CN1995574A - Outer wall outer heat-insulating system of polymer heat-insulating mortar - Google Patents

Outer wall outer heat-insulating system of polymer heat-insulating mortar Download PDF

Info

Publication number
CN1995574A
CN1995574A CNA2005100970297A CN200510097029A CN1995574A CN 1995574 A CN1995574 A CN 1995574A CN A2005100970297 A CNA2005100970297 A CN A2005100970297A CN 200510097029 A CN200510097029 A CN 200510097029A CN 1995574 A CN1995574 A CN 1995574A
Authority
CN
China
Prior art keywords
construction
mortar
interfacial agents
heat
polymer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2005100970297A
Other languages
Chinese (zh)
Other versions
CN1995574B (en
Inventor
王智宇
王志平
阮华
王小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO RONGSHAN NEW MATERIAL CO Ltd
Original Assignee
NINGBO RONGSHAN NEW MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO RONGSHAN NEW MATERIAL CO Ltd filed Critical NINGBO RONGSHAN NEW MATERIAL CO Ltd
Priority to CN2005100970297A priority Critical patent/CN1995574B/en
Publication of CN1995574A publication Critical patent/CN1995574A/en
Application granted granted Critical
Publication of CN1995574B publication Critical patent/CN1995574B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/90Passive houses; Double facade technology

Abstract

The invention discloses an external insulation system for polymer insulation mortar external wall and the construction method. The external insulation system comprises base course wall, interface layer, insulation layer, buffering layer, protective layer and external facing layer. Construction procedures are treating basic wall face, doing grey bake by sprung control line, coating interface agent, constructing insulation mortar, constructing buffering layer, treating fine part, constructing protective layer, and constructing external wall decoration. In the invention the characteristic of polymer insulation mortar is combined and the construction habit for painting external wall is considered. Not only empty drum and crack generated in common external wall insulation system easily are solved but also waste work, waste time, big technological difficulty and needed special construction team in common external wall insulation system are conquered. It takes a good foundation for development and application of polymer insulation mortar and similar insulation material. In addition, the external insulation system in invention satisfies the technological demand to thermal performance of building external wall insulation and isolation in JGJ 134-2001 ''standard of building energy-saving design in the area with hot summer and cold winter'' and is coincidence with the national industry policy of building energy saving and development of dry powder mortar.

