CN201024891Y - Long spiral replaced and compacted driller - Google Patents

Long spiral replaced and compacted driller Download PDF

Info

Publication number
CN201024891Y
CN201024891Y CNU2007201042346U CN200720104234U CN201024891Y CN 201024891 Y CN201024891 Y CN 201024891Y CN U2007201042346 U CNU2007201042346 U CN U2007201042346U CN 200720104234 U CN200720104234 U CN 200720104234U CN 201024891 Y CN201024891 Y CN 201024891Y
Authority
CN
China
Prior art keywords
long
drill lip
extruded
hole
spiral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201042346U
Other languages
Chinese (zh)
Inventor
杨松
刘登明
赵朝成
刘波
王力生
张飚
张开传
马凛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ZHONGXINGJIAN CIVIL ENGINEERING Co Ltd
China Jingye Engineering Corp Ltd
Original Assignee
BEIJING ZHONGXINGJIAN CIVIL ENGINEERING Co Ltd
China Jingye Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHONGXINGJIAN CIVIL ENGINEERING Co Ltd, China Jingye Engineering Corp Ltd filed Critical BEIJING ZHONGXINGJIAN CIVIL ENGINEERING Co Ltd
Priority to CNU2007201042346U priority Critical patent/CN201024891Y/en
Application granted granted Critical
Publication of CN201024891Y publication Critical patent/CN201024891Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a long helix changing and tight drilling hole drilling device, comprising a drill bit and a long helix drill rod. The drill bit takes a crossed shape drilling bit. The helix blade of the long helix drill rod is provided with a blade through hole. The utility model is also provided with a soil crushing device. The soil crushing device is dismountablely arranged on the helix blade through the through hole positioned on the helix blade. Building the slope protective pile with the utility model has the advantages of smooth and regular hole wall of the slope protective pile, being hard to have hole collapsing and hollow belly, relative small permeation factor of the pile body concrete, saving the pile body concrete, decreasing the construction cost, decreasing the safety hidden dangers of manual digging hole pile construction in the sand pebble layer.

