CN1997199A - An integrated testing system and method for 3G network management interface - Google Patents
An integrated testing system and method for 3G network management interface Download PDFInfo
- Publication number
- CN1997199A CN1997199A CNA2007100005607A CN200710000560A CN1997199A CN 1997199 A CN1997199 A CN 1997199A CN A2007100005607 A CNA2007100005607 A CN A2007100005607A CN 200710000560 A CN200710000560 A CN 200710000560A CN 1997199 A CN1997199 A CN 1997199A
- Authority
- CN
- China
- Prior art keywords
- test
- module
- interface
- functional
- omc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
This invention relates to one 3G network interface integral test system and method, which comprises the following steps: executing OMC north interface or connecting network type function test IRP function test module; executing OMC north interface or connecting information mode accordance setting and comparing module; receive and process person input and display measurement results interacting module; getting property and set files between network interface test system and tested system by file transmission module; operation sustain center function module to realize NMS south interface test.
Description
Technical field
The present invention relates to mobile communication, network management technology field, particularly a kind of 3G network management interface integrated test system and method.
Background technology
The 3G network management system has important role in whole 3G network.Network management interface is an important component part of network management system, it described the management function that will be provided to management system and mutual both sides by guard system the data interactive mode that should follow, be connection management system and by the bridge between the guard system.The functional test of network management interface and information model uniformity test are to guarantee to interconnect between the different network management systems and the important means and the steps necessary of interoperability.
Summary of the invention
The purpose of this invention is to provide a kind of network management interface integrated test system and method for supporting 3 kinds of 3G standards (WCDMA, TD-SCDMA, CDMA2000).This test macro can be to the 3G wireless network, core net, the data service net, OMC northbound interface (the interface that producer's network management system makes progress of intelligent network and IMS (IP multimedia system) network, the centralized network management system by it with the butt joint of producer network management system) carry out functional test and information model uniformity test, also can carry out functional test and information model uniformity test to the southbound interface (interface that the centralized network management system is downward) of 3G on-line file management system (NMS), can also be by the network element of direct connecting ne to 3G data service net, the network management interface of IMS network element carries out functional test.
For realizing purpose of the present invention, a kind of 3G network management interface integrated test system is provided, has comprised integrated reference point IRP functional test module, configuration, performance resource model comparison module, human-computer interaction module, document transmission module, the OMC of operation maintenance center functional simulation module, northbound interface functional module and adaptation layer; Wherein IRP functional test module is used to carry out the functional test of OMC northbound interface or direct connecting ne mode; Configuration, performance resource model comparison module link to each other with human-computer interaction module with described document transmission module, are used to carry out the information model uniformity test of OMC northbound interface or direct connecting ne mode; Human-computer interaction module carries out information interaction with described IRP functional test module and described configuration, performance resource model comparison module, is used to accept, handle tester's input and show test results; Document transmission module links to each other with described configuration, performance resource model comparison module, is used to obtain performance file and configuration file, and carries out file transfer between network management interface integrated test system and system under test (SUT); The OMC of operation maintenance center functional simulation module links to each other with described northbound interface functional module with described human-computer interaction module, is used to realize the test of NMS southbound interface; The northbound interface functional module is used for finishing the conversion of data format when carrying out the test of NMS southbound interface; And adaptation layer, be connected with network management interface with document transmission module, IRP functional test module and adopt the plug-in type design, be used to finish the conversion of consensus standard, thinking that OMC northbound interface test, the test of NMS southbound interface and direct connecting ne mode are tested provides corresponding insert.
