CN201047089Y - Rapid mounting rack of multifunctional engineering equipment - Google Patents

Rapid mounting rack of multifunctional engineering equipment Download PDF

Info

Publication number
CN201047089Y
CN201047089Y CNU2007200125017U CN200720012501U CN201047089Y CN 201047089 Y CN201047089 Y CN 201047089Y CN U2007200125017 U CNU2007200125017 U CN U2007200125017U CN 200720012501 U CN200720012501 U CN 200720012501U CN 201047089 Y CN201047089 Y CN 201047089Y
Authority
CN
China
Prior art keywords
work
utility
model
excavator
engineering equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200125017U
Other languages
Chinese (zh)
Inventor
杨旭升
韩少军
陈德利
邓念庭
孙庆虎
付强
赵宝民
张金辉
曹向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Military District Headquarters Engineering Scientific Research Designin
Original Assignee
Shenyang Military District Headquarters Engineering Scientific Research Designin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Military District Headquarters Engineering Scientific Research Designin filed Critical Shenyang Military District Headquarters Engineering Scientific Research Designin
Priority to CNU2007200125017U priority Critical patent/CN201047089Y/en
Application granted granted Critical
Publication of CN201047089Y publication Critical patent/CN201047089Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a fast mounting deck in a multi-functional engineering equipment; the problem to be solved is that at present a plurality of engineering machines such as a bulldozer, a hydraulic down-the-hole drill, a frozen soil drill and an excavator are needed and have to work at the same working site at the same time to finish a tunnel task, and sometimes because of the small work surface, the operation efficiency for a plurality of engineering machines to work at the same site and at the same time is rather low. The key points of the utility model are that a bottle gourd is arranged on an L-shaped support which is fixed on a platform which is provided with locating blocks fixing each work head. The utility model can be used for hanging various work heads.

Description

Fast mounting deck in the multifunctional engineering equipment
Technical field
The utility model relates to the employed fast mounting deck of multifunctional engineering equipment, and said multifunctional engineering equipment is meant the engineering equipment that integrates excavation, rock drilling, frozen soil brill and broken function.
Background technology
Modern war requires the controllable velocity of army more and more faster, motor-driven war has become main operation pattern, under this condition, military engineering construction machinery follows the engineering support task must have controllable velocity faster in order to finish, and could guarantee finishing smoothly of engineering duty.Finishing a tunneling task at present just needs various engineering machineries such as bulldozer, hydraulic pressure down-the-hole drill, frozen-clay drill and excavator to show up simultaneously, work simultaneously, sometimes because the scope of operation is less, some engineering machinery operating efficiency of showing up simultaneously is extremely low, can not adapt to the requirement of modern war.
Summary of the invention
At the deficiencies in the prior art, the purpose of this utility model is to provide a kind of combination type multifunctional engineering equipment and the employed fast mounting deck of this equipment that integrate excavation, rock drilling, frozen soil brill and broken function that can avoid above-mentioned deficiency.
The purpose of this utility model is achieved in that
1, it the excavator matrix (the said excavator matrix of this paper be meant excavator remove scraper bowl after rest parts) on other working head be installed successively realized, specifically be, it has the excavator matrix, it is characterized in that: it also has the hidden hole drilling drill bit, the scraper bowl of excavator, frozen soil bores drilling rod and hydraulic hammer, excavator bucket, the hidden hole drilling drill bit, frozen soil bores on drilling rod and the hydraulic hammer otic placode, be installed in by connector on the forearm of excavator, it also is provided with the hydraulic pressure output circuit and gives the hidden hole drilling drill bit, frozen soil bores drilling rod and hydraulic hammer provides power, secondary wherein is set on the guide rod of hidden hole drilling drill bit advances oil cylinder, air compressor machine is installed in back at excavator hydraulic system, the motor of this air compressor machine is replaced by hydraulic motor, the pneumatic efferent duct of air compressor machine is connected with the hidden hole drilling slag blowing ductwork, is the pneumatic deslagging of hidden hole drilling.
2, for above-mentioned working head is installed easily and fast, and specialized designs fast mounting deck: cucurbit is installed on the L bracket, and support will be fixed on the platform, also has the fixing locating piece of working head separately on the platform.
Using method is, needs the digging machine function that scraper bowl is installed constantly, at this moment the locating piece of other working head by separately is installed on the platform; When needing rock-boring, use cucurbit that scraper bowl is unloaded from the digging machine forearm, be placed on the platform of installing rack, again the hidden hole drilling drill bit is raised on the forearm and installs, open the hydraulic pressure output circuit and give hidden hole drilling drill bit power, implement boring, open pneumatic efferent duct simultaneously and finish deslagging; In the time of need on frozen soil, holing, the drilling rod of hidden hole drilling bit part unloaded change frozen soil and bore drilling rod and implement boring, need when broken, the hidden hole drilling drill bit is unloaded change hydraulic hammer and implement broken.
The utility model is compared with the prior art scheme, and it rolls into one the function of multiple construction operation, has not only reduced the cost of engineering machinery, has also improved operating efficiency simultaneously greatly.It not only is applicable to army, also is applicable to civilian.
Description of drawings
Further specify the utility model below in conjunction with accompanying drawing.
Fig. 1 is the schematic diagram of working head of the present utility model when being the hidden hole drilling drill bit.
Fig. 2 is the schematic diagram of installing rack.
Fig. 3 is the schematic diagram that frozen soil bores drilling rod.
The specific embodiment
It is installed other working head successively and realizes on the excavator matrix, referring to Fig. 1-3, it has excavator matrix 6, it also has hidden hole drilling drill bit 3, the scraper bowl 2 of excavator, frozen soil bores drilling rod and hydraulic hammer 11, the scraper bowl of excavator, the hidden hole drilling drill bit, frozen soil bores on drilling rod and the hydraulic hammer otic placode 4, be installed in by bolt on the forearm 6.1 of excavator, it also is provided with the hydraulic pressure output circuit and gives the hidden hole drilling drill bit, frozen soil bores drilling rod and hydraulic hammer provides power, secondary wherein is set on the guide rod of hidden hole drilling drill bit advances oil cylinder, air compressor machine 9 is installed in back at excavator hydraulic system 6.2, the motor of this air compressor machine is replaced by hydraulic motor, the pneumatic efferent duct of air compressor machine is connected with the hidden hole drilling slag blowing ductwork, is the pneumatic deslagging of hidden hole drilling.
Referring to Fig. 2, cucurbit 8 is installed on the L bracket 5, and support will be fixed on the platform 1, also has the fixing locating piece of working head separately on the platform.Cucurbit can be an electric hoist, also can be bottle gouard moved by hands.12, the 13, the 14th, the fixing locating piece of working head separately.
Using method is, needs the digging machine function that scraper bowl is installed constantly, at this moment the locating piece of other working head by separately is installed on the platform; When needing rock-boring, use cucurbit that scraper bowl is unloaded from the digging machine forearm, be placed on the platform of installing rack, again the hidden hole drilling drill bit is raised on the forearm and installs, open the hydraulic pressure output circuit and give hidden hole drilling drill bit power, implement boring, open pneumatic efferent duct simultaneously and finish deslagging; In the time of need on frozen soil, holing, the drilling rod of hidden hole drilling bit part unloaded change frozen soil and bore drilling rod and implement boring, need when broken, the hidden hole drilling drill bit is unloaded change hydraulic hammer and implement broken.

