under tension is required, anchor cable is met mostly Face the problem stretched out land red-line 7 and cannot use;Common Retaining Structure with Double-row Piles need to meet certain front and rear row away from, because And more plane site is taken, often do not possess execution conditions when periphery place is less.
By this programme, only taper pile wall 2 and supporting pile 3 are set at the edge of foundation ditch, by the level of the foundation ditch periphery soil body The pressure conversion in direction is the power of vertical direction, and is delivered to 6, foundation ditch bottom by supporting pile 3;Taper pile wall 2 inclines insertion foundation ditch Outward, earth's surface place will not be taken, without horizontal support and anchor cable, is excavated for pit earthwork and basement structure construction is provided well Plane operation space, substantially increase efficiency of construction, so as to reduce foundation ditch open-assembly time, shorten the duration;Taper pile is entered Size outside foundation ditch is significantly smaller than anchor cable, solves the problems, such as that anchor cable surmounts the infringement of land red-line 7.The present invention will be acted on by taper pile Horizontal earth pressure load major part in traditional building enclosure is changed into vertical gravity laod, then is held by vertical supporting pile 3 Load, changes the force modes of building enclosure, and effect is better than conventional boom-mounted double-row pile, is significantly reduced building enclosure section chi It is very little, saving construction cost.
The continuous body of wall that taper pile wall 2 is made up of the taper pile for being mutually twisted overlap joint, taper pile includes meat or fish stake 21 and plain stake 22, wherein The configuration reinforcement cage of meat or fish stake 21, is reinforced concrete pile, and plain stake 22 does not configure steel reinforcement cage, is plain concrete pile.
The length of meat or fish stake 21 is more than the length of plain stake 22, and meat or fish passes through obliquely downwards Potential failure surface 1, anchors into Foundation Pit bottom 6 In the following stable soil body, plain stake 22 is arranged in the interval between meat or fish stake 21, and with meat or fish stake 21 overlap joint is engaged.Meat or fish stake 21 is main Load-carrying members, plain stake 22 be soil-baffling structure, plain stake 22 fills up in the gap between meat or fish stake 21 to form continuous body of wall, by foundation ditch The load transmission of the outer soil body is to meat or fish stake 21;Plain stake 22 only undertakes the effect of gear soil, therefore it need not be anchored in the stable soil body, only Need embedment hole bottom a small amount of depth below 6.
The top of taper pile wall 2 is provided with Guan Liang 4, Guan Liang 4 connects the top of all meat or fish stakes 21 and plain stake 22, supporting pile 3 It is connected at Guan Liang 4 with the meat or fish stake 21 in taper pile wall 2.Guan Liang 4 is typically flush to nature ground 5 and arranges, and will be supported by Guan Liang 4 Stake 3 is connected as one with meat or fish stake 21, can be good at transmitting the extruding force that taper pile wall 2 is subject to, and makes whole foundation pit supporting construction more Plus it is reliable and stable.
The wall thickness 800 of taper pile wall 2, using interlocking pile technique, the diameter 800 of supporting pile 3, using cast-in-situ bored pile, referring to Fig. 1. Meat or fish stake 21 and the plain diameter of stake 22 are 800mm, mutually overlap 200mm.Meat or fish stake 21 is reinforced concrete pile, and sectional reinforcement is 16 20 worm steels, the long 15m of stake.Plain stake 22 is plain concrete pile, does not configure steel reinforcement cage, the long 10m of stake.Supporting pile 3 is mixed for reinforcing bar The stake of solidifying soil, sectional reinforcement is 12 20 worm steels, the long 15m of stake, pile spacing 7.2m.Meat or fish stake 21 is with supporting pile 3 by arranging Guan Liang 4 at natural ground 5 connects.The elongated setting of Guan Liang 4, is reinforced beam, and sectional dimension is 2000x600.
Embodiment 2
The construction method of the brace type foundation pit supporting construction of taper pile wall 2 in embodiment 1, it is characterised in that step is as follows:
Step one, form taper pile wall 2, and while supporting pile 3 of constructing in natural ground 5 construction meat or fish stake 21 and plain stake 22;
Step 2, after meat or fish stake 21, plain stake 22 and the construction of supporting pile 3 are finished, in meat or fish stake 21, plain stake 22 and supporting pile 3 Supporting pile 3 and taper pile wall 2 are connected as entirety by top construction Guan Liang 4;