According to another aspect of the present invention, the method of testing that also provides a kind of 3G of use network management interface integrated test system to realize, described 3G network management interface integrated test system comprises: integrated reference point IRP functional test module, configuration, performance resource model comparison module, human-computer interaction module, document transmission module, the OMC of operation maintenance center functional simulation module, northbound interface functional module and adaptation layer; Described method comprises the steps: to be carried out by IRP functional test module the functional test of OMC northbound interface or direct connecting ne mode; By the configuration that links to each other with human-computer interaction module with described document transmission module, performance resource model comparison module carry out OMC northbound interface or direct connecting ne mode the information model uniformity test; Accept, handle tester's input and show test results by the human-computer interaction module that carries out information interaction with described IRP functional test module and described configuration, performance resource model comparison module; From obtaining performance file and configuration file, and between network management interface integrated test system and system under test (SUT), carry out file transfer by the document transmission module that links to each other with described configuration, performance resource model comparison module; By testing with the OMC of the operation maintenance center functional simulation module realization NMS southbound interface that described human-computer interaction module links to each other with described northbound interface functional module; When carrying out the test of NMS southbound interface, finish the conversion of data format by the northbound interface functional module; And by the adaptation layer that is connected and adopts the plug-in type design with document transmission module, IRP functional test module with network management interface, finish the conversion of consensus standard, thinking that OMC northbound interface test, the test of NMS southbound interface and direct connecting ne mode are tested provides corresponding insert.
Advantage of the present invention comprises:
● the integrated level height has almost comprised all 3G network management interface commonly used tests.
● support WCDMA, TD-SCDMA and three kinds of 3G standards of CDMA2000.
● the intellectuality of test and automation.In whole test process, test macro not only can show test result on human-computer interaction module, but also the result can be exported to file, and some test item can be analyzed and add up.Particularly in resource allocation model and performance resource model, realized automatic comparison, exported result and automatic statistical analysis automatically.
● adaptivity and compatibility preferably.The interface specification that system under test (SUT) adopts is constantly upgrading, and test macro can be very easily adjusted system itself and upgraded according to the interface specification that has changed, thereby has improved the adaptivity and the compatibility of test macro.
● idea of modular, expand easily and upgrade.When new test needed, test macro can be easy to increase some functional modules to satisfy the test needs.
Description of drawings
From the description of the following preferred embodiment of the present invention that mode with non-limitative example is provided and from appended drawings, can clear more these and other characteristics of the present invention, advantage and beneficial effect, wherein:
Fig. 1 shows the schematic diagram according to 3G network management interface integrated test system of the present invention;
Fig. 2 shows total structure and the annexation according to 3G network management interface integrated test system of the present invention;
Fig. 3 has schematically shown the flow chart of 3G network management interface integrated test facility according to the present invention when carrying out the test of 3G OMC northbound interface; And
Fig. 4 has schematically shown the flow chart of 3G network management interface integrated test facility according to the present invention when network management system NMS southbound interface is tested.
Embodiment
Below in conjunction with the drawings; preferred implementation of the present invention is described; should be appreciated that; here the preferred implementation of Miao Shuing not is restrictive explanation; those skilled in the art can be according to principle of the present invention, the present invention is made various modifications, improvement and can not break away from the protection range that claim limits of enclosing.
In Fig. 1,3G network management interface integrated test system according to the present invention can be to the wireless network of 3G, core net, service network, intelligent network, IMS (IP multimedia subnet, IP Multi-MediaSub-Network) the OMC northbound interface of network carries out functional test and information model uniformity test, also can carry out functional test and information model uniformity test to the southbound interface of 3G on-line file management system (NMS), can also be by the network element of direct connecting ne to the 3G service network, the network management interface of IMS (IP multimedia subnet, IP Multi-Media Sub-Network) network element carries out functional test.Test macro obtains warning information, configuration data and performance data by the OMC northbound interface from producer's network management system (EMS).Wherein said 3G network management interface integrated test system comprises with the OMC northbound interface of various 3G networks: the OMC-IMS interface that is connected with IMS-NE, the OMC-R interface that is connected with wireless network, the OMC-S interface that is connected with the core net circuit domain, the OMC-G interface that is connected with core network packet-domain, OMC-V interface that is connected with the data service net and the OMC-IN interface that is connected with intelligent network.Described 3G network management interface integrated test system also can direct-connected data service net, intelligent network and IMS-NE (IP multimedia subnet, IPMulti-Media Sub-Network) obtain warning information, configuration data and performance data.
