CN200964706Y - Combined work shop collocation structure using crushing transfer as hub - Google Patents

Combined work shop collocation structure using crushing transfer as hub Download PDF

Info

Publication number
CN200964706Y
CN200964706Y CN 200620200166 CN200620200166U CN200964706Y CN 200964706 Y CN200964706 Y CN 200964706Y CN 200620200166 CN200620200166 CN 200620200166 CN 200620200166 U CN200620200166 U CN 200620200166U CN 200964706 Y CN200964706 Y CN 200964706Y
Authority
CN
China
Prior art keywords
facility
supply system
coal
boiler
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620200166
Other languages
Chinese (zh)
Inventor
吴展光
肖宁超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN 200620200166 priority Critical patent/CN200964706Y/en
Application granted granted Critical
Publication of CN200964706Y publication Critical patent/CN200964706Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Combustion Of Fluid Fuel (AREA)

Abstract

An allocation structure of a combined workshop which uses a crushing transfer station as a hub comprises a coal supply system (1), a boiler facility (2), a gas facility (3) and a crushing transfer station (4). The utility model is characterized in that: the boiler facility (2), the gas facility (3) and the crushing transfer station (4) are lined in one row; the crushing transfer station (4) is arranged between the boiler facility (2) and the gas facility (3); the coal supply system (1) is provided parallel to the gas facility (3) and the crushing transfer station (4); and the positions between the coal supply system (1) and the crushing transfer station (4) and between the crushing transfer station (4) and the boiler facility (2) and the gas facility (3) are respectively connected with transportation belt devices (5).

Description

A kind of is the configuration structure of the assembled factory building of hinge with broken terminal
Technical field:
It is the configuration structure of the assembled factory building of hinge with broken terminal that the utility model relates to a kind of, and particularly a kind of what be used for the charcoal ink factory is the configuration structure of the assembled factory building of hinge with broken terminal, belongs to the configuration structure technical field of charcoal ink factory's factory building.
Background technology:
At present, in the charcoal ink factory, generally be to produce vapours by the boiler room to produce green anode and use for pitch, petroleum coke kneading and compacting, use for the green anode piece roasting of moulding by gas station production combustion gas.In common general layout layout, at plant area's diverse location, the supply of coal fuel relies on a cover that is provided with separately to contain supply system and a belt conveyor device of broken terminal device respectively by dispersed placement for boiler and gas facility.This configuration structure of the prior art not only causes the repeated construction of factory's coal fuel system, and plant area's land area is strengthened, but also causes road to pave area and the increase of pipe installation length, and factory's capital investment and production and operation cost are risen.Therefore, the factory building configuration structure of traditional carbon factory is when reality is used, and its result of use still is not ideal enough.
Summary of the invention:
The purpose of this utility model is: provide a kind of simple and compact for structure, floor space is less, making and the production and operation are lower-cost is the configuration structure of the assembled factory building of hinge with broken terminal, to overcome the deficiencies in the prior art.
The utility model is to constitute like this: it comprises coal-supply system (1), boiler facility (2), gas facility (3) and broken terminal (4), boiler facility (2), gas facility (3) and broken terminal (4) are arranged as a row, and broken terminal (4) is arranged between boiler facility (2) and the gas facility (3), coal-supply system (1) and boiler facility (2), the broken terminal of gas facility (3) (4) be arranged in parallel, all is being connected with belt conveyor device (5) respectively between coal-supply system (1) and the broken terminal (4) and between broken terminal (4) and boiler facility (2) and gas facility (3).
Owing to adopted technique scheme, the utility model is required with a shared cover coal-supply system and the broken terminal of coal with boiler facility (2), gas facility (3), its broken terminal is not arranged on the inside of coal-supply system (1), thereby area is stacked in the inside that has increased coal-supply system (1).Fine coal after its fragmentation is by the blanking control system of broken terminal inside, produce quantity by boiler facility (2), gas facility (3) respectively with the coal requirement, send into respectively in its corresponding belt conveyor by belt conveyor device (5), enter production department, to satisfy production requirement.
Because it is as a whole that the utility model is connected into coal-supply system, boiler facility and gas facility by broken terminal and belt conveyor device, layout structure is simple, compact, has reduced by a cover coal-supply system and a crushing system; And the utility model is located at the outside of coal-supply system, the stacking area and the reserves of also having improved coal-supply system with crushing system.Adopt the utility model can make that regional land area, the road of whole production systems are paved area, the pipe network laying length will be saved more than 10% than prior art, thereby greatly reduce the capital investment and the production and operation cost of engineering.Therefore the utility model compared with prior art, the utlity model has simple and compact for structure, floor space is few, making and the lower-cost advantage of the production and operation.The utility model is particularly suitable for newly-built carbon element factory or existing charcoal ink factory is transformed use.
Description of drawings:
Accompanying drawing 1 is a structural representation of the present utility model.
The specific embodiment:
Embodiment of the present utility model: coal-supply system of the present utility model (1), boiler facility (2), gas facility (3), broken terminal (4) and belt conveyor device (5) all adopt finished product of the prior art to assemble, during making, broken terminal (4) is installed in the outside of coal-supply system (1), with boiler facility (2), gas facility (3) and broken terminal (4) are installed by the structure that is arranged as a row, and broken terminal (4) is arranged between boiler facility (2) and the gas facility (3), with coal-supply system (1) and boiler facility (2), gas facility (3) and broken terminal (4) be arranged in parallel, (5) all distinguishing in the connection belt conveyor device between coal-supply system (1) and the broken terminal (4) and between broken terminal (4) and boiler facility (2) and gas facility (3) then.

