CN1996720A - Antisepsis processing method of the cavity of the motor water cooling base - Google Patents

Antisepsis processing method of the cavity of the motor water cooling base Download PDF

Info

Publication number
CN1996720A
CN1996720A CN 200610102323 CN200610102323A CN1996720A CN 1996720 A CN1996720 A CN 1996720A CN 200610102323 CN200610102323 CN 200610102323 CN 200610102323 A CN200610102323 A CN 200610102323A CN 1996720 A CN1996720 A CN 1996720A
Authority
CN
China
Prior art keywords
spraying
water cooling
internal cavity
cooling base
coating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610102323
Other languages
Chinese (zh)
Inventor
景丹
庞卓卉
孔令江
何庆峰
荆卫锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Yongji Electric Co Ltd
Original Assignee
Yongji Electric Motor Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongji Electric Motor Factory filed Critical Yongji Electric Motor Factory
Priority to CN 200610102323 priority Critical patent/CN1996720A/en
Publication of CN1996720A publication Critical patent/CN1996720A/en
Pending legal-status Critical Current

Links

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

This invention relates to one anti-erosion process method for motor water cooling inner chamber in motor process technique field, which comprises the following steps: firstly painting inner chamber of each parts of water cooling socket; then combining, annealing, wherein, the painting step comprises a, inner chamber surface process; b, spraying; c, keeping then putting till the glue film fully fixed and dried. This invention method can ensure film quality to make the motor water cooling socket anti-erosion and anti-brush with usage life more than 20 years.

