CN201010854Y - Combined prestressed hanging bridge - Google Patents

Combined prestressed hanging bridge Download PDF

Info

Publication number
CN201010854Y
CN201010854Y CNU2007202000656U CN200720200065U CN201010854Y CN 201010854 Y CN201010854 Y CN 201010854Y CN U2007202000656 U CNU2007202000656 U CN U2007202000656U CN 200720200065 U CN200720200065 U CN 200720200065U CN 201010854 Y CN201010854 Y CN 201010854Y
Authority
CN
China
Prior art keywords
bridge
utility
model
prestressed
prestressed cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007202000656U
Other languages
Chinese (zh)
Inventor
安竹石
郑新贵
吴建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou University
Original Assignee
Guizhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou University filed Critical Guizhou University
Priority to CNU2007202000656U priority Critical patent/CN201010854Y/en
Application granted granted Critical
Publication of CN201010854Y publication Critical patent/CN201010854Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a combined prestressing hanging bridge. The utility model comprises a hanging bridge; the two ends of the hanging bridge are provided with a tower pole(1); the tower pole(1) is provided with a prestressing rope(5); the bridge surface(4) of the hanging bridge is connected with the prestressing rope(5). The utility model adopts the prestressing rope to enhance the stability of the hanging bridge; the utility model adopts the tower pole base of the two banks of the hanging bridge as the fixing base of the prestressing rope anchor; and the utility model needs no fixing base to exert the prestress. Compared with the prior hanging bridge, the project construction cost increases little and has a high stability; the position of the prestress component is on the bridge table and will not be influenced by the terrain and the water level; and the utility model is convenient to be constructed. The utility model is applicable to the walking hanging bridge and the submerged bridge of the reservoir basin; and the utility model has a large market.

