CN201104118Y - Sintered ring cooling machine convenient for balk material collection - Google Patents
Sintered ring cooling machine convenient for balk material collection Download PDFInfo
- Publication number
- CN201104118Y CN201104118Y CNU2007201026790U CN200720102679U CN201104118Y CN 201104118 Y CN201104118 Y CN 201104118Y CN U2007201026790 U CNU2007201026790 U CN U2007201026790U CN 200720102679 U CN200720102679 U CN 200720102679U CN 201104118 Y CN201104118 Y CN 201104118Y
- Authority
- CN
- China
- Prior art keywords
- track
- bulk material
- material collection
- machine
- sintering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Abstract
A sintering circulating cooling machine for easy bulk material collection belongs to the smelting equipment technical field, which is used to solve the problems of too many wearing parts of the prior bulk material collection device of the circulating cooling machine, high maintenance cost, and impact on the production efficiency. The sintering circulating cooling machine comprises a circular track, a pellet car and a bulk material collection device. The improved bulk material collection device consists of two parts, namely a track curve unloading section and a pellet car running section, wherein the track curve unloading section is positioned on the lower part of the track beside the discharge point of the circulating cooling machine and has the structure that: a bulk material collection hopper is communicated with the track section, a slide fastener machine is arranged below the bulk material collection hopper, and a vibration feeder is arranged between the slide fastener machine and a conveyer belt. The pallet car running section is positioned on the lower part of the other parts of the tract and has the structure that: a hermetic cement air duct is communicated with the track section. The sintering circulating cooling machine removes a double-layer dump valve and a slewing trolley and is provided with the slide fastener machine, the vibration feeder and the cement air duct to convey the bulk material, thereby effectively reducing emergency shutdown time, improving operating rate and stabilizing sintering practice.
Description
Technical field
The utility model relates to a kind of ironmaking equipment, especially for the central cooler of cooling sintering deposit, belongs to the smelting equipment technical field.
Background technology
The employed sintering deposit of blast furnace process, through behind the sintering machine sintering when tail unloads about 700~800 ℃ of temperature, and actual serviceability temperature of smelting will drop to about 150 ℃, therefore, the cooling of sintering deposit is a very important ring in SINTERING PRODUCTION technology.What the cooling of sintering deposit was used is to utilize circular cooler (being central cooler) to carry out machine to cool off outward for general a kind of method very, circular cooler is made of the chassis that a plurality of mutual head and the tail connect, and chassis is realized cooling through air blast or exhausting in the running on circular orbit.For collecting the unrestrained down bulk cargo of central cooler bend discharge pit and trolley track, have balk cargo collecting device at central cooler bend discharge pit and trolley track, at present, the central cooler balk cargo collecting device as shown in Figure 5, it adopts bulk cargo collection funnel 6 to collect bulk cargo, be discharged on the helicoid dolly 14 by Double-deck cinder discharge valve 13, then buildup transported to belt feeder 9, the bulk cargo collection funnel of central cooler also is the bellows of central cooler.The problem that this device exists is 1, bulk cargo is more serious to the collection funnel wearing and tearing, collection funnel often occurs and leaks the material phenomenon, and bellows can seriously leak out when collection funnel leaked material, influenced the cooling effect of central cooler.2, Double-deck cinder discharge valve is discharged to collected bulk cargo on the helicoid dolly.Material leaks out because of grinding leak in Double-deck cinder discharge valve regular meeting, has a strong impact on the cooling effect and the normal discharging of central cooler.3, rotary machinery is accident Chang Fadian, and dolly maybe can not run well because of sliding down and cause bulk cargo collection funnel buildup too many, influences central cooler cooling and by forced-stopping machine, has a strong impact on production.Because of funnel leakage material, Double-deck cinder discharge valve, rotary machinery often break down, maintenance cost and spare part cost height, and waste great amount of manpower and material resources.
Summary of the invention
The utility model is used to overcome the defective of prior art and a kind of structure that at central cooler bend discharge pit machine for zipper and oscillating feeder is set, the cement air channel is set under trolley track is provided, thereby avoids leak the material air leakage phenomena, reduced the sintering circular-cooler that bulk cargo is collected of being convenient to of maintenance cost.
