CN200985234Y - Telescopic device for steel rail cage guide - Google Patents
Telescopic device for steel rail cage guide Download PDFInfo
- Publication number
- CN200985234Y CN200985234Y CN 200620132768 CN200620132768U CN200985234Y CN 200985234 Y CN200985234 Y CN 200985234Y CN 200620132768 CN200620132768 CN 200620132768 CN 200620132768 U CN200620132768 U CN 200620132768U CN 200985234 Y CN200985234 Y CN 200985234Y
- Authority
- CN
- China
- Prior art keywords
- cage guide
- rail
- rail guide
- guide
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a rail cage guide contractible device which is aimed at solving the problem of: distortion of cage guide and cage shoe caused by the fracture and sinking of the side wall resulted from various factors to the vertical well of mine, which causes the elevating container unable to perform normal elevating and operation. The utility model is a special connecting device that is arranged on the cage shoe of the rail and comprises mainly the upper part special made rail cage guide, the lower part special made rail cage guide, special made rail clamping plate and the connecting bolt. The male end of the rail cage guide is connected with the female end to form a cross connector so as to suit the damage and sinking of the side wall of the well. The rail cage guide is contractible and can be installed vertically and can move freely. The differential amount is adjustable and the circumferential surface of the differential connector is free of the connecting slim of the cross sections. The utility model is preferential for the operation of the elevator and is easy to manufacture.
Description
Technical field
But the utility model relates to a kind of pitshaft rail guide, buntons of making and adapts to the compression apparatus that shaft lining breakage sinks dynamically freely, but especially at basement rock and the silting deposit interface position of borehole wall stress concentration with the rail guide compression apparatus of the position setting of shaft lining breakage sinking has taken place.
Background technology
Be the resource that develops a mine, need the face of land be communicated with underground by shaft of vertical well; For the down-hole resource is carried to the face of land, lifting container need come and go lifting along pit guide.With the coal mine shaft lining pit shaft is example, for the auxiliary shaft of services such as lifting personnel, facility, material, equipment, spoil, is lifting container with the cage, under the traction of ground lifting winch, and the reciprocal lifting of stationarity cage guide fixing along rising, directional tagging; For the main main shaft that promotes the coal service, be lifting container with the skip bucket, under the traction of ground winch, along the reciprocal lifting of pit guide.But owing to many vertical freezing shaft walls and drilling shaft lining generation break accident are arranged today from crossing to go to, and bring corresponding destruction to shaft equipment, bring certain difficulty and danger also for normal lifting work.Entangle its shaft wall fracture major cause: the one, show native water stratum and produce consolidation settlement because of hydrophobic; The 2nd, soil body constraint borehole wall rising-heat contracting-cold; The 3rd, freezing shaft wall is at the back thaw collapse that thaws; The 4th, surface water is to underground infiltration.Above a variety of causes all produces to some extent and covers soil body sinking, the soil body is in the sinking process, borehole wall appearance is produced downward application force---vertical additional force, when this power arrives certain value, cause the borehole wall at basement rock and silting deposit interface position or other position break, sink.According to the pertinent data analysis, this vertical additional force is subjected to objective factor restriction unavoidable, different and shaft wall structure design and construction method, construction quality of geology, Di Kuang, landforms and amblent air temperature different separately just, and the subsidiary load size is also different.
Because the destruction of the borehole wall is sunk, the buntons that drive is taken root on the borehole wall together sinks, buntons is oppressed cage guide again, making it to be in cage guide, buntons and the buntons at positions such as basement rock and silting deposit hand-deliver interface and the borehole wall takes root and a little at first is affected, and then progressively two-way up and down influence, the destruction situations such as a dial-out of twisting, be out of shape, take root until obvious appearance can't normally be carried out lifting work.At this moment; people write an article on the borehole wall often; next is to take passive repairing and " trimming the feet to fit the shoes " on shaft equipment---progressively cuts short cage guide or changes ways such as cage guide and buntons and adapt to shaft lining breakage and sinking; and ignored the variation that how to make cage guide, buntons etc. adapt to the borehole wall dynamically freely, thereby the problem of protection security improvement.
Summary of the invention
The purpose of this utility model just provides a kind of concentrating in shaft lining stress and has produced and easily to have produced the special device that destroys, adopts the assurance security improvement operation that moves freely with the borehole wall of being convenient to measure observation on the cage guide at sinking position.
Be achieved in that order of the present utility model
This device is made up of the special rail guide in top, the special rail guide in bottom, special railways splint and tie bolt respectively.But the rail guide compression apparatus is to be pegged graft with bottom special rail guide female end head by the top special rail guide male end head that intensity is equal to or is higher than former cage guide to cooperate, and formation criss-cross connecting joint can move freely in vertical direction.Criss-cross connecting joint four sides vertically form continuous cross-section, do not have elongated transversal surface seam.This device is formed the one combined action with original buntons, original rail guide clamp.But the rail guide compression apparatus can be located at pit shaft basement rock and silting deposit interface position section, and the borehole wall position section that can contract also can be located at the borehole wall simultaneously sedimentation compressive deformation position or other position that needs have taken place maybe may take place.A position section two groups or many groups can be set continuously as required.
Distinguishing feature of the present utility model is:
1. criss-cross connecting joint intensity height, good stability.
2. each free-running fit of joint is meticulous, and horizontal offset is little, and except that vertical direction can move freely, horizontal all directions can not be rocked.