Description

Long-spiral replaceable and extruded borehole rig
Technical field
The utility model relates to the used rig of drilling construction of slope protection pile in a kind of deep foundation pit support engineering, particularly a kind of long-spiral replaceable and extruded borehole rig.
Background technology
Along with the continuous development of urban architecture, the bodily form of building is also constantly developing to super largeization, superelevationization, super in-depth.Because the progressively intensification of the excavation of foundation pit degree of depth, the difficulty of its pattern foundation pit supporting structure is also increasing, especially at the west of Beijing area half ubiquity one deck sand pebble layer, be characterized in that thickness is big, density is high, particle diameter is big, the big difficulty of bringing for the pore-forming of long-spiral drilling machine, make many engineerings can't adopt long-spiral drilling machine to carry out pore-forming, have to adopt other hole forming method.How to improve the pore-forming technique of long-spiral drilling machine, the application that makes it in sand pebble layer is expanded, and is the key that improves the long-spiral drilling machine function of use.
From early eighties, the drilling construction of slope protection pile generally adopts hand excavated pile in the deep foundation pit support engineering of Beijing area, as long as the quality control on construction of retaining wall is good, pore-forming is no problem in sand pebble layer when running into sand pebble layer.Because soil body landslide in the hole often takes place in hand excavated pile in work progress, retaining wall caves in, accidents such as thing, toxic gas are weighed down in the aperture, in view of there being more problem aspect the construction safety, Beijing relevant department has taked the hand excavated pile license granting mechanisms in the early 1990s, begin to limit the construction of hand excavated pile, encourage to adopt mechanical hole building.
The job practices of long spiral pore-forming begins progressively to promote in the nineties, easy construction, speed are fast because long-spiral drilling machine construction has, friction, noiselessness, characteristics such as pollution-free, have therefore obtained using more widely in the foundation pit supporting project construction.But continuous intensification along with the Beijing area excavation of foundation pit degree of depth, it is more and more darker that the long-spiral drilling machine pore-forming enters the degree of depth of sand pebble layer, therefore the density and the particle diameter of cobble is also increasing in the sand pebble layer, makes that long-spiral drilling machine difficulty of pore-forming in sand pebble layer is more and more higher.Concrete distribution situation is that relatively difficulty of long spiral pore-forming is adopted usually because the buried depth of sand pebble layer is superficial, and the density of cobble and size ratio are bigger in the sand pebble layer in area to the west of the Wu Ke Song, generally adopts modes such as manually digging hole, impact holing.The Wu Ke Song is with in this zone to the west of the street, Xidan, the buried depth of sand pebble layer is generally about 10.00~15.00M, some local still sand pebble layer and argillic horizon are mutual, there is the multilayer sand pebble layer, after long spiral depth of pore forming surpasses 15.00~20.00M (counting) from natural ground, the penetration rate of rig drilling construction is more and more slower, and the difficulty of pore-forming is more and more higher.The long-spiral drilling machine subject matter that pore-forming runs in sand pebble layer has:
1, the content of cobble is higher in the sand pebble layer, and drilling tool is drilling depth not;
2, when cobble particle diameter in the sand pebble layer was big, the cobble band of big particle diameter did not come up in the pore forming process, often causes bit bouncing, bit freezing phenomenon;
3, when sand pebble layer is thicker, relatively poor because of its self-support, it is serious to put forward the hole phenomenon of collapsing behind the brill;
4, when containing a small amount of backwater or residual water in the sand pebble layer, very easily form quicksand, the stake hole hole phenomenon of collapsing is serious, and the slope protection pile drilling construction is difficulty very.
Summary of the invention
The purpose of this utility model is deficiency and the defective that solves the drilling construction method of slope protection pile in the domestic existing deep foundation pit support engineering, propose a kind of can be by large diameter cobble being extruded into both sides and being discharged from, and guarantee that hole wall is stable, slick and sly, be not prone to phenomenons such as the hole of collapsing, bulge, reduce construction cost, reduced the long-spiral replaceable and the extruded borehole rig that in sand pebble layer, adopt the potential safety hazard of manual digging pile construction in the past.
The utility model long-spiral replaceable and extruded borehole rig, comprise drill bit and long screw drill rod, described drill bit is a cross bit, have the blade through hole on the helical blade of described long screw drill rod, described long-spiral replaceable and extruded borehole rig also are provided with the soil compaction device, and described soil compaction device is removably mounted on the helical blade by the through hole on the helical blade.
The utility model long-spiral replaceable and the described long screw drill rod of extruded borehole rig are special-shaped tower drilling rod.
All less than a last joint, the pitch of helical blade all equates on every joint core pipe for the utility model long-spiral replaceable and the tower drilling rod of the described abnormity of extruded borehole rig, the external diameter of every joint core pipe, and width is all greater than a last joint.
The utility model long-spiral replaceable and extruded borehole rig, described soil compaction device be shaped as the cambered surface sheet, the bottom is provided with two and connects legs, each connect have on leg with helical blade on the soil compaction device that adapts of blade through hole through hole is installed.
The utility model long-spiral replaceable and extruded borehole rig, described cross bit comprises the flat main drill lip of isosceles triangle, on each face of main drill lip, be provided with the flat secondary drill lip of a right-angled triangle, the long right-angle side of secondary drill lip and the central lines of main drill lip, on two waists of the isosceles triangle of main drill lip carbide chip is installed, stagger mutually in the position of the carbide chip on two waists, on the hypotenuse of each secondary drill lip carbide chip being installed, staggers mutually in the carbide chip position of installing on the hypotenuse of two secondary drill lips.
The utility model long-spiral replaceable and extruded borehole rig, the length of described secondary drill lip are less than the length of described main drill lip, and the width of described secondary drill lip is less than the width of described main drill lip, and the drift angle of described main drill lip is 40 °~70 °.
