CN201133816Y - Settlement observation sign - Google Patents

Settlement observation sign Download PDF

Info

Publication number
CN201133816Y
CN201133816Y CNU2007201735369U CN200720173536U CN201133816Y CN 201133816 Y CN201133816 Y CN 201133816Y CN U2007201735369 U CNU2007201735369 U CN U2007201735369U CN 200720173536 U CN200720173536 U CN 200720173536U CN 201133816 Y CN201133816 Y CN 201133816Y
Authority
CN
China
Prior art keywords
observation
hole
circular sleeve
embedded
sign
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201735369U
Other languages
Chinese (zh)
Inventor
张胜良
陆静文
焦俊娟
王立娟
马涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhongjian Huahai Engineering Surveying And Mapping Co ltd
China Construction First Group Corp Ltd
China Construction First Group Construction and Development Co Ltd
Original Assignee
Beijing Zhongjian Huahai Engineering Surveying And Mapping Co ltd
China Construction First Group Corp Ltd
China Construction First Group Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhongjian Huahai Engineering Surveying And Mapping Co ltd, China Construction First Group Corp Ltd, China Construction First Group Construction and Development Co Ltd filed Critical Beijing Zhongjian Huahai Engineering Surveying And Mapping Co ltd
Priority to CNU2007201735369U priority Critical patent/CN201133816Y/en
Application granted granted Critical
Publication of CN201133816Y publication Critical patent/CN201133816Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A settlement observation mark is characterized in that a circular sleeve is embedded in a hole of concrete, a hole is flushed with a wall surface, the circular sleeve is covered with an embedded part sealing cover, an adjustable spiral hole is formed in the center of the circular sleeve, a screwing bolt is screwed into the circular sleeve, and a mark head for placing an observation ruler is connected to the screwing bolt. The sign is buried in a hidden mode, the embedded part is buried in a designed position, the movable header is screwed into the embedded hole during observation, and the movable header is taken out after observation and covered with the protective cover, so that the appearance of a building is not affected, and the sign is protected.

Description

The settlement observation sign
Affiliated technical field
The utility model has related to building construction measurement.The settlement observation sign is convenient to carry out buildings'settlement observation.
Background technology
In building subsidence observation, the observation station of direct burial was exposed outside building in the past, was easy to be damaged by collision, and influenced measuring accuracy, and was unfavorable for preserving, and the observation station of direct burial is exposed outside building, influences the attractive in appearance of buildings.
The utility model content
Should not preserve and influence buildings deficiency attractive in appearance in order to overcome in the past the direct burial observation station, the utility model uses concealed type, and this method is not only preserved easily, but also does not influence the attractive in appearance of buildings.
The technical scheme that the utility model adopted is: the annular sleeve is embedded in the concrete hole, hole and metope are smeared together, and are stamped the built-in fitting capping, and there is the adjustable spiral hole at the center of annular sleeve, the precession bolt screws in the annular sleeve, is connected with the header of placing sight gauge on the precession bolt.
(1) built-in fitting is buried underground
Electric hammer with φ 32 when burying underground punches at design attitude, and built-in fitting is put into the hole, fills with epoxy resin on every side to make it firm.
(2) sign is stable
It is fixing to mix filling with cloud stone glue and hardening agent.Cloud stone glue and hardening agent mix and have good stickup and high mechanicalness resistivity, solidification-stable at short notice, general 24 hours full solidification, primary solidification 6-8 minute.Comprehensively engineering construction experience in the past by adjusting the proportioning of cloud stone glue and hardening agent, can shorten set time greatly.
(3) settlement observation
During observation activation flag is screwed, sight gauge is placed on the movable header, observe.
(4) observation finishes
After observation finishes, activation flag is screwed out, build over cap.
The beneficial effects of the utility model are:
(1) accuracy of observation height:
The naked leakage of direct burial observation station is in the past clashed into damage during as construction outside building, be difficult to judge whether be virtual condition during observation, certainly will cause excessive measuring error, is not this observation station actual value; Simultaneously the direct burial observation station is easy to destroyedly fall, and can only bury again a little, has destroyed the continuity of observation data, difficult a whole set of complete observation achievement that forms.
(2) it is attractive in appearance not influence buildings
The built-in fitting sleeve is embedded in concrete inside, and hole and metope are smeared together, does not influence the attractive in appearance of buildings like this.
(3) be easy to preserve:
Concealed type is different from direct burial, and the direct burial monumented point is exposed to be easily damaged in fitment process outside, and concealed type then can be dodged these unfavorable factors.And the concealed type monumented point observes at any time at any time and to install, and is difficult for the destroyed long preservation that is easy to.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the utility model structural map.
1. annular sleeves among the figure, there is the adjustable spiral hole at the sleeve center; 2. built-in fitting capping; 3. precession bolt.4. header.
Embodiment
Annular sleeve 1 is put into the hole, build built-in fitting capping 2, during observation built-in fitting capping 2 is screwed out, precession bolt 3 is screwed in the annular sleeve 1, sight gauge is positioned on the header 4, and observation finishes, and screws out precession bolt 3, builds built-in fitting capping 2.

