CN201034312Y - Central re-burning boiler - Google Patents

Central re-burning boiler Download PDF

Info

Publication number
CN201034312Y
CN201034312Y CNU2007200213357U CN200720021335U CN201034312Y CN 201034312 Y CN201034312 Y CN 201034312Y CN U2007200213357 U CNU2007200213357 U CN U2007200213357U CN 200720021335 U CN200720021335 U CN 200720021335U CN 201034312 Y CN201034312 Y CN 201034312Y
Authority
CN
China
Prior art keywords
strile
chamber
boiler
backs
burner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200213357U
Other languages
Chinese (zh)
Inventor
王永波
张世仓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO KINGLLI BOILER CO Ltd
Original Assignee
QINGDAO KINGLLI BOILER CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO KINGLLI BOILER CO Ltd filed Critical QINGDAO KINGLLI BOILER CO Ltd
Priority to CNU2007200213357U priority Critical patent/CN201034312Y/en
Application granted granted Critical
Publication of CN201034312Y publication Critical patent/CN201034312Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Incineration Of Waste (AREA)

Abstract

The utility model provides a central reverse boiler, consisting of a cylinder, a rear tube plate, an internal furnace, a smoke tube, a rear smoke box, a water supply interface, a steam or hot water outlet, a smoke outlet and a burner. The reverse burning chamber at the front of the internal furnace and the internal furnace comprise a combustion chamber. The front end of the front reverse burning chamber going through the front tube plate of the boiler shell is fixedly connected to the burner. The front end of the smoke tube is communicated with the front reverse burning chamber. The water is distributed in the space of the combustion chamber and the boiler shell. The front reverse burning chamber surrounded by the water and the internal furnace comprise a whole combustion chamber. The function of the front smoke box of the present central reverse boiler is fulfilled by the front reverse burning chamber, which solves the problem of heat resistance and sealing of the front smoke box. The burner is directly connected to the front reverse burning chamber without the arrangement of a fore door cover, which is of simple structure and reliable using performance.