Claims (2)

1. the fast mounting deck in the multifunctional engineering equipment, it has cucurbit, it is characterized in that: cucurbit is installed on the L bracket, and support will be fixed on the platform, also has the fixing locating piece of working head separately on the platform.
2. according to the fast mounting deck in the described multifunctional engineering equipment of claim 1, it is characterized in that: said cucurbit is a bottle gouard moved by hands.
CNU2007200125017U 2007-06-08 2007-06-08 Rapid mounting rack of multifunctional engineering equipment Expired - Fee Related CN201047089Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200125017U CN201047089Y (en) 2007-06-08 2007-06-08 Rapid mounting rack of multifunctional engineering equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200125017U CN201047089Y (en) 2007-06-08 2007-06-08 Rapid mounting rack of multifunctional engineering equipment

Publications (1)

Publication Number Publication Date
CN201047089Y true CN201047089Y (en) 2008-04-16

Family

ID=39299667

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200125017U Expired - Fee Related CN201047089Y (en) 2007-06-08 2007-06-08 Rapid mounting rack of multifunctional engineering equipment

Country Status (1)

Country Link
CN (1) CN201047089Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971514A (en) * 2016-07-27 2016-09-28 华树猛 Multifunctional drilling and pole setting machine
CN108221913A (en) * 2017-12-21 2018-06-29 陈细妹 A kind of novel concrete disintegrating road roller

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971514A (en) * 2016-07-27 2016-09-28 华树猛 Multifunctional drilling and pole setting machine
CN108221913A (en) * 2017-12-21 2018-06-29 陈细妹 A kind of novel concrete disintegrating road roller
CN108221913B (en) * 2017-12-21 2019-11-08 东阳市天杨建筑工程设计有限公司 A kind of concrete disintegrating road roller

Similar Documents

Publication Publication Date Title
CN101319509A (en) Combination type multifunctional engineering equipment
CN102227857B (en) Method for using mining vehicle, arrangement in mine, rock drilling rig, and mining vehicle
CN203891089U (en) Multifunctional coal mine tunnel repairing equipment
CN107130656B (en) Integrated mining loader with functions of underground drilling, anchoring and rock breaking
CN201215012Y (en) Hydraulic rock development machine
CN101319508A (en) Hydraulic shock vibration system in multifunctional engineering equipment
CN101382041A (en) Dredger type drill
CN201047089Y (en) Rapid mounting rack of multifunctional engineering equipment
CN202500488U (en) Drilling, crushing, excavating and loading integrator for fully hydraulic drilling
CN210483527U (en) Multifunctional drilling machine and engineering equipment
ES2128481T3 (en) HYDRAULIC EXCAVATOR FOR AN ADVANCED TEAM OF UNDERGROUND GALLERIES.
CN202882751U (en) Improved rock drill hydraulic system based on excavator hydraulic system
CN108150098A (en) A kind of multifunctional integrated airborne drilling apparatus
CN201047086Y (en) Combined type multifunctional engineering equipment
CN105350909A (en) Energy-saving bundled combined hammer
CN102561433A (en) Drilling, crushing, digging and loading integrated machine for all-hydraulic tunneling
CN207892529U (en) A kind of multifunctional integrated airborne drilling apparatus
CN108505938A (en) A kind of airborne drilling machine of rope sheave stroke amplification
CN101319507A (en) Fast mounting deck in multifunctional engineering equipment
CN203531028U (en) Multifunctional auxiliary loading device integrating crushing and excavation
CN201747370U (en) Digging machine with machine digging operation function and drill carriage drilling operation function
CN218177149U (en) New forms of energy non-excavation rig
CN103670275B (en) A kind of hydraulic rock drilling machine
CN216841455U (en) Be applied to wear-resisting baffle of machine of digging soon
CN110306928A (en) A kind of multifunctional drill and the non-blasting construction method of hard rock tunnel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080416

Termination date: 20110608