Claims (1)

1. settlement observation sign, it is characterized in that: annular sleeve (1) is embedded in the concrete hole, hole and metope are smeared together, and be stamped built-in fitting capping (2), there is the adjustable spiral hole at the center of annular sleeve (1), precession bolt (3) screws in the annular sleeve (1), is connected with the header (4) of placing sight gauge on the precession bolt (3).
CNU2007201735369U 2007-10-08 2007-10-08 Settlement observation sign Expired - Fee Related CN201133816Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201735369U CN201133816Y (en) 2007-10-08 2007-10-08 Settlement observation sign

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201735369U CN201133816Y (en) 2007-10-08 2007-10-08 Settlement observation sign

Publications (1)

Publication Number Publication Date
CN201133816Y true CN201133816Y (en) 2008-10-15

Family

ID=40062087

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201735369U Expired - Fee Related CN201133816Y (en) 2007-10-08 2007-10-08 Settlement observation sign

Country Status (1)

Country Link
CN (1) CN201133816Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101545271B (en) * 2009-03-21 2011-01-26 标力建设集团有限公司 Telescopic type settlement observer
CN101706270B (en) * 2009-11-05 2011-05-25 河海大学 Device for measuring embankment settlement and measuring method
CN102721414A (en) * 2012-06-28 2012-10-10 中建八局第二建设有限公司 Embedded part on settlement observation point and application method thereof
CN103453843A (en) * 2013-09-12 2013-12-18 中铁隧道集团二处有限公司 Installation method of tunnel ruler-free measurement detachable reflector
CN105698753A (en) * 2016-03-14 2016-06-22 江苏建筑职业技术学院 Settlement observation device capable of preventing collision damage and use and safekeeping method
CN106289197A (en) * 2016-09-08 2017-01-04 中铁十九局集团第七工程有限公司 Tunnel non-prism monitoring parameter mark and tunnel non-prism monitoring measurement method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101545271B (en) * 2009-03-21 2011-01-26 标力建设集团有限公司 Telescopic type settlement observer
CN101706270B (en) * 2009-11-05 2011-05-25 河海大学 Device for measuring embankment settlement and measuring method
CN102721414A (en) * 2012-06-28 2012-10-10 中建八局第二建设有限公司 Embedded part on settlement observation point and application method thereof
CN103453843A (en) * 2013-09-12 2013-12-18 中铁隧道集团二处有限公司 Installation method of tunnel ruler-free measurement detachable reflector
CN105698753A (en) * 2016-03-14 2016-06-22 江苏建筑职业技术学院 Settlement observation device capable of preventing collision damage and use and safekeeping method
CN106289197A (en) * 2016-09-08 2017-01-04 中铁十九局集团第七工程有限公司 Tunnel non-prism monitoring parameter mark and tunnel non-prism monitoring measurement method

Similar Documents

Publication Publication Date Title
CN201133816Y (en) Settlement observation sign
Meier Mode of flow of Saskatchewan glacier, Alberta, Canada
CN104075696B (en) Coordinate measuring method
WO2004034076A3 (en) System and method for highly accurate real time tracking and location in three dimensions
CN105136110A (en) Firmly-embedded settlement ring, and soil layering settlement amount monitoring system
CN208502788U (en) The protection device for installing and measuring system of earth pressure gauge on the outside of shield duct piece
GB2436052A (en) Method and apparatus for monitoring a line and mooring line relocation method
CN107861158A (en) It is a kind of to determine gas hydrates BSR interfaces and the research method of seabed intersection location
CN206052677U (en) A kind of thickness of frozen earth layer measurement apparatus
CN104933831A (en) Protective apparatus of geological disaster monitoring station
CN202304715U (en) Caliper for measuring embedded depth of electric pole
CN205804433U (en) Metro Deep Excavation water sealing structure seepage defect sonar seepage detector
CN205384014U (en) Drilling bored concrete pile underwater concrete pours a height measurement system
CN103743496A (en) Method for testing temperature gradient in cement concrete pavement slab
US20170328828A1 (en) Electric anticorrosive potential measurement electrode unit
CN202041208U (en) Stable direct-buried GPS (global positioning system) observation sign
CN205664938U (en) Fixed blasting vibration -measuring sensor's device on deep loose soil layer
ZHAO et al. High Precision GPS Tide Measurement Method in a Far-Distanceand Transformation Model for the Vertical Datum
CN207907854U (en) A kind of monitoring device for Underground Construction
Hvidberg et al. Mass balance and surface movement of the Greenland Ice Sheet at Summit, Central Greenland
CN202403703U (en) Settlement observation mark
CN204944477U (en) Firm embedded type sedimentation ring
CN207163355U (en) A kind of floor tile cutting aided measurement device of floor drain installation
CN202258114U (en) Underground pipeline ground marking point based on RFID (radio frequency identification)
CN220508053U (en) Hidden tunnel observation pier

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081015

Termination date: 20161008

CF01 Termination of patent right due to non-payment of annual fee