Description

Boiler strile-backs at a kind of center
Technical field
The utility model belongs to the boiler technology field, specifically front smoke box has been carried out improved a kind of center boiler that strile-backs.
Background technology
The front smoke box of boiler is strile-backd in the front tube sheet front in existing center, it is the dry construction that surrounds by front tube sheet, preceding door closure and connecting plate, the boiler front smoke box temperature of pressure combustion can reach 800-1200 ℃, so the heat-resisting and sealing property of front smoke box is all had higher requirement.In addition, the strile-back burner of boiler of existing center directly is fixedly connected on the Qianmen and covers door closure before the burner operation vibrations very easily damage.
Summary of the invention
The utility model improves at the existing center defective that boiler dry construction front smoke box exists of strile-bacing, a kind of center that has the chamber of strile-bacing before wet type structure boiler that strile-backs is provided, strile-back heat-resisting, the sealing difficult problem of boiler front smoke box of existing center solved, solve simultaneously the burner operation vibrations damage before the problem of door closure.
Goal of the invention of the present utility model is to be realized by following technical scheme: boiler strile-backs at a kind of center, comprise cylindrical shell 9, back tube sheet 13, flue 8, smoke pipe 10, back smoke box 14, the feedwater interface, steam or hot water outlet, exhanst gas outlet, burner 1, it is characterized in that being positioned at flue 8 front portions before strile-back chamber 4 and flue 8 form combustion chambers; Before chamber 4 front ends that strile-back pass the front tube sheet 2 of boiler shell, fixedly connected burner 1; The chamber 4 of strile-bacing before the front end of smoke pipe 10 is communicated with; Water distribution is in the space of combustion chamber and boiler shell.
The combustion chamber of forming by flue 8, the preceding chamber 4 of strile-bacing in the shell of forming by front tube sheet 2, cylindrical shell 9, back tube sheet 13, the wet type structure of being surrounded by the boiler water body.The chamber 4 of strile-bacing before the flue gas that returns from flue 8 afterbodys arrives enters smoke pipe 10, fully enters atmosphere by back smoke box 14, exhanst gas outlet, chimney behind the heat convection.Flue 8, the preceding chamber 4 of strile-bacing are surrounded by the boiler water body, solved existing center strile-back the boiler front smoke box heat-resisting, the sealing difficult problem.Strile-back before burner 1 directly the is fixedly connected on front end of chamber 4 can save preceding door closure is set.
Before the chamber 4 of strile-bacing form by the chamber tube sheet 6 that strile-backs, the chamber cylindrical shell 5 that strile-backs, the chamber end socket 3 that strile-backs.
The chamber end socket 3 anterior reducings of strile-bacing pass the front tube sheet 2 of boiler shell, fixedly connected burner 1, and the chamber tube sheet 6 that strile-backs is connected as a single entity with flue 8.Before strile-back chamber 4 and flue 8 be an integral body, rigidity is very strong.
The shower nozzle of burner 1 is in the front portion of preceding strile-bacing chamber 4.Before the chamber 4 of strile-bacing are parts of combustion chamber, be again to return the passage that flue gas enters smoke pipe 10 from flue 8 afterbodys.
See the rear end that firearm is positioned at flue.
The utility model has the advantages that: by the boiler water body surround before the combustion chamber that chamber and flue form a whole of strile-bacing, the strile-back function of front smoke box of boiler of existing center is finished by the chamber of preceding strile-bacing, heat-resisting, the sealing difficult problem of front smoke box are solved.The chamber of strile-bacing before burner directly connects need not to be provided with preceding door closure, and is simple in structure, serviceability is reliable.
Description of drawings
Fig. 1 is the structural representation of a kind of embodiment of the present utility model;
Fig. 2 is the strile-back structural representation of boiler of existing center.
The specific embodiment
In of the present utility model a kind of embodiment shown in Figure 1, shell is made up of front tube sheet 2, cylindrical shell 9, back tube sheet 13, the boiler jacket that is placed on the base 7 has heat-insulation layer 11, is back smoke box 14 between back tube sheet 13 and the heat-insulation layer 11, and exhanst gas outlet is on smoke box 14 tops, back.The combustion chamber is made up of wavy flue 8, the preceding chamber 4 of strile-bacing.Before the chamber 4 of strile-bacing form by the chamber tube sheet 6 that strile-backs, the chamber cylindrical shell 5 that strile-backs, the chamber end socket 3 that strile-backs, the chamber tube sheet 6 that strile-backs is connected as a single entity with flue 8, the chamber end socket 3 anterior reducings of strile-bacing pass the front tube sheet 2 of shell, connect burner 1.Chamber 4 and back smoke box 14 strile-back before smoke pipe 10 is communicated with.The shower nozzle of burner 1 is in the back of preceding strile-bacing 4 front portions, chamber, the chamber end socket 3 that strile-backs.See the center that firearm is placed in furnace gall head 12.Hot water outlet does not illustrate among the figure such as feedwater interface, safety block interface, water level interface on shell top.Fuel oil (gas) mixes the back in the burner hearth internal combustion by burner 1 with air, gas fume after burning is carried out radiation heat transfer by burner hearth heat is passed to water in the boiler, temperature drops to 800-1200 ℃ by about 2600 ℃, flue gas arrival flue 8 afterbodys return preceding combustion chamber 4 and enter smoke pipe 10, flue gas is abundant heat convection in smoke pipe 10, temperature drops to below 250 ℃, enters atmosphere by back smoke box 14, exhanst gas outlet, chimney at last.
Fig. 2 is the strile-back structural representation of boiler of existing center, and front smoke box 16 is in front tube sheet 2 fronts, is the dry construction that is surrounded by front tube sheet 2, preceding door closure 15 and connecting plate 17.Burner 1 is installed on the preceding door closure 15.Existing center strile-back boiler exist heat-resisting, the sealing of front smoke box 16 and burner 1 work fragile before the problem of door closure 15.
The combustion chamber that chamber 4 and flue 8 form a whole of strile-bacing before of the present utility model, by the wet type structure that the boiler water body surrounds, the strile-back function of front smoke box 16 of boiler of existing center is finished by the chamber 4 of preceding strile-bacing, and heat-resisting, the sealing difficult problem of front smoke box 16 are solved.Strile-back before burner 1 directly the connects chamber end socket 3 that strile-backs of chamber 4, door closure 15 before need not to be provided with, simple in structure, serviceability is reliable.

Claims (5)

1. boiler strile-backs at a center, comprise cylindrical shell (9), back tube sheet (13), flue (8), smoke pipe (10), back smoke box (14), the feedwater interface, steam or hot water outlet, exhanst gas outlet, burner (1), it is characterized in that being positioned at flue (8) anterior before strile-back chamber (4) and flue (8) composition combustion chamber; Before chamber (4) front end that strile-backs pass the front tube sheet (2) of boiler shell, fixedly connected burner (1); The chamber (4) of strile-bacing before the front end of smoke pipe (10) is communicated with; Water distribution is in the space of combustion chamber and boiler shell.
2. a kind of center according to claim 1 boiler that strile-backs, the chamber (4) of strile-bacing before it is characterized in that is made up of the chamber tube sheet (6) that strile-backs, the chamber cylindrical shell (5) that strile-backs, the chamber end socket (3) that strile-backs.
3. a kind of center according to claim 2 boiler that strile-backs, the anterior reducing of chamber end socket (3) that it is characterized in that strile-bacing passes the front tube sheet (2) of boiler shell, fixedly connected burner (1), the chamber tube sheet (6) that strile-backs is connected as a single entity with flue (8).
4. according to claim 1 or the 3 described a kind of centers boiler that strile-backs, the shower nozzle that it is characterized in that burner (1) is in the front portion of preceding strile-bacing chamber (4).
5. a kind of center according to claim 1 boiler that strile-backs is characterized in that there is the sight firearm rear end of flue (8).
CNU2007200213357U 2007-04-28 2007-04-28 Central re-burning boiler Expired - Fee Related CN201034312Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200213357U CN201034312Y (en) 2007-04-28 2007-04-28 Central re-burning boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200213357U CN201034312Y (en) 2007-04-28 2007-04-28 Central re-burning boiler