3. the cage guide stroke can be determined according to the mine situation, and is adjustable before the fabrication and installation.
4. need other processing and fabricating except that the special rail guide in top, the special rail guide in bottom, special railways splint, other all adopts existing facility as cage guide, buntons, rail guide clamp etc., and the dismounting amount is little, and on-site installation is easy.
5. peg graft and cooperate the back to form the criss-cross connecting joint in rail guide male and female termination, and all side surfaces of joint can be continuous, do not have elongated transversal surface seam, is beneficial to the fixedly cage shoe operation of lifting container.
6. can intuitively measure inspection by criss-cross connecting joint position.By the variation of this position stroke, get final product the variation that dynamic reflection goes out the borehole wall, help the borehole wall is in time taked Corresponding Countermeasures.
Description of drawings
But Fig. 1 is the utility model rail guide compression apparatus assembly drawing (one-sided cage guide)
But Fig. 2 is the utility model rail guide compression apparatus A-A section-drawing
But Fig. 3 is the utility model rail guide compression apparatus B-B section-drawing
But Fig. 4 is the utility model rail guide compression apparatus C-C section-drawing
The specific embodiment
But by Fig. 1, Fig. 2, Fig. 3, Fig. 4, the basic structure and the assembling operation form of this rail guide compression apparatus as can be seen.
The lower end of the special rail guide 1 in top is the male end head, and the upper end of the special rail guide 2 in bottom is the female end head, and the male end head forms telescopic criss-cross connecting joint after inserting the female end head, sees Fig. 2 (A-A section-drawing) for details.
The special rail guide 2 in special rail guide 1 in top and bottom is the linking with original rail guide 8, adopts butt joint to be welded as a whole.For strengthening the intensity at track bond weld seam 5 positions, utilize special railways splint 3 to carry out fastening reinforcement by tie bolt 4, see Fig. 4 (C-C section-drawing) for details.
After special rail guide 2 butt joints in special rail guide 1 in top and bottom are in place, fix to one by original rail guide clamp 6, see Fig. 3 (B-B section-drawing) for details at original buntons 7 places.
In addition, but among the figure L be the maximal dilation amount of rail guide compression apparatus; L
1Be the minimum amount of lap in male and female termination; A is a pitch of bolts; B is the height dimension of original rail guide clamp; H is the height dimension of original buntons.
Claims (1)
1. but rail guide compression apparatus, it is characterized in that: pegging graft between it mainly is equal to or is higher than former cage guide by intensity top special rail guide male end head and the bottom special rail guide female end head cooperates, form the criss-cross connecting joint, can move freely in vertical direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620132768 CN200985234Y (en) | 2006-08-31 | 2006-08-31 | Telescopic device for steel rail cage guide |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200620132768 CN200985234Y (en) | 2006-08-31 | 2006-08-31 | Telescopic device for steel rail cage guide |
Publications (1)
Publication Number | Publication Date |
---|---|
CN200985234Y true CN200985234Y (en) | 2007-12-05 |
Family
ID=38914694
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200620132768 Expired - Lifetime CN200985234Y (en) | 2006-08-31 | 2006-08-31 | Telescopic device for steel rail cage guide |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN200985234Y (en) |
-
2006
- 2006-08-31 CN CN 200620132768 patent/CN200985234Y/en not_active Expired - Lifetime
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205189893U (en) | Be used for a lane coal column to wearing reinforced (rfd) supporting construction | |
CN102562074A (en) | Construction method for composite stratum with hard top and soft bottom of large-section tunnel | |
CN104153792B (en) | A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system and method | |
CN108894784A (en) | A kind of tight roof orientation acid fracturing control top pressure relief method | |
CN102877857B (en) | Deep hole pre-grouting top plate reinforcement method for large-mining height working face under special geological conditions | |
CN204082170U (en) | A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system | |
CN113062354A (en) | Assembly method for prefabricated subway station of open-cut pile support system | |
CN102817621B (en) | Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions | |
CN111608688A (en) | Method for reinforcing ground of shield underpass building | |
CN106089207A (en) | Super high seam work surface gob side entry driving thin coal pillar stays equipment, method | |
CN110566226A (en) | shallow-consolidation deep-injection supporting method for rapid excavation of broken roof large-section roadway | |
CN108517795A (en) | Railroad bridge protecting canopy frame structure and its construction method | |
CN109183831B (en) | Become the multistage load stake of stake diameter string hole and its construction method | |
CN203855967U (en) | Drilling and filling trolley on slope gallery | |
CN108661062A (en) | A kind of heavy cut ruggedized construction and construction method | |
CN200985234Y (en) | Telescopic device for steel rail cage guide | |
CN104805830A (en) | Uplift pile construction method without rock blasting | |
CN201705357U (en) | Retractable square rigid cage guide | |
CN208415124U (en) | A kind of railroad bridge protecting canopy frame structure | |
CN100535259C (en) | Partial adhered prestressed pile against drawing and floating and its construction | |
CN116104499A (en) | Retaining wall structure with lower middle section extending through horsehead door and construction method | |
CN2866432Y (en) | Mine cage guide differential coupling device | |
CN104453960B (en) | Containing sliding deformation laneway support method wrong outside soft dirt band thickness coal seam | |
CN103850247B (en) | A kind of underground continuous wall connector guard shield and construction equipment and construction method | |
CN202038797U (en) | *-shaped mine cageway differential motion connecting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20071205 |
|
EXPY | Termination of patent right or utility model |