CN207907854U - A kind of monitoring device for Underground Construction - Google Patents

A kind of monitoring device for Underground Construction Download PDF

Info

Publication number
CN207907854U
CN207907854U CN201820053395.5U CN201820053395U CN207907854U CN 207907854 U CN207907854 U CN 207907854U CN 201820053395 U CN201820053395 U CN 201820053395U CN 207907854 U CN207907854 U CN 207907854U
Authority
CN
China
Prior art keywords
monitoring
drilling
structure layer
road structure
deformation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820053395.5U
Other languages
Chinese (zh)
Inventor
付国刚
袁银书
王丽梅
葛强
张振禹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201820053395.5U priority Critical patent/CN207907854U/en
Application granted granted Critical
Publication of CN207907854U publication Critical patent/CN207907854U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses a kind of monitoring devices for Underground Construction, the foundation pit periphery or multiple monitoring locations right over the monitoring pipeline that need to carry out deformation monitoring to be dug of deformation monitoring need to be carried out including being separately positioned on, it is vertically drilled with drilling at each monitoring location of setting, drilling penetrates the setting of road structure layer, it is vertically inserted with measuring rod in each drilling, at the top of measuring rod 3cm is no less than less than road structure layer top surface, lower part placing has concrete in drilling, PVC casings are separately installed in each drilling, PVC sleeve bottoms are supported on top of concrete and top and road structure layer either flush, sand is filled in PVC casings, it is stamped steel lid in cannula tip nozzle.Settlement monitoring point can quickly, be easily arranged using this structure and can accurately reflect the deformation numerical value of the sedimentation and the foundation pit periphery soil body of underground utilities.