Description

Combined prestressed drawbridge
Technical field:
The utility model relates to a kind of combined prestressed drawbridge, belongs to large span People's Bank of China suspension bridge technical field.
Background technology:
Because three plate stream storehouses are built up, Jianhe County, clear water river section water level rises 50 meters, and many small towns, number county original paths such as Guizhou Jianhe are submerged.Masses' dealing and student go to school and are broken by water resistance, must construct a bridge.Because the restriction of construction costs can only be built pedestrian bridge, span does not wait from 100 meters to 320 meters, and bridge floor is wide only 2 meters, and width 1/50~1/160, longeron are rail.Consider that livestock also will pass a bridge, therefore higher to the stability requirement of bridge.People's Bank of China of the prior art its structure of suspension bridge is generally at the two ends, riverbank builds king-post, connect main rope on the king-post, main rope connects the bridge floor of suspension bridge by suspension rod, the width of suspension bridge is usually in 1/30, when the span of suspension bridge surpasses 150 meters, the wind resistance rope that this bridge is general can not satisfy vertical and the lateral stability requirement, understands and must be rocked by wind, even suspension bridge blown turn over.In order to improve the stability of suspension bridge, if suspension bridge adopts horizontal wind resistance rope to launch in the both sides of bridge, from the plane, because bridge site is generally narrow in the river course, the two sides salient position, the wind resistance rope can't set up sometimes.If arch (promptly from bridge under the anti-rope that draws one) adopted open by suspension bridge, increase vertical rigidity, the place can adopt at the dry river ditch, and reservoir is then not all right.Because bridge floor is apart from the water surface very near (as raise bridge floor, span increases many), vang is fallen with regard under water in a position that not have down to open arch not so, from opening the navigation or air flight and requirement for anticorrosion does not allow.
Summary of the invention:
The purpose of this utility model is: the combined prestressed drawbridge that a kind of cost is lower, be suitable for the suspension bridge construction of large span People's Bank of China is provided.
Combined prestressed drawbridge of the present utility model is, it comprises suspension bridge, and the two ends of suspension bridge are provided with king-post (1), are provided with prestressed cable (5) between king-post (1), and the bridge floor of suspension bridge (4) links together with prestressed cable (5).
Above-mentioned combined prestressed drawbridge, king-post (1) is gone up and is connected main rope (2), main rope (2) is by the bridge floor (4) of suspension rod (3) connection suspension bridge, and in suspension rod (3) each junction with bridge floor (4), bridge floor (4) is fixed together by folder (6) and prestressed cable (5).
Above-mentioned combined prestressed drawbridge is provided with prestressed cable anchor (7) at the suspension bridge two ends, connect prestressed cable (5) between the prestressed cable anchor (7).
Above-mentioned combined prestressed drawbridge is provided with prestressed cable anchor (7) on the king-post (1) at suspension bridge two ends, connect prestressed cable (5) between the prestressed cable anchor (7).
The utility model adopts prestressed cable to improve the stability of suspension bridge, utilizes the immobilizing foundation of the king-post basis of suspension bridge two sides as the prestressed cable anchor, need not build immobilizing foundation in addition, can apply prestressing force.Compare with existing suspension bridge, construction costs increases little, and stability is high, and the prestressing force position component is not subjected to the influence of landform and water level at the abutment place, and it is comparatively convenient to construct.Be applicable to People's Bank of China's suspension bridge of large span, flood at the reservoir basin and go back bridge that bigger market is arranged.
Description of drawings:
Accompanying drawing 1 is a structural representation of the present utility model;
Accompanying drawing 2 is the A-A sectional view of accompanying drawing 1.
The specific embodiment:
Embodiment of the present utility model: adopt existing suspension bridge design, produce king-post (1) at the two ends, riverbank of building suspension bridge, king-post (1) is gone up and is connected main rope (2), one end of main rope (2) connects anchor ingot (11), imbed in the massif (10), main rope (2) is born the gravity of bridge floor (4) by the bridge floor (4) of suspension rod (3) connection suspension bridge, connect prestressed cable (5) between the king-post (1) at suspension bridge two ends, bridge floor (4) links together with prestressed cable (5).Improve the horizontal and vertical stability of suspension bridge by prestressed cable (5), and the cost of making prestressed cable (5) is low, is applicable to People's Bank of China's suspension bridge of large span.
The prestressed cable of suspension bridge (5) design all can in top, the below of bridge floor (4), produce the basis at the suspension bridge two ends, fix prestressed cable anchor (7), connect prestressed cable (5) between the prestressed cable anchor (7), also prestressed cable anchor (7) can be squeezed in the massif (10).In order to save cost, can directly adopt the basis of the basis of king-post (1) as prestressed cable anchor (7), on the basis of the king-post (1) at suspension bridge two ends, produce prestressed cable anchor (7), connect prestressed cable (5) between the prestressed cable anchor (7).When building, prestressed cable (5) can be installed in longeron (8) below of bridge floor (4), the crossbeam (9) for walking usefulness is installed in longeron (8) top, suspension rod (3) is fixed on the longeron (8), in suspension rod (3) each junction with bridge floor (4), bridge floor (4) is fixed together by folder (6) and prestressed cable (5), when about bridge floor, when teetertottering, because the existence of prestressed cable (5), can reduce the amplitude that suspension bridge rocks, improve stability, improvement value is relevant with the tension force of prestressed cable (5), can be calculated by designing requirement and determine.
Large-scale suspension highway bridge road bridge bridge floor broad, general 9~28 meters, longeron rigidity is very big, normally steel case beam, steel truss beam and prestressed concrete beam, from great, width is no more than 1/40 generally 1/25~1/35.These bridges can solve stable problem by the rigidity of longeron self.Can adopt the combined type form of drawing of hanging in case of necessity, as the Wujiang River, Guizhou bridge.So technology of the present utility model is not suitable for suspension highway bridge, it is big to be suitable for span, and the lower-cost People's Bank of China of cost suspension bridge.

Claims (4)

1. combined prestressed drawbridge, it comprises suspension bridge, the two ends of suspension bridge are provided with king-post (1), it is characterized in that: be provided with prestressed cable (5) between king-post (1), the bridge floor of suspension bridge (4) links together with prestressed cable (5).
2. combined prestressed drawbridge according to claim 1, it is characterized in that: king-post (1) is gone up and is connected main rope (2), main rope (2) connects the bridge floor (4) of suspension bridge by suspension rod (3), in suspension rod (3) each junction with bridge floor (4), bridge floor (4) is fixed together by folder (6) and prestressed cable (5).
3. combined prestressed drawbridge according to claim 1 and 2 is characterized in that: be provided with prestressed cable anchor (7) at the suspension bridge two ends, connect prestressed cable (5) between the prestressed cable anchor (7).
4. combined prestressed drawbridge according to claim 3 is characterized in that: be provided with prestressed cable anchor (7) on the king-post (1) at suspension bridge two ends, connect prestressed cable (5) between the prestressed cable anchor (7).
CNU2007202000656U 2007-02-12 2007-02-12 Combined prestressed hanging bridge Expired - Fee Related CN201010854Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007202000656U CN201010854Y (en) 2007-02-12 2007-02-12 Combined prestressed hanging bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007202000656U CN201010854Y (en) 2007-02-12 2007-02-12 Combined prestressed hanging bridge