Description

A kind of outer wall outer heat-insulating system of polymer heat-insulating mortar
Technical field
The present invention relates to the new polymers heat-insulating mortar exterior wall outer heat preservation system and the job practices thereof of a kind of suitable Xia Redong cryogenic region and hot summer and warm winter zone residential building external wall outer insulation.
Background technology
Building energy conservation is long-range strategy policy and the fundamental policies that China formulates, and is the final goal that china natural resources obtains sustainable development.The socio-economic development level of nearly 20 years China has obtained raising highly visible, and the people's living standard has obtained swift and violent raising, but aspect building energy conservation, compares with Western industrialized economy, and distance is still very big.The energy consumption of China unit's building area is up to 3 times of the close developed country of weather conditions, and 95% building belongs to the high energy consumption building.Because developed country is also further saving energy for building, the trend that this gap also has continuation to enlarge.
The thermal transmittance that reduces the architectural exterior-protecting construction body of wall is one of the major measure of building energy conservation and effective means, its principle mainly is to adopt the building thermal insulation material in light porous crack, increase the thermal resistance value of space enclosing structure, thereby suppress in radiant heat heat transfer, conduction heat transfer and the convection heat transfer' heat-transfer by convection inlet chamber, thereby increase the heat preservation and insulation of building, reach the purpose of building energy conservation.Heat insulating material is meant that hot-fluid is had remarkable resistance, is used to reduce a kind of functional constructional materials of works and environment interchange of heat, and its coefficient of thermal conductivity is generally less than 0.2W/mK.
The outer insulation of external wall is for alleviating the city heat requirement, preventing that peripheral structure be full of cracks and internal condensation from all being favourable; protect agent structure simultaneously; reduce thermal stress; avoid the generation of heat (cold) bridge; having tangible technological merit, is the mainstream technology of current home and abroad building enclosure thermal insulation.
At present domestic outer wall heat preservation system mainly contains two types of heat preservation plate material and thermal insulation mortars, and their construction technology, essential structure and pluses and minuses are as shown in the table.
The construction technology of two types of outer wall heat preservation systems, essential structure and pluses and minuses are relatively
The insulation layer material Construction technology and essential structure Advantage Shortcoming
Heat preservation plate material The foamed polystyrene plate Surface of wall is handled; With bonding agent and fixture with plate adhesion to body of wall; Smear (scraping) one layer of polymeric mortar, and be pressed in the glue ash after stretching the bound edge grid cloth tightly earlier, then grid cloth is pressed in the glue ash with trowel; With mortar that the surface is floating at last. Coefficient of thermal conductivity is low, and thermal and insulating performance is good 1. difficulty of construction is big, and high 3. intensity of high 2. costs of technical requirements are low
Rock wool, block of glass wool
Thermal insulation mortar Polyphenyl particle heat-insulating mortar Surface of wall is handled; Whitewash thermal insulation mortar; Add mortar with alkaline-resisting plastic-coated glass fiber reticular cloth and whitewash, with mortar that the surface is floating at last. 1. low high 3. costs of 2. intensity of easy construction, technical requirements are low 1. easily the dry shrinkage and cracking 2. easy moisture absorption 3. heat-proof qualities are general
The sepiolite thermal insulation mortar
Swelling perlite heat-insulating mortar
It is in northern heating area that China's building energy-saving standard is implemented the earliest, and the thermal resistance of insulation layer requires high, and corresponding insulation layer thickness is very thick, and the cost of exterior-wall heat insulation is also very high.Insulation layer adopts heat preservation plate material commonplace, and the present situation that this and Foreign Architecture power-saving technology develop is synchronous.Northern area generally uses heat preservation plate material class External Walls Heating Insulation, is subjected to the influence of shortcomings such as its price is relatively costly, difficulty of construction is big, technical requirements height, is difficult to obtain large-area use in south of the River hot summer and warm winter region and promotes.
According to the present situation of southern Xia Redong cryogenic region, the Ministry of Construction has formulated a series of building energy-saving standards in recent years, and " hot summer and warm winter region energy Saving Design of Residential Buildings standard " and " utilities building energy-saving design standard " formally carried out in some areas, China south of the River.The design standard that the Xia Redong cryogenic region is formulated is at present compared less demanding for the wall heat resistance value with northern heating area.Therefore seek a kind of technical feasible, economic index is suitable, the reliable architecture exterior wall insulating materials of easy construction, is that the Xia Redong cryogenic region is obtained the key that building energy conservation work extensively launches.Using the External Walls Heating Insulation of thermal insulation mortar to have easy construction, technical requirements is low, intensity is high and cost is low characteristics, is the only selection of Xia Redong cryogenic region heat preservation energy-saving standard implementation.
Owing to be to be incubated from the outside, its thermal insulation structure layer must be able to satisfy the requirement that watertightness, Wind-Pressure Resistance and bigger humiture change, unlikely generation crack, and can resist effects such as extraneous issuable collision impact, can also and adjacent regions (as door and window, pipeline through walls etc.) between and all obtain suitable joining process at aspects such as edge, facing decorations.And traditional thermal insulation mortar type heat insulating material still can not satisfy the requirement of the outer insulation of external wall preferably owing to have easy dry shrinkage and cracking, the easy moisture absorption and the shortcoming low with the body of wall adhesive strength.
Adopt polymer modification technology and nano modification technology can effectively improve the performance of traditional thermal insulation mortar, the polymer thermal insulating mortar product that the applicant and Zhejiang University develop cooperatively on this basis (Chinese patent application number 200410018187.4 " heat preservation mortar for outer wall of buildings ", on April 30th, 2004) be present south of the River Xia Redong cryogenic region one of main heat insulating material that building energy conservation adopts, its performance indications are as follows:
Project Unit Index
Outward appearance - Taupe, evenly, do not have caking and contain particle fiber powdery
Bulk density kg/m 3 ≤450
The quality moisture content ≤0.8
Dried product density kg/m 3 ≤520
Coefficient of thermal conductivity W/m·K ≤0.11
