CN1900428A - 轻便装配式钢结构临时挡水装置 - Google Patents
轻便装配式钢结构临时挡水装置 Download PDFInfo
- Publication number
- CN1900428A CN1900428A CN 200610039925 CN200610039925A CN1900428A CN 1900428 A CN1900428 A CN 1900428A CN 200610039925 CN200610039925 CN 200610039925 CN 200610039925 A CN200610039925 A CN 200610039925A CN 1900428 A CN1900428 A CN 1900428A
- Authority
- CN
- China
- Prior art keywords
- steel
- base plate
- temporary water
- facing
- assembling type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Revetment (AREA)
Abstract
本发明涉及一种钢结构临时挡水设施。所要解决的问题是:提供一种可以人力施工、堰顶可溢流的装配式钢结构临时挡水装置。特点是:包括两个底架、四个以上的钢管桩和钢面板;底架由底板、滑槽和支撑杆组成,钢管桩通过底板上的桩孔打入地下,钢面板插装在底架上的滑槽内,使用安装时,相邻钢面板依次插装连接形成围堰。本发明采用了部件分步组装的结构方式,每一个部件都可以使用人工搬运至河道,然后再进行装配;拆卸方便。本发明不仅可以起到河流临时围堰的效果,堰顶可溢流,施工方便、快捷,工程量小。
Description
技术领域
本发明涉及一种钢结构临时挡水设施,属于水利工程领域的新型水工设施
背景技术
就挡水措施而言,目前的方式有土围堰和钢围堰两种。
传统的土围堰主要有土、石材料构成。土围堰可以充分利用当地材料或废弃的土石方,构造简单,施工方便,可以在水流中、深水中、岩基上或有覆盖层的河床上修建,但工程量大,堰身沉陷也较大,不能够重复使用,同时未经处理的土围堰堰顶不能在水位波动时满足短时间和小流量溢流。
传统的钢围堰主要指钢板桩格型围堰,根据挡水高度不同,其平面型式有圆筒型格体、扇型格体和花瓣型格体等。钢板桩格型围堰因为采用机械化施工,施工速度快、占地少、安全可靠等优点,因此在大、中型水利水电工程项目中的应用比较普遍。
而对于交通不便,只能以人力施工的地区,且需要短期溢流的临时挡水设施,传统的围堰形式则无能为力。
发明内容
为了克服传统的钢围堰需要机械化施工,传统的土围堰未经处理堰顶不可溢流的缺点,本发明旨在提供一种可以人力施工、堰顶可溢流的轻便装配式钢结构临时挡水装置。
实现上述发明目的的技术方案如下:
轻便装配式钢结构临时挡水装置,其特征在于:
A、包括两个支撑底板、钢面板和两个以上的钢管桩;
B、所述支撑底板包括底板8,底板8上表面固定连接着三角状支撑杆6,三角状支撑杆6的前立杆与水平面之间的夹角为60-90度,底板8上设有两个以上的桩孔,钢管桩10位于桩孔内;
C、所述钢面板3的背面设有两条竖直平行的滑槽1,钢面板3的背面还固定设有两条以上水平梁7;钢面板3一侧竖直边为与另一侧竖直边对应的凹槽;钢面板3通过两条滑槽1插设在两个平行设置的支撑底板的支撑杆6上。
所述钢面板3的背面中下部设有两个以上直角三角状打击支撑5。
所述水平梁7为槽钢,其横截面为倒U形。
本发明的有益技术效果是:
1、本发明采用了部件分步组装的结构方式,每一个部件都可以使用人工搬运至河道,然后再进行装配;当设施需要拆除时,部件可方便分块拆卸。
2、本发明结构设计合理,底架采用桩基形式,结构简单,保证了施工便捷。
3、本发明不仅可以起到河流临时围堰的效果,而且可以人力施工,堰顶可溢流,施工方便、快捷,工程量小。尤其适用于交通不便,只能以人力施工的地区。
附图说明
图1为本发明结构示意图,
图2为图1的侧视图,
图3为图1的俯视图,
图4为图1的A-A剖视图,
图5为图1的B-B剖视图。
具体实施方式
下面结合附图,通过实施例对本发明作进一步地描述。
实施例1:
轻便装配式钢结构临时挡水装置,包括两个支撑底板、钢面板3和四个以上的钢管桩10;钢面板3上部开有起吊孔2。
支撑底板包括底板8,底板8上表面固定连接着三角状支撑杆6,三角状支撑杆6的前立杆与水平面之间的夹角为60-90度,底板8上开有两个桩孔,钢管桩10位于桩孔内;
钢面板3的背面固定安装有两条竖直平行的滑槽1,钢面板3的背面还固定安装有两条以上水平梁7;水平梁7为槽钢,其横截面为倒U形,如图1所示钢面板3的背面固定安装有四条水平梁7,钢面板3一侧竖直边为与另一侧竖直边对应的凹槽;钢面板3通过两条滑槽1插装在两个平行设置的支撑底板的支撑杆6的前立杆上。
钢面板3的背面中下部通过螺栓4固定安装有四个直角三角状打击支撑5,便于插装钢面板时使用。通过打击支撑5,使得钢面板有一部分被打击入土中用于抗滑防渗。
使用安装时,先将两个底架放置在确定的位置,再将钢管桩10通过底板8上的桩孔打入地下以固定底架,接着将钢面板3通过其背面的滑槽1插装入支撑底板的支撑杆6的前立杆上,即完成一块挡水装置的安装。接着安装相邻另一挡水装置,其它操作同上,不同在于,钢面板3在安装除满足上述要求外,其一侧竖直边应插装在前块钢面板3一侧为凹槽的竖直边内,依此安装即可形成一完整的围堰。
钢面板的后方可设置水箱9,当河道中上游水位升高时,水可以从围堰的顶部溢流,然后落入水箱9中,防止了溢流时不流对桩基础的冲刷。
Claims (3)
1、轻便装配式钢结构临时挡水装置,其特征在于:
A、包括两个支撑底板、钢面板和两个以上的钢管桩;
B、所述支撑底板包括底板(8),底板(8)上表面固定连接着三角状支撑杆(6),三角状支撑杆(6)的前立杆与水平面之间的夹角为60-90度,底板(8)上设有两个以上的桩孔,钢管桩(10)位于桩孔内;