Fig. 2 shows total structure and the annexation according to 3G network management interface integrated test system of the present invention.3G network management interface integrated test system according to the present invention mainly comprises following functional module, as shown in Figure 2:
IRP (integrated reference point, Integration Reference Point) functional test module 201; Document transmission module 203; Configuration, performance resource model comparison module 205; OMC (operation maintenance center, Operation Maintenance Center) functional simulation module 207; Northbound interface functional module 209; Adaptation layer 210; System initialization module 213; And human-computer interaction module 215.
Wherein, IRP functional test module 201 is mainly finished the functional test of network management interface.Wherein, the test of network management interface comprises functional test and information model uniformity test.Concrete test request is stipulated by test specification.In general, functional test comprises: fault management test, file transfer management test, configuration management test, performance management test.The method of functional test for example can be: all operations function that test platform provides test specification to require, and the user calls these functions one by one, and the return value of observing function gets final product.
The file transfer that document transmission module 203 is responsible between network management interface integrated test system and the system under test (SUT).Test macro can obtain required data file from system under test (SUT) by document transmission module 203, such as in the information model uniformity test, test macro can be (not shown from the OMC database of equipment under test by document transmission module 203, this database generally disposes in the OMC server, is provided by equipment vendors) in obtain performance file and configuration file.
OMC functional simulation module 207 is connected with northbound interface functional module 209, and these two modules are important module that realization is tested NMS (centralized network management system, Network ManagementSystem) southbound interface.In one embodiment, OMC functional simulation module 207 is simulated programs, the work of simulation OMC, and message that simulation produces and data are through uploading to NMS after the northbound interface functional module 209.In one embodiment, this OMC functional simulation module 207 generally possesses following function: message produces, the function of message response.The message that produces mainly is the warning information of simulation OMC and reports notice.The generation of these message can be also can customize at random.Convert suitable form to after the message process northbound interface functional module 209 and upload to NMS.In addition, when NMS sends when uploading the order of data, also response command that can be correct, and corresponding message uploaded up.In addition, the database shown in the figure 217 is used for using when OMC functional simulation module 207 is simulated.
Northbound interface functional module 209 is responsible for producing with the related news form of NMS compatibility and the conversion of data format.On the other hand, the order that issues from NMS or other data are also given OMC functional simulation module 207 after through 209 conversions of northbound interface functional module and are handled.
Configuration, performance resource model comparison module 205 will compare with ready template file from configuration file and the performance file that system under test (SUT) obtains, then with the comparative result demonstration and export to file.In one embodiment, configuration, performance resource model comparison module 205 obtain configuration file and performance file by document transmission module 203 from system under test (SUT).In one embodiment, the result that configuration file that configuration, performance resource model comparison module 205 will obtain from system under test (SUT) and performance file and ready template file compare exports to the file by human-computer interaction module 215.Configuration, performance resource model comparison module 205 are the modules that are used to finish the information model uniformity test function of network management interface, it can be the module that integrates, it also can be independent module, preferably possesses following function: read the initial data of uploading up from system under test (SUT), for example be the configuration data file and the performance data files that come from the OMC database, and extract corresponding test item, then relatively with template file.Test result is exported with certain form.The result can output to file and man-machine interface.In addition, can customize output format.Test result is carried out analytic statistics, and the analytic statistics result is outputed to file.
In addition, show and reception user input, and link to each other with OMC functional simulation module 207 according to human-computer interaction module 215 special disposal information of the present invention.The information that OMC functional simulation module 207 produces can present in human-computer interaction module 215.In addition, user's input also can be passed to OMC functional simulation module 207 by human-computer interaction module 215.
