CN201129023Y - 储罐浮顶施工时用组合式平台 - Google Patents

储罐浮顶施工时用组合式平台 Download PDF

Info

Publication number
CN201129023Y
CN201129023Y CNU2007201173554U CN200720117355U CN201129023Y CN 201129023 Y CN201129023 Y CN 201129023Y CN U2007201173554 U CNU2007201173554 U CN U2007201173554U CN 200720117355 U CN200720117355 U CN 200720117355U CN 201129023 Y CN201129023 Y CN 201129023Y
Authority
CN
China
Prior art keywords
cylinder
pillar
height
crossbeam
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201173554U
Other languages
English (en)
Inventor
李小强
刘聪
张雷
姚建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Petroleum Administration Bureau
Daqing Oilfield Construction Group Co Ltd
Original Assignee
Daqing Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Petroleum Administration Bureau filed Critical Daqing Petroleum Administration Bureau
Priority to CNU2007201173554U priority Critical patent/CN201129023Y/zh
Application granted granted Critical
Publication of CN201129023Y publication Critical patent/CN201129023Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

本实用新型公开了一种储罐浮顶施工时用组合式平台,包括多根横梁(1)和支柱(2),所述横梁(1)的长度相等,在横梁(1)的两端分别固定上下方向的销(3),所述支柱(2)由底座(7)、可调高低的柱体和支柱上的托板(4)组成,在托板(4)上沿周向等距分布孔洞,横梁(1)两端固定的销(1)插入托板(4)的孔洞中,多根高度相同的支柱(2)与多根横梁(1)组装后所有横梁(1)在同一平面上;该组合式平台的各部分受力合理均匀,安装、拆卸方便、快捷。

Description

储罐浮顶施工时用组合式平台
技术领域:
本实用新型涉及工程施工用的操作平台,具体的是储罐浮顶施工时使用的组合式平台。
背景技术:
大型储罐浮顶组装临时平台梁原为平行网格状,平台主梁采用槽钢或工字钢焊接成一个整体。安装时需要焊接,拆卸时需用气焊切割,耗费工时较多。平行网状平台受力不均匀,一旦某一处失稳,易造成整体结构的垮塌。槽钢根据储罐大小切割,长短不规则,材料损耗量在25%左右。
实用新型内容:
为了要解决背景技术中所存在的技术问题,本实用新型提供了一种受力合理均匀,安装、拆卸方便、快捷,可提高工作效率,适应范围广,避免工时和材料浪费的储罐浮顶施工时使用的组合式操作平台。
为解决上述技术问题,本实用新型的储罐浮顶施工时用组合式平台,包括多根横梁和支柱,所述横梁的长度相等,在横梁的两端分别固定上下方向的销,所述支柱由底座、可调高低的柱体和支柱上的托板组成,在托板上沿周向等距分布孔洞,横梁两端固定的销插入托板的孔洞中,多根高度相同的支柱与多根横梁组装后所有横梁在同一平面上。
所述可调高度的柱体包括两部分,其中一段柱体是中空的,并在该段柱体上开有多个通孔,另一段柱体可插入中空的柱体中,并在其上有与中空柱体上的通孔相配合的孔洞,两段柱体插接后通过调节不同的通孔与孔洞用连接件固定在一起,即可实现支柱高度的调整。
为了更好的适应高低不同的地面,所述可调高度的柱体还包括高度微调装置;
本实用新型具有如下有益效果:本实用新型的储罐浮顶施工时用组合式平台的横梁长度相等,支柱的高低可调,横梁与支柱插接,所以该平台没有材料损耗,安装、拆卸方便,支柱托板上的孔洞均匀分布,使得横梁呈星形发射状分布,所以各横梁所起的支撑力较大,不会造成平台的坍塌。
附图说明:
图1是本实用新型储罐浮顶施工时用组合式平台的单根横梁与支柱组合状态示意图。
1、横梁,2、支柱,3、横梁两端的销,4、支柱上的托板,5、柱体上的孔洞,6、支柱高度微调装置,7、支柱的底座
具体实施方式:
下面结合附图对本实用新型作进一步说明:
本实用新型的储罐浮顶施工时用组合式平台,包括多根横梁(1)和支柱(2),所述横梁(1)的长度相等,在横梁(1)的两端分别固定上下方向的销(3),通常横梁(1)采用工字形钢梁;所述支柱(2)由底座(7)、可调高低的柱体和支柱上的托板(5)组成,在托板(4)上沿周向等距分布孔洞,横梁(1)两端固定的销(3)插入托板(4)的孔洞中,每根支柱的托板(5)上插满横梁(1)后呈星形发射状;多根高度相同的支柱(2)与多根横梁(1)组装后所有横梁(1)在同一平面上。
所述可调高度的柱体包括两部分,其中一段柱体是中空的,并在该段柱体上开有多个通孔,另一段柱体可插入中空的柱体中,并在其上有与中空柱体上的通孔相配合的孔洞(5),两段柱体插接后通过调节不同的通孔与孔洞用连接件固定在一起,即可实现支柱高度的调整;当然也可采用其他的方式调整柱体(2)的高度。
为了更好的适应高低不同的地面,可调高度的柱体(2)还包括高度微调装置(6);高度微调装置(6)可以是在底座(7)与柱体相连处采用螺纹连接,通过调节螺纹的长度实现高度的调整;也可以是在底座上固定一弹簧及带螺纹的短柱,短柱上套螺母,调节螺母高低的同时挤压弹簧实现柱体的高度微调。
实际储罐浮顶平台安装时从储罐中心开始,先立三根支柱(2),然后将三根工字形钢梁(1)与三根支柱(2)连接成为三角形,以该三角形为中心,分别放射性向周边扩展连接横梁及支柱,并根据罐底坡度调节支撑高度,使浮顶平台处于施工需求的高度,然后在该平台上铺设储罐的浮顶,当浮顶铺设好后将浮顶平台撤离出储罐。