Compressive strength MPa ≥2.5
Frost resistance (strength retention ratio) ≥75
Drying shrinkage value mm/m ≤3.0
The compressive strength of finding out this polymer thermal insulating mortar from above performance indications is near the common external wall render mortar strength, and its construction technology is near common external wall render mortar construction technology simultaneously.Because it is different from the high strength and the good workability of other heat-insulation systems, heat-insulating property is moderate simultaneously, so polymer thermal insulating mortar has obtained high occupation rate of market in the actual popularization of Xia Redong cryogenic region and hot summer and warm winter zone residential building external wall outer insulation.
Summary of the invention
The objective of the invention is based on the basic characteristics of polymer thermal insulating mortar and similar thermal insulation mortar material thereof and the Essential Performance Requirements of external wall outer insulation, a kind of supporting outer wall outer heat-insulating system of polymer heat-insulating mortar and job practices thereof are provided, are convenient to guarantee the heat-insulating property and the construction quality of polymer thermal insulating mortar.
Technique scheme of the present invention is implemented by following technical problem: a kind of outer wall outer heat-insulating system of polymer heat-insulating mortar is characterized in that comprising with the infrastructure construction forming: basic unit's body of wall 1, boundary layer 2, insulation layer 3; Wherein said insulation layer 3 is formed by the construction of polymer thermal insulating mortar slurry.
In above-mentioned outer wall outer heat-insulating system of polymer heat-insulating mortar, comprise that following techonosphere construction forms: cushion coat 4, topping 5, exterior trim surface layer.
As preferably, described boundary layer 2 is formed by the construction of interfacial agents slurry.
As preferably, described cushion coat 4 is formed by one or both materials in alkali-resistant glass fibre grid cloth, the galvanizing electrowelding net and the construction of lightweight body of wall interfacial agents; Wherein lightweight body of wall interfacial agents is a kind of in the interfacial agents, and its is fit to the interface processing of lightweight body of wall, as basic metope interface processing such as sand aerated concrete, ash aerated concrete or thermal insulation mortars.
As preferably, described topping 5 is to be formed by the anti-cracking and waterproofing mortar construction.
A kind of polymer mortar construction of exterior wall external heat-preservation system method is characterized in that described job practices may further comprise the steps:
The processing of a, basic unit's body of wall 1: after basic unit's surface of wall protrusion evened out, hang vertical, cover side, bullet control line, be coated with full interfacial agents slurry formation boundary layer 2 at basic unit's body of wall then, the interfacial agents slurry that is coated with evenly is coated with, and every square metre of consumption is 0.8~1.2Kg;
The construction of b, insulation layer 3: insulation layer adopts the polymer thermal insulating mortar slurry to divide 2~4 constructions, and wherein per twice interval should be at 24h~36h, and a back construction thickness, solidifies the insulation layer after the above-mentioned construction 3 dry 5~7 days all over the little 2~4mm of thickness than last.
The construction of c, cushion coat (4): cushion coat adopts the alkali-resistant glass fibre grid cloth for strengthening the anti-crack net construction or adopting the galvanizing electrowelding net for after strengthening the anti-crack net construction, and thin portion handles, smears then lightweight base material interfacial agents; Wherein adopt the alkali-resistant glass fibre grid cloth to be: with lightweight base material interfacial agents the alkali-resistant glass fibre grid to be layouted to be attached to and solidify on the dried insulation layer for the process that strengthens the anti-crack net construction, point of 400mm~600mm, grid cloth will overlap, lap width is 50mm~70mm, lap-joint smears one deck lightweight base material interfacial agents earlier, and grid cloth is pressed into, and is pressed into a side earlier, be coated with lightweight base material interfacial agents again, be pressed into opposite side again; Wherein adopt the galvanizing electrowelding net for the process that strengthens the anti-crack net construction to be: after treating that insulation layer solidifies drying, hole on insulation layer, galvanizing electrowelding net in shop is fixed the galvanizing electrowelding net with the plastics holdfast, and 400mm~600mm is by an anchoring piece in length and breadth;
D. the construction of topping (5): smear lightweight base material interfacial agents after 10~15 minutes, smeared the anti-cracking and waterproofing mortar slurry in 4~5 hours, the topping gross thickness is controlled at 8-10mm.Surface finish requires native 3mm.
In above-mentioned polymer mortar construction of exterior wall external heat-preservation system method, the compound method of described interfacial agents slurry is: earlier 1 part of water is added in the mortar mixer, add 3~6 parts of interfacial agents powders then and stirred 2~3 minutes, pour out after stirring; The compound method of described polymer thermal insulating mortar slurry is: earlier 0.75 part of water is added in the mixer, add 0.5~1.5 part of polymer thermal insulating mortar then and stirred 3~4 minutes, pour out after stirring; The compound method of described anti-cracking and waterproofing mortar slurry is: earlier with antimitotic agent, common 42.5 portland cements, medium sand by 0.25~0.5: stir in 1: 2~4 adding mixers, add entry then, wherein the ratio of the amount of water and powder body material amount is 1: 3, pours out after stirring; The compound method of described lightweight base material interfacial agents is: earlier 1 part of water is added in the mortar mixer, add 3~5 parts of lightweight base material interfacial agents powders then and stirred 2~4 minutes, pour out after stirring.The antimitotic agent that makes by polymer glue powder, polypropylene monofilament fiber and multiple auxiliary agent of antimitotic agent wherein.
As preferably, in the construction of described cushion coat 4 thin portion handle comprise divide ruling, make drip, handle the corner, paste in the dividing strip drip one or more with anticracking grout.
As preferably, adopt the alkali-resistant glass fibre grid cloth to be in the construction of described cushion coat 4: the alkali-resistant glass fibre grid cloth is sturdy with lightweight base material interfacial agents for strengthening the described process of smearing lightweight base material interfacial agents of anti-crack net construction, lightweight base material interfacial agents is pressed in the net, requirement is sticking real with alkali-resistant glass fibre grid cloth and substrate insulated mortar, and cushion coat is controlled at 1~2 millimeter; Adopt the galvanizing electrowelding net for strengthening the described process of smearing lightweight base material interfacial agents of anti-crack net construction to be: on galvanizing electrowelding net metope, evenly be coated with full lightweight base material interfacial agents, wherein coating amount is 1~4kg/ square metre, and cushion coat is controlled at 2~4 millimeters.
(2) construction technology process:
Basic unit's metope is handled → is hung vertically, cover side, play control line → do ash cake, do the angle, make mouth → brushing interfacial agents → construction of thermal insulation mortar construction → cushion coat → carefully portion's processing → topping construction → exterior wall finish is constructed.
Its job practices of building exterior wall heat preserving system of the present invention has following relatively more outstanding innovation point:
(1) on interface processing: ordinary mortar whitewashes general and is coated with interfacial agents at concrete material.And thermal insulation mortar will all need to be coated with interfacial agents at all bodies of wall, for guaranteeing polymer thermal insulating mortar not hollowing, cracking, insulation layer and basic unit's adhesive power are strengthened in the interfacial agents effect on the one hand, prevent basic unit's body of wall accumulation of salt in the surface soil on the other hand, destroy the interface and cause hollowing, cracking.
(2) vertical, cover side, bullet control line: whitewash that the degree of plainness for wall surface key is to hang vertically, cover side, bullet control line.Hang vertical, cover side, bullet control line method is whitewashed identical with ordinary mortar, difference is that ordinary mortar control thickness is to have suffered exterior plaster thickness, whether and polymer thermal insulating mortar control thickness is insulation layer thickness, up to standard because the key of heat insulation effect is insulation layer thickness.The outer protective layer thickness of insulation layer is controlled available two kinds of methods and is handled, and the one, directly do topping, because the whole levelling of insulation layer, the 2nd, on insulation layer, play control line again, do ash cake, do the angle, do mouth, carry out the topping construction then.
(3) do ash cake, do the angle, do mouthful: on the good control line of bullet basis, do ash cake, do the angle, to make mouth method identical with ordinary mortar, difference is ash cake, angle THICKNESS CONTROL line difference, the heat-insulation system major control be the thickness of insulation layer.For reducing heat bridge, ash cake is made of thermal insulation mortar, and it is low to do angle section material intensity, constructional difficulties and fragile, and the angular position heat waste is few, does angle section material ordinary mortar.
(4) in the process of whitewashing: polymer thermal insulating mortar insulation layer and ordinary mortar whitewash similar process, all divide the bottoming of twice construction first pass, second time levelling.But insulation layer gene basis body of wall, require the heat insulation effect difference, the insulation layer thickness difference will be divided the multipass construction sometimes, reaches the levelling of ash cake thickness at last.Twice engineering time of ordinary mortar got final product at interval in 3-4 hour, and thermal insulation mortar is slow because of coming on the intensity, and twice engineering time wanted more than 24 hours at interval.
(5) on topping: the common whitewash mortar layer that do not need protection, finish coat is directly done in the outside.And polymer thermal insulating mortar must layer protective layer, its role is to improve the surface impact energy on the one hand, improves the heat-insulation system water resistance on the other hand.The used anticracking grout of topping is to add anti-crack water-proof agent in the common external wall render mortar, and its intensity is higher than polymer thermal insulating mortar.In traditional external rendering process, be not allow outer intensity to be higher than internal layer intensity, be easy to cause hollowing, cracking because do like this.Outer wall outer heat-insulating system of polymer heat-insulating mortar faces same problem.For solving this contradiction; outer wall outer heat-insulating system of polymer heat-insulating mortar is taked two kinds of technological means in construction technology; the one, one deck cushion coat is set between insulation layer and topping; therebetween one deck alkali-resistant glass fibre grid cloth or galvanizing electrowelding net; the crackle that reduces two media interface stress generated by defferent temp and produce; the 2nd, in anti-cracking and waterproofing mortar, add flexible material, improve its plastic deformation ability, prevent cracking.
(6) on cushion coat: the general outer way that is incubated is that reinforcing mat is clipped in the middle of the topping, and this technology way is that cushion coat is set one.It is also different to paste alkali-resistant glass fibre grid cloth method, and other external wall outer insulations are that the topping sequence of construction is to spread one deck finishing mucilage earlier, under the not dried situation of bottom finishing mucilage; grid cloth is sticked; float coat finishing mucilage then, grid cloth can only be pasted by a fritter a small area of ground like this, and overlap joint is many.Polymerization heat-insulating mortar exterior wall outer heat preservation system alkali-resistant glass fibre grid cloth adopts point pasting method, and monoblock is pasted from top to bottom, and overlap joint is few, saving of work and time.
Therefore the present invention has the following advantages:
1, the characteristics of conjugated polymer thermal insulation mortar of the present invention, take into account external rendering construction custom again, promptly solve general external thermal insulation system and easily produce hollowing, cracking problem, overcoming general construction of exterior wall external heat-preservation system again takes a lot of work bothersome, technical difficulty is big, need professional construction troop problem, apply for polymer thermal insulating mortar and similar heat insulating material thereof and lay a good foundation.
2, adopt new polymers heat-insulating mortar exterior wall outer heat preservation system of the present invention to satisfy among the JGJ 134-2001 " Xia Redong cryogenic region energy Saving Design of Residential Buildings standard ", meet the industrial policy of the building energy conservation and the development dry powder and mortar of country the technical requirements of the heat insulation thermal property of building exterior wall heat preserving.
Description of drawings
Fig. 1 is an outer wall outer heat-insulating system of polymer heat-insulating mortar organigram of the present invention
The specific embodiment
Below be specific embodiments of the invention and in conjunction with the accompanying drawings, technical scheme of the present invention is done the description in a nearly step, but the present invention be not limited to following embodiment.
Embodiment 1 is as shown in Figure 1: 1 is basic unit's body of wall, and 2 is boundary layer, and 3 is insulation layer, and 4 is cushion coat, and 5 is topping
(1) material preparation:
1, the preparation of interfacial agents slurry:
Earlier 1 part of water is added in the mortar mixer, add 3 parts of interfacial agents powders then and stirred 3 minutes, pour out after stirring, this slurry uses up in 4h.
2, the preparation of polymer thermal insulating mortar slurry:
Earlier 0.75 part of water is added in the mixer, add 0.5 part of polymer thermal insulating mortar then and stirred 4 minutes, pour out after stirring, the preparation of thermal insulation mortar should be with stirring with usefulness, and use up in 4h.
3, the preparation of anti-cracking and waterproofing mortar slurry:
Earlier antimitotic agent, common 42.5 portland cements, medium sand were added in the mixer by 0.25: 1: 2 and stir, adding an amount of water then stirred 3 minutes, wherein the ratio of the amount of water and powder body material amount is 1: 3, pours out after stirring, and this slurry uses up in 4h.
