CN201090249Y - 高瓦斯采煤工作面上隅角封堵气囊 - Google Patents

高瓦斯采煤工作面上隅角封堵气囊 Download PDF

Info

Publication number
CN201090249Y
CN201090249Y CNU2007200410711U CN200720041071U CN201090249Y CN 201090249 Y CN201090249 Y CN 201090249Y CN U2007200410711 U CNU2007200410711 U CN U2007200410711U CN 200720041071 U CN200720041071 U CN 200720041071U CN 201090249 Y CN201090249 Y CN 201090249Y
Authority
CN
China
Prior art keywords
air
upper corner
air bag
shutoff
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200410711U
Other languages
English (en)
Inventor
潘章华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QIDONG COALMINE ANHUI WANBEI COAL-ELECTRICITY GROUP Co Ltd
Original Assignee
QIDONG COALMINE ANHUI WANBEI COAL-ELECTRICITY GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QIDONG COALMINE ANHUI WANBEI COAL-ELECTRICITY GROUP Co Ltd filed Critical QIDONG COALMINE ANHUI WANBEI COAL-ELECTRICITY GROUP Co Ltd
Priority to CNU2007200410711U priority Critical patent/CN201090249Y/zh
Application granted granted Critical
Publication of CN201090249Y publication Critical patent/CN201090249Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

高瓦斯采煤工作面上隅角封堵气囊,其特征是沿上隅角切顶线布置两排单体支柱,在两排单位支柱之间形成夹道,在所述夹道内,以层叠的充气风筒形成气囊垛,气囊垛以巷道底板为地基,两侧端面分别抵于巷帮,顶部抵于巷道顶板,形成上隅角封堵面。本实用新型挪移方便、投入低、既可以减轻工人劳动强度,又能保证高瓦斯工作面上隅角封堵效果的高瓦斯采煤工作面上隅角封堵气囊。