The alleged problem of the utility model is that following technical scheme solves:
A kind of sintering circular-cooler of being convenient to the bulk cargo collection, comprise circular orbit in the formation, chassis and balk cargo collecting device, its special feature is: described balk cargo collecting device is made up of bend unloading part and chassis target phase two parts, wherein the bend unloading part is positioned at the track bottom of central cooler blanking point 1 side, its structure is: the bulk cargo collection funnel 6 that communicates with this section track 12, bulk cargo collection funnel bottom is provided with machine for zipper 7, be provided with oscillating feeder 8 between machine for zipper and haul belt feeder, described chassis target phase is positioned at the bottom at other positions of track, and structure is: the airtight cement air channel 5 that communicates with this section track.
The above-mentioned sintering circular-cooler of being convenient to the bulk cargo collection is provided with air-tightness door 10 in the described air channel, the doorway of air-tightness door is provided with the ramp 11 that communicates with the air channel.
The above-mentioned sintering circular-cooler of being convenient to the bulk cargo collection, described machine for zipper is two.
The utility model improves at be scattered gathering-device Double-deck cinder discharge valve quick abrasion, drawback that the rotary machinery accident is many of existing central cooler: abandon Double-deck cinder discharge valve and rotary machinery; chain machine for zipper oscillating feeder is set finishes transporting of bend discharge pit bulk cargo; the unrestrained bulk cargo in other position accumulates in the cement air channel of setting up; machine for zipper is simple in structure; for ease of maintenaince; long shutdown can not appear; the space is big in the air channel; also can not cause shutdown even there is the part bulk cargo to pile up, every half a year, cleaning once just can guarantee ordinary production approximately.Above-mentioned improvement has effectively reduced accident downtime, has improved operating rate, has stablized SINTERING PRODUCTION.Simultaneously, reduced spare part expense and equipment maintenance cost, reduced labour cost, reduced worker's labour intensity, improved the output of sintering machine operating rate and sintering deposit, the economic benefit of creating considerable, have the prospect of promoting the use of.
Description of drawings
Fig. 1 is the utility model schematic diagram;
Fig. 2 is the floor plan of balk cargo collecting device;
Fig. 3 is the air channel schematic diagram;
Fig. 4 is air-tightness door and ramp schematic diagram;
Fig. 5 is a central cooler schematic diagram before improving.
The label of each parts and letter representation are as follows in the accompanying drawing: 1. blanking point; 2. chassis; 3. central cooler cover; 4. chimney; 5. air channel; 6. bulk cargo collection funnel; 7. machine for zipper; 8. oscillating feeder; 9. belt feeder; 10. air-tightness door; 11. ramp; 12. track; 13. Double-deck cinder discharge valve; 14. helicoid dolly.
The specific embodiment
Referring to Fig. 1, the chassis 2 that main composition of the present utility model comprises circular orbit 12, orbits is positioned at central cooler cover 3, the chimney 4 on chassis top and is positioned at the balk cargo collecting device of track bottom.Balk cargo collecting device is made up of bend unloading part and chassis target phase two parts, and wherein the bend unloading part is positioned at central cooler blanking point 1 side, and the chassis target phase is positioned at other bottoms, position of track, and it occupies more than half annulus.
Referring to Fig. 1, Fig. 2, the structure of balk cargo collecting device bend unloading part is: track 12 bottoms are provided with bulk cargo collection funnel 6, and bulk cargo collection funnel bottom is provided with two machine for zipper 7, and 9 of machine for zipper and haul belt feeders are provided with oscillating feeder 8.Its course of work is, directly moves oscillating feeder to by machine for zipper after the bulk cargo that drops on this section is collected by the bulk cargo collection funnel, again by oscillating feeder feed track belt feeder.Machine for zipper is simple in structure, for ease of maintenaince, long shutdown can not occur, and a small amount of bulk cargo of a machine for zipper roping bend discharge pit, and the bulk cargo amount is little, has prolonged the service life of equipment.
Referring to Fig. 1~Fig. 4, the structure of balk cargo collecting device chassis target phase is: the airtight cement air channel 5 that communicates with track is set in the track bottom, be provided with air-tightness door 10 in the air channel, for ease of loading the vehicle pass-through of bulk cargo, the doorway of air-tightness door is provided with the ramp 11 that communicates with the air channel.The chassis target phase is used to collect the unrestrained down bulk cargo of track that accounts for whole track significant proportions; bulk cargo under this paragraph directly remains in the air channel; because duct space is big, can not cause shutdown even there is the part bulk cargo to pile up yet, the buildup in the air channel is cleared up once approximately half a year; install on the automobile with forklift and to transport; just can guarantee production requirement, and not have leakage material, air leakage phenomena, thereby effectively avoid accidental shutdown; improve operating rate, stablized SINTERING PRODUCTION.
