CN201166656Y - Automatic water-bending mechanism for soil erosion real time monitoring instrument - Google Patents

Automatic water-bending mechanism for soil erosion real time monitoring instrument Download PDF

Info

Publication number
CN201166656Y
CN201166656Y CNU2008200838324U CN200820083832U CN201166656Y CN 201166656 Y CN201166656 Y CN 201166656Y CN U2008200838324 U CNU2008200838324 U CN U2008200838324U CN 200820083832 U CN200820083832 U CN 200820083832U CN 201166656 Y CN201166656 Y CN 201166656Y
Authority
CN
China
Prior art keywords
tipping bucket
weighing
rotation axis
real time
shifting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200838324U
Other languages
Chinese (zh)
Inventor
叶碎高
廖承彬
叶永棋
聂国辉
江影
邵明
张锦娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Soil And Water Conservation Monitoring Center
Zhejiang Institute of Hydraulics and Estuary
Original Assignee
Zhejiang Soil And Water Conservation Monitoring Center
Zhejiang Institute of Hydraulics and Estuary
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Soil And Water Conservation Monitoring Center, Zhejiang Institute of Hydraulics and Estuary filed Critical Zhejiang Soil And Water Conservation Monitoring Center
Priority to CNU2008200838324U priority Critical patent/CN201166656Y/en
Application granted granted Critical
Publication of CN201166656Y publication Critical patent/CN201166656Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model relates a mechanism for dumping slurry on a soil erosion real time monitoring instrument, the technical problems which need to be solved are that the provided slurry dumping mechanism needs enabling a weighing tipping bucket to automatically dump slurry and automatically return to the original position, and the mechanism needs having the characteristics of high measuring accuracy and high working efficiency. The technical proposal is that an automatic water dumping mechanism of the soil erosion real time monitoring instrument comprises a rotation axis capable of rotating which is arranged on a weighing support in the horizontal direction, and a motor which is fixed on the weighing support, wherein a weighing tipping bucket is fixed on the rotation axis, and one end of the rotation axis is further connected with a tipping bucket shifting block, and a tipping bucket deflector rod is fixed on a tipping bucket motor shaft, which is convenient to apply force the tipping bucket shifting block and to enable the weighing bucket to rotate. The tipping bucket shifting block is movably positioned on one end of a crank rod, the other end of the crank rod is fixed on the rotation axis, the weighing support is further provided with a locking device which is used for positioning the weighing tipping bucket.

