- Publication number
- CN201126951Y CN201126951Y CNU2007201175935U CN200720117593U CN201126951Y CN 201126951 Y CN201126951 Y CN 201126951Y CN U2007201175935 U CNU2007201175935 U CN U2007201175935U CN 200720117593 U CN200720117593 U CN 200720117593U CN 201126951 Y CN201126951 Y CN 201126951Y
- Authority
- CN
- China
- Prior art keywords
- cable
- hole
- steel strand
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model relates to a cable quadrant which directly cooperated with a steel stranded wire. The cable quadrant is used for the device of pole, tower steel stranded wire on the fastened power transmitting line; the axial line of the cable quadrant which directly cooperated with a steel stranded wire is arranged with a cable hole symmetrically; the cable hole is a wedge-shaped hole; a strengthened board is horizontally arranged on the potion which is vertically cross to the cable hole. when the utility model is in the cable construction, the steel stranded wire directly traverses the cable hole to remove the cable stick and the UT wire clamp in the original LP serial cable quadrant, which overcomes the problem of larceny of the cable stick and the UT wire clamp; the utility model has a simple technique and low construction cost of the cable.
Description
One, technical field:
The utility model relates to the cable quadrant that is used to tighten up the following transmission line upper boom of 10Kv, tower backguy, what be specifically related to is a kind of cable quadrant that directly cooperates with steel strand wire.
Two, background technology:
The LP series cable quadrant that uses at present is solid, when the overhead power transmission line line guy is constructed, needs and distaff, UT wire clamp cooperate assembling to use, in outlying district distaff and UT wire clamp frequent loss, power department all needs to drop into the backguy of substantial contribution complement every year, if under natural calamity weather, after the distaff of windproof backguy and load backguy and UT wire clamp are lost, backguy effect inefficacy can cause the lodging of overhead power line large tracts of land, brings about great losses for power department and industrial and mining enterprises.For example: Daqing oil field Bei Wu district ten row power circuits cause 5 kilometers power circuits lodging because windproof backguy and the backguy of corner load are all lost on March 27th, 2005 driving snow, and surplus direct economic loss reaches 80 ten thousand yuan, 3,000,000 yuan of indirect economic loss.
Three, summary of the invention:
The purpose of this utility model provides a kind of cable quadrant that directly cooperates with steel strand wire, is used to solve used LP series cable quadrant and in use is mated the distaff of use and the problem of UT wire clamp frequent loss.
The technical scheme that its technical problem that solves the utility model adopts is: on the vertical direction of the cable quadrant that this and steel strand wire directly cooperate the backguy hole is set.
Backguy hole in the such scheme is arranged on the axis symmetric position.
Backguy hole in the such scheme is a wedged hole.
With such scheme in perpendicular crossing position, backguy hole level stiffener is installed.
Beneficial effect: the utility model is provided with the backguy hole in cable quadrant axis symmetric position, when backguy is constructed, galvanized strand wires directly penetrates the backguy hole, distaff and UT wire clamp that former LP series cable quadrant need assemble have been removed, distaff and UT wire clamp are stolen easily, therefore, the utility model can be antitheft, has the advantage that assembly technology is easy, the backguy construction cost is low simultaneously.
Four, description of drawings:
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model user mode;
Fig. 3 is the diagrammatic sketch of overlooking of the present utility model;
Fig. 4 is the structural representation of stiffener in the utility model.
1 cable quadrant, 2 backguy holes, 3 stiffeners, 4 wedges, 5 steel strand wire
Five, embodiment:
Fig. 1 is a structural representation of the present utility model, in conjunction with Fig. 3, shown in Figure 4, the cable quadrant that this and steel strand wire directly cooperate is on the basis that has kept LP series cable quadrant 20# concrete and arrangement of reinforcement, distaff and UT wire clamp that former design need be assembled have been removed, in cable quadrant 1 axis symmetric position backguy hole 2 is set, backguy hole 2 is a wedged hole, and backguy hole 2 can also be the hole of other shape, as circular hole, square opening etc.
Because cable quadrant is a reinforced concrete structure,, stiffener 3 is being installed with backguy hole 2 perpendicular crossing position levels in order to improve each intensity of stiffness of the present utility model.
