CN201172810Y - 分离卸荷式板桩岸壁结构 - Google Patents

分离卸荷式板桩岸壁结构 Download PDF

Info

Publication number
CN201172810Y
CN201172810Y CNU2008200742317U CN200820074231U CN201172810Y CN 201172810 Y CN201172810 Y CN 201172810Y CN U2008200742317 U CNU2008200742317 U CN U2008200742317U CN 200820074231 U CN200820074231 U CN 200820074231U CN 201172810 Y CN201172810 Y CN 201172810Y
Authority
CN
China
Prior art keywords
wall
sheet pile
cushion cap
front wall
anchorage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200742317U
Other languages
English (en)
Inventor
刘永绣
吴荔丹
朱吉全
董文才
刘进生
李元音
申立明
于泳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Port Industry Group Co Ltd
TIANJIN SHENJI ENGINEERING Co Ltd
CCCC First Harbour Consultants Co Ltd
Original Assignee
CCCC First Harbour Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbour Consultants Co Ltd filed Critical CCCC First Harbour Consultants Co Ltd
Priority to CNU2008200742317U priority Critical patent/CN201172810Y/zh
Application granted granted Critical
Publication of CN201172810Y publication Critical patent/CN201172810Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本实用新型提供一种分离卸荷式板桩岸壁结构,该结构包括有前墙、锚碇墙、锚碇拉杆,在所述前墙的后方设置卸荷承台,在卸荷承台的下方连接有起支撑作用的桩,所述前墙、卸荷承台和锚碇墙之间由锚碇拉杆连接起来或前墙与卸荷承台之间及卸荷承台与锚碇墙之间由锚碇拉杆连接起来。本实用新型的效果是该板桩结构能有效地减小作用于码头的前墙的土压力,从而创造了适用于建造大型、深水板桩式岸壁的新结构型式。打破了过去的认为板桩式岸壁结构只适用于中小型岸壁的理念。同时,该分离卸荷式岸壁结构施工简便,具有造价低,施工工期短的优点。适用于码头结构、护岸结构、地下建构筑物结构及各种岸壁挡土结构。同时,分离卸荷式板桩结构施工速度快、造价省。

