CN201056694Y - 一种沉管桩桩头 - Google Patents

一种沉管桩桩头 Download PDF

Info

Publication number
CN201056694Y
CN201056694Y CNU2007200908252U CN200720090825U CN201056694Y CN 201056694 Y CN201056694 Y CN 201056694Y CN U2007200908252 U CNU2007200908252 U CN U2007200908252U CN 200720090825 U CN200720090825 U CN 200720090825U CN 201056694 Y CN201056694 Y CN 201056694Y
Authority
CN
China
Prior art keywords
pile
pile head
tube
pile crown
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200908252U
Other languages
English (en)
Inventor
焦安亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CNU2007200908252U priority Critical patent/CN201056694Y/zh
Application granted granted Critical
Publication of CN201056694Y publication Critical patent/CN201056694Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种沉管桩桩头,包括有桩头和管体,在管体与桩头之间设有传力管,该传力管的上端与管体固定连接,其下端与桩头螺纹连接,在传力管与桩头连接处的外壁上设有位置相对应的凹槽,凹槽内设有与传力管固定连接的挡片,位于桩头下端的外壁上设有均布有四对凸耳,每对凸耳上设有位置相对应的耳孔,耳孔内设有销轴,销轴上装有可以转动的桩瓣。由于在管体与桩头之间设有传力管,而桩瓣通过销轴安装在桩头外壁上每对凸耳之间,且可以自由上下活动,在施工过程中增大了抗震动、抗冲击和耐磨性能,也增大了桩瓣之间的接触面积,有效地提高了桩瓣的抗变形能力,使得桩头的使用寿命增长。

Description

一种沉管桩桩头
技术领域
本实用新型涉及一种建筑用的沉管桩桩头。
背景技术
目前在建筑施工过程中沉管桩法采用桩头与管体焊接,桩瓣与连接筋板、凸耳与筒体焊接的结构形式,这种结构易使桩辬变形,各接触面不能达到有效的密封,缩短了桩头的使用寿命。尤其在沉管过程中松软的土和水易挤入管内,使桩的承载能力无法达到设计要求,影响了桩的使用寿命。
发明内容
本实用新型的目的在于克服上述现有技术的缺点,提供一种结构合理,既能达到抗震动、抗冲击的目的,而且耐磨性能好,使用寿命长的一种沉馆桩桩头。
本实用新型是通过一下技术方案实现的:
一种沉管桩桩头,包括有桩头和管体,在管体与桩头之间设有传力管,该传力管的上端与管体固定连接,其下端与桩头螺纹连接,在传力管与桩头连接处的外壁上设有位置相对应的凹槽,凹槽内设有与传力管固定连接的挡片,位于桩头下端的外壁上设有均布有四对凸耳,每对凸耳上设有位置相对应的耳孔,耳孔内设有销轴,销轴上装有可以转动的桩瓣。
所述凹槽在传力管与桩头连接处的外壁上均布有至少两个。
本实用新型具有以下优点:
由于在管体与桩头之间设有传力管,而桩瓣通过销轴安装在桩头外壁上每对凸耳之间,且可以自由上下活动,在施工过程中增大了抗震动、抗冲击和耐磨性能,也增大了桩瓣之间的接触面积,有效地提高了桩辬的抗变形能力,使得桩头的使用寿命增长。
附图说明
图为本实用新型的结构示意图。
具体实施方式
实施例:如图所示的沉管桩桩头,包括有桩头5和管体1,在管体1与桩头5之间设有传力管2,该传力管2的上端与管体1焊接在一起,其下端与桩头6螺纹连接,在传力管2与桩头6连接处的外壁上设有位置相对应的凹槽3、5,所述凹槽3、5在传力管2与桩头6连接处的外壁上均布有四个。凹槽3、5内设有与传力管2固定连接的挡片4,该档片4主要是用于阻止传力管2与桩头6在施工中相对转动。位于桩头6下端的外壁上设有均布有四对凸耳7,每对凸耳7上设有位置相对应的耳孔8,耳孔8内设有销轴9,销轴9上装有可以转动的桩瓣10。
工作过程如下:沉桩时桩瓣10处于闭合状态,在与软基接触后慢慢向下沉桩,当桩头6进入地基预定深度后,从管体1顶部送下填料,然后向上提管体1,填料将桩瓣10打开,填料送入地基预定深度后,随着管体1与桩头6慢慢向上振动提升,填料不断进入地基直到地面。