The utility model long-spiral replaceable and extruded borehole rig, the drift angle of described main drill lip are 60 °
Compared with prior art, the utility model long-spiral replaceable and extruded borehole rig can be extruded into both sides with large diameter cobble by cross bit, the special-shaped tower drilling rod formed of the blade of core pipe by different-diameter and different pitch is brought the cobble of different-grain diameter up again, to replace used the banketing of cobble simultaneously inserts in the hole, by the soil compaction device that is installed on the helical blade clay in the hole is pushed again, make the clay around the stake hole obtain compacted, stable, slick and sly to guarantee hole wall, solved the problem of hole wall collapse.Use the utility model long-spiral replaceable and extruded borehole rig to carry out the construction of slope protection pile, the hole wall slyness of its slope protection pile, regular, be not prone to phenomenons such as the hole of collapsing, bulge, make that the fullness coefficient of pile concrete is less, saved pile concrete, reduce construction cost, reduced the potential safety hazard that in the past in sand pebble layer, adopts manual digging pile construction.
Other details of the utility model long-spiral replaceable and extruded borehole rig and characteristics can hereinafter and in conjunction with the accompanying drawings the embodiment of detailed description just can be cheer and bright by reading.
Description of drawings
Front view when Fig. 1 is unkitted the soil compaction device for the utility model long-spiral replaceable and extruded borehole rig;
Left view when Fig. 2 is unkitted the soil compaction device for the utility model long-spiral replaceable and extruded borehole rig;
Vertical view when Fig. 3 is unkitted the soil compaction device for the utility model long-spiral replaceable and extruded borehole rig;
Upward view when Fig. 4 is unkitted the soil compaction device for the utility model long-spiral replaceable and extruded borehole rig;
Schematic diagram when Fig. 5 loads onto the soil compaction device for the utility model long-spiral replaceable and extruded borehole rig;
Fig. 6 is that the A-A of Fig. 5 is to sectional view;
Fig. 7 is a kind of structural representation of soil compaction device;
Fig. 8 is the vertical view of Fig. 7;
Fig. 9 is the stereogram of soil compaction device;
Figure 10 installs the schematic diagram of the soil compaction device of another kind of structure for Fig. 6;
The schematic diagram of punching displacement cobble when Figure 11 constructs for using the utility model long-spiral replaceable and extruded borehole rig;
Figure 12 is the schematic diagram that bankets when using the utility model long-spiral replaceable and extruded borehole rig to construct;
The schematic diagram of soil compaction when Figure 13 constructs for using the utility model long-spiral replaceable and extruded borehole rig.
The specific embodiment
To shown in Figure 10, the utility model long-spiral replaceable and extruded borehole rig comprise drill bit and long screw drill rod 2 as Fig. 1.Long screw drill rod 2 is special-shaped tower drilling rod, and all less than a last joint, the pitch of helical blade 21 all equates the external diameter of every joint core pipe 23 on every joint core pipe 23, and width is all greater than a last joint.Have blade through hole 211 on the helical blade 21 of long screw drill rod 2, long-spiral replaceable and extruded borehole rig also are provided with soil compaction device 3, and soil compaction device 3 is removably mounted on the helical blade 21 by the through hole on the helical blade 21.Soil compaction device 3 be shaped as the cambered surface sheet, the bottom is provided with two and connects legs 31, each connect have on leg 31 with helical blade 21 on the soil compaction device that adapts of blade through hole 211 through hole 301 is installed.Drill bit is a cross bit 1, cross bit 1 comprises the flat main drill lip 11 of isosceles triangle, on main drill lip 11 each face, be provided with the flat secondary drill lip 12 of a right-angled triangle, the long right-angle side of secondary drill lip 12 and the central lines of main drill lip 11, the length of secondary drill lip 12 is less than the length of main drill lip 11, the width of described secondary drill lip 12 is less than the width of described main drill lip 11, and the drift angle of described main drill lip 11 is 40 °, 45 °, 50 °, 55 °, 60 °, 65 °, 70 °.On two waists of the isosceles triangle of main drill lip 11 carbide chip 111 is installed, stagger mutually in the position of the carbide chip 111 on two waists, carbide chip 121 positions of installing on the hypotenuse of 121, two secondary drill lips 12 of carbide chip are installed on the hypotenuse of each secondary drill lip 12 staggers mutually.
To shown in Figure 13, the utility model long-spiral replaceable and extruded borehole rig are constructed according to following steps in use as Figure 11;
1) selects unit head and the long screw drill rod 2 and the cross bit 1 of corresponding power according to the length of the buried depth of boulder bed, thickness, slope protection pile, the degree of depth that slope protection pile enters boulder bed;
2) begin to creep into according to design attitude, when creeping into, the size of strict control electric current keeps the slow-speed of revolution, to guarantee bigger moment of torsion;
3) enter the boulder bed of certain depth after, drilling rod 2 is all proposed;
4) detect the hole wall quality of being holed, measure the particular location of hole void;
5) clay backfilling gone into hole, the degree of depth will be filled to more than the whole boulder bed;
6) soil compaction device 3 is installed on the helical blade 21 with the corresponding long screw drill rod 2 in the pertusate position of hole wall, with drilling rod 2 put into once more hole, start rig drilling rod is bored for 2 times, when drilling to completion, drilling rod 2 is all proposed;
7) reinforcing cage is positioned over hole;
8) placing of concrete.
As Fig. 7~shown in Figure 10, soil compaction device 3 can have different shape and size, is used for realizing different soil compaction effects.Control the amount of the soil compaction device 3 that clay passes through by the size of the opening between soil compaction device 3 and the core pipe 23, remaining clay is then clamp-oned in the hole of collapsing by soil compaction device 3, makes hole wall stable, slick and sly.
Embodiment recited above is described preferred implementation of the present utility model; be not that design of the present utility model and scope are limited; do not breaking away under the utility model design scheme prerequisite; common engineers and technicians make the technical solution of the utility model in this area various modification and improvement; all should fall into protection domain of the present utility model; the technology contents that the utility model is asked for protection all is documented in claims.