Adaptation layer 210 according to the present invention is mainly finished the conversion of consensus standard and is configurable.Because system will test different interfaces, so want adaptive different interfacing.What some network management interface adopted is CORBA (common object request broker system, CommonObject Request Broker Architecture) technology, the employing SNMP that has (Simple Network Management Protocol, Simple Network Management Protocol) technology.Adaptation layer is the plug-in type design.Adaptation layer is made up of a series of adaptive plug-in unit, and each plug-in unit is corresponding to a kind of interfacing.When will test a brand-new interface, the adaptive plug-in unit that only needs to increase this interface in system gets final product, and need not revise system itself.The existence of adaptation layer 210 has improved the compatibility of test macro, has enlarged the scope of application of system.
System initialization module 213 is mainly finished some initial work when test macro starts.Human-computer interaction module 215 mainly accept, handle tester input and with test result with effective and efficient manner directly perceived.
3G network management interface integrated test system according to the present invention also has a database 217.When carrying out the test of NMS southbound interface, at the beginning of system's operation, this database carries out initialization earlier.NMS sends when uploading the order of data to test macro then, the accessing database that test macro can be correct and with relevant data upload.In addition, when NMS when test macro sends data download, test macro can be correct with Data Receiving and store corresponding position into.Test macro provides the function of database monitoring and inquiry.
When system problem appearred in NMS, test macro can receive the error message that NMS sends over and be correspondingly processed, and such as no longer uploading data, but data was saved in file, received that NMS recovers to upload after the normal messages again.
Advantageously, all data relevant with system are initialised in system initialization.System data can be stored in the file with certain form, can read in this document during system start-up and finish corresponding initial work then.
According to one embodiment of the present invention, OMC northbound interface test function is preferably finished jointly by IRP functional test module 201, document transmission module 203, configuration, performance resource model comparison module 205 and human-computer interaction module 215.NMS southbound interface test function is finished jointly by OMC functional simulation module 207, northbound interface functional module 209, human-computer interaction module 215 and database 217.The function and the OMC northbound interface test function of network element being tested by direct-connected mode.
Accompanying drawing 3 has schematically shown 3G network management interface integrated test system according to the present invention and has carried out the 3G OMC northbound interface flow chart in when test.When 3G OMC northbound interface is tested, preferably include the following step:
At step S301: distribute available IP address for the OMC northbound interface, and correctly dispose the network configuration of the PC at 3G network management interface integrated test system place.Guarantee that at first 3G network management interface integrated test system can be connected to OMC.The initialization information of correct configuration testing system comprises the IP information and the version information of OMC northbound interface.
At step S303: start 3G network management interface integrated test system, after some initialize routines of automated system operation to be tested, formally enter test phase.
At step S305: whenever carry out the test of a test item, test macro can be saved in test result in the file automatically, and the title of this document is exactly the title of this test item and the concrete time that test is carried out.Sometimes we import to test platform again with the test file that obtains possibly, carry out analytic statistics by test macro again, export last test statistics result.
At step S307: on the PC at test macro place, move FTP (file transfer protocol (FTP), File Transfer Protocol) service end, correctly dispose the information of ftp server, start ftp server then.Then in the mode of FTP from OMC data base call OMC configuration data and performance data.These configuration datas and performance data are imported to allocation models comparison module and performance comparison module, and then fuzzy comparison scale is set, start comparison program, obtain the comparative result form.
At step S309: can be as required form be as a result exported to the EXCEL file.Also the test result report printing can be come out.
Fig. 4 has schematically shown according to the flow chart of 3G network management interface integrated test system of the present invention when the NMS southbound interface is tested.When the NMS southbound interface is tested, preferably include the following step:
At step S401: by network NMS is connected with 3G network management interface test macro, correct configuration network parameter guarantees that both connect.
At step S403: start the OMC analog functional module and the database of test macro, carry out initial work.
At step S405:, need carry out specific setting to the OMC analog functional module in order to finish specific test assignment.Such as detecting the collection situation of NMS system, can be provided with in OMC analog functional module the inside and generate a warning information warning information.
At step S407: send instructions to test macro in the NMS side, receive and upload data.
At step S409: test result is added up according to test data.Send order in the NMS side, receive data.
