CN201002941Y - Winch rope arranger - Google Patents

Winch rope arranger Download PDF

Info

Publication number
CN201002941Y
CN201002941Y CNU2006201616628U CN200620161662U CN201002941Y CN 201002941 Y CN201002941 Y CN 201002941Y CN U2006201616628 U CNU2006201616628 U CN U2006201616628U CN 200620161662 U CN200620161662 U CN 200620161662U CN 201002941 Y CN201002941 Y CN 201002941Y
Authority
CN
China
Prior art keywords
gear
winch
wheel
gas
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2006201616628U
Other languages
Chinese (zh)
Inventor
吴师桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2006201616628U priority Critical patent/CN201002941Y/en
Application granted granted Critical
Publication of CN201002941Y publication Critical patent/CN201002941Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ropes Or Cables (AREA)

Abstract

The utility model relates to a winch wireline guide, comprising a winch roller and a winch shaft. One end of the winch shaft is provided with a first chain wheel. The first chain wheel is meshed with a second chain wheel. The other end of the shaft of the second chain wheel is provided with a first gear. A second gear is positioned under the first gear. The first gear is meshed with the second gear, and synchronously the first gear is meshed with a third gear. The third gear is positioned on one end of a screw rod, and the screw rod is positioned on the bracket. The screw rod is provided with a guide rope wheel connected with a guide wheel, and the guide wheel is connected with the carrying roller. The steel wire rounds the guide rope wheel and passes through the groove formed by the clamping for the guide rope wheel and the guide wheel edge, and is through from the lower end of the guide wheel. The screw rod is connected with the piston rod, and the piston rod is positioned in the pneumatic implement. One end of the bracket is provided with a first programmed switch, and the other end of the bracket is provided with a second programmed switch. The utility model adopts the pneumatic controlling, which completely solves the problem of separating ring and pressing rope for the steel rope and provides the safeguard for production and running. The utility model has the advantages of a simple structure, convenient stallation and use and low cost, which provides the good technical proposal for big and medium sized winch.