Step 3, overall excavation pit all complete to bottom 6, pattern foundation pit supporting structure and earth excavation is cheated, and transfer civil engineering list Position carries out basement structure construction.
Embodiment 3
The brace type foundation pit supporting construction of Double-layer oblique piling wall 2, on the basis of embodiment 1, is additionally provided with below taper pile wall 2 Second taper pile wall 23, the structure of the second taper pile wall 23 is identical with the structure of taper pile wall 2, and the top of the second taper pile wall 23 arranges waist rail 8, waist rail 8 is connected with the waist of supporting pile 3.The foundation ditch larger for depth, can adopt the scheme of the supporting of multilamellar taper pile wall 2.With The depth of foundation ditch increases, and surrounding soil needs higher supporting construction to provide support force, and the structure of monolayer taper pile wall 2 cannot Enough support force is provided, we are layered supporting using the structure of multilamellar taper pile wall 2, then by waist rail 8 and support column by multilamellar Taper pile wall 2 connects into the support frame of an entirety, the soil body around foundation ditch is fixed and is supported.Each layer of taper pile wall 2 is not only propped up The weight of the soil body above it is supportted, while will also play a part of anchoring, whole supporting construction foundation ditch week is firmly fixed on into In the soil body for enclosing, prevent it from toppling.
As shown in Fig. 2 agent structure is planned to build in foundation ditch for underground two-layer, and excavation of foundation pit depth 11m, 120 meters of plane span, Deformation control of foundation pit is required stricter.Pattern foundation pit supporting structure overall plan adopts the supporting type foundation pit supporting construction of Double-layer oblique piling wall 2.
Two-layer taper pile wall 2, wall thickness 900, using interlocking pile technique, the diameter 1000 of supporting pile 3, using brill are set from top to bottom Hole pouring pile, referring to Fig. 2.Meat or fish stake 21 and the plain diameter of stake 22 are 900mm, mutually overlap 200mm.Meat or fish stake 21 is armored concrete Stake, sectional reinforcement is 16 22 worm steels, and 21 long 19m of meat or fish stake of taper pile wall 2, the meat or fish stake 21 of the second taper pile wall 23 is long 15m.Plain stake 22 is plain concrete pile, does not configure steel reinforcement cage, the long 6.5m of stake of the plain stake 22 of taper pile wall 2, the second taper pile wall 23 The long 7.5m of stake of plain stake 22.Supporting pile 3 be reinforced concrete pile, sectional reinforcement be 14 22 worm steels, the long 20m of stake, Away from 7m.The meat or fish stake 21 of taper pile wall 2 is connected with supporting pile 3 by being arranged on the Guan Liang 4 at nature ground 5, the second taper pile wall 23 Meat or fish stake 21 is connected with supporting pile 3 by being arranged on the waist rail 8 of middle excavation face 9.Guan Liang 4 and waist rail 8 are elongated setting, are Reinforced beam, the sectional dimension of Guan Liang 4 is 2000x600, and the sectional dimension of waist rail 8 is 1500x500.
Embodiment 4
The construction method of the brace type foundation pit supporting construction of taper pile wall 2 in embodiment 3, step is as follows:
Step one, taper pile wall 2, and supporting pile 3 of constructing are formed in natural ground 5 construction meat or fish stake 21 and plain stake 22, while applying The second taper pile of work wall 23, bear 12 is set to staying between natural ground 5 in the stake top of meat or fish stake 21 and the plain stake 22 of the second taper pile wall 23;
Step 2, after step one construction is finished, meat or fish stake 21, plain stake 22 and supporting pile 3 top construction Guan Liang 4 will Hold stake 3 and taper pile wall 2 is connected as entirety;
Step 3, excavation pit are to middle excavation face 9, and the height of middle excavation face 9 is neat with the position height of waist rail 8 Flat, the second taper pile wall 23 is connected as entirety by waist rail 8 of constructing with supporting pile 3;
Step 4, foundation ditch bottom 6 is excavated to, pattern foundation pit supporting structure and earth excavation all complete, transferring civil engineering unit is carried out Basement structure construction.
These are only presently preferred embodiments of the present invention, not to limit the present invention, all spirit in the present invention and Any modification, equivalent and improvement for being made within principle etc., should be included within the scope of the present invention.

