CN202221163U - Preheating device of boiler water - Google Patents

Preheating device of boiler water Download PDF

Info

Publication number
CN202221163U
CN202221163U CN2011203063856U CN201120306385U CN202221163U CN 202221163 U CN202221163 U CN 202221163U CN 2011203063856 U CN2011203063856 U CN 2011203063856U CN 201120306385 U CN201120306385 U CN 201120306385U CN 202221163 U CN202221163 U CN 202221163U
Authority
CN
China
Prior art keywords
water
water tank
heat
smoke
flue gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203063856U
Other languages
Chinese (zh)
Inventor
邱丁坤
章黎军
姚方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU CHANGLE BUBBLE AND PLASTICS CO Ltd
Original Assignee
SUZHOU CHANGLE BUBBLE AND PLASTICS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU CHANGLE BUBBLE AND PLASTICS CO Ltd filed Critical SUZHOU CHANGLE BUBBLE AND PLASTICS CO Ltd
Priority to CN2011203063856U priority Critical patent/CN202221163U/en
Application granted granted Critical
Publication of CN202221163U publication Critical patent/CN202221163U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a preheating device of boiler water. The preheating device of the boiler water includes a water tank, and a water inlet pipe and a water outlet pipe correspondingly arranged on two sides of the water tank. The two sides of the water tank are also provided with a smoke inlet pipe and a smoke outlet pipe correspondingly. The smoke inlet pipe communicates with the smoke outlet pipe through a plurality of shunt pipes penetrating through the water tank. The preheating device of the boiler water in the utility model utilizes heat of smoke for pre-heating water, thereby reducing load of waste heat processing. The smoke exchanges heat with water in the water tank through the shunt pipes. The heat exchange area is large, and the waste heat escape volume of the smoke is small. The heat utilization rate is high. The water temperature can achieve to 70 DEG C and above through pre-heating, thereby saving energy substantially.

Description

The boiler feed water preheating device
Technical field
The utility model relates to a kind of boiler feed water preheating device.
Background technology
Expandable polystyrene (EPS) is produced and to be adopted intermittently operated usually, with styrene, pure water and auxiliary material in the agitated reactor that has the jacket steam coil pipe after operations such as low temperature polymerization, aeration, high temperature polymerization, make EPS.Required hot water need burn heat with cold water in advance by boiler in the preparation process, and the cold water initial temperature is low, so that this operation power consumption is bigger; And the boiler flue gas that produces in the process of heating up water contains more dust, need under air-introduced machine drives, deliver to chimney, after the water curtain dedusting, can discharge.
Problem is, flue gas has higher temperature, and this part used heat is directly handled discharge, has not only increased the processing burden, has also wasted the heat of being with.Also have the people that economizer is set in flue at present, like cast iron gilled tube economizer, cold water flows in the economizer tube; Flue gas is outer at pipe, when flowing in the flue and the cold water heat exchange, yet, owing to considerable part heat in the flue gas can directly shed through flue; Flue gas flow velocity outside pipe is often very fast, and flue gas and cold water heat exchange area are limited, and water only can be heated to 30-40 degree centigrade; Water temperature is not high enough, in boiler, still need absorb more heat transfer.
Summary of the invention
The technical problem that the utility model solves is, a kind of boiler feed water preheating device is provided, and flue gas heat is used for preheating water, and heat exchange area is big, and heat utilization ratio is high, has also alleviated used heat and has handled load.
The technical scheme that the utility model adopts is:
A kind of boiler feed water preheating device comprises water tank and corresponding water inlet pipe, the outlet pipe that is arranged on the water tank both sides, and said water tank both sides also correspondence are provided with flue gas and go into pipe and go out pipe with flue gas, and flue gas is gone into pipe and gone out to manage with flue gas through the some isocons that run through water tank and be communicated with.
Further, said water tank also is provided with heat-insulation layer outward.
Further, said flue gas is gone into the opposite side that pipe is arranged on water inlet pipe on the water tank.
The beneficial effect of the utility model is:
The utility model has alleviated used heat and has handled load through flue gas heat is used for preheating water; Flue gas through isocon in water tank with the water heat exchange, heat exchange area is big, fume waste heat is overflowed few, heat utilization ratio is high, through preheating, water temperature can reach more than 70 degrees centigrade, has practiced thrift the energy greatly.
Description of drawings
Fig. 1 is the structural representation of the utility model.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is described further.
Embodiment:
Shown in accompanying drawing; The boiler feed water preheating device; Comprise water tank 4 and corresponding water inlet pipe 22, the outlet pipe 21 that is arranged on the water tank both sides; Said water tank 4 both sides also correspondence are provided with flue gas and go into pipe 11 and go out pipe 12 with flue gas, and the isocon 5 that flue gas is gone into the some parallel connections of pipe 11 through running through water tank 4 goes out to manage 12 with flue gas and is communicated with.
Further, also be provided with heat-insulation layer 3 outside the said water tank 4, like the rock wool heat-preservation layer.
Further, said flue gas is gone into the opposite side that pipe 11 is arranged on water inlet pipe 22 on the water tank 4.
During use, water gets into the water tank 4 from water inlet pipe 22 in advance, is full of water tank 4, and then, flue gas is gone into pipe 11 opposite sides from water inlet pipe 22, fed fume waste heat against water (flow) direction, then through flowing out after cellular densely covered isocon 5 and the water heat exchange.
Because the flue gas water tank inside of flowing through, flue gas can be fully and the water heat exchange, and used heat is seldom overflowed from heat-exchange system, heat-insulation layer is set outside water tank further reduced heat and from whole heat-exchange system, overflow; Isocon is cellular to gather, and has increased the heat exchange area with water, and heat utilization ratio is high; The counterflow exchange of flue gas and water is with the efficient and the effect that have further guaranteed heat exchange.After heat exchange, water temperature can reach more than 70 degrees centigrade, has practiced thrift the energy greatly.

