CN201047089Y - Rapid mounting rack of multifunctional engineering equipment - Google Patents
Rapid mounting rack of multifunctional engineering equipment Download PDFInfo
- Publication number
- CN201047089Y CN201047089Y CNU2007200125017U CN200720012501U CN201047089Y CN 201047089 Y CN201047089 Y CN 201047089Y CN U2007200125017 U CNU2007200125017 U CN U2007200125017U CN 200720012501 U CN200720012501 U CN 200720012501U CN 201047089 Y CN201047089 Y CN 201047089Y
- Authority
- CN
- China
- Prior art keywords
- work
- utility
- model
- excavator
- engineering equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model provides a fast mounting deck in a multi-functional engineering equipment; the problem to be solved is that at present a plurality of engineering machines such as a bulldozer, a hydraulic down-the-hole drill, a frozen soil drill and an excavator are needed and have to work at the same working site at the same time to finish a tunnel task, and sometimes because of the small work surface, the operation efficiency for a plurality of engineering machines to work at the same site and at the same time is rather low. The key points of the utility model are that a bottle gourd is arranged on an L-shaped support which is fixed on a platform which is provided with locating blocks fixing each work head. The utility model can be used for hanging various work heads.
Description
Technical field
The utility model relates to the employed fast mounting deck of multifunctional engineering equipment, and said multifunctional engineering equipment is meant the engineering equipment that integrates excavation, rock drilling, frozen soil brill and broken function.
Background technology
Modern war requires the controllable velocity of army more and more faster, motor-driven war has become main operation pattern, under this condition, military engineering construction machinery follows the engineering support task must have controllable velocity faster in order to finish, and could guarantee finishing smoothly of engineering duty.Finishing a tunneling task at present just needs various engineering machineries such as bulldozer, hydraulic pressure down-the-hole drill, frozen-clay drill and excavator to show up simultaneously, work simultaneously, sometimes because the scope of operation is less, some engineering machinery operating efficiency of showing up simultaneously is extremely low, can not adapt to the requirement of modern war.
Summary of the invention
At the deficiencies in the prior art, the purpose of this utility model is to provide a kind of combination type multifunctional engineering equipment and the employed fast mounting deck of this equipment that integrate excavation, rock drilling, frozen soil brill and broken function that can avoid above-mentioned deficiency.
The purpose of this utility model is achieved in that
1, it the excavator matrix (the said excavator matrix of this paper be meant excavator remove scraper bowl after rest parts) on other working head be installed successively realized, specifically be, it has the excavator matrix, it is characterized in that: it also has the hidden hole drilling drill bit, the scraper bowl of excavator, frozen soil bores drilling rod and hydraulic hammer, excavator bucket, the hidden hole drilling drill bit, frozen soil bores on drilling rod and the hydraulic hammer otic placode, be installed in by connector on the forearm of excavator, it also is provided with the hydraulic pressure output circuit and gives the hidden hole drilling drill bit, frozen soil bores drilling rod and hydraulic hammer provides power, secondary wherein is set on the guide rod of hidden hole drilling drill bit advances oil cylinder, air compressor machine is installed in back at excavator hydraulic system, the motor of this air compressor machine is replaced by hydraulic motor, the pneumatic efferent duct of air compressor machine is connected with the hidden hole drilling slag blowing ductwork, is the pneumatic deslagging of hidden hole drilling.
2, for above-mentioned working head is installed easily and fast, and specialized designs fast mounting deck: cucurbit is installed on the L bracket, and support will be fixed on the platform, also has the fixing locating piece of working head separately on the platform.
Using method is, needs the digging machine function that scraper bowl is installed constantly, at this moment the locating piece of other working head by separately is installed on the platform; When needing rock-boring, use cucurbit that scraper bowl is unloaded from the digging machine forearm, be placed on the platform of installing rack, again the hidden hole drilling drill bit is raised on the forearm and installs, open the hydraulic pressure output circuit and give hidden hole drilling drill bit power, implement boring, open pneumatic efferent duct simultaneously and finish deslagging; In the time of need on frozen soil, holing, the drilling rod of hidden hole drilling bit part unloaded change frozen soil and bore drilling rod and implement boring, need when broken, the hidden hole drilling drill bit is unloaded change hydraulic hammer and implement broken.
The utility model is compared with the prior art scheme, and it rolls into one the function of multiple construction operation, has not only reduced the cost of engineering machinery, has also improved operating efficiency simultaneously greatly.It not only is applicable to army, also is applicable to civilian.
Description of drawings
Further specify the utility model below in conjunction with accompanying drawing.
Fig. 1 is the schematic diagram of working head of the present utility model when being the hidden hole drilling drill bit.
Fig. 2 is the schematic diagram of installing rack.
Fig. 3 is the schematic diagram that frozen soil bores drilling rod.
The specific embodiment
It is installed other working head successively and realizes on the excavator matrix, referring to Fig. 1-3, it has excavator matrix 6, it also has hidden hole drilling drill bit 3, the scraper bowl 2 of excavator, frozen soil bores drilling rod and hydraulic hammer 11, the scraper bowl of excavator, the hidden hole drilling drill bit, frozen soil bores on drilling rod and the hydraulic hammer otic placode 4, be installed in by bolt on the forearm 6.1 of excavator, it also is provided with the hydraulic pressure output circuit and gives the hidden hole drilling drill bit, frozen soil bores drilling rod and hydraulic hammer provides power, secondary wherein is set on the guide rod of hidden hole drilling drill bit advances oil cylinder, air compressor machine 9 is installed in back at excavator hydraulic system 6.2, the motor of this air compressor machine is replaced by hydraulic motor, the pneumatic efferent duct of air compressor machine is connected with the hidden hole drilling slag blowing ductwork, is the pneumatic deslagging of hidden hole drilling.