4, the preparation of lightweight base material interfacial agents:
Earlier 1 part of water is added in the mortar mixer, add 3 parts of lightweight base material interfacial agents powders then and stirred 3 minutes, pour out after stirring, this slurry uses up in 4h.
(3) construction technology main points
(1) basic unit's metope is handled
Metope should be cleaned out, no oil stain, floating dust etc., and metope is loosening, the weathering part should be picked cutter and be removed clean.Wall rat thing 〉=5mm should even out; The body of wall of concrete material and cylinder position etc. should be cut a hole hair in advance.
(2) hang vertical, rule is looked for by cover side, play the THICKNESS CONTROL line, draw vertical, the logical line of level, cover side's work mouth is made the standard thickness ash cake by the insulation layer thickness line, does the angle.
(3) to handle back wall basic unit full coat interfacial agents, wherein 0.8kg/ square metre with broom or cylinder the interfacial agents slurry is evenly brushed.
(4) construction of polymer thermal insulating mortar layer:
Polymer thermal insulating mortar divides twice construction, at interval should be at 36h; The construction in back thickness, should reach ash cake thickness during back one-pass operation and puts down with big thick stick stranding all over construction thickness little 2mm than last, and metope door and window mouth planeness should reach requirement; The construction of thermal insulation mortar is carried out from top to bottom; Insulation layer solidifies drying (by motionless surface, generally can carry out the construction of anti-cracking and waterproofing mortar layer with palm after about 5 days; Insulation layer solidifies in the dry run, the maintenance of when the surface is canescence, should sprinkling water, and remain surface wettability, if can not do the anti-cracking waterproof layer on time, curing time generally should be no less than 7d.
(5) construction of cushion coat and thin portion handle
With the alkali-resistant glass fibre grid cloth serves as to strengthen the anti-crack net job practices:
A. paste the alkali-resistant glass fibre grid cloth
With lightweight base material interfacial agents the alkali-resistant glass fibre grid is layouted and to be attached on the wall, point of 400mm, grid cloth will overlap, lap width is 50mm, and lap-joint smears one deck lightweight base material interfacial agents earlier, with trowel grid cloth is pressed into, be pressed into a side earlier, smear lightweight base material interfacial agents again, be pressed into opposite side again, forbid dried taking; It is smooth non-wrinkled that the glass fiber reticular cloth paving is wanted; If weather sweltering heat, drying are pasted the net place and should be carried out maintenance.
B. thin portion handles
Thin portion handle comprise divide ruling, make drip, handle the corner, paste dividing strip drip etc. with anticracking grout.
C. smear lightweight base material interfacial agents
With lightweight base material interfacial agents that the alkali-resistant glass fibre grid cloth is sturdy.Require basic unit moistening before sturdy.With trowel lightweight base material interfacial agents is pressed in the net, requires alkali-resistant glass fibre grid cloth and substrate insulated mortar are glued in fact, tack coat will approach, and wherein coating amount is 1kg/ square metre, is controlled at 1 millimeter.
(6) construction of topping
Smear lightweight base material interfacial agents after 10 minutes and 4 hours planted agents carry out the anti-cracking and waterproofing mortar construction, the topping gross thickness is controlled at 8mm, surfacing.Planeness requires to meet the requirements native 3mm.After having smeared anti-cracking and waterproofing mortar, should check smooth, vertically reach negative and positive angle Founder, should repair for undesirable.
Embodiment 2
(1) material preparation:
1, the preparation of interfacial agents slurry:
Earlier 1 part of water is added in the mortar mixer, add 4 parts of interfacial agents powders then and stirred 2 minutes, pour out after stirring, this slurry uses up in 4h.
2, the preparation of polymer thermal insulating mortar slurry:
Earlier 0.75 part of water is added in the mixer, add 1 part of polymer thermal insulating mortar then and stirred 3 minutes, pour out after stirring, the preparation of thermal insulation mortar should be with stirring with usefulness, and use up in 4h.
3, the preparation of anti-cracking and waterproofing mortar slurry:
Earlier antimitotic agent, common 42.5 portland cements, medium sand were added in the mixer by 0.5: 1: 3 and stir, adding an amount of water then stirred 4 minutes, wherein the ratio of the amount of water and powder body material amount is 1: 3, pours out after stirring, and this slurry uses up in 4h.
4, the preparation of lightweight base material interfacial agents:
Earlier 1 part of water is added in the mortar mixer, add 4 parts of lightweight base material interfacial agents powders then and stirred 2 minutes, pour out after stirring, this slurry uses up in 4h.
(3) construction technology main points
(1) basic unit's metope is handled
Metope should be cleaned out, no oil stain, floating dust etc., and metope is loosening, the weathering part should be picked cutter and be removed clean.Wall rat thing 〉=5mm should even out; The body of wall of concrete material and cylinder position etc. should be cut a hole hair in advance.
(2) hang vertical, rule is looked for by cover side, play the THICKNESS CONTROL line, draw vertical, the logical line of level, cover side's work mouth is made the standard thickness ash cake by the insulation layer thickness line, does the angle.
(3) to handle back wall basic unit full coat interfacial agents, wherein 1.0kg/ square metre with broom or cylinder the interfacial agents slurry is evenly brushed.
(4) construction of polymer thermal insulating mortar layer:
Polymer thermal insulating mortar divides three times constructions, at interval should be at 30h; The construction in back thickness, should reach ash cake thickness during last one-pass operation and rub with the hands with big thick stick and put down all over construction thickness little 4mm than last, and metope door and window mouth planeness should reach requirement; The construction of thermal insulation mortar is carried out from top to bottom; Insulation layer solidifies drying (by motionless surface, generally can carry out the construction of anti-cracking and waterproofing mortar layer with palm after about 6 days; Insulation layer solidifies in the dry run, the maintenance of when the surface is canescence, should sprinkling water, and remain surface wettability, if can not do the anti-cracking waterproof layer on time, curing time generally should be no less than 7d.
(5) construction of cushion coat and thin portion handle
With the alkali-resistant glass fibre grid cloth serves as to strengthen the anti-crack net job practices:
A. paste the alkali-resistant glass fibre grid cloth
With lightweight base material interfacial agents the alkali-resistant glass fibre grid is layouted and to be attached on the wall, point of about 500mm, grid cloth will overlap, lap width 70mm, lap-joint smear one deck lightweight base material interfacial agents earlier, with trowel grid cloth are pressed into, be pressed into a side earlier, smear lightweight base material interfacial agents again, be pressed into opposite side again, forbid dried taking; It is smooth non-wrinkled that the glass fiber reticular cloth paving is wanted; If weather sweltering heat, drying are pasted the net place and should be carried out maintenance.