Description

分离卸荷式板桩岸壁结构
技术领域
本实用新型涉及港口、修造船建筑物、水利及建筑工程领域中的建筑结构,特别是一种适用于港口码头、护岸、地下建构筑物及岸壁挡土建筑物的分离卸荷式板桩岸壁结构。
背景技术
板桩式结构是码头、护岸、地下建构筑物及岸壁挡土建筑物的主要结构型式之一,公知的板桩式结构是由前墙1、锚碇拉杆3、后方的锚碇墙2结构组成,如图1所示。板桩岸壁结构具有施工简便、造价低等特点,在港口、修造船建筑物、水利工程和建筑工程中有着广泛的应用。但由于板桩式码头结构在水深和挡土高度加大时,前墙1内力急剧增大,安全性和耐久性难以得到保证,故而国内已建造的板桩式岸壁结构水深和挡土高度较小。因此,需要开发新的板桩式岸壁结构型式。
对板桩式岸壁结构来说,水深和挡土高度的变化对前墙的强度和稳定性的影响非常敏感。为建造大型、深水板桩式岸壁结构,必须设法减小作用于前墙的土压力,从而急需开发适用于大型、深水岸壁结构建设的板桩结构型式。
发明内容
本实用新型的目的是提供一种分离卸荷式板桩岸壁结构,以利于减小作用于前墙的土压力,开发适用于大型、深水岸壁建设的板桩式结构型式。
为实现上述目的,本实用新型采用的技术方案是提供一种分离卸荷式板桩岸壁结构,其中:该结构包括有前墙、锚碇墙、锚碇拉杆,在所述前墙的后方设置卸荷承台,在卸荷承台的下方连接有起支撑作用的桩,所述前墙、卸荷承台和锚碇墙之间由锚碇拉杆连接起来或前墙与卸荷承台之间及卸荷承台与锚碇墙之间由锚碇拉杆连接起来。
本实用新型的效果是该分离卸荷式板桩结构能有效地减小作用于码头的前墙的土压力,从而创造了适用于建造大型、深水板桩式岸壁的新结构型式。打破了过去的认为板桩式岸壁结构只适用于中小型岸壁的理念。同时,该分离卸荷式岸壁结构施工简便,具有造价低,施工工期短的优点。适用于码头结构、护岸结构、地下建构筑物结构及各种岸壁挡土结构。
附图说明
图1是本实用新型的一实施例构造示意图;
图2是本实用新型的另一实施例构造示意图;
图3是本实用新型的又一实施例构造示意图;
图4是本实用新型的又一实施例的结构断面图。
图中:
1、前墙  2、锚碇墙  3、锚碇拉杆  4、卸荷承台
5、桩    6、地基    7、土体
具体实施方式
下面结合附图和实施例对本实用新型的分离卸荷式板桩岸壁结构进一步说明。
本实用新型的分离卸荷式板桩岸壁结构包括有前墙1、锚碇墙2、锚碇拉杆3,在所述前墙1的后方设置卸荷承台4,在卸荷承台4的下方连接有起支撑作用的桩5,所述前墙1、卸荷承台4和锚碇墙2之间由锚碇拉杆3连接起来或前墙1与卸荷承台4之间及卸荷承台4与锚碇墙2之间由锚碇拉杆3连接起来。
所述桩5为多排的直桩、斜桩、叉桩之一种或两种以上的组合桩。所述桩5的断面形状为方形、矩形、T形、圆形、环形、梯形、箱形、U形、Z形、H形之一的不同形状,或两种以上形状的组合形状。
如图1所示,锚碇拉杆3设在卸荷承台4之上面,卸荷承台4下面支撑连接的桩5为直桩或斜桩组合。前墙1与锚碇墙2由锚碇拉杆3连接起来,锚碇墙2埋于土体7中,前墙1的下部沉入地基6中,上部用锚碇拉杆3拉住,锚碇拉杆3为钢拉杆或钢索。土体7产生土压力作用于前墙1,为保持前墙1的稳定性和强度要求,应尽量减小作用于前墙1的土压力,卸荷承台4由桩5支撑,承担了卸荷承台4以上的土体重量和顶面的荷载,起到减小前墙1的土压力的作用,创造了加大前墙挡土高度和水深的条件。为了避免结构不均匀沉降等因素产生过大的结构内力,卸荷承台4与前墙1之间分离或铰接。
如图2所示,锚碇拉杆3与卸荷承台4相连,卸荷承台4下面的桩5为直桩或斜桩。前墙1与锚碇墙2之间通过锚碇拉杆3与卸荷承台4连接,卸荷承台4与前墙1之间通过锚碇拉杆3或采用铰接或短拉杆连接起来,其他部分的构造与图1所示相同。
如图3所示,卸荷承台4下面的桩5为叉桩和直桩组合,其他部分的构造与图1相同。
图4所示实施例为港口码头的工程实例,其中板桩码头的顶面标高为+4.0m,前墙1前面的泥面标高为-15.5m。前墙1为地下连续墙,厚1.05m;卸荷承台4为钢筋混凝土结构,也可以用预应力钢筋混凝土板或梁板结构,顶标高为0.3m,宽10.5m,厚度1.0m,起支撑作用的桩5为矩形断面钢筋混凝土灌注桩,海侧一排桩5断面为1.6×1.2m,陆侧一排桩5断面为1.2×1.2m,其底标高均为-36.0m。锚碇墙2为地下连续墙结构,厚1.2m,底标高-14.0m。锚碇墙2也可以为钢筋混凝土板、钢筋混凝土墙、预应力钢筋混凝土板、预应力钢筋混凝土墙、钢筋混凝土桩、预应力钢筋混凝土桩、钢筋混凝土板桩、预应力钢筋混凝土板桩、钢筋混凝土地下连续墙、钢桩或钢板桩结构。锚碇拉杆为Q345钢拉杆,直径95mm,间距平均为1.33m。
前墙1、锚碇墙2地下连续墙结构及灌注桩的施工方法为:先定位挖槽,槽中采用泥浆护壁,然后安放钢筋笼,再从底向上浇筑混凝土至预定标高,形成前墙、锚碇墙、灌注桩。然后浇筑胸墙和导梁、卸荷承台、按装拉杆、回填土及码头前的港池挖泥。
本实例证明了该实用新型结构的优点,极具推广和应用价值。