Description

The soil erosion real time monitoring instrument water mechanism that inclines automatically
Technical field
The utility model relates to a kind of mechanical mechanism of environment measuring instrument, specifically is the mechanism of toppling over muddy water on the soil erosion real time monitoring instrument.
Background technology
The slope runoff washed off soil that rainfall, snow melt form carries, washes away soil particle, is the main type of soil erosion.Soil erosion amount is monitored (sediment charge in the runoff is measured), is for grasping the soil erosion rule, carrying out water and soil conservation the scientific and reliable foundation is provided, and is an important water and soil conservation element task.Existing soil erosion monitoring means are backward manual type, and it is low to exist measuring accuracy; Many defectives such as operating cost height, labour productivity are low.
In order to improve monitoring accuracy and monitoring efficient, the inventor has designed soil erosion real time monitoring instrument, and the basic system of this instrument comprises frame, water intake mechanism, Weighing mechanism, battery and control circuit; Described Weighing mechanism comprises by at least one universal joint and is suspended on LOAD CELLS on the frame, is articulated in the frame and be positioned at the tipping bucket of weighing on the frame of weighing of weighing on the LOAD CELLS, and described water intake mechanism comprises the shift fork that is connected on the movement pipeline motor shaft and by the shift fork clamping and be suspended on the floating pipe of the tipping bucket top of weighing; Main frame in the described control circuit is connected each automatically controlled components and parts by IO interface.Its principle of work is by the floating pipe in the water intake mechanism runoff to be introduced in the tipping bucket of weighing, and LOAD CELLS obtains measurement data and data are transferred to data platform by communication network, downloads to each client.
Yet because monitoring needs continuously or carry out the compartment of terrain, the muddy water in the tipping bucket of therefore weighing needs discharging in good time, so that introduce and measure the weight of muddy water once more.So, need a discharging mechanism and improve whole monitor.
The utility model content
Technical problem to be solved in the utility model is the deficiency that overcomes the above-mentioned background technology, a kind of water mechanism that inclines of soil erosion real time monitoring instrument is provided, this mechanism should make the tipping bucket of weighing topple over muddy water and self-return automatically, and have the characteristics of measuring accuracy and high efficiency, so that satisfy the needs that monitor continues to monitor.
The utility model provides following technical scheme:
The soil erosion real time monitoring instrument water mechanism that inclines automatically, this water mechanism that inclines comprise a horizontal location on the frame of weighing and rotating rotation axis and be fixed on motor on the frame of weighing; An end of fixing weigh tipping bucket and rotation axis on the rotation axis also connects a tipping bucket shifting block, fixes a tipping bucket driving lever on the tipping bucket motor shaft and so that force in the tipping bucket shifting block the described tipping bucket of weighing is rotated.
Described tipping bucket shifting block is rotatably positioned the end at toggle-action lever, and the other end of toggle-action lever is fixed on the rotation axis.
Also be shaped on the locking device of the tipping bucket location that is used to weigh on the described frame of weighing.
The utility model only need be placed in the scene that needs monitoring when using, and current to be measured being inserted floating pipe in the utility model with pipeline, this monitor just can be introduced runoff automatically and take a sample, weighs automatically, automatically institute's survey data is sent to client and handle.
Adopt the utility model, the muddy water in the tipping bucket of weighing is toppled over and resetting of the tipping bucket of weighing can be carried out fully automatically, not only obviously improved measuring accuracy, guaranteed that monitoring carries out and significantly reduced the working strength and the workload of survey crew incessantly, increased substantially monitoring efficient.
Description of drawings
Fig. 1 is main TV structure figure of the present utility model.
Fig. 2 is left TV structure figure of the present utility model.
Fig. 3 is plan structure figure of the present utility model.
Fig. 4 is the A portion structure for amplifying synoptic diagram among Fig. 2.
Fig. 5 be the utility model when the pouring position, the another structure for amplifying synoptic diagram of A portion among Fig. 2.
Fig. 6 is the B portion structure for amplifying synoptic diagram among Fig. 2.
Fig. 7 is that E among Fig. 5 is to structural representation.
Fig. 8 is the structural representation of another kind of locking device of the present invention.
Fig. 9 is the D portion structure for amplifying synoptic diagram among Fig. 2.
Figure 10 is a control circuit principle schematic of the present utility model.
Figure 11 is the control circuit synoptic diagram of the tipping bucket motor in the utility model.
Figure 12 is the control circuit synoptic diagram of the movement pipeline motor in the utility model.
Embodiment
The method that the soil erosion real time monitoring instrument device is measured is considered serial sampling from the runoff that rainfall produces, and weighs and compares with the proportion of water, therefrom calculates traction load and suspended load content in the runoff.Because (continual) weighed and influenced accuracy dynamically, realize that difficulty is bigger, therefore static relatively (dispersing) method sampling of employing is weighed, and the data accuracy is higher, and is simultaneously technical also than being easier to realization.The soil erosion real time monitoring instrument device can obtain runoff, traction load and suspended load content, runoff generation and concluding time, rainfall parameter.And above parameter is transferred to data platform by communication network, and download to each client, handle, store, print.
The soil erosion real time monitoring instrument that specific design is finished comprises frame 1, water intake mechanism, Weighing mechanism, water mechanism, battery and control circuit incline.Wherein, described battery is a rechargeable battery, and it is the power supply of all electrical appliances in the monitor.Battery adopts the capacity of 12V65AH, and safeguards system is under the state that does not charge, and continuous working is more than 100 hours.Charging adopts the alternating current 220V power supply regularly to charge, and charging current is 2A.
In the described Weighing mechanism: LOAD CELLS 3 is suspended on the frame by at least one universal joint 6, articulates the frame 2 of weighing on the LOAD CELLS, tipping bucket 4 of weighing in location on the frame of weighing; The frame of weighing adopts suspension type can guarantee the weighing sensor vertical weight, and the frame of weighing is not easy to be stained with mud, with guarantee measurement data accurately and reliability.In addition, a locking device is set also on the frame of weighing, the effect of this device is to make the tipping bucket of weighing can both be locked in same position when each weighing, guarantees the not crooked and water yield unanimity that completely struggles against of funnel, is surveyed the accurate of data to guarantee.