B. thin portion handles
Thin portion handle comprise divide ruling, make drip, handle the corner, paste dividing strip drip etc. with anticracking grout.
C. smear lightweight base material interfacial agents
With lightweight base material interfacial agents that the alkali-resistant glass fibre grid cloth is sturdy.Require basic unit moistening before sturdy.With trowel lightweight base material interfacial agents is pressed in the net, requires alkali-resistant glass fibre grid cloth and substrate insulated mortar are glued in fact, tack coat will approach, and wherein coating amount is 2kg/ square metre, is controlled at 2 millimeters.
(6) construction of topping
Smear lightweight base material interfacial agents after 12 minutes and 5 hours planted agents carry out the anti-cracking and waterproofing mortar construction, the topping gross thickness is controlled at 9mm, surfacing.Planeness requires to meet the requirements native 3mm.After having smeared anti-cracking and waterproofing mortar, should check smooth, vertically reach negative and positive angle Founder, should repair for undesirable.(7) construction of exterior trim surface layer: adopt coating, face brick or other finish material that exterior wall is decorated.
Embodiment 3
(1) material preparation:
1, the preparation of interfacial agents slurry:
Earlier 1 part of water is added in the mortar mixer, add 6 parts of interfacial agents powders then and stirred 3 minutes, pour out after stirring, this slurry uses up in 4h.
2, the preparation of polymer thermal insulating mortar slurry:
Earlier 0.75 part of water is added in the mixer, add 1.5 parts of polymer thermal insulating mortars then and stirred 4 minutes, pour out after stirring, the preparation of thermal insulation mortar should be with stirring with usefulness, and use up in 4h.
3, the preparation of anti-cracking and waterproofing mortar slurry:
Earlier antimitotic agent, common 42.5 portland cements, medium sand were added in the mixer by 0.5: 1: 3 and stir, adding an amount of water then stirred 3 minutes, wherein the ratio of the amount of water and powder body material amount is 1: 3, pours out after stirring, and this slurry uses up in 4h.
4, the preparation of lightweight base material interfacial agents:
Earlier 1 part of water is added in the mortar mixer, add 5 parts of lightweight base material interfacial agents powders then and stirred 4 minutes, pour out after stirring, this slurry uses up in 4h.
(3) construction technology main points
(1) basic unit's metope is handled
Metope should be cleaned out, no oil stain, floating dust etc., and metope is loosening, the weathering part should be picked cutter and be removed clean.Wall rat thing 〉=5mm should even out; The body of wall of concrete material and cylinder position etc. should be cut a hole hair in advance.
(2) hang vertical, rule is looked for by cover side, play the THICKNESS CONTROL line, draw vertical, the logical line of level, cover side's work mouth is made the standard thickness ash cake by the insulation layer thickness line, does the angle.
(3) to handle back wall basic unit full coat interfacial agents, wherein 1.2kg/ square metre with broom or cylinder the interfacial agents slurry is evenly brushed.
(4) construction of polymer thermal insulating mortar layer:
Polymer thermal insulating mortar divides four times constructions, at interval should be at 24h; The construction in back thickness, should reach ash cake thickness during last one-pass operation and rub with the hands with big thick stick and put down all over construction thickness little 2mm than last, and metope door and window mouth planeness should reach requirement; The construction of thermal insulation mortar is carried out from top to bottom; Insulation layer solidifies drying (by motionless surface, generally can carry out the construction of anti-cracking and waterproofing mortar layer with palm after about 6 days; Insulation layer solidifies in the dry run, the maintenance of when the surface is canescence, should sprinkling water, and remain surface wettability, if can not do the anti-cracking waterproof layer on time, curing time generally should be no less than 7d.
(5) construction of cushion coat and thin portion handle
With the galvanizing electrowelding net serves as to strengthen the anti-crack net job practices:
A. spread the galvanizing electrowelding net
After treating that insulation layer solidifies drying, hole on insulation layer, galvanizing electrowelding net in shop is fixed the galvanizing electrowelding net with the plastics holdfast, and about in length and breadth 500mm is by an anchoring piece.
B. thin portion handles
Thin portion handle comprise divide ruling, make drip, handle the corner, paste dividing strip drip etc. with anticracking grout.
C. smear lightweight base material interfacial agents
Fixing on the galvanizing electrowelding net metope,, requiring basic unit moistening before the roller coating with cylinder full coat lightweight base material interfacial agents.Boundary layer will approach, and wherein coating amount is 4kg/ square metre, is controlled at 2 millimeters.
(6) construction of topping
Smear lightweight base material interfacial agents after 15 minutes and 6 hours planted agents carry out the anti-cracking and waterproofing mortar construction, the topping gross thickness is controlled at 10mm, surfacing.Planeness requires to meet the requirements native 3mm.After having smeared anti-cracking and waterproofing mortar, should check smooth, vertically reach negative and positive angle Founder, should repair for undesirable.(7) construction of exterior trim surface layer: adopt coating, face brick or other finish material that exterior wall is decorated.
Table 1: the Engineering Projects of outer wall outer heat-insulating system of polymer heat-insulating mortar of the present invention and job practices thereof
Sequence number The Engineering Projects title Building area Engineering time
1 The silver village, Fengshan (building energy conservation demonstration quarter) 8900m 2 2003
2 Ivy small city (national the Affordable Housing Program) 120000m 2 2004
3 Home, the sky and water 15600m 2 2004
4 Phoenix Lai Yinyuan 130000m 2 2004
5 Small town, hundred victory kylin eastern suburbs 102000m 2 2005
6 Hat reaches Lan Tingyuan 170000m 2 2005
7 Dong Fangqiancheng 146000m 2 2005
8 High permanent Oriental Pearl (high level) 38000m 2 2005
9 With the letter garden 28000m 2 2005
10 The group rises Jin Shuiwan 260000m 2 2005
11 Century Hua Cheng 38000m 2 2005
12 The square, Yongtai 33000m 2 2005
13 Develop emerald city, green city 140000m 2 2005
14 The Lv Cheng Peach Garden 2000m 2 2005
15 The not busy woods scenery with hills and waters in gold city 45000m 2 2005
16 Gold city bamboo seawater rhythm 60000m 2 2005
17 Water Qingyuan, the region of rivers and lakes, city 28000m 2 2005
18 Water chain garden, the region of rivers and lakes, city 30000m 2 2005
Specific embodiment described in the present invention only is that the present invention's spirit is illustrated.The technician of the technical field of the invention can make various modifications or replenishes or adopt similar mode to substitute described specific embodiment, but can't depart from spirit of the present invention or surmount the defined scope of appended claims.
Although the present invention has been made detailed explanation and has quoted some instantiations as proof, to those skilled in the art, only otherwise leave that the spirit and scope of the present invention can be done various variations or correction is obvious.