C、所述钢面板(3)的背面设有两条竖直平行的滑槽(1),钢面板(3)的背面还固定设有两条以上水平梁(7);钢面板(3)一侧竖直边为与另一侧竖直边对应的凹槽;钢面板(3)通过两条滑槽(1)插设在两个平行设置的支撑底板的支撑杆(6)上。
2、根据权利要求1所述的轻便装配式钢结构临时挡水装置,其特征在于:所述钢面板(3)的背面中下部设有两个以上直角三角状打击支撑(5)。
3、根据权利要求1或2所述的轻便装配式钢结构临时挡水装置,其特征在于:所述水平梁(7)为槽钢,其横截面为倒U形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100399252A CN100507155C (zh) | 2006-04-19 | 2006-04-19 | 轻便装配式钢结构临时挡水装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100399252A CN100507155C (zh) | 2006-04-19 | 2006-04-19 | 轻便装配式钢结构临时挡水装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1900428A true CN1900428A (zh) | 2007-01-24 |
CN100507155C CN100507155C (zh) | 2009-07-01 |
Family
ID=37656396
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006100399252A Expired - Fee Related CN100507155C (zh) | 2006-04-19 | 2006-04-19 | 轻便装配式钢结构临时挡水装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100507155C (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103362101A (zh) * | 2013-07-19 | 2013-10-23 | 贾永明 | 活动挡水坝 |
CN109137944A (zh) * | 2018-10-26 | 2019-01-04 | 四川公路桥梁建设集团有限公司 | 一种深水无封底钢围堰内止水墙的施工方法 |
-
2006
- 2006-04-19 CN CNB2006100399252A patent/CN100507155C/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103362101A (zh) * | 2013-07-19 | 2013-10-23 | 贾永明 | 活动挡水坝 |
CN109137944A (zh) * | 2018-10-26 | 2019-01-04 | 四川公路桥梁建设集团有限公司 | 一种深水无封底钢围堰内止水墙的施工方法 |
CN109137944B (zh) * | 2018-10-26 | 2021-01-05 | 四川公路桥梁建设集团有限公司 | 一种深水无封底钢围堰内止水墙的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN100507155C (zh) | 2009-07-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101108269B1 (ko) | 앙카볼트 고정용 지그 및 이를 이용한 태양광 발전모듈 지지용 지주의 시공방법 | |
US20140215953A1 (en) | Solar panel mounting stand installation method, pile and solar panel mounting stand | |
CN110453724A (zh) | 一种新型装配式抗震扶壁挡土墙 | |
CN202208904U (zh) | 半活动式组合拦洪堤坝 | |
CN109083173A (zh) | 直立配重式轻质移动围堰 | |
CN100507155C (zh) | 轻便装配式钢结构临时挡水装置 | |
CN202117073U (zh) | 输电线路铁塔偏心装配式基础 | |
CN2918540Y (zh) | 一种包边棱锥形桩尖 | |
KR101261407B1 (ko) | 태양전지 모듈 지지장치 | |
CN2911006Y (zh) | 轻便装配式钢结构临时挡水装置 | |
CN214301067U (zh) | 一种新型的沙地临时施工道路板块 | |
CN220080041U (zh) | 一种地下工程上的斜桩支撑装置 | |
CN208949951U (zh) | 一种河道淤泥清理装置 | |
CN218437085U (zh) | 一种沟槽开挖预应力装配式支护装置 | |
CN112832287A (zh) | 一种仰斜式挡土墙 | |
CN2412925Y (zh) | 水利围堤筑坝构件 | |
CN2769319Y (zh) | 新型混凝土渗水路 | |
KR20220057039A (ko) | 태양광 패널 지지장치 | |
CN221919186U (zh) | 一种预制式生态防浪结构 | |
CN221398825U (zh) | 一种水利工程河道防洪结构 | |
CN216475062U (zh) | 一种市政道路明挖法施工用基坑支护结构 | |
CN221256131U (zh) | 一种用于传统土筑城墙夯土的支模结构 | |
CN104967392A (zh) | 一种建造在粉煤灰场地上的光伏电站 | |
CN110848176A (zh) | 一种漂浮式环保泥浆泵承载装置及其安装方法 | |
CN220565378U (zh) | 一种市政工程地面雨水渗流装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090701 Termination date: 20120419 |