CN200985507Y - 混凝土封底、带桩帽和带桩翼的筒(管)桩 - Google Patents

混凝土封底、带桩帽和带桩翼的筒(管)桩 Download PDF

Info

Publication number
CN200985507Y
CN200985507Y CN 200620027413 CN200620027413U CN200985507Y CN 200985507 Y CN200985507 Y CN 200985507Y CN 200620027413 CN200620027413 CN 200620027413 CN 200620027413 U CN200620027413 U CN 200620027413U CN 200985507 Y CN200985507 Y CN 200985507Y
Authority
CN
China
Prior art keywords
pile
tube
stake
pipe
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620027413
Other languages
English (en)
Inventor
徐东强
刘春原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huabei Construction Group Co Ltd
Hebei University of Technology
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620027413 priority Critical patent/CN200985507Y/zh
Application granted granted Critical
Publication of CN200985507Y publication Critical patent/CN200985507Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种混凝土封底、带桩帽和带桩翼的筒(管)桩,它包括混凝土筒或管桩和桩底,其混凝土筒或管桩为现场浇筑的混凝土筒或管桩1,其底部后浇筑有封闭的柱底3,现场浇筑的混凝土筒或管桩的两侧对称位置处带桩翼2,其两桩翼2与筒或管桩1连成一体,在桩顶处加桩帽5,其优点是:筒桩的桩端承载力和桩侧摩擦阻力大,提高了单桩的承载力,因此减少了桩的个数,减少了整体材料,既节约了成本又加快了施工进度。增加了桩帽后提高了桩顶的强度,带桩翼和桩底的筒桩,使筒桩变为端承摩擦桩,提高了桩的承载力,减小了地基工后沉降。

Description

混凝土封底、带桩帽和带桩翼的筒(管)桩
技术领域
本实用新型涉及一种混凝土筒(管)桩,特别是涉及一种提高筒桩桩端承载力和桩侧摩擦阻力、节约材料、施工速度快和减小地基工后沉降的混凝土封底、带桩帽和带桩翼的筒或管桩。
背景技术
众所周知,目前,有种桩底后注浆预应力管桩,他对管桩桩底结构进行了改进,加固了桩端持力层,桩底端阻力大幅地提高,使桩周侧阻力有效发挥,从而使桩的承载力之大幅度提高,但该桩仅对压入的预制的管桩桩端持力层进行了注浆加固,而管桩顶部没有加桩帽,也不是现浇混凝土筒或管桩。另外,还有一种具有高压旋喷桩基的固底筒或管桩,预应力桩身插入高压旋喷桩基内,桩身和高压旋喷桩基连成一体,提高管桩端阻力和单桩承载力。但它是采用高压旋喷技术和静压预制桩技术相结合形成的新型桩,不是现浇混凝土筒或管桩,也没有涉及对预制桩桩顶的处理改造。由此可见,它们对于现场浇筑的混凝土筒或管桩,所形成的筒或管桩桩底均无封闭,筒或管桩也不带翼,对于预制的筒桩,虽加固了桩底持力层,但桩顶没有加桩帽。由于地质条件的复杂性,其实用性受到限制。
发明内容
本实用新型的主要目的在于克服以上不足而提供一种提高筒桩桩端承载力和桩侧摩擦阻力的混凝土封底、带桩帽和带桩翼的筒(管)桩。
本实用新型解决其技术问题所采用的技术方案是:它包括混凝土筒或管桩和桩底,其特征在于:混凝土筒或管桩为现场浇筑的混凝土筒或管桩1,其底部后浇筑有封闭的柱底3,现场浇筑的混凝土筒或管桩的两侧对称位置处带桩翼2,其两桩翼2与混凝土筒或管桩1连成一体,在桩顶处加桩帽5,桩帽5也与混凝土筒或管桩1连成一体。
本实用新型具有的优点和积极效果是:筒桩通过封底和带桩翼,增加了筒桩的桩端承载力和桩侧摩擦阻力,从而使单桩的承载力得到提高,因此在上部设计荷载确定的条件下,减少了桩的个数,也减少了整体材料,既节约了成本又加快了施工进度。通常桩顶部分受力大容易被损坏,所以增加桩帽后提高了桩顶的强度,封底带翼的筒桩,使筒桩变为端承摩擦桩,提高了桩的承载力,减小了地基工后沉降。
附图说明
图1是本实用新型的结构示意图;
图2是图1的A--A剖视示意图。
图1、图2中:1.筒或管桩,  2.桩翼,    3.桩底,  4.桩心,
            5.桩帽,      6.碎石层,  7.土工格栅。
具体实施方式
为能进一步了解本实用新型的发明内容特点及功效兹举例以下实施例,并配合附图详细说明如下,请参阅图1、图2。
如图1、图2所示:混凝土筒或管桩为现场浇筑的混凝土筒或管桩1,其底部后浇筑有封闭的柱底3,混凝土筒或管桩的两侧对称位置处带桩翼2,其两桩翼2与筒或管桩1连成一体,筒桩通过封底和带翼,使筒桩变为端承摩擦桩,增加了筒桩的桩端承载力和桩侧摩擦阻力,从而使单桩的承载力得到提高,因此在上部设计荷载确定的条件下,减少了桩的个数,也减少了整体材料,既节约了成本又加快了施工进度,减小了地基工后沉降。桩心4是原地基土,通常桩顶部分受力大容易被损坏,所以在桩顶处加桩帽5,增加桩帽5后提高了桩顶的强度,桩帽5也与筒或管桩1连成一体。桩帽5以上加盖200mm碎石层6和放置土工格栅7。
现场浇筑的混凝土筒或管桩1为圆形,其内壁直径为40-130cm,壁厚为15-20cm,桩底封闭厚度为20-30cm,桩端持力层加固厚度30-50cm。桩筒材料为:C20混凝土;桩端封底、持力层加固及桩翼的材料为水泥砂浆。
当筒桩长度为10m,地基土承载力为90kPa时,封底筒桩相对于不封底筒桩提高的单桩承载力如表1。
表1封底筒、管桩相对于不封底筒、管桩提高的单桩承载力
 D(cm)   60  80  100  120  130  150
 Pu(KN)   152.6  271.3  423.9  610.42  716.39  953.78
注:D为筒、管桩外直径,  Pu提高的地基承载力。
可见,当筒、管桩的直径大于1米时,单桩承载力提高显著,材料的节省最为有效。
其优点是:筒、管桩的桩端承载力和桩侧摩擦阻力大,单桩承载力提高,因此可以减少桩的个数和整体材料,节约了成本,加快了施工进度,提高了桩顶的强度,减小了地基工后沉降。