Description

高瓦斯采煤工作面上隅角封堵气囊
技术领域
本实用新型涉及煤矿通风与安全设备,更具体地说是一种高瓦斯采煤工作面上隅角封堵设备。
背景技术
对于高瓦斯采煤工作面,目前采用传统垛袋封堵技术,如图1所示,沿着切顶线侧采用装煤的双抗编织袋垒成一堵长8~10m的煤墙11,然后用黄泥抹缝,封堵上隅角瓦斯,在煤墙11后形成抽放气室7,通过抽放管路9对抽放气室7中的瓦斯进行抽放。这种方式所存在的问题是:
1、劳动强度大
工作面每班要投入4~5人专门用于上隅角封堵,每次将装煤的双抗编织袋进行挪移需2~3小时;工作面每推进1.2m就都要重复进行装煤和垒墙。
2、增加材料投入
每班需要投入大量的双抗编织袋装煤封堵,并用黄泥抹缝,这些材料均丢弃在采空区内不能回收。
3、封堵效果差
工作面来压时,墙体容易变形,上隅角瓦斯涌出量增加、抽采效果变差。
4、安全威胁大。
双抗编织袋垒墙易塌倒,特别是在综采工作面移架时,易造成上隅角瓦斯涌出突然增大,存在安全隐患。
实用新型内容
本实用新型是为避免上述现有技术所存在的不足之处,提供一种挪移方便、投入低、既可以减轻工人劳动强度,又能保证高瓦斯工作面上隅角封堵效果的高瓦斯采煤工作面上隅角封堵气囊。
本实用新型解决技术问题所采用的技术方案是:
本实用新型的结构特点是沿上隅角切顶线布置两排单体支柱,在两排单位支柱之间形成夹道,在所述夹道内,以层叠的充气风筒形成气囊垛,所述气囊垛以巷道底板为地基,两侧端面分别抵于巷帮和支架,顶部抵于巷道顶板,形成上隅角封堵面。
本实用新型的结构特点也在于:
所述风筒采用抗静电、抗阻燃风筒。
在所述气囊垛靠近巷帮的位置用双抗编织袋装填锯末作为衬垫。
与已有技术相比,本实用新型的有益效果体现在:
1、本实用新型成本低
本实用新型相对于传统封堵技术,每个工作面可以节约成本70600元/月,多回收煤炭120吨/月。
2、本实用新型可减轻工人劳动强度
本实用新型采用气囊封堵,每次2个人作业,不到1小时即可完成,大大减轻了劳动强度。
3、本实用新型消除火灾隐患。
本实用新型采用气囊封堵,避免了由于煤炭被大量丢弃在采空区,而造成后期自然发火的隐患。
4、安全效果好。
《煤矿安全规程》规定,工作面回风流瓦斯浓度必须保持在0.8%以下,瓦斯浓度越低,安全系数越高。本实用新型在试验阶段中测得:采用“气囊”封堵技术,上隅角瓦斯浓度一般在1.5%以下,回风瓦斯一般稳定在0.4%~0.55%,埋管瓦斯抽采量由2.5m3/min提高到3.2m3/min,保证了工作面安全回采。
5、本实用新型以层叠的充气风筒形成气囊垛,对于可能出现的个别充气风筒的漏气现象,不会在短时间内太大地影响整个气囊垛的封堵效果,可以在一定的时间通过修补或填充保持其整体封堵效果,使用安全可靠。
附图说明
图1为已有技术结构示意图。
图2为本实用新型实施位置示意图。
图3为本实用新型局部放大示意图。
图4为本实用新型断面结构示意图。
图5为本实用新型断面结构局部放大示意图。
图中标号:1单体支柱、2气囊垛、3支架、4气阀、5气囊封口、6风筒、7抽放气室、8双抗编织袋、9抽放管路、10压风管、11煤墙。
以下通过具体实施方式,结合附图对本实用新型作进一步说明:
具体实施方式
参见图2、图3、图4和图5,沿上隅角切顶线布置两排单体支柱1,在两排单体支柱1之间形成夹道(图2、图3所示),在夹道内,以层叠的充气风筒6形成气囊垛2,气囊垛2以巷道底板为地基,两侧端面分别抵于巷帮和支架3,顶部抵于巷道顶板,形成上隅角封堵面。
为了适于煤矿井下本安型的要求,风筒6应采用高强度、抗静电、抗阻燃的双抗风筒。
具体实施中的相应设置也包括:
为了防止巷帮杂物刺破气囊造成漏气,在气囊垛2靠近巷帮的地方用双抗编织袋8装锯末进行衬垫,支架3按常规设置,支架3的作用是支撑工作面的顶板。
图4所示,在气筒6的中部设置气阀4用于充气;在气袋末端设置气囊封口5,用于封堵气囊,防止气囊漏气;在气囊垛2对上隅角封堵过后,在气囊垛2后形成一个空间,即抽放气室7(图2所示),联接抽放管路9抽放采空区瓦斯;在风巷内安设压风管10,使用充气管与风筒充气嘴联接,用于气囊充气;
使用6~7m长、
Figure Y20072004107100051
400mm的高强双抗(抗静电、抗阻燃)风筒6,加工成气囊,利用井下压风通地压风管10进行充气,几个风筒6上下叠加在一起形成一堵气囊垛2,同时沿上隅角切顶线布置单体支柱1,将气囊垛2固定在夹道内,封堵采空区瓦斯涌出。
封堵操作流程:
1、工作面受采动影响,每间隔一段距离,随工作面回棚老空区顶板自然冒落,每次放顶时,必须将上隅角处底板清理干净。
2、在切顶线处用单体打上两排单体支柱1,单体支柱的排距为0.3~0.4m,间距为0.8~1.0m,每排支柱不少于6根。
3、支柱立好之后,将风筒6层叠放置在两排单体支柱1间,根据巷道高度确定放置风筒6的层数,一般为3~4层。
4、用压风“手枪”通过压风管10对风筒6进行充气,形成气囊,各层风筒6的充气顺序为自下而上,充气压力为0.4MP左右,以气囊完全膨胀为准。
5、对气囊与作为支护的铰接顶梁接触处的缝隙使用小气囊充填,以确保不漏气。
6、拆除之前,首先用长胶管插入在封堵区内检查瓦斯浓度,若浓度在1.5%以下时,按从上而下的顺序,逐步放气进行拆除移挪。