Claims (10)

1. long-spiral replaceable and extruded borehole rig, comprise drill bit and long screw drill rod (2), it is characterized in that: described drill bit is cross bit (1), have blade through hole (211) on the helical blade (21) of described long screw drill rod (2), described long-spiral replaceable and extruded borehole rig also are provided with soil compaction device (3), and described soil compaction device (3) is removably mounted on the helical blade (21) by the through hole on the helical blade (21).
2. long-spiral replaceable according to claim 1 and extruded borehole rig is characterized in that: described long screw drill rod is special-shaped tower drilling rod.
3. long-spiral replaceable according to claim 2 and extruded borehole rig, it is characterized in that: the tower drilling rod of described abnormity, the external diameter of every joint core pipe (23) is all less than a last joint, and the pitch that every joint core pipe (23) is gone up helical blade (21) equates that all width is all greater than a last joint.
4. according to claim 1 or 2 or 3 described long-spiral replaceables and extruded borehole rig, it is characterized in that: described soil compaction device (3) be shaped as the cambered surface sheet, the bottom is provided with two and connects legs (31), each connect have on leg (31) with helical blade (21) on the soil compaction device that adapts of blade through hole (211) through hole (301) is installed.
5. according to claim 1 or 2 or 3 described long-spiral replaceables and extruded borehole rig, it is characterized in that: described cross bit (1) comprises the flat main drill lip (11) of isosceles triangle, on each face of main drill lip (11), be provided with the flat secondary drill lip (12) of a right-angled triangle, the long right-angle side of secondary drill lip (12) and the central lines of main drill lip (11), carbide chip (111) is installed on two waists of the isosceles triangle of main drill lip (11), stagger mutually in the position of the carbide chip on two waists (111), carbide chip (121) is installed on the hypotenuse of each secondary drill lip (12), staggers mutually in carbide chip (121) position of installing on the hypotenuse of two secondary drill lips (12).
6. long-spiral replaceable according to claim 4 and extruded borehole rig, it is characterized in that: described cross bit (1) comprises the flat main drill lip (11) of isosceles triangle, on each face of main drill lip (11), be provided with the flat secondary drill lip (12) of a right-angled triangle, the long right-angle side of secondary drill lip (12) and the central lines of main drill lip (11), carbide chip (111) is installed on two waists of the isosceles triangle of main drill lip (11), stagger mutually in the position of the carbide chip on two waists (111), carbide chip (121) is installed on the hypotenuse of each secondary drill lip (12), staggers mutually in carbide chip (121) position of installing on the hypotenuse of two secondary drill lips (12).
7. long-spiral replaceable according to claim 5 and extruded borehole rig, it is characterized in that: the length of described secondary drill lip (12) is less than the length of described main drill lip (11), the width of described secondary drill lip (12) is less than the width of described main drill lip (11), and the drift angle of described main drill lip (11) is 40 °~70 °.
8. long-spiral replaceable according to claim 6 and extruded borehole rig, it is characterized in that: the length of described secondary drill lip (12) is less than the length of described main drill lip (11), the width of described secondary drill lip (12) is less than the width of described main drill lip (11), and the drift angle of described main drill lip (11) is 40 °~70 °.
9. long-spiral replaceable according to claim 7 and extruded borehole rig is characterized in that: the drift angle of described main drill lip (11) is 60 °.
10. long-spiral replaceable according to claim 8 and extruded borehole rig is characterized in that: the drift angle of described main drill lip (11) is 60 °.
CNU2007201042346U 2007-04-13 2007-04-13 Long spiral replaced and compacted driller Expired - Fee Related CN201024891Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201042346U CN201024891Y (en) 2007-04-13 2007-04-13 Long spiral replaced and compacted driller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201042346U CN201024891Y (en) 2007-04-13 2007-04-13 Long spiral replaced and compacted driller