Description

The method for anticorrosion treatment of motor water cooling base inner chamber
Technical field
The present invention relates to motor processing and manufacturing technical field, be specially the method for anticorrosion treatment of motor water cooling base inner chamber.
Background technology
The support water-cooled machine is the existing conventional product.Because the long-term work of water cooling base inner chamber in the mobile hot water more than 50 ℃, is subjected to the souring of circulating water, coating must have excellent water tolerance and anti-scouring force, and therefore the preservative treatment to the water cooling base inner chamber has proposed specific (special) requirements.At present, the anticorrosive paint that adopts usually is an epoxy zinc rich primer.Existing motor water cooling base adopts assembling and annealing in process earlier, carries out the preservative treatment of water cooling base inner chamber again.Because elongated narrow and small, the complex structure of water cooling base intracavity space after the assembling is difficult to effectively carry out Coating Pretreatment operation, can't guarantee good coating quality, and can only adopts and irritate the method that is coated with and carry out external coating and realize preservative treatment.Water cooling base inner chamber antiseptic effect through above-mentioned existing method for anticorrosion treatment processing is undesirable, service life is shorter, can't reach designing requirement.
Summary of the invention
The present invention is undesirable for the method for anticorrosion treatment antiseptic effect that solves existing motor water cooling base inner chamber, water cooling base short problem service life, and a kind of method for anticorrosion treatment of motor water cooling base inner chamber is provided.This processing method can greatly improve antiseptic effect, can make reach 20 years the service life of water cooling base.
The present invention adopts following technical scheme to realize: the method for anticorrosion treatment of motor water cooling base inner chamber, and the inner chamber to each component parts of water cooling base sprays paint earlier, and then assembles, anneals; Lacquer spraying technique is as follows: one, surface of internal cavity is handled, 1, surface of internal cavity is carried out ball blast or blasting treatment (ball blast, sandblast are existing known, ripe process of surface treatment), make the surface of internal cavity derusting grade reach the Sa2.5 level of GB8923 standard, roughness reaches 40~70 μ m; Adopt craft and powertool cleaning at each parts surface of internal cavity ball blast or place, blasting treatment blind area, derusting grade reaches the St3 level of GB8923 standard; 2, surface of internal cavity is cleaned (thoroughly removing pollutants such as surface of internal cavity oil, fat, dust); Two, application, 1, surface of internal cavity is sprayed, high mode waterborne zinc-rich thermostable rustproof lacquer, film thickness 50~80 μ m are adopted in spraying; 2, after the spraying workpiece was placed 30~60 minutes, made the paint film surface drying; Three, maintenance behind the paint film surface drying, is lower than in relative humidity under 65% the environment, every 30~40 minutes coating surface is sprayed a water smoke, carry out 4~5 times (at ambient humidity greater than 65% o'clock, under overcast and rainy season, need not to carry out water smoke handles), place then and make the full cross-linked curing of paint film.The present invention is owing to be to spray paint earlier afterwards to assemble, anneal, therefore can handle surface of internal cavity fully, and provided concrete process of surface treatment parameter, also be convenient to simultaneously the detection of coating quality after the application, film thickness, guaranteed that water cooling base inner chamber coating quality is even, consistent, satisfied the long-effective corrosion quality requirement of water cooling base inner chamber.If roughness is too big, be prone to thick coating crest place, trough place coating and approach, be full of cracks appears in trough place coating, and crest place coating antiseptic effect does not reach requirement; If roughness is too little, the mechanical bond power of coating and metallic matrix is little, and adhesive force is equally also relatively poor.The adhesion of coating and metal surface is poor; the problem that can occur disbonding on the one hand; even coating is not peeled off temporarily on the other hand; but also can not firmly can not form a firm entity because of combining between coating and metallic matrix; cause coating to produce good electrochemical protection effect to matrix; in corrosive environment, can cause coating to be peeled off in early days, reduce the anticorrosion useful life of product.Adopting sprays paint earlier afterwards assemble, anneals, and carries out under 550~600 ℃ of high temperature and anneal, therefore, height is anti-corrosion except that having for the anticorrosive paint that need select for use, high adhesion force, Gao Naihou, anti-wash away and good self-healing, also to have high temperature tolerance.Conventional adopt anticorrosive paint---epoxy zinc rich primer is bonding agent with epoxy resin, therefore about 200 ℃ of the high-temperature resistants of paint film are not suitable for the present invention.The present invention is preferred high mode waterborne zinc-rich thermostable rustproof lacquer in numerous anticorrosive paints, this antirust paint has high anti-corrosion, high-temperature resistant (650 ℃), high adhesion force, Gao Naihou and good self-healing, the long-effective corrosion that adapts to workpiece in the water has satisfied the technological requirement of the high annealing that eliminates stress after the workpiece welding.High mode waterborne zinc-rich thermostable rustproof lacquer is the existing known products that sell in market, and concrete model is AL-551, by Wuhan Fumaishi New Material Chemical Co. Ltd.'s production and selling.During this product export, be divided into solid material and liquid material, the weight allotment ratio that is provided according to product description by the user during use is carried out solid-liquid and is mixed.The weight allotment ratio that product description provides is solid material: liquid material=72: 28.Carry out the solid-liquid mixing in this weight allotment ratio and can satisfy needs of the present invention.The present invention has also carried out the film forming maintenance, and has provided concrete maintaining process parameter and film thickness requirement.