Claims (4)

1.高瓦斯采煤工作面上隅角封堵气囊,其特征是沿上隅角切顶线布置两排单体支柱(1),在两排单位支柱(1)之间形成夹道,在所述夹道内,以层叠的充气风筒(6)形成气囊垛(2),所述气囊垛(2)以巷道底板为地基,两侧端面分别抵于巷帮和支架(3),顶部抵于巷道顶板,形成上隅角封堵面。
2.根据权利要求1所述的高瓦斯采煤工作面上隅角封堵气囊,其特征是所述层叠的充气风筒(6)的层数为3~4层。
3.根据权利要求1所述的高瓦斯采煤工作面上隅角封堵气囊,其特征是所述充气风筒(6)采用抗静电、抗阻燃风筒。
4.根据权利要求1所述的高瓦斯采煤工作面上隅角封堵气囊,其特征是在所述气囊垛(2)靠近巷帮的位置用双抗编织袋(8)装填锯末作为衬垫。
CNU2007200410711U 2007-07-27 2007-07-27 高瓦斯采煤工作面上隅角封堵气囊 Expired - Fee Related CN201090249Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200410711U CN201090249Y (zh) 2007-07-27 2007-07-27 高瓦斯采煤工作面上隅角封堵气囊

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200410711U CN201090249Y (zh) 2007-07-27 2007-07-27 高瓦斯采煤工作面上隅角封堵气囊

Publications (1)

Publication Number Publication Date
CN201090249Y true CN201090249Y (zh) 2008-07-23

Family

ID=39862009

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200410711U Expired - Fee Related CN201090249Y (zh) 2007-07-27 2007-07-27 高瓦斯采煤工作面上隅角封堵气囊

Country Status (1)

Country Link
CN (1) CN201090249Y (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102678175A (zh) * 2012-05-29 2012-09-19 淮南久辉工贸有限责任公司 矿用柔性充气气囊
CN102979577A (zh) * 2012-12-25 2013-03-20 河南理工大学 一种密封胶囊及其在煤矿中的应用
CN103306725A (zh) * 2013-06-26 2013-09-18 安徽理工大学 采煤工作面用柔性气囊及采用该气囊封堵隅角的方法
CN103306723A (zh) * 2013-06-26 2013-09-18 安徽理工大学 采煤工作面用便携气帘及采用该气帘封堵隅角的方法
CN103628917A (zh) * 2013-08-16 2014-03-12 淮南郑煤机舜立机械有限公司 采煤工作面上隅角瓦斯封堵装置
CN104454002A (zh) * 2014-10-23 2015-03-25 河南理工大学 煤矿瓦斯爆炸快速封堵系统
CN104963688A (zh) * 2015-06-06 2015-10-07 山东黄金矿业(莱州)有限公司三山岛金矿 中深孔采矿法采场顶板及两帮浮石冒落预防及控制方法
CN106522952A (zh) * 2016-12-26 2017-03-22 山东科技大学 一种大倾角开采工作面的上隅角处理方法
CN109184788A (zh) * 2018-11-14 2019-01-11 中煤科工集团重庆研究院有限公司 可伸缩折叠式的工作面隅角瓦斯封堵装置
CN109653796A (zh) * 2018-12-18 2019-04-19 山东科技大学 一种综放工作面端头气囊式快速堵漏风装置
CN109827070A (zh) * 2019-03-12 2019-05-31 西安科技大学 一种迅速封闭上隅角防止瓦斯泄漏的实验装置及方法
CN110617107A (zh) * 2019-10-26 2019-12-27 陕西德源府谷能源有限公司 一种综采工作面隅角自动挡风密封装置