When by direct-connected mode network element being tested, step is similar with the test of OMC northbound interface, is not described in detail here.
When network element being tested, as long as the configuration that adaptation layer is correlated with (increase or be provided with relevant plug-in unit) by direct-connected mode.Usually, this class network element is to adopt SNMP (simplenetwork management protocol) technology, gets final product so increase an adaptive plug-in unit of SNMP.
Three kinds of functions (the direct connecting ne mode is tested for the test of OMC northbound interface, the test of NMS southbound interface) are independently.The interface that each function is corresponding different.Though it is similar that test of OMC northbound interface and direct connecting ne mode are tested, they are to carry out under different interfaces.Under different interfaces, need adaptation layer is carried out some configurations or increased some adaptive plug-in units.
Below in conjunction with the drawings a kind of 3G network management interface integrated test system according to the present invention and method are set forth, but the present invention is not limited to this.One skilled in the art will appreciate that according to the principle of the invention, can make various modifications, improvement, and do not break away from the enclose scope of claim of the present invention the present invention.
Claims (22)
1, a kind of 3G network management interface integrated test system comprises integrated reference point IRP functional test module, configuration, performance resource model comparison module, human-computer interaction module, document transmission module, the OMC of operation maintenance center functional simulation module, northbound interface functional module and adaptation layer; Wherein
IRP functional test module is used to carry out the functional test of OMC northbound interface or direct connecting ne mode;
Configuration, performance resource model comparison module link to each other with human-computer interaction module with described document transmission module, are used to carry out the information model uniformity test of OMC northbound interface or direct connecting ne mode;
Human-computer interaction module carries out information interaction with described IRP functional test module and described configuration, performance resource model comparison module, is used to accept, handle tester's input and show test results;
Document transmission module links to each other with described configuration, performance resource model comparison module, is used to obtain performance file and configuration file, and carries out file transfer between network management interface integrated test system and system under test (SUT);
The OMC of operation maintenance center functional simulation module links to each other with described northbound interface functional module with described human-computer interaction module, is used to realize the test of NMS southbound interface;
The northbound interface functional module is used for finishing the conversion of data format when carrying out the test of NMS southbound interface; And
Adaptation layer, be connected with network management interface with document transmission module, IRP functional test module and adopt the plug-in type design, be used to finish the conversion of consensus standard, thinking that OMC northbound interface test, the test of NMS southbound interface and direct connecting ne mode are tested provides corresponding insert.
2, according to the system of claim 1, wherein, described configuration, performance resource model comparison module can be the modules that integrates, and also can be independent modules.
3, according to the system of claim 1, wherein, described configuration, performance resource model comparison module read initial data, the corresponding test item of uploading up from system under test (SUT) of extraction from document transmission module, with template file relatively, described initial data comprises configuration data stored file and performance data files in the database then.
4, according to the system of claim 1, wherein, described configuration, performance resource model comparison module are exported test result according to certain form; Described result can output to file and human-computer interaction interface; And can customize output format, test result is carried out analytic statistics, and the analytic statistics result is outputed to file.
5, according to the system of claim 1, wherein, the described OMC of operation maintenance center functional simulation module also is used to produce and comprises the warning information of simulating OMC and the message that reports notice, the generation of described message can be also can customize at random, described message converts suitable form to and uploads to NMS after the northbound interface functional module, and when the order of data was uploaded in the NMS transmission, corresponding message was uploaded in the also described order of response that can be correct.
6, according to the system of claim 1, wherein, described northbound interface functional module is also carried out and the related news form of NMS compatibility and the conversion of data format, and conversion is used for OMC functional simulation module and handles from order or other data that NMS issues.
7, according to the system of claim 1, wherein, described system also comprises:
Database is connected with described OMC functional simulation module, is used for receiving and store relevant data when carrying out the test of NMS southbound interface.
8, according to the system of claim 1, wherein, described system also comprises:
System initialization module is used in system initialization all data relevant with system being carried out initialization.