Claims (8)

1. a kind of taper pile wall brace type foundation pit supporting construction, it is characterised in that:The taper pile wall brace type foundation pit supporting construction bag Taper pile wall, supporting pile and Guan Liang are included, the taper pile wall is obliquely installed, towards foundation ditch inner inclination at the top of taper pile wall, taper pile wall In the soil body outside the oblique entrance foundation ditch in bottom, the supporting pile be vertically arranged at taper pile wall top lower section, supporting pile top with it is oblique Piling wall top is connected, and supporting pile bottom is arranged in the soil body of bottom of foundation ditch.
2. as claimed in claim 1 a kind of taper pile wall brace type foundation pit supporting construction, it is characterised in that:The inclination of the taper pile wall Angle is 10 °~30 °.
3. as claimed in claim 1 a kind of taper pile wall brace type foundation pit supporting construction, it is characterised in that:The taper pile wall is by mutual The continuous body of wall of the taper pile composition of occlusion overlap joint, the taper pile includes meat or fish stake and plain stake, wherein meat or fish stake configuration reinforcement cage, is reinforcing bar Concrete-pile, plain stake does not configure steel reinforcement cage, is plain concrete pile.
4. as claimed in claim 3 a kind of taper pile wall brace type foundation pit supporting construction, it is characterised in that:The length of the meat or fish stake is big In the length of the plain stake, meat or fish passes through obliquely downwards Potential failure surface, in anchoring into the stable soil body below Foundation Pit bottom, the element Stake is arranged in the interval between meat or fish stake, and with meat or fish stake overlap joint is engaged.
5. as claimed in claim 4 a kind of taper pile wall brace type foundation pit supporting construction, it is characterised in that:Set in taper pile coping Guan Liang is equipped with, the Guan Liang connects the top of all meat or fish stakes and plain stake, and the meat or fish stake in the supporting pile and taper pile wall is in the hat Liang Chu connects.
6. as claimed in claim 5 a kind of taper pile wall brace type foundation pit supporting construction, it is characterised in that:The taper pile wall lower section is also The second taper pile wall is provided with, the structure of the second taper pile wall is identical with the structure of taper pile wall, the second taper pile coping Waist rail is set, and the waist rail is connected with the waist of supporting pile.
7. the construction method of taper pile wall brace type foundation pit supporting construction described in a kind of claim 3, it is characterised in that step is as follows:
Step one, form taper pile wall, and while supporting pile of constructing in the stake of natural ground construction meat or fish and plain stake;
Step 2, after meat or fish stake, plain stake and supporting pile driving construction are finished, will in the top construction Guan Liang of meat or fish stake, plain stake and supporting pile Supporting pile and taper pile wall are connected as entirety;
Step 3, overall excavation pit all complete to bottom, pattern foundation pit supporting structure and earth excavation is cheated, and transferring civil engineering unit is carried out Basement structure construction.
8. the construction method of taper pile wall brace type foundation pit supporting construction described in a kind of claim 6, it is characterised in that step is as follows:
Step one, taper pile wall, and supporting pile of constructing are formed in the stake of natural ground construction meat or fish and plain stake, while the second taper pile of constructing Wall, bear is set to staying between natural ground in the stake top of meat or fish stake and the plain stake of the second taper pile wall;
Step 2, after step one construction is finished, meat or fish stake, plain stake and supporting pile top construction Guan Liang by supporting pile and taper pile Wall is connected as entirety;
, to middle excavation face, the height of middle excavation face is flushed with the position height of waist rail, is applied for step 3, excavation pit Work waist rail, by the second taper pile wall and supporting pile entirety is connected as;
Step 4, foundation ditch bottom is excavated to, pattern foundation pit supporting structure and earth excavation all complete, transferring civil engineering unit carries out basement Structure construction.
CN201611169748.XA 2016-12-16 2016-12-16 A kind of taper pile wall supporting type foundation pit supporting construction and its construction method Active CN106677189B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611169748.XA CN106677189B (en) 2016-12-16 2016-12-16 A kind of taper pile wall supporting type foundation pit supporting construction and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611169748.XA CN106677189B (en) 2016-12-16 2016-12-16 A kind of taper pile wall supporting type foundation pit supporting construction and its construction method