Publications (1)

Publication Number Publication Date
CN201010854Y true CN201010854Y (en) 2008-01-23

Family

ID=39045798

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007202000656U Expired - Fee Related CN201010854Y (en) 2007-02-12 2007-02-12 Combined prestressed hanging bridge

Country Status (1)

Country Link
CN (1) CN201010854Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680598A (en) * 2018-12-19 2019-04-26 中铁大桥勘测设计院集团有限公司 A kind of people's row braced-chain suspension bridge using glass bridge floor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680598A (en) * 2018-12-19 2019-04-26 中铁大桥勘测设计院集团有限公司 A kind of people's row braced-chain suspension bridge using glass bridge floor
CN109680598B (en) * 2018-12-19 2021-01-15 中铁大桥勘测设计院集团有限公司 Pedestrian suspension chain bridge adopting glass bridge deck

Similar Documents

Publication Publication Date Title
CN104499413B (en) Modularity punching block concrete combination arch bridge and suspension cable hanging construction method thereof
CN204282199U (en) Pile-column concrete hollow pile bridge pier structure
CN104404869A (en) Pile column type concrete hollow pile pier structure
CN101215819B (en) Separated double-layer bridge-floor cable stayed bridge
CN103410082B (en) Double-layer bridge floor cable-stayed bridge
CN203247495U (en) Pedestrian rope bridge
CN208995896U (en) Space truss suspension bridge
CN209162616U (en) Formula main cable suspension bridge structure outside a kind of tunnel immediately adjacent to bridge
CN201952737U (en) Stay rope hanging basket suitable for wide double plane cable stayed bridge
CN105133484B (en) A kind of part earth anchor higher-lower tower cable-stayed bridge structure
CN107489090A (en) A kind of circle bamboo space truss bridge based on novel joint make
CN201778275U (en) Dual-lane cableway bridge
CN101368370B (en) Wind-proof temporary rest pier and wind-proof method for large span stayed-cable bridge cantilever construction
CN201317908Y (en) Double deck cable stayed bridge of separation type
CN113174829B (en) Half-through type suspension bridge structure
CN205775786U (en) A kind of novel railway curve Cable-stayed Bridge with Slanted Pylon
CN208072166U (en) Hybrid combining beam three stride continuous suspension bridge
CN201411627Y (en) Steel-concrete composite tower-beam consolidation kilometer grade multi-span suspension bridge
CN201010854Y (en) Combined prestressed hanging bridge
CN202530364U (en) Inverted triangle pier simply supported or continuous bridge structure
CN216663757U (en) Bridge span structure of pedestrian bridge
CN101012634A (en) Combined prestressed drawbridge and method for making same
CN108978436A (en) Space truss suspension bridge
CN206941363U (en) A kind of long-span arch bridge bridge floor beam supporting system
CN214089518U (en) Double-amplitude four-cable-plane cable-stayed bridge of single-blade hyperboloid single-column tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
COR Change of bibliographic data

Free format text: CORRECT: CO-PATENTEE TO: QIAOLIANGSHEJI YARD, GUIZHOU PROVINCE ^

CU01 Correction of utility model patent

Correction item: Co-patentee

Correct: Guizhou Bridge Design Institute

Number: 04

Page: The title page

Volume: 24

CU03 Correction of utility model patent gazette

Correction item: Co-patentee

Correct: Guizhou Bridge Design Institute

Number: 04

Volume: 24

ERR Gazette correction

Free format text: CORRECT: CO-PATENTEE; FROM: NONE ^ TO: QIAOLIANGSHEJI YARD, GUIZHOU PROVINCE ^

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080123

Termination date: 20120212