9, according to the system of claim 1, wherein, described network management interface adopts: common object request broker system CORBA technology, Simple Network Management Protocol SNMP technology.
10, according to the system of claim 1, wherein, described system can carry out functional test and information model uniformity test to the OMC northbound interface of 3G wireless network, core net, data service net, intelligent network and IP multimedia system IMS network; Southbound interface to 3G on-line file management system NMS carries out functional test and information model uniformity test; And the network element of 3G data service net, the network management interface of IMS network element are carried out functional test by direct connecting ne; Wherein said northbound interface refers to the interface that producer's network management system makes progress, and the centralized network management system docks with producer's network management system by it, and southbound interface refers to the interface that the centralized network management system is downward.
11, according to the system of claim 1, wherein, the described functional test of being finished by described IRP functional test module comprises: fault management test, file transfer management test, configuration management test, performance management test; And the method for functional test can be: all operations function that test platform provides test specification to require, the user calls these functions one by one, and the return value of observing function.
12, a kind of method of testing of using 3G network management interface integrated test system to realize, described 3G network management interface integrated test system comprises: integrated reference point IRP functional test module, configuration, performance resource model comparison module, human-computer interaction module, document transmission module, the OMC of operation maintenance center functional simulation module, northbound interface functional module and adaptation layer; Described method comprises the steps:
Carry out the functional test of OMC northbound interface or direct connecting ne mode by IRP functional test module;
By the configuration that links to each other with human-computer interaction module with described document transmission module, performance resource model comparison module carry out OMC northbound interface or direct connecting ne mode the information model uniformity test;
Accept, handle tester's input and show test results by the human-computer interaction module that carries out information interaction with described IRP functional test module and described configuration, performance resource model comparison module;
From obtaining performance file and configuration file, and between network management interface integrated test system and system under test (SUT), carry out file transfer by the document transmission module that links to each other with described configuration, performance resource model comparison module;
By testing with the OMC of the operation maintenance center functional simulation module realization NMS southbound interface that described human-computer interaction module links to each other with described northbound interface functional module;
When carrying out the test of NMS southbound interface, finish the conversion of data format by the northbound interface functional module; And
By the adaptation layer that is connected and adopts the plug-in type design with document transmission module, IRP functional test module with network management interface, finish the conversion of consensus standard, thinking that OMC northbound interface test, the test of NMS southbound interface and direct connecting ne mode are tested provides corresponding insert.
13, according to the method for claim 12, further comprise described configuration, performance resource model comparison module are integrated, perhaps described configuration, performance resource model comparison module are carried out the step that independent being configured to forms independent module.
14, according to the method for claim 12, also comprise by described configuration, performance resource model comparison module and read initial data, the corresponding test item of uploading up from system under test (SUT) of extraction from document transmission module, with template file step relatively, wherein said initial data comprises configuration data stored file and performance data files in the database then.
15,, also comprise by described configuration, performance resource model comparison module the step of test result according to certain form output according to the method for claim 12; Wherein, described result can output to file and man-machine interface; And also comprise output format is customized, test result is carried out analytic statistics, and the analytic statistics result is outputed to the step of file.
16, according to the method for claim 12, produce the step that comprises the warning information of simulating OMC and report the message of notice by the described OMC of operation maintenance center functional simulation module, the generation of described message can be also can customize at random, and after the northbound interface functional module, convert described message to suitable form and upload to NMS, and when the order of data is uploaded in the NMS transmission, the also described order of response that can be correct, and the step that corresponding message is uploaded.
17, according to the method for claim 12, also comprise by described northbound interface functional module and carry out step with the conversion of the related news form of NMS compatibility and data format, and the conversion order or other data that issue from NMS, the step of handling by OMC functional simulation module.
18, according to the method for claim 12, wherein, described method also comprises:
When carrying out the test of NMS southbound interface, dispose a database that connects with described OMC functional simulation module to receive and to store the step of relevant data.
19, according to the method for claim 12, wherein, described method also comprises:
In system initialization, all data relevant with system are carried out initialized step.