Publications (1)

Publication Number Publication Date
CN201034312Y true CN201034312Y (en) 2008-03-12

Family

ID=39195203

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200213357U Expired - Fee Related CN201034312Y (en) 2007-04-28 2007-04-28 Central re-burning boiler

Country Status (1)

Country Link
CN (1) CN201034312Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105066437A (en) * 2015-08-22 2015-11-18 郑州大学 Integrated full-wet-back central-reverse-flame boiler
CN105066434A (en) * 2015-08-22 2015-11-18 郑州大学 Direct-contact type waste heat recovery constant-pressure integral boiler
CN105157228A (en) * 2015-08-22 2015-12-16 郑州大学 Water-tube type central-reverse-flame and condensation integrated boiler
CN105180421A (en) * 2015-08-22 2015-12-23 郑州大学 Central back combustion boiler with water pipes being transversely scoured
CN107238076A (en) * 2017-06-23 2017-10-10 西安交通大学 A kind of compact condensing oil-burning gas-fired boiler of enhanced heat exchange step cooling

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105066437A (en) * 2015-08-22 2015-11-18 郑州大学 Integrated full-wet-back central-reverse-flame boiler
CN105066434A (en) * 2015-08-22 2015-11-18 郑州大学 Direct-contact type waste heat recovery constant-pressure integral boiler
CN105157228A (en) * 2015-08-22 2015-12-16 郑州大学 Water-tube type central-reverse-flame and condensation integrated boiler
CN105180421A (en) * 2015-08-22 2015-12-23 郑州大学 Central back combustion boiler with water pipes being transversely scoured
CN105066437B (en) * 2015-08-22 2018-02-06 郑州大学 The complete wet back of the body central flame flame boiler of integral type
CN105180421B (en) * 2015-08-22 2018-04-06 郑州大学 Transversal flow waterpipe type central flame flame boiler
CN105157228B (en) * 2015-08-22 2018-05-22 郑州大学 Waterpipe type central flame flame condenses all-in-one oven
CN105066434B (en) * 2015-08-22 2018-05-22 郑州大学 Direct contact type waste heat recovery normal pressure all-in-one oven
CN107238076A (en) * 2017-06-23 2017-10-10 西安交通大学 A kind of compact condensing oil-burning gas-fired boiler of enhanced heat exchange step cooling

Similar Documents

Publication Publication Date Title
CN201034312Y (en) Central re-burning boiler
CN201522091U (en) Horizontal flashback coal burning boiler
CN201066195Y (en) Horizontal type reverse-combusting coal-firing boiler
CN214147835U (en) High-efficiency energy-saving horizontal oil-gas steam boiler
CN102393070B (en) Energy-saving hot-air boiler
CN201731618U (en) Horizontal shell-type boiler
CN210014353U (en) Fire grate type gas boiler
CN210688170U (en) Dry distillation type boiler
CN201014711Y (en) High efficiency energy saving tea stove
CN203240561U (en) Fuel oil, fuel gas and steam hot-water boiler
CN2723893Y (en) Vacuum phase changing hot water boiler structure
CN205939674U (en) Extreme misery pipe boiler
CN100451479C (en) Heating furnace
CN201028775Y (en) Split type domestic burners for central heating
CN205037284U (en) Dual -purpose boiler of environmental protection and energy saving soda
CN201311080Y (en) Hot-blast stove with secondary air inlet
CN201145397Y (en) Forced circulation hot water boiler of circumferential direction flow around smoke channel
CN2347114Y (en) Vacuum phase change hot water boiler
CN2563440Y (en) Multiple combustion chanmber separate burning gasification energy saving boiler
CN214147836U (en) Efficient energy-saving pot body structure and horizontal fuel oil and gas steam boiler
CN2331911Y (en) Horizontal type atmospheric hot-water boiler
CN220771370U (en) Hot water boiler with central backfire structure
CN201568970U (en) Reforming cell furnace side burning self-preheating natural ventilation burner
CN214198614U (en) High-efficiency energy-saving furnace body structure and horizontal fuel-gas steam boiler
CN201014723Y (en) Non-pressure hot water generators

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080312

Termination date: 20120428