Publications (1)

Publication Number Publication Date
CN201024891Y true CN201024891Y (en) 2008-02-20

Family

ID=39098747

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201042346U Expired - Fee Related CN201024891Y (en) 2007-04-13 2007-04-13 Long spiral replaced and compacted driller

Country Status (1)

Country Link
CN (1) CN201024891Y (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725323B (en) * 2009-12-03 2012-05-09 中冶交通工程技术有限公司 Spiral drill
CN103541667A (en) * 2013-09-30 2014-01-29 王君 Flushing drill bit
CN103835285A (en) * 2014-04-01 2014-06-04 宁波市江东元典知识产权服务有限公司 Construction method and special hole forming machine of concrete cylinder buried in soft foundation
CN104499939A (en) * 2014-11-25 2015-04-08 重庆市永川区石梁子煤业有限公司 Hydraulic drilling rig for coal mine
CN105436933A (en) * 2015-12-16 2016-03-30 无锡福镁轻合金科技有限公司 Drilling machine
CN105484680A (en) * 2015-12-15 2016-04-13 荣昌精密机械(苏州)有限公司 Combined drill rod applied to spiral drilling machine
CN106401462A (en) * 2016-10-31 2017-02-15 广西固瑞科技股份有限公司 Drilling method for tracking drill bit
CN106481289A (en) * 2016-12-13 2017-03-08 邵金安 Auger stem, rig and the stake holes being molded by auger stem and VDS bored concrete pile
CN107366503A (en) * 2016-05-13 2017-11-21 周兆弟 A kind of underlying drill rod assemblies of power
CN108179978A (en) * 2018-01-10 2018-06-19 河南理工大学 Strengthen cherry coal rock intensity drilling method and drilling tool
CN108278079A (en) * 2018-01-10 2018-07-13 河南理工大学 Strengthen cherry coal rock intensity layered cutting drilling method and drilling tool
CN109723393A (en) * 2019-02-25 2019-05-07 刘守进 A kind of spiral is at hole drill tool and bore forming method
CN110984850A (en) * 2019-12-23 2020-04-10 周振珊 Surrounding type compacted synchronous drilling equipment special for mine