Claims (2)

1.一种沉管桩桩头,包括有桩头和管体,其特征是:在管体与桩头之间设有传力管,该传力管的上端与管体固定连接,其下端与桩头螺纹连接,在传力管与桩头连接处的外壁上设有位置相对应的凹槽,凹槽内设有与传力管固定连接的挡片,位于桩头下端的外壁上设有均布有四对凸耳,每对凸耳上设有位置相对应的耳孔,耳孔内设有销轴,销轴上装有可以转动的桩瓣。
2.根据权利要求1所述的沉管桩桩头,其特征是:所述凹槽在传力管与桩头连接处的外壁上均布有至少两个。
CNU2007200908252U 2007-06-25 2007-06-25 一种沉管桩桩头 Expired - Fee Related CN201056694Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200908252U CN201056694Y (zh) 2007-06-25 2007-06-25 一种沉管桩桩头

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200908252U CN201056694Y (zh) 2007-06-25 2007-06-25 一种沉管桩桩头

Publications (1)

Publication Number Publication Date
CN201056694Y true CN201056694Y (zh) 2008-05-07

Family

ID=39425533

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200908252U Expired - Fee Related CN201056694Y (zh) 2007-06-25 2007-06-25 一种沉管桩桩头

Country Status (1)

Country Link
CN (1) CN201056694Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631442A (zh) * 2014-12-24 2015-05-20 福建工程学院 全套管取土振动挤扩灌注桩施工方法
CN111395397A (zh) * 2020-03-20 2020-07-10 华侨大学 一种折弯型沉管防变形结构及施工方法
CN112664142A (zh) * 2021-01-19 2021-04-16 贵阳云海岩土工程有限公司 深层夯扩桩机钻头

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631442A (zh) * 2014-12-24 2015-05-20 福建工程学院 全套管取土振动挤扩灌注桩施工方法
CN111395397A (zh) * 2020-03-20 2020-07-10 华侨大学 一种折弯型沉管防变形结构及施工方法
CN111395397B (zh) * 2020-03-20 2021-11-30 华侨大学 一种折弯型沉管防变形结构的施工方法
CN112664142A (zh) * 2021-01-19 2021-04-16 贵阳云海岩土工程有限公司 深层夯扩桩机钻头

Similar Documents

Publication Publication Date Title
CN201056694Y (zh) 一种沉管桩桩头
CN103161154A (zh) 桩基井挤扩承力盘钢筋布设与应用
CN201358483Y (zh) 静音型液压破碎锤
CN203229943U (zh) 桩基井挤扩承力盘钢筋布设结构
CN203374213U (zh) 一种同心式双壁钻具钻杆内管悬挂结构
CN201687401U (zh) 整体驱动键套式旋挖钻机钻杆
CN201486483U (zh) 一种钻杆保持机构
CN114277834B (zh) 风电单桩基础及施工方法
CN107989544B (zh) 凿岩钻车
CN103225302B (zh) 一种用于海上隔水导管的六翼结构打桩帽
CN202390835U (zh) 新型人工桩锤
CN214940107U (zh) 一种海上打桩锤用的锤帽
CN105274985A (zh) 一种内设多个弧形加劲肋的钢管桩及其施工方法
CN203977416U (zh) 一种新型工具护筒
CN202730739U (zh) 一种夯锤
CN202672139U (zh) 预制钢筋混凝土方桩
CN201521255U (zh) 新型防喷溅接头
CN105337234A (zh) 应用剪切增稠液体的电力防震锤
CN201851065U (zh) 水下井口环空试压塞
CN210598842U (zh) 一种工程钻机大臂的改良结构
CN219886902U (zh) 一种沉井助沉装置
CN214005657U (zh) 一种纵向三头钻桩机的液压步履式底架
CN201381512Y (zh) 一种悬挂式桩架
CN209854776U (zh) 一体型铸铁混凝土高强井座
CN203961404U (zh) 新型火炬塔

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080507

Termination date: 20120625