Claims (3)
1. be convenient to the sintering circular-cooler that bulk cargo is collected for one kind, comprise circular orbit in the formation, chassis and balk cargo collecting device, it is characterized in that: described balk cargo collecting device is made up of bend unloading part and chassis target phase two parts, wherein the bend unloading part is positioned at the track bottom of central cooler blanking point (1) side, its structure is: the bulk cargo collection funnel (6) that communicates with this section track (12), bulk cargo collection funnel bottom is provided with machine for zipper (7), be provided with oscillating feeder (8) between machine for zipper and haul belt feeder, described chassis target phase is positioned at the bottom at other positions of track, and structure is: the airtight cement air channel (5) that communicates with this section track.
2. the sintering circular-cooler of being convenient to the bulk cargo collection according to claim 1, it is characterized in that: be provided with air-tightness door (10) in the described air channel, the doorway of air-tightness door is provided with the ramp (11) that communicates with the air channel.
3. the sintering circular-cooler of being convenient to the bulk cargo collection according to claim 1 and 2, it is characterized in that: described machine for zipper is two.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201026790U CN201104118Y (en) | 2007-09-30 | 2007-09-30 | Sintered ring cooling machine convenient for balk material collection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201026790U CN201104118Y (en) | 2007-09-30 | 2007-09-30 | Sintered ring cooling machine convenient for balk material collection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201104118Y true CN201104118Y (en) | 2008-08-20 |
Family
ID=39951148
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201026790U Expired - Fee Related CN201104118Y (en) | 2007-09-30 | 2007-09-30 | Sintered ring cooling machine convenient for balk material collection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201104118Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102192655A (en) * | 2011-03-24 | 2011-09-21 | 芜湖新兴铸管有限责任公司 | Discharging system for blast boxes of pellet recirculation cooler |
-
2007
- 2007-09-30 CN CNU2007201026790U patent/CN201104118Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102192655A (en) * | 2011-03-24 | 2011-09-21 | 芜湖新兴铸管有限责任公司 | Discharging system for blast boxes of pellet recirculation cooler |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101224363B (en) | Dedusting dry powder recycling process | |
EP2014742A1 (en) | Glowing coke delivering equipment and method of delivering the same | |
CN201245378Y (en) | Circular storage yard feed back system | |
CN101792835B (en) | Feeding system for blast furnace ore and coke channel system | |
CN201104118Y (en) | Sintered ring cooling machine convenient for balk material collection | |
CN103332493A (en) | Pneumatic conveying method for removing dust and crude ash in dry process of converter gas | |
CN105129359A (en) | Shaft furnace raw material conveying device | |
CN211282950U (en) | Blast furnace scrap steel feeding and charging system | |
CN103143295B (en) | Lime briquetting production line | |
CN210753165U (en) | Feeding device of blast furnace coal powder making system | |
CN213010836U (en) | Finished pellet storage and temporary outward transportation device for pellets | |
CN201686702U (en) | Feeding device for blast furnace ore and coke groove system | |
CN201007613Y (en) | Improved circle-cooling machine | |
CN202481674U (en) | Flash recovery scraper | |
CN214526964U (en) | Dust collector at storage silo top | |
CN103333985A (en) | Converter gas dry dedusting coarse ash pneumatic conveying system | |
CN202973937U (en) | Novel bulk stock collecting device for circular cooler | |
CN202924337U (en) | A dust-suppression vibration feeding device | |
CN202284916U (en) | Sealing device of sinter cooler | |
CN205505758U (en) | Cold quick -witted bulk cargo collecting system of ring | |
CN103043452B (en) | Bulk material is closed slot type storehouse and is unloaded storage system | |
CN101462638A (en) | Heavy duty dumper | |
CN220624938U (en) | Ash conveying device for dust removal of sintering machine smoke circulation multi-pipe dust remover | |
CN202648445U (en) | Low emission sintered ore cooling system | |
CN209778958U (en) | High-temperature return mine recovery system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080820 Termination date: 20100930 |