CN201169780Y - Concrete equipment foundation with enclosing edge - Google Patents
Concrete equipment foundation with enclosing edge Download PDFInfo
- Publication number
- CN201169780Y CN201169780Y CNU2008200698691U CN200820069869U CN201169780Y CN 201169780 Y CN201169780 Y CN 201169780Y CN U2008200698691 U CNU2008200698691 U CN U2008200698691U CN 200820069869 U CN200820069869 U CN 200820069869U CN 201169780 Y CN201169780 Y CN 201169780Y
- Authority
- CN
- China
- Prior art keywords
- equipment foundation
- concrete
- equipment
- grouting
- surrounding edge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a concrete equipment foundation provided with a surrounding edge, comprising an equipment foundation, wherein, embedded bolt holes are uniformly arranged on the upper surface of the equipment foundation; a layer of surrounding edge which is 50 to 100 millimeters higher and 100 to 200 millimeters wider than the equipment foundation is arranged on the circumference of the upper surface of the equipment foundation. The concrete equipment foundation provided with the surrounding edge has the advantages of eliminating the working procedure of formwork erection under the condition of secondary grouting, guaranteeing the consistence of the overall color of the equipment foundation and preventing the phenomenon of slab staggering, quickening the construction speed of the secondary grouting, saving the labor and materials, and improving the appearance quality.
Description
Technical field:
The utility model relates to a kind of large equipment base, particularly a kind ofly can effectively save the back-grouting material, and the band that improves basic impression quality encloses the concrete equipment basis on edge.
Background technology:
At present, during the large equipment base construction, owing to need the very high bolt of pre-buried required precision, this just need have the 50-100mm back-grouting on the Equipment Foundations surface.During grouting construction, need install the grouting template separately, waste of manpower, material resources, influence speed of application, and the faulting of slab ends phenomenon appears easily, the grouting materials flow dropped down causes the concrete pollution in bottom, and produce aberration with the bottom concrete, back-grouting layer and original structure surface layer very easily form horizontal construction joint, influence concrete surface quality.
Summary of the invention:
The purpose of this utility model provides a kind ofly can accelerate the back-grouting speed of application, save artificial, save material, the band that improves impression quality encloses the concrete equipment basis on edge.
Technical solution of the present utility model is finished as follows, it includes Equipment Foundations, be evenly equipped with the pre-embedded bolt hole at the Equipment Foundations upper surface, it is characterized in that: the upper surface periphery in Equipment Foundations has one deck to exceed Equipment Foundations 50-100mm, and wide 100-200mm encloses the edge.
The beneficial effects of the utility model are, the die process when having cancelled back-grouting has guaranteed that one of the whole color and lusters of Equipment Foundations are made peace to prevent the faulting of slab ends phenomenon, has accelerated the speed of application of back-grouting, save artificial, save material, improved impression quality.
Description of drawings:
Accompanying drawing is a structural representation of the present utility model.
The specific embodiment:
Describe embodiment in conjunction with the accompanying drawings in detail, when installing the template of Equipment Foundations 1, should be according to back-grouting thickness, set out wide 100-200mm around on Equipment Foundations, high 50-100mm encloses along 2 templates, simultaneously at the Equipment Foundations upper surface pre-embedded bolt hole 3 is set evenly, once-cast grouting forms whole.Formwork once more in the time of can cancelling back-grouting like this, saving of labor, material-saving improve speed of application and quality.
Claims (1)
1, band encloses the concrete equipment basis on edge, and it includes Equipment Foundations, at the Equipment Foundations upper surface pre-embedded bolt hole is arranged, and it is characterized in that: the upper surface periphery in Equipment Foundations has one deck to exceed Equipment Foundations 50-100mm, and wide 100-200mm encloses the edge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200698691U CN201169780Y (en) | 2008-03-26 | 2008-03-26 | Concrete equipment foundation with enclosing edge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200698691U CN201169780Y (en) | 2008-03-26 | 2008-03-26 | Concrete equipment foundation with enclosing edge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201169780Y true CN201169780Y (en) | 2008-12-24 |
Family
ID=40208832
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200698691U Expired - Fee Related CN201169780Y (en) | 2008-03-26 | 2008-03-26 | Concrete equipment foundation with enclosing edge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201169780Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8522507B2 (en) | 2009-06-24 | 2013-09-03 | Mitsubishi Heavy Industries, Ltd. | Concrete platform production process, concrete platform, and connecting member |
-
2008
- 2008-03-26 CN CNU2008200698691U patent/CN201169780Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8522507B2 (en) | 2009-06-24 | 2013-09-03 | Mitsubishi Heavy Industries, Ltd. | Concrete platform production process, concrete platform, and connecting member |
CN102333625B (en) * | 2009-06-24 | 2013-10-09 | 三菱重工业株式会社 | Method for producing concrete trestle, concrete trestle, and connecting member |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104453229B (en) | Large-span load-bearing prestress double-T plate construction method | |
CN201169780Y (en) | Concrete equipment foundation with enclosing edge | |
CN202347839U (en) | Adjustable set shaped steel formwork | |
CN204488353U (en) | A kind of emulation garden landscape texture tool processes mould | |
CN102912978A (en) | One-step forming temporary protection device for floor reserved hole and construction method | |
CN103088996A (en) | Ceramic tile sticking method | |
CN201730350U (en) | Adjustable assembly type steel structure temporary structure support for structure post-cast strip | |
CN201539094U (en) | Composite wooden formwork | |
CN215406639U (en) | Prefabricated steel plate structure of post-cast strip pretreatment for advance construction of top plate backfill | |
CN202214982U (en) | One-shot forming ground beam template | |
CN201738499U (en) | Steel bar protective layer position limiting cushion block of cast steel bar concrete beam post | |
CN107558604A (en) | A kind of method for exempting from form removal raised table building | |
CN208934508U (en) | A kind of prefabricated flag platform | |
CN209350489U (en) | A kind of wire box precast concrete block structure of transvers plate for building | |
CN203145375U (en) | Simulated stone covering layer for wall body | |
CN201424795Y (en) | Silicate overhead movable floor | |
CN109930726A (en) | A kind of concreting process applied in hollow floor construction | |
CN204804322U (en) | Board construction equipment falls in instrument formula building | |
CN205637563U (en) | Building templates of composite sheet panel | |
CN202227689U (en) | Plant column foot expansion joint template | |
CN206205457U (en) | A kind of steel reinforcement cage aids in colligation frame | |
CN204225354U (en) | A kind of high strength prefabricated units | |
CN204309093U (en) | The clear mould fueling injection equipment of a kind of haydite block demoulding | |
CN107842199A (en) | A kind of preforming combination tool of mattess partitioning slot and its built-in process | |
CN202672497U (en) | Concrete cover cushion block |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081224 Termination date: 20160326 |
|
CF01 | Termination of patent right due to non-payment of annual fee |