Locking device shown in Fig. 6, Fig. 7 is the lock dog 11-2 that is shaped on pit that one tapered end 11-1 is housed respectively and matches with this tapered end top in the relevant position of the weigh frame and the tipping bucket of weighing; Tapered end 11-1 passed through behind the through hole on the frame 2 of weighing two ends screw on respectively nut 11-3 and nut 11-5, volute spring 11-4 be held and pressurized in the centre, make tapered end can be on the through hole on the frame 2 of weighing linear slide, and be subjected to the reacting force that spring 11-4 applies.
Shown in Fig. 8 is the locking device of another kind of structure.Among the figure as can be known: but tapered end 11-9 is set on axial slip among the tapered end bar 11-8 (tapered end bar 11-8 is fixed on the frame 2 of weighing with nut), and is subjected to the pushing force of the spring 11-7 in the tapered end bar; Limit the bead that nut 11-6 is tightened on tapered end masthead end and blocks tapered end 11-9 rear end, tapered end is located and unlikely skidding off.
Among the figure as can be known: be shaped on four shelves 14 on the frame, fix four levers 22 respectively on the shelves head; Other has the lower end of four vertical rods 21 to be separately fixed on two levers of frame top, and a channel-section steel 20 is fixed in the upper end of four vertical rods, and described LOAD CELLS 3 just is suspended on the channel-section steel 20 by suspension connection device 6.In addition, the frame bottom also is provided with four installation feet 15, keeps frame stable to increase contact area.
Further, this Weighing mechanism is joined and is hung two universal joints, and promptly except the universal joint 6 of original upper end that is suspended on LOAD CELLS, the lower end of LOAD CELLS is connected in series a universal joint 5 again with weighing of being hung between the frame; After the two ends of LOAD CELLS respectively connected a universal joint, the verticality of the frame of weighing had just had further assurance, and accuracy of weighting is able to further raising.
In addition, the edge, upper end of the described tipping bucket of weighing also is shaped on overflow vent 4-1; This edge, place is lower, and after the filled with water, unnecessary water just flows out (muddy water bypass) from overflow vent in the tipping bucket of weighing.
In the described water mechanism that inclines: the tipping bucket of weighing is fixed on the rotation axis 10,10 of rotation axiss rotationally horizontal location on the frame of weighing (among Fig. 9 as can be known: after axis hole on the frame of weighing was passed through at the two ends of rotation axis 10 respectively, suit upper gasket 10-1 and spring jump ring 10-2 carry out axial location again), the also fixedly connected tipping bucket shifting block 9 of one end of rotation axis (the shifting block bar 9-2 that tipping bucket shifting block 9 is housed is fixed on the end of toggle-action lever 9-1, and the other end of toggle-action lever is fixed on the rotation axis); The side (with tipping bucket shifting block the same side) of frame of weighing is fixed a tipping bucket motor M 1, fixes a tipping bucket driving lever 7 on the tipping bucket motor shaft again; Among Fig. 1 as can be known, 1 startup of tipping bucket motor M just drives tipping bucket driving lever 7 and rotates (the arrow F direction among Fig. 1), driving lever 7 just forces in 9 generations one of tipping bucket shifting block and stirs moment, overcome the moment of resistance that locking device produces (among Fig. 7 as can be known: until this moment because the shrinkage pool downside of lock dog 11-2 is more smooth, therefore the resistance that moment can overcome spring 11-4 of stirring of tipping bucket driving lever 7 forces tapered end 11-1 to retreat, tapered end just skids off from the shrinkage pool of lock dog 11-2), rotate immediately moving axis 10 of the tipping bucket of weighing rotates and topples over.Time and direction that the tipping bucket motor rotates are controlled by control circuit.Nature, when the tipping bucket of weighing resets, also oppositely force in tipping bucket shifting block 9 by driving lever 7, make the tipping bucket counter-rotating (reverse direction of arrow F) of weighing, tapered end 11-1 in locking device inserts in the shrinkage pool of lock dog 11-2 on the tipping bucket of weighing, the tipping bucket of weighing promptly locked (among Fig. 7 also as can be known: because the shrinkage pool upside of lock dog 11-2 is more precipitous, the stirring moment the tipping bucket of weighing is rotated further of tipping bucket driving lever 7, the tipping bucket of weighing just rests on same water inlet position exactly, has guaranteed the consistance of inflow).
The difference of Fig. 5 and Fig. 4 is: Fig. 5 shows is that the tipping bucket of weighing is in pouring position (being the dotted line position among Fig. 1), so rotation axis 10 is positioned at the back of shifting block bar 9-2 among this moment figure; And Fig. 4 shows is that the tipping bucket of weighing is in normal weighing positions (being the solid line position among Fig. 1), thus among the figure rotation axis 10 retainings in the front of shifting block bar (shifting block 9 is housed).
In the described water intake mechanism: frame top is fixed a shift fork motor M 2, connects a shift fork 17 on the shift fork motor shaft, and shift fork 17 is clamping one floating pipe 13-1 again, and the endpiece of this floating pipe is suspended on the tipping bucket top of weighing; The shift fork motor rotates just swing of shift fork, thereby makes the endpiece of floating pipe aim at the tipping bucket of weighing (current are introduced the tipping bucket of weighing) or shift out the tipping bucket of weighing (making the current bypass).Time, angle and direction that the shift fork motor rotates are controlled by control circuit.
Further, described water intake mechanism also comprises a bypass funnel 12 that is arranged on the tipping bucket top of weighing, and a side 12-1 of bypass funnel is low as the spilling water limit; The one water inlet pipe 13-2 that aims at the tipping bucket of weighing is housed in the bypass funnel, and the upper end-face edge of water inlet pipe is higher than the spilling water limit of bypass funnel; Floating pipe 13-1 can introduce current when aiming at water inlet pipe 13-2, and the current during bypass among the floating pipe 13-1 fall into the bypass funnel, overflow from the spilling water limit.
Described control circuit comprises main frame W, mobile gsm communication module, IO interface, timing relay plate and sensor, trigger.
Described main frame is electrically connected with mobile gsm communication module, timing relay plate YJ, sensor and trigger by IO interface.
Communications portion adopts mobile gsm communication module that remote data is issued the user.The advantage that adopts mobile communications network to communicate is that current mobile radio communication network becomes basically universal, as long as instrument and equipment is installed in the position of mobile communications network signal, just can transmit data.Its simple and convenient function of communicating by letter is strong, is not only a good public voice communication platform, also is good data transfer platform simultaneously.