Claims (4)

1.一种分离卸荷式板桩岸壁结构,其特征是:该结构包括有前墙(1)、锚碇墙(2)、锚碇拉杆(3),在所述前墙(1)的后方设置卸荷承台(4),在卸荷承台(4)的下方连接有起支撑作用的桩(5),所述前墙(1)、卸荷承台(4)和锚碇墙(2)之间由锚碇拉杆(3)连接起来或前墙(1)与卸荷承台(4)之间及卸荷承台(4)与锚碇墙(2)之间由锚碇拉杆(3)连接起来。
2.根据权利要求1所述的分离卸荷式板桩岸壁结构,其特征是:所述桩(5)为多排的直桩、斜桩、叉桩之一种或两种以上的组合桩。
3.根据权利要求1或2所述的分离卸荷式板桩岸壁结构,其特征是:所述桩(5)的断面形状为方形、矩形、T形、圆形、环形、梯形、箱形、U形、Z形、H形之一种或两种以上的断面形状的组合形。
4.根据权利要求1所述的分离卸荷式板桩岸壁结构,其特征是:所述锚碇拉杆(3)为钢拉杆或钢索。
CNU2008200742317U 2008-03-28 2008-03-28 分离卸荷式板桩岸壁结构 Expired - Lifetime CN201172810Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200742317U CN201172810Y (zh) 2008-03-28 2008-03-28 分离卸荷式板桩岸壁结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200742317U CN201172810Y (zh) 2008-03-28 2008-03-28 分离卸荷式板桩岸壁结构

Publications (1)

Publication Number Publication Date
CN201172810Y true CN201172810Y (zh) 2008-12-31

Family

ID=40199922

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200742317U Expired - Lifetime CN201172810Y (zh) 2008-03-28 2008-03-28 分离卸荷式板桩岸壁结构

Country Status (1)

Country Link
CN (1) CN201172810Y (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985835A (zh) * 2010-10-28 2011-03-16 刘元雪 边坡分离式桩板墙支挡结构
CN103215963A (zh) * 2013-05-06 2013-07-24 陈灿斌 一种桩或桩群结构
CN103966975A (zh) * 2014-04-24 2014-08-06 河海大学 一种桩基-柔性加筋垫层复合承台式板桩结构
CN104652355A (zh) * 2015-01-12 2015-05-27 河海大学 一种带增强肋梁和消浪措施的板桩岸壁结构
CN105975722A (zh) * 2016-05-26 2016-09-28 河海大学 分离卸荷式板桩码头中桩承平台的卸荷效果评价方法
CN106894385A (zh) * 2017-04-12 2017-06-27 广州粤科工程建设监理咨询有限公司 一种装甲式轻质码头结构及其施工方法
CN108335618A (zh) * 2018-04-26 2018-07-27 山东科技大学 含斜桩的码头桩基教学模型
CN112854120A (zh) * 2021-02-24 2021-05-28 中交第四航务工程勘察设计院有限公司 一种带锚碇的扶壁结构
CN113152364A (zh) * 2021-03-04 2021-07-23 中交第四航务工程勘察设计院有限公司 一种带桩基基础的地连墙码头结构

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101985835A (zh) * 2010-10-28 2011-03-16 刘元雪 边坡分离式桩板墙支挡结构
CN103215963A (zh) * 2013-05-06 2013-07-24 陈灿斌 一种桩或桩群结构
CN103966975A (zh) * 2014-04-24 2014-08-06 河海大学 一种桩基-柔性加筋垫层复合承台式板桩结构
CN104652355A (zh) * 2015-01-12 2015-05-27 河海大学 一种带增强肋梁和消浪措施的板桩岸壁结构
CN105975722A (zh) * 2016-05-26 2016-09-28 河海大学 分离卸荷式板桩码头中桩承平台的卸荷效果评价方法
CN105975722B (zh) * 2016-05-26 2019-04-30 河海大学 分离卸荷式板桩码头中桩承平台的卸荷效果评价方法
CN106894385A (zh) * 2017-04-12 2017-06-27 广州粤科工程建设监理咨询有限公司 一种装甲式轻质码头结构及其施工方法
CN108335618A (zh) * 2018-04-26 2018-07-27 山东科技大学 含斜桩的码头桩基教学模型
CN112854120A (zh) * 2021-02-24 2021-05-28 中交第四航务工程勘察设计院有限公司 一种带锚碇的扶壁结构
CN113152364A (zh) * 2021-03-04 2021-07-23 中交第四航务工程勘察设计院有限公司 一种带桩基基础的地连墙码头结构