Claims (1)

1. one kind is the configuration structure of the assembled factory building of hinge with broken terminal, it comprises coal-supply system (1), boiler facility (2), gas facility (3) and broken terminal (4), it is characterized in that: boiler facility (2), gas facility (3) and broken terminal (4) are arranged as a row, and broken terminal (4) is arranged between boiler facility (2) and the gas facility (3), coal-supply system (1) and boiler facility (2), gas facility (3) and broken terminal (4) be arranged in parallel, all are being connected with belt conveyor device (5) respectively between coal-supply system (1) and the broken terminal (4) and between broken terminal (4) and boiler facility (2) and gas facility (3).
CN 200620200166 2006-02-17 2006-02-17 Combined work shop collocation structure using crushing transfer as hub Expired - Fee Related CN200964706Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620200166 CN200964706Y (en) 2006-02-17 2006-02-17 Combined work shop collocation structure using crushing transfer as hub

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620200166 CN200964706Y (en) 2006-02-17 2006-02-17 Combined work shop collocation structure using crushing transfer as hub

Publications (1)

Publication Number Publication Date
CN200964706Y true CN200964706Y (en) 2007-10-24

Family

ID=38868719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620200166 Expired - Fee Related CN200964706Y (en) 2006-02-17 2006-02-17 Combined work shop collocation structure using crushing transfer as hub

Country Status (1)

Country Link
CN (1) CN200964706Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287061A (en) * 2011-06-21 2011-12-21 中国瑞林工程技术有限公司 General plane layout of hard alloy factory

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287061A (en) * 2011-06-21 2011-12-21 中国瑞林工程技术有限公司 General plane layout of hard alloy factory
CN102287061B (en) * 2011-06-21 2014-12-24 赣州澳克泰工具技术有限公司 General plane layout of hard alloy factory

Similar Documents

Publication Publication Date Title
CN200964706Y (en) Combined work shop collocation structure using crushing transfer as hub
CN202092095U (en) Million kilowatt unit tower type boiler system with lateral coal bunker in power plant
CN202646981U (en) Universal flange plate connected with transformer fuel outlet valve
CN101067473A (en) Gas filling substation additional high-pressure gas-filling method and device
CN1810636A (en) Configuration method of gas station and boiler room with belt conveyor corridor as connection bond
CN202291745U (en) Heating system connector applied to ball grid array (BGA) repair workstation
CN2908678Y (en) Distribution structure of anode factory and calcination factory building and gas cleaning device
CN201121424Y (en) Combined factory building structure for aluminum manufacturer processing aluminum hydroxide
CN201501708U (en) Elevator control cabinet
CN203964682U (en) A kind of layout structure of suspended preheater system of multi-stage heat exchanger
CN206301861U (en) Dismount easily battery structure
CN204370729U (en) Grid step plate mounting structure
CN204593393U (en) Multifunctional burner
CN201170693Y (en) Connection structure for calcination department and flue gas purification system
CN102337960A (en) Diesel engine combustion chamber
CN202615982U (en) Semi-oblique fuel tank outer bracket of transformer
CN202083100U (en) Pulverized coal combustion hot air boiler device lower than 75 T
CN202246028U (en) Oiling machine with video advertisement screen
CN202260203U (en) Underground box-type substation
CN2809456Y (en) Air-fuel ratio control device
CN201206168Y (en) Arrangement structure for green anode production system
CN206646964U (en) A kind of inter-city passenger rail underground station shield door top and structural wall surface seal structure
CN204455918U (en) Road separator
CN203043771U (en) Uniform airflow distributing device of dust cleaner
CN202582209U (en) Hydraulic pushing transportation system of kiln

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE C

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110525

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110525

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071024

Termination date: 20140217