Description

A kind of monitoring device for Underground Construction
Technical field
The utility model is related to hypogee structure construction and excavation of foundation pit etc. to induce underground pipeline settlement and foundation pit periphery The monitoring of soil deformation is specifically related to a kind of monitoring device for Underground Construction.
Background technology
With the fast development of urban public utilities construction, all kinds of large-scale, high-rise buildings or structures the more are built the more more, bury All kinds of pipelines for being located at city underground also greatly increase.It can all change the existing stress of the soil body in the foundation construction phase of buildings or structures State generates ambient enviroment and landform certain influence, to influence whether the safety of underground utilities and foundation pit construction.It is true The operational safety of underground utilities and being smoothed out for foundation pit construction are protected, it must be to burying near construction area in carrying out engineering construction If pipeline and the foundation pit periphery soil body carry out deformation monitoring, the generation of accident is avoided.How in no excavation condition and inspection shaft Within the scope of conduit region, quickly, settlement monitoring point is easily set, it is most important to construction speed and construction safety.
Application No. is the Chinese patents of CN201720024342.6 to disclose " a kind of underground pipeline settlement monitoring device ", should Utility model is related to settlement monitoring technology field, and especially a kind of underground pipeline settlement monitoring device, described device includes at least Anchor ear, settlement observation bar and disrance sleeve, the settlement observation bar are rigidly attached to the top of the anchor ear, the disrance sleeve It is sleeved on the periphery of the settlement observation bar, the shape of the anchor ear, the shape of size and underground utilities, size kissing are suitable Match, the anchor ear at least blocks the outer outline area for embracing the underground utilities half, needs to contact with each other with monitored pipeline.Do not having There is the pipe settlement of excavation condition or inspection shaft to monitor to apply.
Disclose that " a kind of monitoring underground space and underground utilities become application No. is the Chinese patent of CN201510618159.4 The device and its measurement method of shape ", device includes:Fixing piece, deformation measurement casing bit, data collecting system, aggregation of data Handle (calculating) system and public radio network communication launcher etc..Measurement method is by measuring deformation measurement casing because of ground Down space and underground pipeline settlement etc. deform and generate corner change monitor the underground space deformation and underground utilities it is opposite Sedimentation and laterally opposed deformation.By introducing, geodetic datum can obtain the underground space and the absolute of underground utilities sinks Drop and lateral absolute deformation.It should pass through and monitoring point is set, be changed by measuring elevation at index point, accurate reflection underground utilities Settlement values, fixing piece, deformation measurement casing bit need to be fixed on underground utilities in this method, in no excavation condition or It cannot be applied in the pipe settlement monitoring of person's inspection shaft;Data collection need to utilize wireless network, data collection stability and coherent Property can not ensure.
Invention content
The shortcomings that the purpose of the utility model is to overcome prior arts provides a kind of monitoring for Underground Construction Device can accurately reflect the numerical value of the sedimentation and foundation pit periphery soil deformation of underground utilities, and low cost using this structure It is honest and clean convenient, fast.
The utility model structure is achieved by the following technical programs:
A kind of monitoring device for Underground Construction, including be separately positioned on and need to carry out the to be dug of deformation monitoring Foundation pit periphery or multiple monitoring locations right over the monitoring pipeline that need to carry out deformation monitoring, in each monitoring of setting Drilling is vertically drilled at point position, the drilling penetrates the setting of road structure layer, along vertical in each drilling Direction is inserted with measuring rod, and measuring rod top is no less than 3cm less than road structure layer top surface, the lower part in the drilling Placing has concrete, and PVC casings are separately installed in each drilling, and the PVC sleeve bottoms are supported on top of concrete Upper and top and road structure layer either flush, are filled with sand, in the cannula tip pipe in the PVC casings Lid has steel lid.
The utility model has the beneficial effects that:
Settlement monitoring point can quickly, be easily arranged in the utility model structure, by the change for measuring coordinate at index point Change and carry out simple computation, can accurately reflect the deformation numerical value of the sedimentation and the foundation pit periphery soil body of underground utilities, and part Component material therefor is repeatable to be utilized, easy to process, at low cost, is suitable for the conduit region model in no excavation condition and inspection shaft It encloses and is applied in interior construction.
Description of the drawings
Fig. 1 is that the utility model shows for what the monitoring device of Underground Construction was applied in underground pipeline settlement monitoring It is intended to;
Fig. 2 is that monitoring device of the utility model for Underground Construction is applied in the monitoring of foundation pit periphery soil deformation Schematic diagram.
Specific implementation mode
For that can further appreciate that the content, feature and effect of the utility model, the utility model is added below in conjunction with the accompanying drawings To be described in detail.
As shown in the picture, the utility model discloses a kind of monitoring devices for Underground Construction, including set respectively It sets on the foundation pit periphery to be dug that need to carry out deformation monitoring or more right over the monitoring pipeline 6 that need to carry out deformation monitoring A monitoring location, is vertically drilled with drilling at each monitoring location of setting, and the drilling penetrates road knot Structure layer 1 is arranged, and the aperture of the drilling is preferably 120mm-240mm, so as to interior remaining soil taking-up and the subsequently monitoring of drilling Point installation operation;Measuring rod 2 is vertically inserted in each drilling, 2 top of measuring rod is less than road structure 1 top surface of layer is no less than 3cm, in the drilling lower part placing have concrete 5, the 5 thickness 30cm- of concrete 40cm, is separately installed with PVC casings 3 in each drilling, 3 bottom of PVC casings be supported on 5 top surface of concrete and Top and 1 either flush of road structure layer, are filled with sand 4, in 3 top nozzle of casing in the PVC casings 3 It is stamped steel lid 7.
Included the following steps using the utility model construction:
(1) on the foundation pit periphery to be dug that need to carry out deformation monitoring or in the monitoring pipeline 6 that need to carry out deformation monitoring Multiple monitoring locations are set separately in surface, and monitoring location quantity can be in conjunction with on-site actual situations, according to measurement accuracy Requirement choose;
(2) until road structure layer 1 is drilled through, the aperture of drilling is preferred for drilling at each monitoring location of setting For 120mm-240mm, to drill, interior remaining soil takes out and follow-up monitoring point installation operation;
(3) the interior remaining soil of drilling is taken out;
(4) measuring rod 2 is vertically inserted into each drilling, 2 top of measuring rod is less than road structure layer 1 Top surface is no less than 3cm, is squeezed with measuring rod 2 to avoid the deformation of steel lid 7, influences observed result;
(5) the lower part concreting 5 in the drilling, the preferred 5 thickness 30cm-40cm of concrete, coagulation Soil 5 preferably selects fast hard, early strength concrete to be accelerated construction progress to shorten front and back activity time interval.Concrete 5 reaches just After solidifying, PVC casings 3 are installed in each drilling, 3 bottom of PVC casings is supported on concrete 5 and top and road 1 either flush of structure sheaf, PVC casings 3 can take out recycling, reduce cost.
(6) sand 4 is filled in PVC casings 3;
(7) steel lid 7 is protected in 3 mouthpiece cover of casing, completes monitoring point setting.
(8) top mark for measuring measuring rod 2 using measurement of higher degree instrument before digging foundation pit is high, and height is utilized after digging foundation pit The top mark that journey measuring instrument measures measuring rod 2 is high, then calculates measuring rod 2 and digs the high changes in coordinates of front and back top mark in foundation pit Value, obtains the deformation numerical value of the 9 periphery soil body 8 of settlement values and foundation pit of underground utilities 6.Whole station may be used in measurement of higher degree instrument Instrument or GPS.