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725323B (en) * 2009-12-03 2012-05-09 中冶交通工程技术有限公司 Spiral drill
CN103541667A (en) * 2013-09-30 2014-01-29 王君 Flushing drill bit
CN103835285A (en) * 2014-04-01 2014-06-04 宁波市江东元典知识产权服务有限公司 Construction method and special hole forming machine of concrete cylinder buried in soft foundation
CN103835285B (en) * 2014-04-01 2016-08-17 宁波市江东元典知识产权服务有限公司 It is embedded in the construction method of the concrete barrel of subgrade and special perforating device thereof
CN104499939A (en) * 2014-11-25 2015-04-08 重庆市永川区石梁子煤业有限公司 Hydraulic drilling rig for coal mine
CN105484680A (en) * 2015-12-15 2016-04-13 荣昌精密机械(苏州)有限公司 Combined drill rod applied to spiral drilling machine
CN105484680B (en) * 2015-12-15 2017-12-05 温州聚龙知识产权有限公司 A kind of combined drill rod applied to twist bit
CN105436933A (en) * 2015-12-16 2016-03-30 无锡福镁轻合金科技有限公司 Drilling machine
CN107366503A (en) * 2016-05-13 2017-11-21 周兆弟 A kind of underlying drill rod assemblies of power
CN106401462B (en) * 2016-10-31 2018-09-21 广西固瑞科技股份有限公司 A kind of boring method of tracking drill bit
CN106401462A (en) * 2016-10-31 2017-02-15 广西固瑞科技股份有限公司 Drilling method for tracking drill bit
CN106481289A (en) * 2016-12-13 2017-03-08 邵金安 Auger stem, rig and the stake holes being molded by auger stem and VDS bored concrete pile
CN108278079A (en) * 2018-01-10 2018-07-13 河南理工大学 Strengthen cherry coal rock intensity layered cutting drilling method and drilling tool
CN108179978A (en) * 2018-01-10 2018-06-19 河南理工大学 Strengthen cherry coal rock intensity drilling method and drilling tool
CN108278079B (en) * 2018-01-10 2019-04-16 河南理工大学 Strengthen cherry coal rock intensity layered cutting drilling method and drilling tool
CN109723393A (en) * 2019-02-25 2019-05-07 刘守进 A kind of spiral is at hole drill tool and bore forming method
CN110984850A (en) * 2019-12-23 2020-04-10 周振珊 Surrounding type compacted synchronous drilling equipment special for mine

Similar Documents

Publication Publication Date Title
CN201024891Y (en) Long spiral replaced and compacted driller
CN101029559B (en) Long-spiral replaceable and extruded borehole construction
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN106088099A (en) A kind of subway foundation pit anchor cable processing method
CN105926391B (en) A kind of curb method for widening of existing railway roadbed
CN103526754A (en) Method for constructing head-expanded anchoring rod in sand-rich decomposed rock
CN102296591A (en) Rapid drainage solidifying treatment method of soft soil foundation
CN103643674A (en) Erect column pile construction method under geologic condition of pebble bed sandstone
CN102829246B (en) Arrangement method for jacking pipe of circular caisson
Mangushev et al. Modern technologies of foundation building in the conditions of weak soils of St. Petersburg
Gao et al. Experimental Study on the Bearing Characteristics of Rigid-Flexible Long-Short Pile Composite Foundations in Thick Collapsible Loess Areas
CN102829245A (en) Method for arranging jacking pipe of rectangular open caisson
CN204626443U (en) A kind of transmission line of electricity batter post directly digs and expands the large plate base in the end
CN105133629B (en) A kind of determination method of refuse landfill Groundwater Control System Halt water curtain
Mitew-Czajewska Geotechnical investigation and static analysis of deep excavation walls–a case study of metro station construction in Warsaw
CN1081266C (en) Hole forming process by wall sliding of large diameter pile
Song et al. Stop-end method for the panel connection of cut-off walls
CN201362846Y (en) Bagged scattered solid for grout hole forming in concrete weight body
CN110985026B (en) Shield station-crossing construction method for layered backfilling in narrow shaft
CN208105284U (en) A kind of detachable casing structure improving soft layer pile foundation hole quality
CN103161183B (en) Dry ash storehouse building lot reinforcement means
CN202430740U (en) Construction assembly for forming underground continuous wall through secant piles
Ai-hua Optimal Design and Application of Earthwork Excavation Scheme for Deep Foundation Pit: Taking the New Construction of the Entrance and Exit of the Underground Passage in the
Rao et al. Treatment Technology of Closed Tunnel Filled with Water
Xu et al. Research on deformation monitoring and stability of argillaceous siltstone soil-like slope

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080220

Termination date: 20110413