Claims (3)

1、一种储罐浮顶施工时用组合式平台,包括多根横梁(1)和支柱(2),其特征在于:所述横梁(1)的长度相等,在横梁(1)的两端分别固定上下方向的销(3),所述支柱(2)由底座(7)、可调高低的柱体和支柱上的托板(4)组成,在托板(4)上沿周向等距分布孔洞,横梁(1)两端固定的销(1)插入托板(4)的孔洞中,多根高度相同的支柱(2)与多根横梁(1)组装后所有横梁(1)在同一平面上。
2、按照权利要求1所述的储罐浮顶施工时用组合式平台,其特征在于:所述可调高度的柱体包括两部分,其中一段柱体是中空的,并在该段柱体上开有多个通孔,另一段柱体可插入该中空的柱体中,并在其上有与中空柱体上的通孔相配合的孔洞(5)。
3、按照权利要求1或2所述的储罐浮顶施工时用组合式平台,其特征在于:所述可调高度的柱体还包括高度微调装置(6)。
CNU2007201173554U 2007-11-06 2007-11-06 储罐浮顶施工时用组合式平台 Expired - Fee Related CN201129023Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201173554U CN201129023Y (zh) 2007-11-06 2007-11-06 储罐浮顶施工时用组合式平台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201173554U CN201129023Y (zh) 2007-11-06 2007-11-06 储罐浮顶施工时用组合式平台

Publications (1)

Publication Number Publication Date
CN201129023Y true CN201129023Y (zh) 2008-10-08

Family

ID=40016861

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201173554U Expired - Fee Related CN201129023Y (zh) 2007-11-06 2007-11-06 储罐浮顶施工时用组合式平台

Country Status (1)

Country Link
CN (1) CN201129023Y (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900928A (zh) * 2012-10-31 2013-01-30 宁波电业局 一种支撑平台装置
CN104596561A (zh) * 2014-12-25 2015-05-06 贵州黔程天力智能科技有限公司 一种平面度可调的接收机支撑座

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900928A (zh) * 2012-10-31 2013-01-30 宁波电业局 一种支撑平台装置
CN104596561A (zh) * 2014-12-25 2015-05-06 贵州黔程天力智能科技有限公司 一种平面度可调的接收机支撑座

Similar Documents

Publication Publication Date Title
CN108389463A (zh) 一种适用于钢筋混凝土梁试验实践教学用的加载系统
CN102518050A (zh) 一种桥梁支座更换操作平台
CN103276676B (zh) 交通诱导显示屏架
CN201129023Y (zh) 储罐浮顶施工时用组合式平台
CN202117074U (zh) 用于塔吊底座定位安装的基座钢结构
CN208889071U (zh) 一种适用于钢筋混凝土梁试验实践教学用的加载系统
CN201837557U (zh) 一种多功能自平衡加载反力架
CN105227066A (zh) 水上光伏发电系统
CN202672689U (zh) 可调式立式圆筒形储罐浮顶台架
CN211102414U (zh) 一种加劲钢板剪力墙加工胎架
CN204531180U (zh) 控制大型构件钢筋绑扎精度的劲性骨架
CN205081729U (zh) 水上光伏发电系统
CN203840258U (zh) 一种光伏组件的主轴小桁架安装的工装结构
CN110721653B (zh) 多功能可调节支撑梁
CN110468960B (zh) 一种可调节网架结点位移的支撑结构及施工方法
CN202214736U (zh) 可调节式支撑装置
CN219547579U (zh) 一种钢结构桥梁安装临时支架
CN205246433U (zh) 一种防止试验试件底座滑移错动的固定装置
CN205081730U (zh) 水上光伏发电装置
CN205896569U (zh) 一体化支承座
CN220531664U (zh) 一种升降式核酸合成柱装载装置
CN216685796U (zh) 一种新型顶置式搅拌站支撑结构
CN205081732U (zh) 水上光伏发电装置的基础
CN202380406U (zh) 一种桥梁支座更换操作平台
CN213287524U (zh) 一种可调节滑撬支点

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: DAQING OIL FIELD CONSTRUCTION CO., LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20100816

Address after: 163453 Heilongjiang Province, Daqing City Ranghulu District Central Street No. 263

Co-patentee after: Daqing Oil Field Construction Co., Ltd.

Patentee after: Daqing Petroleum Administration

Address before: 163453 Heilongjiang Province, Daqing City Ranghulu District Central Street No. 263

Patentee before: Daqing Petroleum Administration

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081008

Termination date: 20161106

CF01 Termination of patent right due to non-payment of annual fee