Similar Documents

Publication Publication Date Title
CN201172810Y (zh) 分离卸荷式板桩岸壁结构
CN103510531B (zh) 一种分体式沉井加桩复合锚碇基础及其施工方法
CN105862663A (zh) 一种叉桩与卸荷板相结合的岸壁式支挡结构
CN105133620A (zh) 局部流塑状淤泥质土体坑中坑支护结构及其施工方法
CN105220697A (zh) 型钢与预应力钢筋混凝土组合结构支撑及其施工方法
CN106012960A (zh) 一种装配式高桩码头上部结构体系及其施工方法
CN104727340A (zh) 高切坡锚索空间框架支挡结构
CN210887094U (zh) 一种重力式码头升级结构
CN104878835A (zh) 条形基础房屋后增地下室结构
KR101211811B1 (ko) 조립케이슨을 이용한 현장타설말뚝
CN108179735A (zh) 一种卵石层大型深水基础施工平台及方法
CN108999204B (zh) 一种裙式加隔板地下连续墙-桩复合式基础
CN205822123U (zh) 20万吨级深水板桩岸壁结构
CN103898868A (zh) 一种新型高桩码头
CN111236260A (zh) 变刚度组合式预制双排桩支护结构及其施工方法
JP7149919B2 (ja) 既存岸壁の改良構造及び改良方法
CN203834422U (zh) 一种新型高桩码头
CN214401781U (zh) 适用于大吨位水中钢管桩清除装置的握裹机构
CN203639929U (zh) 一种分体式沉井加桩复合锚碇基础
CN211898498U (zh) 一种树形多节段桩柱承台的海峡大桥深水基础结构
CN102477716A (zh) 栈桥式梁板桥在两岸为滩涂的内陆河流中的应用
CN210104765U (zh) 一种软弱地质边坡的高大支挡结构
CN208309592U (zh) 一种基坑支护结构
CN214401783U (zh) 适用于大吨位水中钢管桩清除装置的浮箱平台
CN207062955U (zh) 一种粗长桩与细短桩组合的基坑支护结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: TANGSHAN PORT INDUSTRIAL GROUP CO., LTD. TIANJIN S

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Yongxiu

Inventor after: Dong Wencai

Inventor after: Wu Lidan

Inventor after: Zhu Jiquan

Inventor after: Liu Jinsheng

Inventor after: Li Yuanyin

Inventor after: Yu Yong

Inventor after: Shen Liming

Inventor after: Zhao Hui

Inventor before: Liu Yongxiu

Inventor before: Wu Lidan

Inventor before: Zhu Jiquan

Inventor before: Dong Wencai

Inventor before: Liu Jinsheng

Inventor before: Li Yuanyin

Inventor before: Shen Liming

Inventor before: Yu Yong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU YONGXIU WU LIDAN ZHU JIQUAN DONG WENCAI LIU JINSHENG LI YUANYIN SHEN LIMING YU YONG TO: LIU YONGXIU DONG WENCAI WU LIDAN ZHU JIQUAN LIU JINSHENG LI YUANYIN YU YONG SHEN LIMING ZHAO HUI

TR01 Transfer of patent right

Effective date of registration: 20100906

Address after: 300222 No. 1472 South Dagu Road, Tianjin, Hexi District

Co-patentee after: Tangshan Port Industry Group Co., Ltd.

Patentee after: China Communication Construction Company First Harbour Consultants Co., Ltd.

Co-patentee after: Tianjin Shenji Engineering Co., Ltd.

Address before: 300222 No. 1472 South Dagu Road, Tianjin, Hexi District

Patentee before: China Communication Construction Company First Harbour Consultants Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20081231