20, according to the method for claim 12, wherein, described network management interface adopts: common object request broker system CORBA technology, Simple Network Management Protocol SNMP technology.
21, according to the method for claim 12, wherein, described method can be carried out functional test and information model uniformity test to the OMC northbound interface of 3G wireless network, core net, data service net, intelligent network and IP multimedia system IMS network; Southbound interface to 3G on-line file management system NMS carries out functional test and information model uniformity test; And the network element of 3G data service net, the network management interface of IMS network element are carried out functional test by direct connecting ne; Wherein said northbound interface refers to the interface that producer's network management system makes progress, and the centralized network management system docks with producer's network management system by it, and southbound interface refers to the interface that the centralized network management system is downward.
22, according to the method for claim 12, wherein, the described functional test of being finished by described IRP functional test module comprises: fault management test, file transfer management test, configuration management test, performance management test; And the method for functional test can be: all operations function that test platform provides test specification to require, the user calls these functions one by one, and the return value of observing function.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007100005607A CN1997199B (en) | 2007-01-12 | 2007-01-12 | An integrated testing system and method for 3G network management interface |
HK08100337.4A HK1109690A1 (en) | 2007-01-12 | 2008-01-10 | A kind of comprehensive testing system and testing method for 3g network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007100005607A CN1997199B (en) | 2007-01-12 | 2007-01-12 | An integrated testing system and method for 3G network management interface |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1997199A true CN1997199A (en) | 2007-07-11 |
CN1997199B CN1997199B (en) | 2011-05-11 |
Family
ID=38252090
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2007100005607A Active CN1997199B (en) | 2007-01-12 | 2007-01-12 | An integrated testing system and method for 3G network management interface |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN1997199B (en) |
HK (1) | HK1109690A1 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009140789A1 (en) * | 2008-05-20 | 2009-11-26 | 中国移动通信集团公司 | A network performance measurement method and system |
CN103051467A (en) * | 2011-10-17 | 2013-04-17 | 中兴通讯股份有限公司 | Automatic detecting method and device of northbound interface |
CN102104504B (en) * | 2009-12-21 | 2013-09-11 | 中兴通讯股份有限公司 | Platform and method for testing northbound interface |
CN105099807A (en) * | 2014-09-18 | 2015-11-25 | 兴义供电局 | Equipment test method and device |
CN108156045A (en) * | 2016-12-05 | 2018-06-12 | 中国移动通信有限公司研究院 | A kind of software definition grouping conveying network SPTN tests system and method |
CN108683570A (en) * | 2018-07-03 | 2018-10-19 | 烽火通信科技股份有限公司 | Controller network element managerial ability tests system and method in software definition transmission net |
CN109039731A (en) * | 2018-07-25 | 2018-12-18 | 武汉虹信通信技术有限责任公司 | A kind of alarm of network management northbound interface is from adaptation method |
CN111723036A (en) * | 2019-03-22 | 2020-09-29 | 华为技术有限公司 | Data processing method, related device and computer storage medium |
CN112054916A (en) * | 2019-06-06 | 2020-12-08 | 烽火通信科技股份有限公司 | Method and system for automatic event conversion |
CN116016245A (en) * | 2021-10-21 | 2023-04-25 | 中国移动通信有限公司研究院 | Network element testing method and device and processing equipment |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1329837C (en) * | 2004-08-20 | 2007-08-01 | 中兴通讯股份有限公司 | Method and apparatus for simulating base station network management system on personal computer |
-
2007
- 2007-01-12 CN CN2007100005607A patent/CN1997199B/en active Active
-
2008
- 2008-01-10 HK HK08100337.4A patent/HK1109690A1/en unknown
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009140789A1 (en) * | 2008-05-20 | 2009-11-26 | 中国移动通信集团公司 | A network performance measurement method and system |