Processing method science of the present invention, reasonable can be guaranteed the coating quality of forming film, can make the antiseptic effect of water cooling base and reach 20 years useful life.
It is that main film forming substance and high mode potassium silicate carry out compound that high mode waterborne zinc-rich thermostable rustproof lacquer adopts the high mode lithium metasilicate, adding fluorine activating agent and high-purity zinc powder is made, have high anti-corrosion, high-temperature resistant, high adhesion force, high performance such as weather-proof, the key technical indexes sees Table 1.
The key technical indexes of table 1 high mode waterborne zinc-rich thermostable rustproof lacquer
Project Technical indicator Examination criteria
Outward appearance Grey, smooth GB1729-79
Pliability, mm 3 GB/T1731-93
Pencil hardness 4H GB6739-96
Adhesive force Draw the circle method, more than 2 grades GB1720-79
Draw back method, 5MPa GB/T5210-1985
Resistance to impact 50kg·cm GB1732-79
Salt fog resistance 3000h, the no change of filming GB1771-91
Resistance to salt water 3000h, the no change of filming GB/T10834-89
Ageing-resistant 1000h, the no change of filming GB1766-79
Thermal endurance 650 ℃ * 24h, paint film does not have damage GB1735-79
Paint film organic solvent-resistant test (gasoline, banana oil, paint stripper, turpentine wet goods) 720h, the paint film no change GB1734-93
Engineer testing
Adopt test plate (panel) that high mode waterborne zinc-rich thermostable rustproof lacquer has been carried out manual oxygen cutting groove soldering test, resistance to water, heat-resisting quantity and adhesion test.
1, test plate (panel) is made
Manual oxygen cutting groove soldering test, resistance to water, the used material of heat-resisting quantity engineer testing and surface treatment thereof, spraying method are identical with the actual product workpiece.
1.. material of test piece: Q235-A steel plate.
2.. test plate (panel) size: δ mm * 200mm * 200mm.
3.. lacquer spraying technique: identical with the above-mentioned processing method of the present invention.
2, manual oxygen cutting groove soldering test
The test plate (panel) that sprays paint is carried out oxy-acetylene manual oxygen cutting groove, groove size: C8.Behind the workpiece manual oxygen cutting groove, carry out CO 2The Buchholz protection welding.Gas such as visual no zinc mist produces in gas cutting and welding process, the gas cutting and the weldability of test plate (panel) of having painted is good, paint film damaged area is less, be about 1/2~1/3 of organic coating damaged area under the similarity condition, except that damage of position, weld seam molten bath paint film and the damage of weld edge heat affected area part paint film, remainder paint film not damaged.
3, resistance to water and heat-resisting quantity test
Test plate (panel) annealing, immersion 24 hours, the water-resistant coating of double annealing, heat-resisting quantity engineer testing have been carried out.
1.. carry out GB1735-79 " paint film thermal endurance determination method ", the japanning test plate (panel) has been carried out and the heat-resistance test of annealing workpiece with stove heating, 600 ℃ * 3h insulation, cooling, after the annealing, coating surface is complete, phenomenons such as no aliquation, elephant skin, bubbling, cracking.
2.. the test plate (panel) after the annealing is carried out 24 hours running water soaks, treat the coating surface moisture drying after, coating is carried out the test of double annealing temperature tolerance, test plate (panel) and annealing workpiece are with stove heating, 600 ℃ * 3h insulation, cooling, after the double annealing, coating surface is complete, not damaged.
3.. according to test result analysis: coating can satisfy the resistance to water and the heat-resisting quantity requirement of workpiece.
4, adhesion test
By adopting artificial polishing and mechanical sandblast, to the ground spraying high mode waterborne zinc-rich thermostable rustproof lacquer of different roughness, the adhesive force test result behind the coating bone dry sees Table 2.Find out that from test result different surface treatments is very big to the coating adhesion influence, coating obviously will be got well at the adhesive force of sandblast surface of the work.
Table 2 high mode waterborne zinc-rich thermostable rustproof lacquer coat adhesive force test result
Surface treatment mode Draw back method adhesive force/MPa
/ No. 0 sand paper of artificial polishing 2.17
/ No. 3 sand paper of artificial polishing 4.62
The machinery sandblast 7.4
The salt fog resistance of coating is to estimate a kind of main accelerate corrosion test method of coating antiseptic performance, but the concrete numerical value corresponding relation of neither one service life of this result and coating.Antiseptic effect of the present invention and useful life 20 years were the characteristic according to coating, an estimated value of environment for use.
Embodiment
Embodiment 1
The method for anticorrosion treatment of motor water cooling base inner chamber, the inner chamber to each component parts of water cooling base sprays paint earlier, and then assembles, anneals; Lacquer spraying technique is as follows: one, surface of internal cavity is handled, and 1, surface of internal cavity is carried out blasting treatment, make the surface of internal cavity derusting grade reach the Sa2.5 level of GB8923 standard, roughness reaches 40 μ m; As there being the blind area, adopt craft and powertool cleaning at each place, parts sandblast blind area in the sandblast process, derusting grade reaches the St3 level.2, surface of internal cavity is cleaned, thoroughly remove pollutants such as surface of internal cavity oil, fat, dust; To paint as early as possible in surface after the clean; Two, application, 1, should carry out application as early as possible through the qualified workpiece of surface treatment, its blanking time is shorter better, is no more than 4 hours in principle.Before application, surface of the work generation oxidation will be carried out ball blast or blasting treatment again, reaches specified standard; Surface of internal cavity is sprayed, high mode waterborne zinc-rich thermostable rustproof lacquer is adopted in spraying, and (model is AL-551, by Wuhan Fumaishi New Material Chemical Co. Ltd.'s production and selling), take by weighing solid material and liquid material with electronic scale ratio in accordance with regulations, Gu weight allotment ratio (Gu the material: liquid material=72: 28) that the ratio of material and liquid material provides in product description; Film thickness 50 μ m; Before the application the non-positions of spraying paint such as bevel for welding are protected with adhesive