The function of main frame is the center of handling and controlling.Main frame adopts the industrial computer of low-power-consumption embedded 104 buses, and concrete model can be selected for use as required.The present invention recommends to select for use to grind magnificent ICOP6015 or 6016, the about 3W of power consumption; These facility have RS232 serial communication port, LPTx ports, the IDE hard disk mouth of standard; The 4M internal memory of standard.Can be with the advanced language programming under the dos operating system, it is very convenient simple to revise debugging.Nature also can select for use single-chip microcomputer as main frame.
IO interface becomes digital signal to issue main frame the conversion of signals of each sensor, trigger input; And control command is transmitted to each motor, finish control action; IO interface is also issued data the gsm communication module.IO interface adopts RS232 serial communication port, the LPTx ports of the standard that has on the main frame, and connects timing relay plate composition.
Above-described main frame and respectively all outsourcing acquisitions of all automatically controlled components and parts (comprising each sensor, trigger, IO interface, gsm communication module and timing relay plate).
Technical data of the present utility model is set at:
Weighing precision :≤± 3%;
Operating temperature range :-10~+ 50 ℃
Work relative humidity: 〉=90%
The data of testing and sending are:
1, obtaining the footpath flows to the bucket time and completely struggles against the time;
2, obtain the data that the tipping bucket of weighing is weighed at every turn.
Principle of work of the present utility model is:
1. during original state when runoff (no), the tipping bucket 4 of weighing (being represented by Fig. 1 dotted line) opening is seen the dotted line position of Fig. 1 tipping bucket down, movable inlet channel 13 also is in current bypass position (moving on to dotted line position);
2. when producing runoff, runoff trigger JC contact (see figure 10) closure, timing relay plate YJ repeat circuit J1 adhesive, device power; After the startup, main frame W sends control command, makes timing relay plate repeat circuit J1 remain adhesive; Main frame sends control command simultaneously, make Electric Machine Control plate repeat circuit J3 adhesive, 1 energising of tipping bucket motor M, tipping bucket driving lever 7 is stirred (direction opposite with arrow F stirred) tipping bucket shifting block 9, the tipping bucket 4 of will weighing turns back water receiving position (solid line position among Fig. 1), and tipping bucket locking device 11 tipping bucket 4 locking of will weighing is after the tipping bucket 4 of weighing is locked, limit switch XJ3 is disconnected, and tipping bucket motor M 1 is de-energized; LOAD CELLS 3 claims initial value, as the initial value of deduction tare weight;
3. main frame W sends control command, make relay J 4 adhesives in the Electric Machine Control plate, 2 energisings of movement pipeline motor M are rotated, mobile water pipe shift fork 17 is put (aiming at the water inlet pipe 13-2 in the bypass funnel) with the water level that adds that floating pipe 13-1 moves on in tipping bucket, this moment, limit switch XJ4 was backed down, and movement pipeline motor M 2 is de-energized;
4. when muddy water injected, LOAD CELLS 3 was started working, and gave secondary instrument Y with data by signal wire transmits, and this instrument sends to main frame W with data by the RS232 communication port, and main frame begins whether full bucket is judged;
5. when the tipping bucket 4 of weighing was filled, 4 overflow vent 4-1 were excessive for tipping bucket along weighing in beginning, and the muddy water flow that enter tipping bucket this moment equates substantially with the muddy water flow of outflow; Main frame no longer rises by LOAD CELLS 3 weighed amounts and is in substantially in the certain limit of equilibrium state, thinks full this moment and struggles against; Main frame sends control command, motor power is connected in relay J 5 adhesives in the control circuit, movement pipeline motor 16 rotates, mobile water pipe shift fork 17 moves on to bypass position (still in the bypass funnel with movable inlet channel 13, but 13-2 staggers with water inlet pipe), this moment, limit switch XJ5 was backed down, and the movement pipeline motor is de-energized;
6. after a period of stabilisation, main frame is by LOAD CELLS 3 comparison of weighing, when finding data variation≤0.002kg, think stable and weigh, and with the start time of tipping bucket water inlet, completely struggle against time, weighing amount is sent data by gsm module by mobile wireless network;
7. finish after the data transmission, main frame sends control command, tipping bucket motor M 1 power supply is connected in relay J 2 adhesives, this driven by motor tipping bucket driving lever 7 rotates (arrow F direction) together, stir tipping bucket shifting block 9 tipping bucket 4 upset operation 180 degree (dotted line position among Fig. 1) of will weighing, tipping bucket connects rewinding and gets rid of and outwell muddy water (tipping bucket 4 upset operation surpasses 180 degree if weigh, and then limit switch XJ2 is backed down, and guarantees that tipping bucket motor M 1 is de-energized shutdown); After a period of stabilisation, main frame sends control command, and motor M 1 power supply is connected in relay J 3 adhesives, and tipping bucket motor M 1 drives tipping bucket driving lever 7 and oppositely stirs (direction opposite with arrow F stirred) tipping bucket shifting block 9, the tipping bucket 4 of weighing is turned back the position of water receiving; Main frame tares in order to the deduction tare weight of weighing next time by LOAD CELLS 3 again;
8. 3. bring into operation by the front flow process again.
When 9. finishing as if runoff, the tipping bucket 4 of weighing can not completely struggle against all the time, and LOAD CELLS 3 is weighed when finding in 1 hour completely not struggle against continuously, and main frame will be noted the runoff concluding time, and by gsm module the concluding time be sent by mobile wireless network; Main frame sends control command simultaneously, and movement pipeline motor M 2 power supplys are connected in relay J 5 adhesives, and this driven by motor water pipe shift fork 17 moves on to movable inlet channel 13 after the bypass position, and limit switch XJ5 is backed down makes motor M 2 outages; Main frame sends control command again, and tipping bucket motor M 1 power supply is connected in relay J 2 adhesives, and this driven by motor tipping bucket driving lever 7 rotates (arrow F direction), forces in tipping bucket shifting block 9 and makes tipping bucket 4 upset operations 180 degree of weighing, and tipping bucket connects rewinding and gets rid of and outwell remaining muddy water; Main frame sends control command again, and timing relay plate repeat circuit J1 discharges, system cut-off, and total system is got back to initial state again.
In addition, in Figure 10 control circuit principle schematic, also has Electric Machine Control plate DK.