Claims (1)

1、一种混凝土封底、带桩帽和带桩翼的筒(管)桩,它包括混凝土筒或管桩和桩底,其特征在于:混凝土筒或管桩(1)为现场浇筑的混凝土筒或管桩(1),其底部后浇筑有封闭的柱底(3),现场浇筑的混凝土筒或管桩(1)的两侧对称位置处带桩翼(2),其两桩翼(2)与混凝土筒或管桩(1)连成一体,在桩顶处加桩帽(5),桩帽(5)也与混凝土筒或管桩(1)连成一体。
CN 200620027413 2006-09-26 2006-09-26 混凝土封底、带桩帽和带桩翼的筒(管)桩 Expired - Lifetime CN200985507Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620027413 CN200985507Y (zh) 2006-09-26 2006-09-26 混凝土封底、带桩帽和带桩翼的筒(管)桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620027413 CN200985507Y (zh) 2006-09-26 2006-09-26 混凝土封底、带桩帽和带桩翼的筒(管)桩

Publications (1)

Publication Number Publication Date
CN200985507Y true CN200985507Y (zh) 2007-12-05

Family

ID=38914965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620027413 Expired - Lifetime CN200985507Y (zh) 2006-09-26 2006-09-26 混凝土封底、带桩帽和带桩翼的筒(管)桩

Country Status (1)

Country Link
CN (1) CN200985507Y (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134854A (zh) * 2011-02-16 2011-07-27 中交二航局第四工程有限公司 船台滑道水下桩基及其施工方法
CN103628504A (zh) * 2013-11-28 2014-03-12 广州市恒盛建设工程有限公司 一种拼装式预制钢筋混凝土平台结构水下节点的连接方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134854A (zh) * 2011-02-16 2011-07-27 中交二航局第四工程有限公司 船台滑道水下桩基及其施工方法
CN102134854B (zh) * 2011-02-16 2012-08-22 中交二航局第四工程有限公司 船台滑道水下桩基的施工方法
CN103628504A (zh) * 2013-11-28 2014-03-12 广州市恒盛建设工程有限公司 一种拼装式预制钢筋混凝土平台结构水下节点的连接方法

Similar Documents

Publication Publication Date Title
CN203639942U (zh) 拱形挡土墙
CN201598642U (zh) 一种双排桩基坑支护结构
CN103015414B (zh) 一种预制混凝土后注浆桩及注浆工艺
CN105649078B (zh) 一种可回收液压伞状挤土锚杆
CN201245839Y (zh) 水泥搅拌土植入预制钢筋混凝土芯棒复合承压桩
CN200985507Y (zh) 混凝土封底、带桩帽和带桩翼的筒(管)桩
CN207998838U (zh) 一种抗拔复合管桩
CN104563101A (zh) 一种作为主体结构立柱的复合桩结构及其施工方法
CN201144425Y (zh) 微型桩杆塔基础
CN109537588A (zh) 一种新型实用锚杆桩
CN202187288U (zh) 隧道式复合锚碇
CN2313959Y (zh) 建筑基础水泥土硬芯复合桩
CN204371386U (zh) 一种巷道底板内外双注式预应力锚索结构
CN103046547A (zh) 锚碇锚杆组合型支挡结构
CN207619975U (zh) 一种新型变截面预制钢管桩
CN203891020U (zh) 捆绑式浆囊袋注浆锚杆
CN202989911U (zh) 一种预制混凝土后注浆桩
CN202148523U (zh) 高喷插芯组合桩
CN204959967U (zh) 一种环向增强钢管混凝土结构
WO2009076858A1 (zh) 一种带箍的桩
CN209066455U (zh) 复合抗滑支挡结构
CN202969406U (zh) 一种倒锥台与独立柱结合的风力发电塔基础
CN208267861U (zh) 一种隧洞
CN102926384A (zh) 一种后注浆的预制扩孔桩及其施工方法
CN205399409U (zh) 一种管桩

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HUABEI CONSTRUCTION GROUP CO., LTD.; PATENTEE

Free format text: FORMER OWNER: XU DONGQIANG; PATENTEE

Effective date: 20080627

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20080627

Address after: No. 1 building, No. 7, Chang Wa Street, Haidian District, Beijing, zip code: 100089

Co-patentee after: Hebei University of Technology

Patentee after: Huabei Construction Group Co., Ltd.

Address before: Hongqiao District, Tianjin, 300132 apartments, 56, 501

Co-patentee before: Liu Chunyuan

Patentee before: Xu Dong Qiang

CX01 Expiry of patent term

Granted publication date: 20071205

EXPY Termination of patent right or utility model