tape; During spraying, earlier precoating is carried out at difficult spraying positions such as workpiece weld seam corner.PQ-I type lip-syncing formula spray gun is adopted in spraying, spraying method is an aerial spraying, spray gun should keep vertical with surface of the work during spraying, distance 250~400mm is (because the character of selected antirust paint has determined, the spray gun distance is too high, the spray phenomenon can occur doing, makes film efflorescence), the spray gun translational speed is even, and the edge of each spraying band repeatedly is pressed in 1/2nd places of a spray strip belt edge; In the coating process, cause the solid-liquid coating quality that influences out of proportion for preventing zinc powder precipitation, require in coating process otherwise the time the tank body that shakes spray gun.2, after the spraying, workpiece was placed 30~60 minutes,, (ambient temperature is higher, humidity is lower, then surface drying time is shorter to make the paint film surface drying; On the contrary, ambient humidity is lower, humidity is higher, and then surface drying time is longer); Three, maintenance behind the paint film surface drying, is lower than in relative humidity under 65% the environment, every 30~40 minutes (30 minutes or 35 minutes or 40 minutes) coating surface is sprayed a water smoke, carries out 4~5 times (4 times or 5 times), places then and makes the full cross-linked curing of paint film; General standing time is at least 24-48 hour (comprising the time of spraying water smoke).Painting quality is tested: detect equably at surface of the work with the not damaged elcometer, guarantee that coating surface is even, complete, film thickness reaches requirement.Here, film thickness is an average thickness values, the change that film thickness is spent roughly with surface of the work and corresponding change.The magnetic thickness tester method among the GB1764-79 " paint film thickness test " is carried out in the detection of film thickness, and the arithmetic mean of getting each dot thickness is the average thickness values of paint film.The repairing of holiday: high mode waterborne zinc-rich thermostable rustproof lacquer has good recoatability, behind the coating curing, film thickness is not met the requirements of position, paint film damage location, polishes, repairs with this coating after the clean.At last, motor water cooling base is carried out welding assembly, be about to each component parts soldering group of water cooling base and dress up support, carry out 550~600 ℃ of high annealings behind the welding assembly.
Embodiment 2
The method for anticorrosion treatment of motor water cooling base inner chamber, the inner chamber to each component parts of water cooling base sprays paint earlier, and then assembles, anneals; Lacquer spraying technique is as follows: one, surface of internal cavity is handled, and 1, surface of internal cavity is carried out Shot Blasting, make the surface of internal cavity derusting grade reach the Sa2.5 level of GB8923 standard, roughness reaches 70 μ m; As there being the blind area, adopt craft and powertool cleaning at each place, parts ball blast blind area in the ball blast process, derusting grade reaches the St3 level.2, surface of internal cavity is cleaned, thoroughly remove pollutants such as surface of internal cavity oil, fat, dust; To paint as early as possible in surface after the clean; Two, application, 1, should carry out application as early as possible through the qualified workpiece of surface treatment, its blanking time is shorter better, is no more than 4 hours in principle.Before application, surface of the work generation oxidation will be carried out ball blast or blasting treatment again, reaches specified standard; Surface of internal cavity is sprayed, high mode waterborne zinc-rich thermostable rustproof lacquer is adopted in spraying, and (model is AL-551, by Wuhan Fumaishi New Material Chemical Co. Ltd.'s production and selling), take by weighing solid material and liquid material with electronic scale ratio in accordance with regulations, Gu weight allotment ratio (Gu the material: liquid material=72: 28) that the ratio of material and liquid material provides in product description; Film thickness 80 μ m; Before the application the non-positions of spraying paint such as bevel for welding are protected with adhesive tape; During spraying, earlier precoating is carried out at difficult spraying positions such as workpiece weld seam corner.PQ-I type lip-syncing formula spray gun is adopted in spraying, spraying method is an aerial spraying, spray gun should keep vertical with surface of the work during spraying, distance 250~400mm is (because the character of selected antirust paint has determined, the spray gun distance is too high, the spray phenomenon can occur doing, makes film efflorescence), the spray gun translational speed is even, and the edge of each spraying band repeatedly is pressed in 1/2nd places of a spray strip belt edge; In the coating process, cause the solid-liquid coating quality that influences out of proportion for preventing zinc powder precipitation, require in coating process otherwise the time the tank body that shakes spray gun.2, after the spraying, workpiece was placed 30~60 minutes, (ambient temperature is higher, humidity is lower, then surface drying time is shorter to make the paint film surface drying; On the contrary, ambient humidity is lower, humidity is higher, and then surface drying time is longer); Three, maintenance behind the paint film surface drying, is lower than in relative humidity under 65% the environment, every 30~40 minutes (30 minutes or 35 minutes or 40 minutes) coating surface is sprayed a water smoke, carries out 4~5 times (4 times or 5 times), places then and makes the full cross-linked curing of paint film; General standing time is at least 24-48 hour (comprising the time of spraying water smoke).Painting quality is tested: detect equably at surface of the work with the not damaged elcometer, guarantee that coating surface is even, complete, film thickness reaches requirement.Here, film thickness is an average thickness values, the change that film thickness is spent roughly with surface of the work and corresponding change.The magnetic thickness tester method among the GB1764-79 " paint film thickness test " is carried out in the detection of film thickness, and the arithmetic mean of getting each dot thickness is the average thickness values of paint film.The repairing of holiday: high mode waterborne zinc-rich thermostable rustproof lacquer has good recoatability, behind the coating curing, film thickness is not met the requirements of position, paint film damage location, polishes, repairs with this coating after the clean.At last, motor water cooling base is carried out welding assembly, be about to each component parts soldering group of water cooling base and dress up support, carry out 550~600 ℃ of high annealings behind the welding assembly.