Claims (10)

1. an outer wall outer heat-insulating system of polymer heat-insulating mortar is characterized in that comprising with the infrastructure construction forming: basic unit's body of wall (1), boundary layer (2), insulation layer (3); Wherein said insulation layer (3) is formed by the construction of polymer thermal insulating mortar slurry.
2, outer wall outer heat-insulating system of polymer heat-insulating mortar according to claim 1 is characterized in that described outer wall outer heat-insulating system of polymer heat-insulating mortar comprises that also following techonosphere construction forms: cushion coat (4), topping (5), exterior trim surface layer.
3, outer wall outer heat-insulating system of polymer heat-insulating mortar according to claim 1 and 2 is characterized in that described boundary layer (2) is formed by the construction of interfacial agents slurry.
4, outer wall outer heat-insulating system of polymer heat-insulating mortar according to claim 1 and 2 is characterized in that described cushion coat (4) is formed by one or both materials in alkali-resistant glass fibre grid cloth, the galvanizing electrowelding net and the construction of lightweight body of wall interfacial agents.
5, outer wall outer heat-insulating system of polymer heat-insulating mortar according to claim 1 and 2 is characterized in that described topping (5) is to be formed by the anti-cracking and waterproofing mortar construction.
6. polymer mortar construction of exterior wall external heat-preservation system method is characterized in that described job practices may further comprise the steps:
The processing of a, basic unit's body of wall (1): after basic unit's surface of wall protrusion evened out, hang vertical, cover side, bullet control line, be coated with full interfacial agents slurry formation boundary layer (2) at basic unit's body of wall then, the interfacial agents slurry that is coated with evenly is coated with, and every square metre of consumption is 0.8~1.2Kg;
The construction of b, insulation layer (3): insulation layer adopts the polymer thermal insulating mortar slurry to divide 2~4 constructions, wherein per twice interval should be at 24h~36h, the construction in back thickness, solidifies the insulation layer after the above-mentioned construction (3) dry 5~7 days all over the little 2~4mm of thickness than last.
7. polymer mortar construction of exterior wall external heat-preservation system method according to claim 6 is characterized in that also comprising the steps:
The construction of c, cushion coat (4): cushion coat adopts the alkali-resistant glass fibre grid cloth for strengthening the anti-crack net construction or adopting the galvanizing electrowelding net for after strengthening the anti-crack net construction, and thin portion handles, smears then lightweight base material interfacial agents; Wherein adopt the alkali-resistant glass fibre grid cloth to be: with lightweight base material interfacial agents the alkali-resistant glass fibre grid to be layouted to be attached to and solidify on the dried insulation layer for the process that strengthens the anti-crack net construction, point of 400mm~600mm, grid cloth will overlap, lap width is 50mm~70mm, lap-joint smears one deck lightweight base material interfacial agents earlier, and grid cloth is pressed into, and is pressed into a side earlier, be coated with lightweight base material interfacial agents again, be pressed into opposite side again; Wherein adopt the galvanizing electrowelding net for the process that strengthens the anti-crack net construction to be: after treating that insulation layer solidifies drying, hole on insulation layer, galvanizing electrowelding net in shop is fixed the galvanizing electrowelding net with the plastics holdfast, and 400mm~600mm is by an anchoring piece in length and breadth;
D. the construction of topping (5): smear lightweight base material interfacial agents after 10~15 minutes, smeared the anti-cracking and waterproofing mortar slurry in 4~5 hours, the topping gross thickness is controlled at 8-10mm.
8. according to claim 6 or 7 described polymer mortar construction of exterior wall external heat-preservation system methods, the compound method that it is characterized in that described interfacial agents slurry is: earlier 1 part of water is added in the mortar mixer, add 3~6 parts of interfacial agents powders then and stirred 2~3 minutes, pour out after stirring; The compound method of described polymer thermal insulating mortar slurry is: earlier 0.75 part of water is added in the mixer, add 0.5~1.5 part of polymer thermal insulating mortar then and stirred 3~4 minutes, pour out after stirring; The compound method of described anti-cracking and waterproofing mortar slurry is: earlier with antimitotic agent, common 42.5 portland cements, medium sand by 0.25~0.5: stir in 1: 2~4 adding mixers, add entry then, wherein the ratio of the amount of water and powder body material amount is 1: 3, pours out after stirring; The compound method of described lightweight base material interfacial agents is: earlier 1 part of water is added in the mortar mixer, add 3~5 parts of lightweight base material interfacial agents powders then and stirred 2~4 minutes, pour out after stirring.
9, according to claim 6 or 7 described polymer mortar construction of exterior wall external heat-preservation system methods, the thin portion in the construction of described cushion coat (4) of it is characterized in that handle comprise divide ruling, make drip, handle the corner, paste in the dividing strip drip one or more with anticracking grout.
10, according to claim 6 or 7 described polymer mortar construction of exterior wall external heat-preservation system methods, it is characterized in that adopting in the construction of described cushion coat (4) the alkali-resistant glass fibre grid cloth to be: the alkali-resistant glass fibre grid cloth is sturdy with lightweight base material interfacial agents for strengthening the described process of smearing lightweight base material interfacial agents of anti-crack net construction, lightweight base material interfacial agents is pressed in the net, requirement is sticking real with alkali-resistant glass fibre grid cloth and substrate insulated mortar, and cushion coat is controlled at 1~2 millimeter; Adopt the galvanizing electrowelding net for strengthening the described process of smearing lightweight base material interfacial agents of anti-crack net construction to be: on galvanizing electrowelding net metope, evenly be coated with full lightweight base material interfacial agents, the amount that wherein is coated with is 1~4kg/ square metre, and cushion coat is controlled at 2~4 millimeters.
CN2005100970297A 2005-12-31 2005-12-31 Outer wall outer heat-insulating system of polymer heat-insulating mortar Expired - Fee Related CN1995574B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2005100970297A CN1995574B (en) 2005-12-31 2005-12-31 Outer wall outer heat-insulating system of polymer heat-insulating mortar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2005100970297A CN1995574B (en) 2005-12-31 2005-12-31 Outer wall outer heat-insulating system of polymer heat-insulating mortar