Claims (3)

1. a kind of monitoring device for Underground Construction, it is characterised in that:Deformation monitoring need to be carried out including being separately positioned on Foundation pit periphery to be dug or multiple monitoring locations right over the monitoring pipeline that need to carry out deformation monitoring, setting Each monitoring location at be vertically drilled with drilling, the drilling penetrates the setting of road structure layer, in each brill Measuring rod is vertically inserted in hole, measuring rod top is no less than 3cm less than road structure layer top surface, described Lower part placing has concrete in drilling, PVC casings is separately installed in each drilling, the PVC sleeve bottoms are supported on On top of concrete and top and road structure layer either flush, are filled with sand, described in the PVC casings Cannula tip nozzle is stamped steel lid.
2. the monitoring device according to claim 1 for Underground Construction, it is characterised in that:The aperture of drilling is 120mm-240mm。
3. the monitoring device according to claim 1 or 2 for Underground Construction, it is characterised in that:Described is mixed Solidifying soil thickness 30cm-40cm.
CN201820053395.5U 2018-01-12 2018-01-12 A kind of monitoring device for Underground Construction Active CN207907854U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820053395.5U CN207907854U (en) 2018-01-12 2018-01-12 A kind of monitoring device for Underground Construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820053395.5U CN207907854U (en) 2018-01-12 2018-01-12 A kind of monitoring device for Underground Construction

Publications (1)

Publication Number Publication Date
CN207907854U true CN207907854U (en) 2018-09-25

Family

ID=63567355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820053395.5U Active CN207907854U (en) 2018-01-12 2018-01-12 A kind of monitoring device for Underground Construction

Country Status (1)

Country Link
CN (1) CN207907854U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295634A (en) * 2019-08-15 2019-10-01 中国电建集团贵州电力设计研究院有限公司 A kind of GNSS monitoring device and its construction method convenient for field installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295634A (en) * 2019-08-15 2019-10-01 中国电建集团贵州电力设计研究院有限公司 A kind of GNSS monitoring device and its construction method convenient for field installation
CN110295634B (en) * 2019-08-15 2024-04-02 中国电建集团贵州电力设计研究院有限公司 GNSS monitoring device convenient for field installation and construction method thereof

Similar Documents

Publication Publication Date Title
CN104989411B (en) Saturated sand Liquefaction device and method around the section of jurisdiction that shield-tunneling construction causes
CN105021418B (en) Suitable for the shield tunneling surface model and analogy method of geotechnical centrifugal model test
CN106324226B (en) Monitor seepage action of ground water, sedimentation perfusion one laboratory testing rig and method
CN105040667B (en) High roadbed deforms wireless remote comprehensive monitor system and installs monitoring method
CN104296721A (en) Satellite positioning and static leveling-based layered settlement monitoring system and method
CN108317994A (en) A method of it is monitored for underground pipeline settlement and foundation pit deformation
CN103293560B (en) A kind of method of testing adopting triple stress court
Li et al. Study of seepage field distribution and its influence on urban tunnels in water-rich regions
CN105678006B (en) Foundation pit excavation map drawing method
CN104533528B (en) Adopt the fine mining system of surface mine and the mining methods of GNSS technology
CN104596405B (en) Rain dirty pipe deforming contact real-time monitoring device and method on ground
CN102561330A (en) Integrated construction method for artificial dug pile and steel pipe concrete column
CN107102378B (en) Utilize the method for hole pressure touching methods measurement artesian aquifer water level and head height
CN107870097A (en) A kind of tunnel portal slope stability simulation system and application method
CN103410136B (en) A kind of boring method for embedding of soil moisture meter
CN109238161A (en) A kind of observation device and observation method of tunnel surface absolute convergence amount
Zhang et al. Prediction of water inflow in Tsingtao subsea tunnel based on the superposition principle
CN110487243A (en) A kind of airfield runway sedimentation monitoring system and its laying and application method
CN107514995A (en) A kind of highway construction stage is with hydrogeological parameter harvester and system
CN108343432A (en) A kind of drilling pouring pile hole quality detection device and its detection method
CN107940099B (en) Environmental protection segmentation long range mechanical jacking construction method
CN106643649B (en) Device and method for measuring deep settlement and pore water pressure of soil body
CN205804433U (en) Metro Deep Excavation water sealing structure seepage defect sonar seepage detector
CN207907854U (en) A kind of monitoring device for Underground Construction
Qian Design of tunnel automatic monitoring system based on bim and iot

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20190618

Granted publication date: 20180925

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20210415

Granted publication date: 20180925

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20240109

Granted publication date: 20180925