Publications (2)

Publication Number Publication Date
CN106677189A true CN106677189A (en) 2017-05-17
CN106677189B CN106677189B (en) 2019-07-05

Family

ID=58871097

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611169748.XA Active CN106677189B (en) 2016-12-16 2016-12-16 A kind of taper pile wall supporting type foundation pit supporting construction and its construction method

Country Status (1)

Country Link
CN (1) CN106677189B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574825A (en) * 2017-07-27 2018-01-12 天津大学 Foundation pit supporting method and raked pile
CN107630456A (en) * 2017-07-27 2018-01-26 天津大学 Foundation pit supporting method and raked pile
CN108301417A (en) * 2018-01-04 2018-07-20 刘动 Using the foundation pit supporting construction and construction method of mini pile
CN109235448A (en) * 2018-10-11 2019-01-18 安徽省城建设计研究总院股份有限公司 A kind of horizontal arch shell foundation pit supporting method
CN109356169A (en) * 2018-12-03 2019-02-19 中国建筑局(集团)有限公司 Foundation pit row pile supporting system and construction method thereof
CN109577346A (en) * 2019-01-02 2019-04-05 深圳市前海世茂投资管理有限公司 A kind of foundation pit supporting system and its method of construction
CN111321740A (en) * 2020-04-24 2020-06-23 上海勘察设计研究院(集团)有限公司 Inclined pile prestress applying device and construction method thereof
CN111705813A (en) * 2020-07-24 2020-09-25 北京中岩大地科技股份有限公司 Combined type inclined pile anchor rod foundation pit supporting system and supporting method
CN112779853A (en) * 2019-11-07 2021-05-11 中冶京诚工程技术有限公司 Abutment and design and construction method thereof
CN113089683A (en) * 2021-03-24 2021-07-09 浙江省建筑设计研究院 Inclined pile supporting structure and construction method
CN113529730A (en) * 2021-07-28 2021-10-22 中建八局天津建设工程有限公司 Construction method of foundation pit
CN115262573A (en) * 2022-07-13 2022-11-01 上海勘察设计研究院(集团)有限公司 Combined type multilayer vertical self-stabilizing enclosure structure and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE851320A (en) * 1977-01-08 1977-05-31 Hochtief Ag Hoch Tiefbauten STRENGTHENING ELEMENT OF CONSTRUCTION TRENCH WALLS AND CONSTRUCTION PROCESS
DE102005019005A1 (en) * 2005-04-22 2006-10-26 Logic-Logistic Consult Ingenieurgesellschaft Mbh Narrow trench upright or inclined sidewall has sliding shuttering panels retaining concrete during installation of sub-surface public utilities
CN201473959U (en) * 2009-05-22 2010-05-19 邓隆波 Anti-sliding stopping structure
CN201649076U (en) * 2010-04-14 2010-11-24 江苏江中集团有限公司 Inversed Y-type single-row unidirectional rotary spraying, mixing and reinforcing combined tangent pile
CN103485347A (en) * 2012-06-07 2014-01-01 叶强 Batter pile used for building foundation pit support and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE851320A (en) * 1977-01-08 1977-05-31 Hochtief Ag Hoch Tiefbauten STRENGTHENING ELEMENT OF CONSTRUCTION TRENCH WALLS AND CONSTRUCTION PROCESS
DE102005019005A1 (en) * 2005-04-22 2006-10-26 Logic-Logistic Consult Ingenieurgesellschaft Mbh Narrow trench upright or inclined sidewall has sliding shuttering panels retaining concrete during installation of sub-surface public utilities
CN201473959U (en) * 2009-05-22 2010-05-19 邓隆波 Anti-sliding stopping structure
CN201649076U (en) * 2010-04-14 2010-11-24 江苏江中集团有限公司 Inversed Y-type single-row unidirectional rotary spraying, mixing and reinforcing combined tangent pile
CN103485347A (en) * 2012-06-07 2014-01-01 叶强 Batter pile used for building foundation pit support and construction method thereof