Embodiment 3
The method for anticorrosion treatment of motor water cooling base inner chamber, the inner chamber to each component parts of water cooling base sprays paint earlier, and then assembles, anneals; Lacquer spraying technique is as follows: one, surface of internal cavity is handled, and 1, surface of internal cavity is carried out Shot Blasting, make the surface of internal cavity derusting grade reach the Sa2.5 level of GB8923 standard, roughness reaches 50 μ m (or 60 μ m); As there being the blind area, adopt craft and powertool cleaning at each place, parts ball blast blind area in the ball blast process, derusting grade reaches the St3 level.2, surface of internal cavity is cleaned, thoroughly remove pollutants such as surface of internal cavity oil, fat, dust; To paint as early as possible in surface after the clean; Two, application, 1, should carry out application as early as possible through the qualified workpiece of surface treatment, its blanking time is shorter better, is no more than 4 hours in principle.Before application, surface of the work generation oxidation will be carried out ball blast or blasting treatment again, reaches specified standard; Surface of internal cavity is sprayed, high mode waterborne zinc-rich thermostable rustproof lacquer is adopted in spraying, and (model is AL-551, by Wuhan Fumaishi New Material Chemical Co. Ltd.'s production and selling), take by weighing solid material and liquid material with electronic scale ratio in accordance with regulations, Gu weight allotment ratio (Gu the material: liquid material=72: 28) that the ratio of material and liquid material provides in product description; Film thickness 60 μ m (or 70 μ m); Before the application the non-positions of spraying paint such as bevel for welding are protected with adhesive tape; During spraying, earlier precoating is carried out at difficult spraying positions such as workpiece weld seam corner.PQ-I type lip-syncing formula spray gun is adopted in spraying, spraying method is an aerial spraying, spray gun should keep vertical with surface of the work during spraying, distance 250~400mm is (because the character of selected antirust paint has determined, the spray gun distance is too high, the spray phenomenon can occur doing, makes film efflorescence), the spray gun translational speed is even, and the edge of each spraying band repeatedly is pressed in 1/2nd places of a spray strip belt edge; In the coating process, cause the solid-liquid coating quality that influences out of proportion for preventing zinc powder precipitation, require in coating process otherwise the time the tank body that shakes spray gun.2, after the spraying, workpiece was placed 30~60 minutes, (ambient temperature is higher, humidity is lower, then surface drying time is shorter to make the paint film surface drying; On the contrary, ambient humidity is lower, humidity is higher, and then surface drying time is longer); Three, maintenance behind the paint film surface drying, is lower than in relative humidity under 65% the environment, every 30~40 minutes (30 minutes or 35 minutes or 40 minutes) coating surface is sprayed a water smoke, carries out 4~5 times (4 times or 5 times), places then and makes the full cross-linked curing of paint film; General standing time is at least 24-48 hour (comprising the time of spraying water smoke).Painting quality is tested: detect equably at surface of the work with the not damaged elcometer, guarantee that coating surface is even, complete, film thickness reaches requirement.Here, film thickness is an average thickness values, the change that film thickness is spent roughly with surface of the work and corresponding change.The magnetic thickness tester method among the GB1764-79 " paint film thickness test " is carried out in the detection of film thickness, and the arithmetic mean of getting each dot thickness is the average thickness values of paint film.The repairing of holiday: high mode waterborne zinc-rich thermostable rustproof lacquer has good recoatability, behind the coating curing, film thickness is not met the requirements of position, paint film damage location, polishes, repairs with this coating after the clean.At last, motor water cooling base is carried out welding assembly, be about to each component parts soldering group of water cooling base and dress up support, carry out 550~600 ℃ of high annealings behind the welding assembly.
Embodiment 4
The method for anticorrosion treatment of motor water cooling base inner chamber, the inner chamber to each component parts of water cooling base sprays paint earlier, and then assembles, anneals; Lacquer spraying technique is as follows: one, surface of internal cavity is handled, and 1, surface of internal cavity is carried out Shot Blasting, make the surface of internal cavity derusting grade reach the Sa2.5 level of GB8923 standard, roughness reaches 40 μ m; As there being the blind area, adopt craft and powertool cleaning at each place, parts ball blast blind area in the ball blast process, derusting grade reaches the St3 level.2, surface of internal cavity is cleaned, thoroughly remove pollutants such as surface of internal cavity oil, fat, dust; To paint as early as possible in surface after the clean; Two, application, 1, should carry out application as early as possible through the qualified workpiece of surface treatment, its blanking time is shorter better, is no more than 4 hours in principle.Before application, surface of the work generation oxidation will be carried out ball blast or blasting treatment again, reaches specified standard; Surface of internal cavity is sprayed, high mode waterborne zinc-rich thermostable rustproof lacquer is adopted in spraying, and (model is AL-551, by Wuhan Fumaishi New Material Chemical Co. Ltd.'s production and selling), take by weighing solid material and liquid material with electronic scale ratio in accordance with regulations, Gu weight allotment ratio (Gu the material: liquid material=72: 28) that the ratio of material and liquid material provides in product description; Film thickness 80 μ m (or 75 μ m or 70 μ m or 60 μ m); Before the application the non-positions of spraying paint such as bevel for welding are protected with adhesive tape; During spraying, earlier precoating is carried out at difficult spraying positions such as workpiece weld seam corner.PQ-I type lip-syncing formula spray gun is adopted in spraying, spraying method is an aerial spraying, spray gun should keep vertical with surface of the work during spraying, distance 250~400mm is (because the character of selected antirust paint has determined, the spray gun distance is too high, the spray phenomenon can occur doing, makes film efflorescence), the spray gun translational speed is even, and the edge of each spraying band repeatedly is pressed in 1/2nd places of a spray strip belt edge; In the coating process, cause the solid-liquid coating quality that influences out of proportion for preventing zinc powder precipitation, require in coating process otherwise the time the tank body that shakes spray gun.2, after the spraying, workpiece was placed 30~60 minutes, (ambient temperature is higher, humidity is lower, then surface drying time is shorter to make the paint film surface drying; On the contrary, ambient humidity is lower, humidity is higher, and then surface drying time is longer); Three, maintenance behind the paint film surface drying, is lower than in relative humidity under 65% the environment, every 30~40 minutes (30 minutes or 35 minutes or 40 minutes) coating surface is sprayed a water smoke, carries out 4~5 times (4 times or 5 times), places then and makes the full cross-linked curing of paint film; General standing time is at least 24-48 hour (comprising the time of spraying water smoke).Painting quality is tested: detect equably at surface of the work with the not damaged elcometer, guarantee that coating surface is even, complete, film thickness reaches requirement.Here, film thickness is an average thickness values, the change that film thickness is spent roughly with surface of the work and corresponding change.The magnetic thickness tester method among the GB1764-79 " paint film thickness test " is carried out in the detection of film thickness, and the arithmetic mean of getting each dot thickness is the average thickness values of paint film.The repairing of holiday: high mode waterborne zinc-rich thermostable rustproof lacquer has good recoatability, behind the coating curing, film thickness is not met the requirements of position, paint film damage location, polishes, repairs with this coating after the clean.At last, motor water cooling base is carried out welding assembly, be about to each component parts soldering group of water cooling base and dress up support, carry out 550~600 ℃ of high annealings behind the welding assembly.
Embodiment 5
The method for anticorrosion treatment of motor water cooling base inner chamber, the inner chamber to each component parts of water cooling base sprays paint earlier, and then assembles, anneals; Lacquer spraying technique is as follows: one, surface of internal cavity is handled, and 1, surface of internal cavity is carried out blasting treatment, make the surface of internal cavity derusting grade reach the Sa2.5 level of GB8923 standard, roughness reaches 70 μ m (or 65 μ m or 60 μ m or 50 μ m); As there being the blind area, adopt craft and powertool cleaning at each place, parts sandblast blind area in the sandblast process, derusting grade reaches the St3 level.2, surface of internal cavity is cleaned, thoroughly remove pollutants such as surface of internal cavity oil, fat, dust; To paint as early as possible in surface after the clean; Two, spraying, 1, should carry out application as early as possible through the qualified workpiece of surface treatment, its blanking time is shorter better, is no more than 4 hours in principle.Before application, surface of the work generation oxidation will be carried out ball blast or blasting treatment again, reaches specified standard; Surface of internal cavity is sprayed, high mode waterborne zinc-rich thermostable rustproof lacquer is adopted in spraying, and (model is AL-551, by Wuhan Fumaishi New Material Chemical Co. Ltd.'s production and selling), take by weighing solid material and liquid material with electronic scale ratio in accordance with regulations, Gu weight allotment ratio (Gu the material: liquid material=72: 28) that the ratio of material and liquid material provides in product description; Film thickness 50 μ m; Before the application the non-positions of spraying paint such as bevel for welding are protected with adhesive tape; During spraying, earlier precoating is carried out at difficult spraying positions such as workpiece weld seam corner.PQ-I type lip-syncing formula spray gun is adopted in spraying, spraying method is an aerial spraying, spray gun should keep vertical with surface of the work during spraying, distance 250~400mm is (because the character of selected antirust paint has determined, the spray gun distance is too high, the spray phenomenon can occur doing, makes film efflorescence), the spray gun translational speed is even, and the edge of each spraying band repeatedly is pressed in 1/2nd places of a spray strip belt edge; In the coating process, cause the solid-liquid coating quality that influences out of proportion for preventing zinc powder precipitation, require in coating process otherwise the time the tank body that shakes spray gun.2, after the spraying, workpiece was placed 30~60 minutes, (ambient temperature is higher, humidity is lower, then surface drying time is shorter to make the paint film surface drying; On the contrary, ambient humidity is lower, humidity is higher, and then surface drying time is longer); Three, maintenance behind the paint film surface drying, is lower than in relative humidity under 65% the environment, every 30~40 minutes (30 minutes or 35 minutes or 40 minutes) coating surface is sprayed a water smoke, carries out 4~5 times (4 times or 5 times), places then and makes the full cross-linked curing of paint film; General standing time is at least 24-48 hour (comprising the time of spraying water smoke).Painting quality is tested: detect equably at surface of the work with the not damaged elcometer, guarantee that coating surface is even, complete, film thickness reaches requirement.Here, film thickness is an average thickness values, the change that film thickness is spent roughly with surface of the work and corresponding change.The magnetic thickness tester method among the GB1764-79 " paint film thickness test " is carried out in the detection of film thickness, and the arithmetic mean of getting each dot thickness is the average thickness values of paint film.The repairing of holiday: high mode waterborne zinc-rich thermostable rustproof lacquer has good recoatability, behind the coating curing, film thickness is not met the requirements of position, paint film damage location, polishes, repairs with this coating after the clean.At last, motor water cooling base is carried out welding assembly, be about to each component parts soldering group of water cooling base and dress up support, carry out 550~600 ℃ of high annealings behind the welding assembly.

Claims (2)

1, a kind of method for anticorrosion treatment of motor water cooling base inner chamber is characterized by: the inner chamber to each component parts of water cooling base sprays paint earlier, and then assembles, anneals; Lacquer spraying technique is as follows:
One, surface of internal cavity is handled, and 1, surface of internal cavity is carried out ball blast or blasting treatment, make the surface of internal cavity derusting grade reach the Sa2.5 level of GB8923 standard, roughness reaches 40~70 μ m; 2, surface of internal cavity is cleaned;
Two, application, 1, surface of internal cavity is sprayed, high mode waterborne zinc-rich thermostable rustproof lacquer, film thickness 50~80 μ m are adopted in spraying; 2, after the spraying workpiece was placed 30~60 minutes, made the paint film surface drying;
Three, maintenance behind the paint film surface drying, is lower than in relative humidity under 65% the environment, every 30~40 minutes coating surface is sprayed a water smoke, carries out 4~5 times, places then and makes the full cross-linked curing of paint film.
2, the method for anticorrosion treatment of motor water cooling base inner chamber as claimed in claim 1 is characterized by: adopt craft and powertool cleaning at each parts surface of internal cavity ball blast or place, blasting treatment blind area, derusting grade reaches the St3 level of GB8923 standard.
CN 200610102323 2006-12-23 2006-12-23 Antisepsis processing method of the cavity of the motor water cooling base Pending CN1996720A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610102323 CN1996720A (en) 2006-12-23 2006-12-23 Antisepsis processing method of the cavity of the motor water cooling base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610102323 CN1996720A (en) 2006-12-23 2006-12-23 Antisepsis processing method of the cavity of the motor water cooling base