Claims (3)

1, the soil erosion real time monitoring instrument water mechanism that inclines automatically, it is characterized in that this water mechanism that inclines comprise a horizontal location on the frame of weighing and rotating rotation axis (10) and be fixed on motor (M1) on the frame of weighing; An end of fixing tipping bucket of weighing (4) and rotation axis on the rotation axis also connects a tipping bucket shifting block (9), fixes a tipping bucket driving lever (7) on the tipping bucket motor shaft and so that force in the tipping bucket shifting block the described tipping bucket of weighing is rotated.
2, the soil erosion real time monitoring instrument according to claim 1 water mechanism that inclines automatically is characterized in that described tipping bucket shifting block (9) is rotatably positioned the end at toggle-action lever (9-2), and the other end of toggle-action lever is fixed on the rotation axis.
3, the soil erosion real time monitoring instrument according to claim 1 and 2 water mechanism that inclines automatically is characterized in that also being shaped on the described frame of weighing and is used to weigh the locking device of tipping bucket location.
CNU2008200838324U 2008-02-28 2008-02-28 Automatic water-bending mechanism for soil erosion real time monitoring instrument Expired - Fee Related CN201166656Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200838324U CN201166656Y (en) 2008-02-28 2008-02-28 Automatic water-bending mechanism for soil erosion real time monitoring instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200838324U CN201166656Y (en) 2008-02-28 2008-02-28 Automatic water-bending mechanism for soil erosion real time monitoring instrument