Referring to Fig. 2, cucurbit 8 is installed on the L bracket 5, and support will be fixed on the platform 1, also has the fixing locating piece of working head separately on the platform.Cucurbit can be an electric hoist, also can be bottle gouard moved by hands.12, the 13, the 14th, the fixing locating piece of working head separately.
Using method is, needs the digging machine function that scraper bowl is installed constantly, at this moment the locating piece of other working head by separately is installed on the platform; When needing rock-boring, use cucurbit that scraper bowl is unloaded from the digging machine forearm, be placed on the platform of installing rack, again the hidden hole drilling drill bit is raised on the forearm and installs, open the hydraulic pressure output circuit and give hidden hole drilling drill bit power, implement boring, open pneumatic efferent duct simultaneously and finish deslagging; In the time of need on frozen soil, holing, the drilling rod of hidden hole drilling bit part unloaded change frozen soil and bore drilling rod and implement boring, need when broken, the hidden hole drilling drill bit is unloaded change hydraulic hammer and implement broken.
Claims (2)
1. the fast mounting deck in the multifunctional engineering equipment, it has cucurbit, it is characterized in that: cucurbit is installed on the L bracket, and support will be fixed on the platform, also has the fixing locating piece of working head separately on the platform.
2. according to the fast mounting deck in the described multifunctional engineering equipment of claim 1, it is characterized in that: said cucurbit is a bottle gouard moved by hands.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200125017U CN201047089Y (en) | 2007-06-08 | 2007-06-08 | Rapid mounting rack of multifunctional engineering equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007200125017U CN201047089Y (en) | 2007-06-08 | 2007-06-08 | Rapid mounting rack of multifunctional engineering equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201047089Y true CN201047089Y (en) | 2008-04-16 |
Family
ID=39299667
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007200125017U Expired - Fee Related CN201047089Y (en) | 2007-06-08 | 2007-06-08 | Rapid mounting rack of multifunctional engineering equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201047089Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971514A (en) * | 2016-07-27 | 2016-09-28 | 华树猛 | Multifunctional drilling and pole setting machine |
CN108221913A (en) * | 2017-12-21 | 2018-06-29 | 陈细妹 | A kind of novel concrete disintegrating road roller |
-
2007
- 2007-06-08 CN CNU2007200125017U patent/CN201047089Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971514A (en) * | 2016-07-27 | 2016-09-28 | 华树猛 | Multifunctional drilling and pole setting machine |
CN108221913A (en) * | 2017-12-21 | 2018-06-29 | 陈细妹 | A kind of novel concrete disintegrating road roller |
CN108221913B (en) * | 2017-12-21 | 2019-11-08 | 东阳市天杨建筑工程设计有限公司 | A kind of concrete disintegrating road roller |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101319509A (en) | Combination type multifunctional engineering equipment | |
CN102227857B (en) | Method for using mining vehicle, arrangement in mine, rock drilling rig, and mining vehicle | |
CN203891089U (en) | Multifunctional coal mine tunnel repairing equipment | |
CN107130656B (en) | Integrated mining loader with functions of underground drilling, anchoring and rock breaking | |
CN201215012Y (en) | Hydraulic rock development machine | |
CN101319508A (en) | Hydraulic shock vibration system in multifunctional engineering equipment | |
CN101382041A (en) | Dredger type drill | |
CN201047089Y (en) | Rapid mounting rack of multifunctional engineering equipment | |
CN202500488U (en) | Drilling, crushing, excavating and loading integrator for fully hydraulic drilling | |
CN210483527U (en) | Multifunctional drilling machine and engineering equipment | |
ES2128481T3 (en) | HYDRAULIC EXCAVATOR FOR AN ADVANCED TEAM OF UNDERGROUND GALLERIES. | |
CN202882751U (en) | Improved rock drill hydraulic system based on excavator hydraulic system | |
CN108150098A (en) | A kind of multifunctional integrated airborne drilling apparatus | |
CN201047086Y (en) | Combined type multifunctional engineering equipment | |
CN105350909A (en) | Energy-saving bundled combined hammer | |
CN102561433A (en) | Drilling, crushing, digging and loading integrated machine for all-hydraulic tunneling | |
CN207892529U (en) | A kind of multifunctional integrated airborne drilling apparatus | |
CN108505938A (en) | A kind of airborne drilling machine of rope sheave stroke amplification | |
CN101319507A (en) | Fast mounting deck in multifunctional engineering equipment | |
CN203531028U (en) | Multifunctional auxiliary loading device integrating crushing and excavation | |
CN201747370U (en) | Digging machine with machine digging operation function and drill carriage drilling operation function | |
CN218177149U (en) | New forms of energy non-excavation rig | |
CN103670275B (en) | A kind of hydraulic rock drilling machine | |
CN216841455U (en) | Be applied to wear-resisting baffle of machine of digging soon | |
CN110306928A (en) | A kind of multifunctional drill and the non-blasting construction method of hard rock tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |