CN201154905Y - Seven-sleeve heater - Google Patents

Seven-sleeve heater Download PDF

Info

Publication number
CN201154905Y
CN201154905Y CNU2007202013552U CN200720201355U CN201154905Y CN 201154905 Y CN201154905 Y CN 201154905Y CN U2007202013552 U CNU2007202013552 U CN U2007202013552U CN 200720201355 U CN200720201355 U CN 200720201355U CN 201154905 Y CN201154905 Y CN 201154905Y
Authority
CN
China
Prior art keywords
pipe
reduced
material circulation
circulation pipes
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007202013552U
Other languages
Chinese (zh)
Inventor
李文斌
鲁德海
王珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNU2007202013552U priority Critical patent/CN201154905Y/en
Application granted granted Critical
Publication of CN201154905Y publication Critical patent/CN201154905Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility mode discloses a seven-pipe heater, which comprises a steam pipe (1), inside which seven material circulation pipes (2) are evenly distributed. Compared with the prior art, the seven-pipe heater has the advantages that: as the seven material circulation pipes are arranged in the same environment and can be heated evenly, the treatment capacity is improved and the construction investment is reduced. As the total length is shortened, the scabbing rate of the material circulation pipes is reduced; the heat exchanging is more complete, therefore the energy consumption is reduced and the maintenance cost decreases at the same time.

Description

Seven double pipe heaters
Technical field:
The utility model belongs to the double pipe heater of aluminum oxide pipeline stripping.
Technical background:
In aluminum oxide stripping production process, the single double pipe heater that uses is that a less feed-pipe of diameter is arranged in the big vapour pipe of a diameter at present, for guaranteeing the higher solubility rate of aluminum oxide, wants to improve output; Need to adopt the lengthening flow process and the increase residence time to achieve the goal.Will certainly cause investment to increase like this, easily scab defectives such as energy consumption increase in the production.
The utility model content:
The technical problems to be solved in the utility model is: by the layout and the radical of reasonable arrangement streams siphunculus, so that improve treatment capacity, reduce manufacturing expense, reduce production costs.
Formation of the present utility model: it comprises vapour pipe (1), evenly is furnished with 7 streams siphunculus (2) in vapour pipe (1).
The arrangement form of 7 streams siphunculus (2) is: center arrangement is 1 in vapour pipe (1), and 6 of arranged around are rationally controlled every pipe compartment distance, clamps by unit clamp to get final product.
The utility model compared with prior art because seven streams siphunculus are in energy thermally equivalent under the identical environment, makes treatment capacity improve, and construction investment reduces.Owing to shortened length overall, material stream passed duct ligation scar rate is reduced, heat exchange is more abundant, and energy consumption also just reduces, and maintenance cost also reduces simultaneously.
Description of drawings:
Fig. 1 is a synoptic diagram of the present utility model;
Fig. 2 is that the A of Fig. 1 is to figure.
Embodiment:
Embodiment of the present utility model: 7 streams siphunculus 2 are evenly arranged in the vapour pipe 1.The arrangement form of 7 streams siphunculus 2 is: center arrangement is 1 in vapour pipe 1, and 6 of arranged around are rationally controlled every pipe compartment distance, clamps by unit clamp to get final product.

Claims (2)

1. double pipe heater, it comprises vapour pipe (1), it is characterized in that: evenly be furnished with 7 streams siphunculus (2) in vapour pipe (1).
2. seven double pipe heaters according to claim 1 is characterized in that: the arrangement form of 7 streams siphunculus (2) is: center arrangement is 1 in vapour pipe (1), 6 of arranged around.
CNU2007202013552U 2007-11-14 2007-11-14 Seven-sleeve heater Expired - Fee Related CN201154905Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007202013552U CN201154905Y (en) 2007-11-14 2007-11-14 Seven-sleeve heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007202013552U CN201154905Y (en) 2007-11-14 2007-11-14 Seven-sleeve heater

Publications (1)

Publication Number Publication Date
CN201154905Y true CN201154905Y (en) 2008-11-26

Family

ID=40102691

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007202013552U Expired - Fee Related CN201154905Y (en) 2007-11-14 2007-11-14 Seven-sleeve heater

Country Status (1)

Country Link
CN (1) CN201154905Y (en)

Similar Documents

Publication Publication Date Title
CN202267240U (en) Solar and air heat collector
CN201154905Y (en) Seven-sleeve heater
CN202350587U (en) Device for heating water by utilizing waste heat of hot blast heater tail gas
CN218115286U (en) Photovoltaic glass annealing kiln waste heat recovery water supply system
CN201740358U (en) Drying tower system
CN202769275U (en) Temperature control conduction oil circulating pipeline system
CN204727602U (en) Can the synthetic-ammonia transformation process device of restart up
CN204251352U (en) A kind of exhaust steam of aluminum oxide production process utilizes device
CN102338555A (en) Drying tower system
CN207600225U (en) Roaster aluminium oxide waste-heat recovery device
CN207095024U (en) A kind of heating system of conduction oil
CN205262259U (en) Purified cotton production heat exchange device
CN219128771U (en) Novel dryer regeneration system
CN204451188U (en) A kind of heat reclaim unit for biaxial tension BOPP production line
CN202221163U (en) Preheating device of boiler water
CN201567337U (en) Material warming device
CN202141359U (en) Hot air recycling system
CN202687957U (en) Converting device for preparing acid from smoke and system for heating converting device
CN203177695U (en) Efficient heat exchanger
CN201371053Y (en) Jacketed type finial heat preservation device
CN201886836U (en) Device for utilizing residual heat of waste gas
CN202814020U (en) Double-layer air heat exchange utilization device for cylinder drying machine
CN202022921U (en) Plate heat exchanger used for biological material
CN206337022U (en) A kind of energy-saving carbon carries deoxidation nitrogen purification equipment
CN202303596U (en) Comprehensive utilization system of residual heat of plant

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081126

Termination date: 20141114

EXPY Termination of patent right or utility model