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107630456A (en) * 2017-07-27 2018-01-26 天津大学 Foundation pit supporting method and raked pile
CN107574825A (en) * 2017-07-27 2018-01-12 天津大学 Foundation pit supporting method and raked pile
CN108301417B (en) * 2018-01-04 2019-08-30 深圳市岩土综合勘察设计有限公司 Using the foundation pit supporting construction and construction method of mini pile
CN108301417A (en) * 2018-01-04 2018-07-20 刘动 Using the foundation pit supporting construction and construction method of mini pile
CN109235448A (en) * 2018-10-11 2019-01-18 安徽省城建设计研究总院股份有限公司 A kind of horizontal arch shell foundation pit supporting method
CN109356169A (en) * 2018-12-03 2019-02-19 中国建筑局(集团)有限公司 Foundation pit row pile supporting system and construction method thereof
CN109356169B (en) * 2018-12-03 2024-04-19 中国建筑一局(集团)有限公司 Foundation pit row pile supporting system and construction method thereof
CN109577346A (en) * 2019-01-02 2019-04-05 深圳市前海世茂投资管理有限公司 A kind of foundation pit supporting system and its method of construction
CN112779853A (en) * 2019-11-07 2021-05-11 中冶京诚工程技术有限公司 Abutment and design and construction method thereof
CN111321740A (en) * 2020-04-24 2020-06-23 上海勘察设计研究院(集团)有限公司 Inclined pile prestress applying device and construction method thereof
CN111705813A (en) * 2020-07-24 2020-09-25 北京中岩大地科技股份有限公司 Combined type inclined pile anchor rod foundation pit supporting system and supporting method
CN113089683A (en) * 2021-03-24 2021-07-09 浙江省建筑设计研究院 Inclined pile supporting structure and construction method
CN113529730A (en) * 2021-07-28 2021-10-22 中建八局天津建设工程有限公司 Construction method of foundation pit
CN115262573A (en) * 2022-07-13 2022-11-01 上海勘察设计研究院(集团)有限公司 Combined type multilayer vertical self-stabilizing enclosure structure and construction method

Also Published As

Publication number Publication date
CN106677189B (en) 2019-07-05

Similar Documents

Publication Publication Date Title
CN106677189B (en) A kind of taper pile wall supporting type foundation pit supporting construction and its construction method
CN104612160B (en) A kind of next-door neighbour's existing building pit maintenance soil structure and construction method
CN202672093U (en) Anchoring type dock wall structure of sheet-pile wall
CN102605792B (en) Multi-row mini-pile enclosing structure for blocking soil and construction process
CN103898916B (en) Mini stake Composite Braced Retaining Structure and construction method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN101270579B (en) Foundation pit guard method for expansion construction from deep foundation pit to shallow foundation pit
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN110241828A (en) The outer sealing construction method for supporting of anchor in a kind of row's grating tubular pole grouting behind shaft or drift lining
CN106245657A (en) A kind of purlin anchor supporting construction for pattern foundation pit supporting structure
CN104631469B (en) For deep big foundation pit without post reinforced concrete support framework and building method thereof
CN210737572U (en) Foundation ditch stagnant water curtain structure
CN101498133B (en) Method and supporting construction for enlarging basement top-down method earth excavation space
CN108035360B (en) A method of for pattern foundation pit supporting structure
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN108755702A (en) A kind of higher soft soil foundation foundation ditch strengthening processing method of level of ground water
CN204326080U (en) A kind of next-door neighbour's existing building pit maintenance soil structure
CN203821399U (en) Deep foundation pit supporting structure
CN108005086B (en) A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure
CN208309592U (en) Foundation pit supporting structure
CN207004520U (en) A kind of robust structure of subway protection area shaft excavation
CN107447794A (en) The anti-floating of excavation pit plays construction method in a kind of subway protection region
CN114411762A (en) Rear-anchor type rigid foundation pit supporting structure and construction method
CN113737857A (en) Be used for deep pipe gallery structure and major structure to build connection structure again and worker's method thereof
CN112709231A (en) Basement foundation pit supporting structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 9 garden road in Hefei City Baohe District of Anhui province 230051

Applicant after: Anhui Urban Construction Design Research Institute Limited by Share Ltd

Address before: No. 9 garden road in Hefei City Baohe District of Anhui province 230051

Applicant before: ANHUI URBAN CONSTRUCTION DESIGN INSTITUTE CO., LTD.

GR01 Patent grant
GR01 Patent grant