Fig. 2 is the structural representation of the utility model user mode, as shown in the figure, when backguy is constructed, galvanized strand wires 5 directly penetrates backguy hole 2 downwards, walk around the wedge 4 that cooperates with backguy hole 2, anti-body upwards, make steel strand wire 5 form " U " type, upwards spur the two ends of steel hinge line 5, steel hinge line 5 is pulled upwardly wedge 4, after blocking to wedge 4 and backguy hole 2, steel strand wire 5 are stuck between the two simultaneously, and an end of steel strand wire 5 is tied up on the steel strand wire, steel strand wire 5 just have been fixed, because this process not have to use distaff and the UT wire clamp easily lose, overcome the easy stolen problem of distaff and UT wire clamp, it is easy to the utlity model has assembly technology simultaneously, the advantage that the backguy construction cost is low.
Claims (4)
1, a kind of cable quadrant that directly cooperates with steel strand wire is characterized in that: backguy hole (2) is set on the vertical direction of cable quadrant (1).
2, the cable quadrant that directly cooperates with steel strand wire according to claim 1 is characterized in that: described backguy hole (2) is arranged on the axis symmetric position.
3, the cable quadrant that directly cooperates with steel strand wire according to claim 2 is characterized in that: described backguy hole (2) is a wedged hole.
4, according to claim 1 or the 2 or 3 described cable quadrants that directly cooperate with steel strand wire, it is characterized in that: stiffener (3) is being installed with the perpendicular crossing position level in described backguy hole (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201175935U CN201126951Y (en) | 2007-11-30 | 2007-11-30 | Staying disk combining with steel strand directly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201175935U CN201126951Y (en) | 2007-11-30 | 2007-11-30 | Staying disk combining with steel strand directly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201126951Y true CN201126951Y (en) | 2008-10-01 |
Family
ID=40000416
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201175935U Expired - Fee Related CN201126951Y (en) | 2007-11-30 | 2007-11-30 | Staying disk combining with steel strand directly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201126951Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102055144A (en) * | 2010-11-10 | 2011-05-11 | 河南省电力公司南阳供电公司 | Method for preventing guy wire from being broken and foundation from being pulled up |
-
2007
- 2007-11-30 CN CNU2007201175935U patent/CN201126951Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102055144A (en) * | 2010-11-10 | 2011-05-11 | 河南省电力公司南阳供电公司 | Method for preventing guy wire from being broken and foundation from being pulled up |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204662661U (en) | The two rope truss string structure system of the two case beam of large span | |
CN205243135U (en) | Two times overhead transmission line alternately bores tower more | |
CN203855866U (en) | Large-span frame bridge overhead roof with beams convenient to construct | |
CN202401815U (en) | Novel composite insulator cross arm repairing tower of 220 kV electric transmission line | |
CN203222919U (en) | Circular-arc-shaped coal storage steel shed of net rack structure | |
CN101858053A (en) | Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower | |
CN103362343A (en) | Same-tower six-loop tower | |
CN102022019B (en) | A kind of method of complex terrain route split tower erection | |
CN102777068B (en) | Lattice insulation power transmission tower | |
CN201126951Y (en) | Staying disk combining with steel strand directly | |
CN103422699A (en) | Electric transmission line tower made of composite materials | |
CN201406865Y (en) | 66KV overhead transmission line double-circuit horizontal crossing tower | |
CN203835019U (en) | Telegraph pole fixing device | |
CN201252365Y (en) | Construction charged crossover device of ultra-high and special-high voltage transmission line | |
CN203924054U (en) | Variable cross-section anchoring body anchor pole or anchor cable ruggedized construction | |
CN210396223U (en) | Photovoltaic power plant shaft tower reinforcing apparatus | |
CN202450450U (en) | Reinforcement and reconstruction structure of suspension bridge | |
CN202559225U (en) | Single-pylon double-cable-plane cable-stayed bridge without backstays | |
CN103956683A (en) | Crossing frame system used for 220-KV outgoing line engineering wire erection of 500-KV transformer substation | |
CN204850639U (en) | GFRP pipe reinforced concrete combined member multiloop transmission of electricity pole | |
CN103147387A (en) | Double-spliced type combining bridge structure | |
CN202450838U (en) | Assembling type iron tower base station | |
CN214194626U (en) | Mountain area transmission tower anchor rope assembled basis | |
CN205934911U (en) | Tubular pile | |
CN206090603U (en) | Transmission line foundation bank protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081001 Termination date: 20091230 |