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102678175A (zh) * 2012-05-29 2012-09-19 淮南久辉工贸有限责任公司 矿用柔性充气气囊
CN102979577A (zh) * 2012-12-25 2013-03-20 河南理工大学 一种密封胶囊及其在煤矿中的应用
CN103306725B (zh) * 2013-06-26 2016-12-28 安徽理工大学 采用采煤工作面用柔性气囊封堵隅角的方法
CN103306725A (zh) * 2013-06-26 2013-09-18 安徽理工大学 采煤工作面用柔性气囊及采用该气囊封堵隅角的方法
CN103306723A (zh) * 2013-06-26 2013-09-18 安徽理工大学 采煤工作面用便携气帘及采用该气帘封堵隅角的方法
CN103628917A (zh) * 2013-08-16 2014-03-12 淮南郑煤机舜立机械有限公司 采煤工作面上隅角瓦斯封堵装置
CN104454002A (zh) * 2014-10-23 2015-03-25 河南理工大学 煤矿瓦斯爆炸快速封堵系统
CN104963688B (zh) * 2015-06-06 2017-01-18 山东黄金矿业(莱州)有限公司三山岛金矿 中深孔采矿法采场顶板及两帮浮石冒落预防及控制方法
CN104963688A (zh) * 2015-06-06 2015-10-07 山东黄金矿业(莱州)有限公司三山岛金矿 中深孔采矿法采场顶板及两帮浮石冒落预防及控制方法
CN106522952A (zh) * 2016-12-26 2017-03-22 山东科技大学 一种大倾角开采工作面的上隅角处理方法
CN106522952B (zh) * 2016-12-26 2018-06-29 山东科技大学 一种大倾角开采工作面的上隅角处理方法
CN109184788A (zh) * 2018-11-14 2019-01-11 中煤科工集团重庆研究院有限公司 可伸缩折叠式的工作面隅角瓦斯封堵装置
CN109653796A (zh) * 2018-12-18 2019-04-19 山东科技大学 一种综放工作面端头气囊式快速堵漏风装置
CN109653796B (zh) * 2018-12-18 2020-09-15 山东科技大学 一种综放工作面端头气囊式快速堵漏风装置
CN109827070A (zh) * 2019-03-12 2019-05-31 西安科技大学 一种迅速封闭上隅角防止瓦斯泄漏的实验装置及方法
CN110617107A (zh) * 2019-10-26 2019-12-27 陕西德源府谷能源有限公司 一种综采工作面隅角自动挡风密封装置

Similar Documents

Publication Publication Date Title
CN201090249Y (zh) 高瓦斯采煤工作面上隅角封堵气囊
CN110206542B (zh) 适用于厚煤层综采放顶煤的无煤柱自成巷开采方法
WO2019140813A1 (zh) 一种厚煤层宽巷掘进矸石膏体充填成巷方法
CN102094670B (zh) 二氧化碳置换矿井采空区瓦斯的方法
CN103821515B (zh) 一种对拉工作面充填采煤工艺
CN106968676B (zh) 巷道掘进穿越空洞的方法
CN103953345B (zh) 一种沿空小断面留巷开采方法
CN104481568A (zh) 一种综放工作面沿空留巷工艺与通风方法
WO2020010696A1 (zh) 一种预留巷道胶结充填回收房式煤柱的方法
CN102748064A (zh) 一种大采高综放工作面瓦斯治理方法
CN104500090A (zh) 利用发泡材料充填体接顶处理煤矿巷道冒顶的方法
AU2015377002A1 (en) Non-coal-pillar gob-side entry retaining method having filling-wall self-elimination
CN106285692B (zh) 一种沿空留巷的施工方法
CN201074523Y (zh) 可移动的煤矿综采工作面端头封堵安全气囊
CN109184788B (zh) 可伸缩折叠式的工作面隅角瓦斯封堵装置
CN109653796B (zh) 一种综放工作面端头气囊式快速堵漏风装置
CN113719255B (zh) 顶部定向长钻孔裂隙带瓦斯抽采封孔方法
CN206360720U (zh) 一种新型柔性充填隔离挡墙
CN213360180U (zh) 高瓦斯矿井切顶成巷采空区侧巷帮封堵预制件
CN211342822U (zh) 一种钻杆斜料车
CN107178390A (zh) 一种可移动升降式煤矿采空区充填装置
CN204175336U (zh) 一种采空区瓦斯快速封堵装置
CN106285779A (zh) 煤矿井下环保型充气式密闭墙
CN203570313U (zh) 一种双巷链式充填回采布置结构
CN106979033B (zh) 一种厚煤层大采高采空区膏体充填施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080723

Termination date: 20110727