CN102104504B (en) * | 2009-12-21 | 2013-09-11 | 中兴通讯股份有限公司 | Platform and method for testing northbound interface |
CN103051467A (en) * | 2011-10-17 | 2013-04-17 | 中兴通讯股份有限公司 | Automatic detecting method and device of northbound interface |
CN105099807A (en) * | 2014-09-18 | 2015-11-25 | 兴义供电局 | Equipment test method and device |
CN105099807B (en) * | 2014-09-18 | 2018-10-26 | 兴义供电局 | Apparatus testing method and device |
CN108156045A (en) * | 2016-12-05 | 2018-06-12 | 中国移动通信有限公司研究院 | A kind of software definition grouping conveying network SPTN tests system and method |
CN108156045B (en) * | 2016-12-05 | 2019-10-29 | 中国移动通信有限公司研究院 | A kind of software definition grouping conveying network SPTN test macro and method |
CN108683570A (en) * | 2018-07-03 | 2018-10-19 | 烽火通信科技股份有限公司 | Controller network element managerial ability tests system and method in software definition transmission net |
CN109039731A (en) * | 2018-07-25 | 2018-12-18 | 武汉虹信通信技术有限责任公司 | A kind of alarm of network management northbound interface is from adaptation method |
CN111723036A (en) * | 2019-03-22 | 2020-09-29 | 华为技术有限公司 | Data processing method, related device and computer storage medium |
CN112054916A (en) * | 2019-06-06 | 2020-12-08 | 烽火通信科技股份有限公司 | Method and system for automatic event conversion |
CN116016245A (en) * | 2021-10-21 | 2023-04-25 | 中国移动通信有限公司研究院 | Network element testing method and device and processing equipment |
Also Published As
Publication number | Publication date |
---|---|
CN1997199B (en) | 2011-05-11 |
HK1109690A1 (en) | 2008-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1997199B (en) | An integrated testing system and method for 3G network management interface | |
CN101183900B (en) | Baseband extension radio frequency subsystem RRU testing method, system and analog BBU device | |
CN100544292C (en) | A kind of method of BAS Broadband Access Server automatic test | |
CN100490398C (en) | Network management interface information interaction method, device and notice reporting method | |
CN201160312Y (en) | RRU testing system of base band dragged away subsystem and BBU simulating apparatus | |
CN102004817B (en) | International electrotechnical commission (IEC) 61850-7-420 standard-based distributed generating equipment modeling implementation method | |
CN109361562A (en) | A kind of automated testing method based on the access of related network equipment | |
CN101123655A (en) | Distribution load monitoring system | |
CN102752166A (en) | Debugging method, chip, single board and system | |
CN101009591A (en) | Method and system for configuring network devices through an operations support system interface | |
CN106712295B (en) | Logic distribution terminal and communication means based on Automation System for Distributing Substation | |
CN101571845A (en) | Self-description realization method of IEC61850 standard | |
JP2011041455A (en) | Apparatus and method of testing report communication in power transformation automation system | |
CN112988495A (en) | Multifunctional test method, device and system for SOC chip multiplex pin | |
CN104698374A (en) | Method for improving testing efficiency and accuracy of automatic relay protecting tester | |
CN103425497A (en) | Network engineering script across-manufacturer conversion method and device | |
CN105929803B (en) | A kind of satellite ground measuring and controlling equipment Automatic monitoring systems | |
CN113472862A (en) | Intelligent gateway, data acquisition method and Internet of things system | |
CN100384287C (en) | Radio communication detecting system | |
CN202190279U (en) | Remote information network management system | |
CN101826985A (en) | Plugin-based centralized signaling tracing method and system | |
CN1937461B (en) | Terminal test device based on terminal management business | |
CN110098989A (en) | A kind of multichannel CAN analogue system and test method based on CANFD bus | |
CN101192975B (en) | Access management sub-system of network management system | |
CN107465716B (en) | Network instrument system and method based on LXI bus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1109690 Country of ref document: HK |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
REG | Reference to a national code |
Ref country code: HK Ref legal event code: GR Ref document number: 1109690 Country of ref document: HK |