Claims (3)

1. boiler feed water preheating device comprises water tank and corresponding water inlet pipe, the outlet pipe that is arranged on the water tank both sides, and said water tank both sides also correspondence are provided with flue gas and go into pipe and go out pipe with flue gas, and flue gas is gone into pipe and gone out to manage with flue gas through the some isocons that run through water tank and be communicated with.
2. boiler feed water preheating device as claimed in claim 1 is characterized in that said water tank also is provided with heat-insulation layer outward.
3. boiler feed water preheating device as claimed in claim 1 is characterized in that said flue gas goes into the opposite side that pipe is arranged on water inlet pipe on the water tank.
CN2011203063856U 2011-08-22 2011-08-22 Preheating device of boiler water Expired - Fee Related CN202221163U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203063856U CN202221163U (en) 2011-08-22 2011-08-22 Preheating device of boiler water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203063856U CN202221163U (en) 2011-08-22 2011-08-22 Preheating device of boiler water

Publications (1)

Publication Number Publication Date
CN202221163U true CN202221163U (en) 2012-05-16

Family

ID=46043188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203063856U Expired - Fee Related CN202221163U (en) 2011-08-22 2011-08-22 Preheating device of boiler water

Country Status (1)

Country Link
CN (1) CN202221163U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102954587A (en) * 2011-08-22 2013-03-06 苏州常乐泡塑有限公司 Water preheating device for boiler

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102954587A (en) * 2011-08-22 2013-03-06 苏州常乐泡塑有限公司 Water preheating device for boiler

Similar Documents

Publication Publication Date Title
CN105509492B (en) A kind of Alumina Rotary Kiln fume afterheat and CO2 recovery systems and method
CN201652315U (en) Boiler sewage-discharge residual heat utilizing device
CN202221163U (en) Preheating device of boiler water
CN202432887U (en) Novel flue gas waste heat recovery device
CN201028494Y (en) Environment-friendly energy-saving boiler group
CN203798205U (en) Industrial waste gas waste heat-recycling heat exchanging device
CN203100474U (en) Steam-water mixer
CN207701210U (en) A kind of jet dynamic control tail gas waste heat utilizing device
CN202118868U (en) Exhaust gas waste heat recovery processor
CN202074503U (en) Energy-saving coal economizer for boiler
CN202065995U (en) Boiler with flue gas afterheat recycling device
CN207661975U (en) A kind of efficient hot water boiler
CN201748650U (en) Heat exchange device of water-storage wall-mounted gas boiler
CN102954587A (en) Water preheating device for boiler
CN204420971U (en) A kind of waste-heat recovery device
CN205807814U (en) Gas fired-boiler flue gas waste heat recovery formula heating plant
CN103868377B (en) Industrial waste gas waste heat recovery heat-exchanger rig
CN205065766U (en) Heating furnace economizer
CN202582140U (en) Cooling water heat energy utilization device of steam dryer
CN202226882U (en) Annealing flue duct residual heat recovering system
CN207454127U (en) Jet dynamic control tail gas waste heat utilizing device
CN213272682U (en) Waste heat recycling device
CN202835850U (en) Multifunctional nonbearing split-type solar energy water-heating device
CN209540924U (en) A kind of flue gas waste heat at the end of boiler recyclable device
CN211232836U (en) Steam condensate recycling device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120516

Termination date: 20140822

EXPY Termination of patent right or utility model