Publications (1)

Publication Number Publication Date
CN1996720A true CN1996720A (en) 2007-07-11

Family

ID=38251693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610102323 Pending CN1996720A (en) 2006-12-23 2006-12-23 Antisepsis processing method of the cavity of the motor water cooling base

Country Status (1)

Country Link
CN (1) CN1996720A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103008207A (en) * 2012-12-14 2013-04-03 中船重工电机科技股份有限公司 Antiseptic treatment process of water jacket motor base
CN105390268A (en) * 2015-12-10 2016-03-09 合肥市菲力克斯电子科技有限公司 Processing device for transformer bobbin production
CN105405629A (en) * 2015-11-20 2016-03-16 南通弘峰机电有限公司 Processing process of base for large-scale transformer
CN110899075A (en) * 2018-09-17 2020-03-24 中车大同电力机车有限公司 Subway framework corrosion prevention method
CN111200136A (en) * 2020-02-20 2020-05-26 浙江锋源氢能科技有限公司 Anti-corrosion treatment method for welding wire of metal bipolar plate and metal bipolar plate
CN113737168A (en) * 2021-08-31 2021-12-03 上海宝冶集团有限公司 Corrosion prevention method for welding joint in coastal damp and hot environment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103008207A (en) * 2012-12-14 2013-04-03 中船重工电机科技股份有限公司 Antiseptic treatment process of water jacket motor base
CN105405629A (en) * 2015-11-20 2016-03-16 南通弘峰机电有限公司 Processing process of base for large-scale transformer
CN105390268A (en) * 2015-12-10 2016-03-09 合肥市菲力克斯电子科技有限公司 Processing device for transformer bobbin production
CN110899075A (en) * 2018-09-17 2020-03-24 中车大同电力机车有限公司 Subway framework corrosion prevention method
CN111200136A (en) * 2020-02-20 2020-05-26 浙江锋源氢能科技有限公司 Anti-corrosion treatment method for welding wire of metal bipolar plate and metal bipolar plate
CN113737168A (en) * 2021-08-31 2021-12-03 上海宝冶集团有限公司 Corrosion prevention method for welding joint in coastal damp and hot environment
CN113737168B (en) * 2021-08-31 2023-10-27 上海宝冶集团有限公司 Corrosion prevention method for welded joint in coastal damp-heat environment

Similar Documents

Publication Publication Date Title
CN1996720A (en) Antisepsis processing method of the cavity of the motor water cooling base
CN111454600B (en) Aqueous treatment fluid integrating antirust agent and pretreatment agent and preparation method thereof
CN111690920B (en) Modified silica sol chromium-free passivator for surface treatment of hot-dip galvanized steel sheet and preparation method and application thereof
US5672390A (en) Process for protecting a surface using silicate compounds
JPH04228583A (en) Steel commodity having double protective coating and its manufacture
CN103350539A (en) High temperature resistant anti-corrosion Al-Zn alloy coated steel sheet and preparation method thereof
EP2354470B1 (en) Methods for inhibiting corrosion of high strength steel turbine components
CN105478330A (en) Ship coating technology
CN104148261A (en) Paint coating process
CN112251744B (en) Metal plate coating pretreatment process
CN106994436A (en) A kind of coating process that aqueous anticorrosion coat is prepared based on single track thick film technology
JP6252400B2 (en) Repair base coating composition
CN108273713A (en) A method of improving the resistance to liquid metal corrosion of metal
CN110776825A (en) Antirust salt-spray-resistant graphene zinc-aluminum coating for metal surface, and preparation method and application thereof
CN112934639A (en) Preparation method of anticorrosive steel
CN104289396A (en) Method for heavy corrosion protection of hot galvanized part for high-voltage electrical equipment
CN114481012B (en) Multielement alloy co-permeation agent for steel member and corrosion prevention process thereof
CN116351682A (en) Novel laser cleaning, spraying and corrosion preventing process
CN109590193A (en) A kind of technique of powder metallurgy product antirust Dacroment
CN102719816A (en) Water-washing-free spraying comprehensive treating agent before spray coating of electronic scale bed plate and preparation method
CN102517574A (en) Steel pipe surface treatment liquor and application method thereof
CN108607797A (en) A kind of surface plastic spraying technique of aluminium alloy extrusions
CN111036513A (en) Method for improving foaming defect of varnish after spraying water-based metal paint
CN203371861U (en) High-temperature-resistant anticorrosive aluminum zinc plating steel plate
CN101705466B (en) Method for carrying out surface treatment on power iron fitting by adopting gas multicomponent thermochemical treatment technology and polymeric zinc-aluminum coating

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: YONGJI NEW SPEED ELECTRIC MOTOR CO.

Free format text: FORMER OWNER: YONGJI MOTOR FACTORY, CHINESE BEICHE GROUP

Effective date: 20080926

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080926

Address after: Number 18, motor street, Yongji, Shanxi Province, China: 044500

Applicant after: Yongji Xinshisu Motor Electrical Appliance Co., Ltd.

Address before: Number 18, motor street, Yongji, Shanxi Province, China: 044500

Applicant before: CNR Yongji Electric Machine Factory

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication