CN201087583Y - Underground bone ash storing coffin chamber - Google Patents

Underground bone ash storing coffin chamber Download PDF

Info

Publication number
CN201087583Y
CN201087583Y CNU2007201163887U CN200720116388U CN201087583Y CN 201087583 Y CN201087583 Y CN 201087583Y CN U2007201163887 U CNU2007201163887 U CN U2007201163887U CN 200720116388 U CN200720116388 U CN 200720116388U CN 201087583 Y CN201087583 Y CN 201087583Y
Authority
CN
China
Prior art keywords
underground
path
coffin
utility
coffin chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201163887U
Other languages
Chinese (zh)
Inventor
王志全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007201163887U priority Critical patent/CN201087583Y/en
Application granted granted Critical
Publication of CN201087583Y publication Critical patent/CN201087583Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to an underground ashes storage coffin chamber. The underground is provided with a path, the exit of the path is communicated with the ground, the middle and lower end part of the path is provided with spaced channels, and the two sides of the channels are respectively provided with coffin chambers which are arranged in a spaced way and symmetrically. The utility model has reasonable layout, does not adopt the land, but adopts the waste land to set the underground coffin chambers, thereby contributing to the environmental protection. The underground coffin chambers can be filled with good earth and be planted with trees, thereby beautifying the environment; besides, the coffin chambers can be used for farming.

Description

Underground bone ash is deposited coffin chamber
Technical field
The utility model relates to a kind of underground bone ash and deposits coffin chamber.
Background technology
At present, China's funeral and interment is carried out and is cremated, but after the dead's cremate, still takes land-fill method to waste a large amount of land resources equally in its bone ash, has destroyed forest tree resource again.
Summary of the invention
The purpose of this utility model is to overcome the weak point that exists in the above-mentioned technology, provides a kind of reasonable in design, and the graveyard is land occupation not, and the underground bone ash of saving the area is deposited coffin chamber.
In order to achieve the above object, the technical solution adopted in the utility model is: have the path on ground, its outlet is communicated with ground, and lower end part equidistantly is provided with passage in the path, the coffin chamber that its both sides have the symmetric arrays spacing to equate respectively.
The utility model has the advantages that:
Rationally distributed, land occupation utilizes and sets up underground burial chamber uselessly, helps environmental protection, and is very native in the underground burial chamber backfill, plant trees, and beautifies the environment, and also can cultivate.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is a structural representation after the utility model backfill
The specific embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is described in further detail.
By Fig. 1-Fig. 2 as can be known, the utility model is to have path 1 on ground, and its outlet 2 is communicated with ground, and lower end part equidistantly is provided with passage 3 in the path 1, and its both sides have the equal coffin chamber 4 of symmetric arrays spacing respectively.
The utility model can utilize any form topography and geomorphology, as gully, slope etc., adopt escarpment should not cultivate waste no idle land, when developing underground bone ash and depositing, the utility model connects at the passage that the 1-1.5 rice degree of depth adopts cast iron pipe or steel and concrete structure to build in underground path 1 and the coffin chamber 4, carriage also can be set in each coffin chamber 4 place cinerary casket, and cover backfill 5 on the graveyard, be used to cultivate or afforest, beautify the environment.

Claims (1)

1. a underground bone ash is deposited coffin chamber, comprise the path, it is characterized in that: have path (1) on ground, its outlet (2) is communicated with ground, lower end part equidistantly is provided with passage (3) in the path (1), the coffin chamber (4) that its both sides have the symmetric arrays spacing to equate respectively.
CNU2007201163887U 2007-06-08 2007-06-08 Underground bone ash storing coffin chamber Expired - Fee Related CN201087583Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201163887U CN201087583Y (en) 2007-06-08 2007-06-08 Underground bone ash storing coffin chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201163887U CN201087583Y (en) 2007-06-08 2007-06-08 Underground bone ash storing coffin chamber

Publications (1)

Publication Number Publication Date
CN201087583Y true CN201087583Y (en) 2008-07-16

Family

ID=39635176

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201163887U Expired - Fee Related CN201087583Y (en) 2007-06-08 2007-06-08 Underground bone ash storing coffin chamber

Country Status (1)

Country Link
CN (1) CN201087583Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587718A (en) * 2012-02-17 2012-07-18 李冰清 Deeply buried cemetery
CN102995948A (en) * 2010-11-11 2013-03-27 徐文平 Group burial deep well grave with built-in bundling plastic pipe and building method thereof
CN104074391A (en) * 2014-07-20 2014-10-01 黄建湘 Novel land-saving grave
CN104100126A (en) * 2014-07-30 2014-10-15 曹荣刚 Underground coffin pit cemetery
CN105064769A (en) * 2015-08-31 2015-11-18 沈杰斌 Cave type eight-diagram-body intelligent cemetery structure design

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995948A (en) * 2010-11-11 2013-03-27 徐文平 Group burial deep well grave with built-in bundling plastic pipe and building method thereof
CN102995948B (en) * 2010-11-11 2015-04-29 徐文平 Group burial deep well grave with built-in bundling plastic pipe and building method thereof
CN102587718A (en) * 2012-02-17 2012-07-18 李冰清 Deeply buried cemetery
CN104074391A (en) * 2014-07-20 2014-10-01 黄建湘 Novel land-saving grave
CN104100126A (en) * 2014-07-30 2014-10-15 曹荣刚 Underground coffin pit cemetery
CN105064769A (en) * 2015-08-31 2015-11-18 沈杰斌 Cave type eight-diagram-body intelligent cemetery structure design

Similar Documents

Publication Publication Date Title
CN201087583Y (en) Underground bone ash storing coffin chamber
Bing-yuan et al. Mine Land Reclamation and Eco‐Reconstruction in Shanxi Province I: Mine Land Reclamation Model
CN101229937B (en) High-load capillary infiltration trench system for treating domestic wastewater
CN106105470B (en) A kind of healthy soil body construction method based on the useless land control of rural area sky
Rhodes Peak phosphorus–peak food? The need to close the phosphorus cycle
CN105417905A (en) Method for treating in situ sludge of lake and river channel based on underwater lawn module system
CN110026430A (en) A kind of ecological recovery method in land reclamation in mining area
CN105174473B (en) A kind of system of enhanced aeration artificial swamp advanced treating biogas slurry
CN202729890U (en) Vertical flow constructed wetland
Niroumand et al. Hill development by Earth architecture
Gould et al. Using every last drop: rainwater harvesting and utilization in Gansu Province, China
CN101965785B (en) Method for remediating cadmium-contaminated soil by using Sweden energy willow No.2
CN103276943A (en) Forest burial method
CN204409076U (en) A kind of park formula seedling growth structure
CN202416254U (en) Ecological protection slope for water conservancy project
CN204907320U (en) View river course pine stake planting device
CN204920426U (en) Cave formula bone ash cemetery park
CN205061701U (en) Modified constructed wetland soil sublayer structure
CN110182954A (en) A method of administering cyanobacteria
CN204104387U (en) The device of the steady base soil moved in improve the original in a kind of Rocky Desertification Region
CN205370082U (en) Non - font bone ash memorial park of nature massif tunnel type
CN204898503U (en) View river course plank road structure with purifying effect
CN109607810A (en) A kind of sewage treating artificial current wetland that winter can run
CN103899131A (en) Marine burial method
CN105621790A (en) Method for processing high-concentration ammonia-nitrogen wastewater through soil infiltration

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080716

Termination date: 20100608