Publications (1)

Publication Number Publication Date
CN201166656Y true CN201166656Y (en) 2008-12-17

Family

ID=40192046

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200838324U Expired - Fee Related CN201166656Y (en) 2008-02-28 2008-02-28 Automatic water-bending mechanism for soil erosion real time monitoring instrument

Country Status (1)

Country Link
CN (1) CN201166656Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104458472A (en) * 2014-12-22 2015-03-25 山东硅元新型材料有限责任公司 Method and equipment for detecting water erosion resistance of ceramic pug

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104458472A (en) * 2014-12-22 2015-03-25 山东硅元新型材料有限责任公司 Method and equipment for detecting water erosion resistance of ceramic pug
CN104458472B (en) * 2014-12-22 2017-02-01 山东硅元新型材料有限责任公司 Method and equipment for detecting water erosion resistance of ceramic pug

Similar Documents

Publication Publication Date Title
CN101236191B (en) Soil erosion real time monitoring instrument
CN206726034U (en) Integrated gate controller
CN110466057B (en) Intelligent stirring tank for stirring station
CN105887942A (en) Automatic and intelligent foundation pit inclinometry method
CN214585417U (en) Experimental device for simulating and monitoring multi-source all-terrain movement of debris flow
CN112986537A (en) Experimental device for simulating and monitoring multi-source all-terrain movement of debris flow
CN101549527B (en) Automatic slurry forming machine
CN201166656Y (en) Automatic water-bending mechanism for soil erosion real time monitoring instrument
CN110031370A (en) The measuring device and monitoring method of the erosion caused by sloping surfaces silt based on the identification of runoff turbidity
CN206510201U (en) Integral and intelligent mud jacking system and squeezing trolley
CN201166655Y (en) Apparatus for hanging and connecting soil erosion real time monitoring instrument
CN201394439Y (en) Automatic pulp blending machine
CN206678173U (en) A kind of concrete batch plant
CN211206826U (en) Portable rainfall measuring device of artificial rainfall device
CN201974360U (en) Digital display automatic adhesion instrument
CN209656694U (en) A kind of soil erosion measurement and positioning device
CN201974514U (en) Photovoltaic array tester based on TMS320F2812
CN107340199B (en) A kind of full-automatic water sand is collected and measuring device
CN115366256A (en) Portable deep well roadway surrounding rock accurate grouting reinforcement device and method
CN213417779U (en) Multifunctional testing device for highway design
CN2158775Y (en) Fully automatic production system for concrete
CN114354300A (en) Preparation method for preparing soil sample with specific water content by applying automatic soil sample preparation device
CN102672823B (en) Cleaning control method for main stirring machine, cleaning control system and stirring station
CN202166755U (en) Precipitation tester
CN112454661A (en) Special concrete production device and process capable of achieving rapid solidification

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081217

Termination date: 20150228

EXPY Termination of patent right or utility model