Publications (2)

Publication Number Publication Date
CN1995574A true CN1995574A (en) 2007-07-11
CN1995574B CN1995574B (en) 2010-11-17

Family

ID=38250770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2005100970297A Expired - Fee Related CN1995574B (en) 2005-12-31 2005-12-31 Outer wall outer heat-insulating system of polymer heat-insulating mortar

Country Status (1)

Country Link
CN (1) CN1995574B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101390480B (en) * 2008-10-31 2010-10-27 李珠 Manufacturing method of ultralow energy consumption day-light greenhouse
CN102704638A (en) * 2012-06-02 2012-10-03 唐国良 Light compound decorative component
CN102839797A (en) * 2012-08-28 2012-12-26 常熟古建园林建设集团有限公司 Method of laying strengthening net on facing base body
CN104060704A (en) * 2013-03-22 2014-09-24 贵州中建建筑科研设计院有限公司 Mechanical repairing method and structure for hollowing of thermal insulation mortar of outer wall
CN106121151A (en) * 2016-06-21 2016-11-16 安徽天锦云漆业有限公司 A kind of construction method of cracking resistance heat preserving exterior wall construction material
CN106400987A (en) * 2016-08-31 2017-02-15 安徽成睿光伏科技有限公司 Construction method of heat insulation material of external solar photovoltaic heat insulation wall
CN106401096A (en) * 2016-08-31 2017-02-15 安徽成睿光伏科技有限公司 Construction method of heat insulation material of external solar photovoltaic heat insulation wall

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669760A (en) * 2013-11-12 2014-03-26 苏州天顺建筑科技有限公司 Interface mortar construction technology

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1095017C (en) * 1998-07-28 2002-11-27 黄振利 Crack-resistant heat-insulation wall and construction technology thereof
CN1142350C (en) * 2002-01-24 2004-03-17 黄振利 Composite walling made of rock wool, polystyrene particles and insulating mortar and its construction technology
EP1418062A1 (en) * 2002-11-11 2004-05-12 Stefan Baumann Method for obtaining an interior or exterior finish surface
CN1176284C (en) * 2002-11-29 2004-11-17 北京振利高新技术公司 Wall with heat insulating facing tile of glue powder and polystyrene grains and its construction process
CN1177114C (en) * 2002-11-29 2004-11-24 北京振利高新技术公司 Wall with heat insulating facing polyurethane tile and its construction process
CN1458366A (en) * 2003-06-18 2003-11-26 北京振利高新技术公司 Outer heat insulating wall with anchored and adhered tile and its construction process
CN100445483C (en) * 2003-09-19 2008-12-24 杨小平 Composite silicate hard heat preservating thermal insulating wall and its construction method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101390480B (en) * 2008-10-31 2010-10-27 李珠 Manufacturing method of ultralow energy consumption day-light greenhouse
CN102704638A (en) * 2012-06-02 2012-10-03 唐国良 Light compound decorative component
CN102839797A (en) * 2012-08-28 2012-12-26 常熟古建园林建设集团有限公司 Method of laying strengthening net on facing base body
CN104060704A (en) * 2013-03-22 2014-09-24 贵州中建建筑科研设计院有限公司 Mechanical repairing method and structure for hollowing of thermal insulation mortar of outer wall
CN104060704B (en) * 2013-03-22 2016-08-31 贵州中建建筑科研设计院有限公司 The mechanical type restorative procedure of heat preservation mortar for outer wall hollowing and structure
CN106121151A (en) * 2016-06-21 2016-11-16 安徽天锦云漆业有限公司 A kind of construction method of cracking resistance heat preserving exterior wall construction material
CN106121151B (en) * 2016-06-21 2018-08-31 安徽天锦云漆业有限公司 A kind of construction method of cracking resistance heat preserving exterior wall construction material
CN106400987A (en) * 2016-08-31 2017-02-15 安徽成睿光伏科技有限公司 Construction method of heat insulation material of external solar photovoltaic heat insulation wall
CN106401096A (en) * 2016-08-31 2017-02-15 安徽成睿光伏科技有限公司 Construction method of heat insulation material of external solar photovoltaic heat insulation wall

Also Published As

Publication number Publication date
CN1995574B (en) 2010-11-17

Similar Documents

Publication Publication Date Title
CN1995574B (en) Outer wall outer heat-insulating system of polymer heat-insulating mortar
CN103276831B (en) Inorganic compounding A level does not fire warming plate wall insulation system and construction method
CN201284516Y (en) Wall heat-preserving system
CN207063215U (en) A kind of external wall of phase-change thermal-storage mortar
CN105155696A (en) Energy-saving self-insulation wall and construction process
CN106630819A (en) Anti-efflorescence sea water coral aggregate concrete block
CN102628306A (en) Roofing thermal insulation and water resistance composite system and construction technology
CN102797316A (en) Flat roof fireproof and thermal insulating brick, its preparation process and construction method
CN101008192A (en) Construction method of outer wall insulation system adopting composite insulation surface tile
CN103790264B (en) Low temperature hot water radiation heating washroom, ground seepproof screen construction method
CN204691089U (en) Light roofing system
CN103526887B (en) A kind of construction technology of inversion type flat roof deck insulation construction
CN207260455U (en) A kind of anti-aging roof structure of waterproof heat insulation
CN212295171U (en) Environment-friendly multifunctional heat-insulation wall for green building
CN104847073A (en) Oyster shell veneer external wall and construction method thereof
CN201915512U (en) Thermal insulation wall structure
CN107540314A (en) A kind of post-cast strip basal plane inorganic agent and its construction method
CN107130695A (en) Foam glass external thermal insulation system and its construction method
CN206189760U (en) Anti integrated layer structure of scribbling of decoration that keeps warm that splits of elasticity reflection thermal barrier coating material
CN205907827U (en) Passive building first floor wall body is at subaerial mounting structure
CN205688706U (en) A kind of it is prone to fixing decoration special form brick
CN204691092U (en) Light roofing system
CN101008279B (en) Production technology of composite thermal-insulating face tile
CN204691091U (en) Light roofing system
CN214195398U (en) Anti-seepage anti-cracking light steel concrete ground structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101117

Termination date: 20181231

CF01 Termination of patent right due to non-payment of annual fee