Description

Winch rope arranger
Technical field
The utility model relates to lifting means, is a kind of Winch rope arranger that uses on winch.
Background technology
Winch is the lifting transportation device that each industrial and mining enterprises uses aborning, and middle-size and small-size winch is because simple structure, easy for installation can adapt to various working environments, so generally use in each industrial and mining enterprises.Yet knocking over that winch is prone to and crowded rope problem are again the principal elements that directly influences winch safe operation problem, because the mine production requirement can not have spark, therefore, this is the technical scheme that those skilled in the art are researching and solving always, does not have so far not produce the report that spark can thoroughly solve the technical scheme of knocking over and crowded rope.
Summary of the invention
The purpose of this utility model is, a kind of Winch rope arranger is provided, and it can solve the deficiency that prior art exists, and winch is under the state of a control steel cable at operation process all the time, guarantees steel cable folding and unfolding and arrangement according to the order of sequence.
The utility model for achieving the above object, be achieved through the following technical solutions: Winch rope arranger, comprise winch drum and winch axle, winch axle one end is installed first sprocket wheel, first sprocket wheel and second sprocket engagement, the axle other end of second sprocket wheel is installed first gear, and second gear is installed in first gear below, first gear and second gear mesh, while first gear and the 3rd gear mesh, the 3rd gear is installed in leading screw one end, and leading screw is rack-mount, sheave is installed on the leading screw, sheave is connected with track adjusting wheel, and track adjusting wheel is connected with carrying roller, and steel cable is walked around sheave, and pass the groove that sheave and track adjusting wheel edge fasten and form, passed by the track adjusting wheel lower end, leading screw is connected with piston rod, and piston rod is inserted in the air-operated apparatus, one end of support is installed first programmed switch, and the other end of support is installed second programmed switch.First programmed switch links to each other with the cavity of change-over swith by gas piping, and piston is installed in the change-over swith, and piston is connected with piston rod, and the piston rod outer end is connected with connecting plate, and connecting plate is connected with gas switch, and gas switch is connected with air-operated apparatus by gas piping.Sheave is connected with second connecting panel with first connecting panel respectively with the track adjusting wheel both sides.Second programmed switch is connected with accumulator by gas piping, and accumulator is connected with gas switch by gas piping.Connecting plate is connected with guiding bolt one end, and the guiding bolt other end is connected with the spool of gas switch, offers first gas passage and second gas passage on the spool.The first gas passage tilt distribution.
Advantage of the present utility model is: the power that it rotates with the winch axle drives leading screw and rotates, sheave is installed on the leading screw, sheave is connected with other parts, making steel cable walk around sheave passes sheave and track adjusting wheel edge and fastens after the groove that forms, pass by the track adjusting wheel lower end again and have certain tensioner degree all the time, and under programmed switch control, reciprocatingly move along leading screw by the sheave drive, thereby the orderly folding and unfolding of steel cable and arrangement have according to the order of sequence been realized, and owing to adopt air operated control, the knocking over and the crowded rope problem of steel cable have thoroughly been solved, for production run provides safety control, the utility model is simple for structure, and is easy to install, cheap, for vast middle-size and small-size winch provides optimal technical scheme.
Description of drawings
Accompanying drawing 1 is the utility model structural representation; Accompanying drawing 2 is plan structure scheme drawings of accompanying drawing 1: accompanying drawing 3 is gas switch 13 and the structure enlarged diagram that is connected 28 parts such as grade in the accompanying drawing 2: accompanying drawing 4 is plan structure scheme drawings of accompanying drawing 3.
The specific embodiment
The contrast accompanying drawing is described further the utility model:
Among the figure, the 21st, cylinder, the 24th, the winch axle, winch axle 24 1 ends are installed first sprocket wheel 2, first sprocket wheel 2 and 4 engagements of second sprocket wheel, the axle other end of second sprocket wheel 4 is installed first gear, 5, the first gears, 5 belows second gear 6 is installed, first gear 5 and 6 engagements of second gear, first gear 5 and 7 engagements of the 3rd gear simultaneously, the 3rd gear 7 is installed in leading screw 8 one ends, and leading screw 8 is installed on the support 1, sheave 9 is installed on the leading screw 8, sheave 9 is connected with track adjusting wheel 17, and track adjusting wheel 17 is connected with carrying roller 18, and steel cable 25 is walked around sheave 9, and pass the groove that sheave 9 and track adjusting wheel 17 edges fasten and form, passed by track adjusting wheel 17 lower ends, leading screw 8 is connected with piston rod 29, and piston rod 29 is inserted in the air-operated apparatus 15, one end of support 1 is installed first programmed switch 10, and the other end of support 1 is installed second programmed switch 34.First programmed switch 10 links to each other with the cavity of change-over swith 12 by gas piping 11, piston 32 is installed in the change-over swith 12, and piston 32 is connected with piston rod 33, and piston rod 33 outer ends are connected with connecting plate 28, connecting plate 28 is connected with gas switch 13, and gas switch 13 is connected with air-operated apparatus 15 by gas piping 14.Sheave 9 is connected with second connecting panel 35 with first connecting panel 30 respectively with track adjusting wheel 17 both sides.Second programmed switch 34 is connected with accumulator 16 by gas piping 27, and gas piping 27 1 ends are connected with accumulator 16, and accumulator 16 is connected with gas switch 13 by gas piping.Connecting plate 28 is connected with guiding bolt 31 1 ends, and guiding bolt 31 other ends are connected with the spool 36 of gas switch 13, offer first gas passage 37 and second gas passage, 38, the first gas passages, 37 tilt distribution on the spool 36.During the utility model work, winch axle 24 rotates, by first sprocket wheel 2, second sprocket wheel 4, chain 3 drives first gear 5 and rotates, first gear 5 meshes with second gear 6 and the 3rd gear 7 respectively, because first gear 5 and second gear 6 mesh and direction of rotation, so, when leading screw 8 rises under the effect of air-operated apparatus 15, forward rotation is made in the 3rd gear 7 and 5 engagements of first gear, when leading screw 8 descended under the effect of air-operated apparatus 15, the 3rd gear 7 and second gear mesh were made backward rotation, rotated thereby reach leading screw 8, sheave 9 is done laterally moved back and forth, drive steel cable 25 and do orderly folding and unfolding arrangement.The utility model adopts the orderly folding and unfolding of air operated control steel cable to arrange, for security consideration has designed programmed switch and pneumatic switch, the spark of having stopped the production base occurs, programmed switch is by gas piping 11 intakes control change-over swith 12, change-over swith 12 drives gas switch 13 swings with piston 32 and connecting rod 33 form that moves reciprocatingly by connecting plate 28, to close or to open gas passage, make gas switch 13 conversion gas piping directions, control air-operated apparatus 15 up-and-down movements by gas piping 14 during gas switch 13 switch change-over gas transmission directions, thereby make leading screw 8 liftings.19 is springs among the figure, the 20th, and spring perch, the 22nd, stay bearing plate, the 23rd, base, the 26th, block.

Claims (6)

1, Winch rope arranger, comprise winch drum (21) and winch axle (24), it is characterized in that: winch axle (24) one ends are installed first sprocket wheel (2), first sprocket wheel (2) and second sprocket wheel (4) engagement, the axle other end of second sprocket wheel (4) is installed first gear (5), second gear (6) is installed in first gear (5) below, first gear (5) and second gear (6) engagement, first gear (5) meshes with the 3rd gear (7) simultaneously, the 3rd gear (7) is installed in leading screw (8) one ends, leading screw (8) is installed on the support (1), leading screw (8) is gone up sheave (9) is installed, sheave (9) is connected with track adjusting wheel (17), track adjusting wheel (17) is connected with carrying roller (18), steel cable (25) is walked around sheave (9), and pass the groove that sheave (9) and track adjusting wheel (17) edge fasten and form, pass by track adjusting wheel (17) lower end, leading screw (8) is connected with piston rod (29), piston rod (29) is inserted in the air-operated apparatus (15), one end of support (1) is installed first programmed switch (10), and the other end of support (1) is installed second programmed switch (34).
2, Winch rope arranger according to claim 1, it is characterized in that: first programmed switch (10) links to each other with the cavity of change-over swith (12) by gas piping (11), piston (32) is installed in the change-over swith (12), piston (32) is connected with piston rod (33), piston rod (33) outer end is connected with connecting plate (28), connecting plate (28) is connected with gas switch (13), and gas switch (13) is connected with air-operated apparatus (15) by gas piping (14).
3, Winch rope arranger according to claim 1 is characterized in that: sheave (9) is connected with second connecting panel (35) with first connecting panel (30) respectively with track adjusting wheel (17) both sides.
4, Winch rope arranger according to claim 1 and 2 is characterized in that: second programmed switch (34) is connected with accumulator (16) by gas piping (27), and accumulator (16) is connected with gas switch (13) by gas piping.
5, Winch rope arranger according to claim 2, it is characterized in that: connecting plate (28) is connected with guiding bolt (31) one ends, guiding bolt (31) other end is connected with the spool (36) of gas switch (13), offers first gas passage (37) and second gas passage (38) on the spool (36).
6, Winch rope arranger according to claim 5 is characterized in that: first gas passage (37) tilt distribution.
CNU2006201616628U 2006-12-27 2006-12-27 Winch rope arranger Expired - Fee Related CN201002941Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2006201616628U CN201002941Y (en) 2006-12-27 2006-12-27 Winch rope arranger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2006201616628U CN201002941Y (en) 2006-12-27 2006-12-27 Winch rope arranger

Publications (1)

Publication Number Publication Date
CN201002941Y true CN201002941Y (en) 2008-01-09

Family

ID=39038482

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2006201616628U Expired - Fee Related CN201002941Y (en) 2006-12-27 2006-12-27 Winch rope arranger

Country Status (1)

Country Link
CN (1) CN201002941Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010133005A1 (en) * 2009-05-18 2010-11-25 杭州天铭机电工具有限公司 Rope guiding device
CN102499611A (en) * 2011-11-08 2012-06-20 上海普英特高层设备有限公司 Traction and rope arranging mechanism for window cleaner
CN102649531A (en) * 2011-02-25 2012-08-29 天津俊昊海洋工程有限公司 Integrated type rear-mounted guide wheel rope discharge and rope storage friction winch
CN103935920A (en) * 2014-04-08 2014-07-23 徐州圣邦机械有限公司 Rope guiding device of winch
CN105110101A (en) * 2015-08-25 2015-12-02 无锡大力神钢构科技有限公司 Copper strip take-up and pay-off device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010133005A1 (en) * 2009-05-18 2010-11-25 杭州天铭机电工具有限公司 Rope guiding device
CN102649531A (en) * 2011-02-25 2012-08-29 天津俊昊海洋工程有限公司 Integrated type rear-mounted guide wheel rope discharge and rope storage friction winch
CN102649531B (en) * 2011-02-25 2014-09-10 天津俊昊海洋工程有限公司 Integrated type rear-mounted guide wheel rope discharge and rope storage friction winch
CN102499611A (en) * 2011-11-08 2012-06-20 上海普英特高层设备有限公司 Traction and rope arranging mechanism for window cleaner
CN103935920A (en) * 2014-04-08 2014-07-23 徐州圣邦机械有限公司 Rope guiding device of winch
CN105110101A (en) * 2015-08-25 2015-12-02 无锡大力神钢构科技有限公司 Copper strip take-up and pay-off device

Similar Documents

Publication Publication Date Title
CN206437794U (en) A kind of shaped steel carrying implement for building
CN100484861C (en) Winch rope arranger
CN201002941Y (en) Winch rope arranger
CN103183293A (en) Rope coring and arranging winch with heavy hook falling freely
CN202609821U (en) Fixed timber grab
CN203820352U (en) Automatic rope arranging device for winch
CN108675062A (en) Walking receives takeoff line machine
CN2892803Y (en) Mechanical reinforced synchronous rope winding jib for capstan
CN202072277U (en) Special fixture for brick feeding machine
CN202346632U (en) Mine hydraulic type lifting crane
CN202000996U (en) Rope arranging mechanism for logging winch
CN102061682A (en) Combined screw hoist
CN203229346U (en) Pneumatic rope-arranging device
CN2687087Y (en) Needle sheave drive type rope winding device and hydraulic drive capstan mounted therewith
CN201915365U (en) Combined threaded rod type headstock gear
CN2881158Y (en) Vertical beam-pumping unit
CN203047589U (en) Lifting device for sealing and cutting machine
CN102514885A (en) Power transmission system of scraper conveyor
CN201671537U (en) Reciprocating rail trolley
CN204661204U (en) A kind of guide tracked rope winding jib
CN203636285U (en) Special welding positioner for up-and-down square-butt-joint welds of movable arm of excavator
CN112252998A (en) Novel oil cylinder pressurization lifting device for blast hole drilling machine
CN203008866U (en) Pumping unit transmission system with movable pulley
CN201753598U (en) Chain type twin-well energy-saving oil extractor
CN204915716U (en) Mining pusher gear

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee