Realize webmaster and network element configuration method of operating and system
Technical field
The present invention relates to the field of network management of communication system, relate in particular to a kind of realization webmaster and network element configuration method of operating and system.
Background technology
The network equipment is generally managed polytype network element and a plurality of network element by webmaster.The normal operation of network element needs the support of certain configuration data, need carry out the initial configuration operation by webmaster when promptly network element starts, and makes network element obtain initiation parameter and operational factor, guarantees that network element can normally start and operation normally; In network element when operation, need be carried out the dynamic-configuration operation by webmaster, to initiation parameter and operational factor increase, operations such as deletion and modification, make network element with the configuration data operation after upgrading.Wherein, configuration data is exactly the initiation parameter and the operational factor of network element, preserves with document form usually.
At present, realize in the prior art that webmaster and network element configuration operation have two kinds of schemes, a kind of scheme is: by webmaster network element is carried out configuration operation, webmaster is revised the element configuration data that is kept on the webmaster, amended element configuration data does not send to network element and comes into force, repeat behind many configuration operations by the webmaster network element that resets, network element obtains initiation parameter and operational factor from webmaster, again with amended element configuration data operation.Another kind of scheme is: by webmaster network element is carried out configuration operation, webmaster is revised the element configuration data that is kept on the webmaster, again amended element configuration data is sent to network element and comes into force, repeat many configuration operations after, network element moves with amended element configuration data.
A kind of scheme of above-mentioned prior art is the initial configuration operating process, this scheme is after repeating many configuration operations, allow the element configuration data of revising come into force by the webmaster network element that resets, thereby the configuration operation efficient that makes webmaster and network element is than higher, but the network element that needs to reset in being configured operating process comes into force the element configuration data of modification, has also interrupted the normal operation of network element simultaneously.Wherein, when the initial configuration operation was the network element startup, webmaster writes network element with configuration data made network element obtain the process of initiation parameter and operational factor.
The another kind of scheme of above-mentioned prior art is the dynamic-configuration operating process, and configuration operation of the every execution of this scheme all will send to network element and come into force, and the network element that therefore do not need to reset comes into force the element configuration data of modification.But this scheme needs webmaster repeatedly the element configuration data of revising to be sent to network element and come into force, so the configuration operation efficient of the webmaster of this scheme and network element is lower when carrying out many configuration operations.Wherein, when dynamic-configuration operation was the network element operation, webmaster write network element with configuration data, and revised network element initiation parameter and operational factor, the data instant of revising was come into force and the process of the network element that do not need to reset again.
By two kinds of schemes of above-mentioned prior art as can be known, the defective of prior art is the efficient of webmaster and network element configuration operation and the webmaster network element close relation that whether resets, if webmaster just can allow the element configuration data behind many configuration operations come into force simultaneously to network element reset; If just can only configuration operation of every execution just not sending network element to network element reset, webmaster comes into force.In addition, above-mentioned prior art can not be carried out dilatation to network element when being configured operation, can not revise element configuration data in a large number.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of realization webmaster and network element configuration method of operating and system, and this method and system just can improve the efficient of webmaster and network element configuration operation in the do not reset situation of network element of webmaster.
For solving the problems of the technologies described above, the invention provides a kind of equipment configuration method, said method comprising the steps of:
A, modification element configuration data form the difference configuration data of element configuration data, and preserve described difference configuration data;
B, webmaster send to network element in batches with the difference configuration data and come into force, and network element moves with the element configuration data after coming into force again.
Wherein, the element configuration data of revising in the steps A is kept on the webmaster.
Wherein, network element comes into force to the difference configuration data and specifically comprises among the step B:
After network element is received the difference configuration data, the initiation parameter and the operational factor of network element are made amendment.
According to said method, the present invention also provides a kind of realization webmaster and network element configuration operated system, and this system is achieved in that
A kind of realization webmaster and network element configuration operated system, this system comprises webmaster and network element, webmaster is used for element configuration data is made amendment, and forms the difference configuration data of element configuration data, and preserves described difference configuration data;
Network element is used to receive the difference configuration data, and the described difference configuration data that comes into force in batches, moves with the element configuration data after coming into force again.
Wherein, described webmaster comprises:
The graphic user interface operational module is used to receive the configuration operation instruction, again the element configuration data of revising is sent to data management module;
Data management module is used to revise the element configuration data that is kept on the webmaster.
Wherein, described webmaster further comprises:
The variance data administration module is used to receive the network element difference configuration data that data management module sends, and preserves described network element difference configuration data, network element difference configuration data is sent to network element again and carries out batch and come into force.
Wherein, described network element comprises:
The variance data administration module is used to receive network element difference configuration data, and the described network element difference configuration data that comes into force in batches, and the initiation parameter and the operational factor of network element are made amendment.
Above technical scheme as can be seen, a kind of realization webmaster provided by the invention and network element configuration method of operating and system have following beneficial effect:
At first, because the present invention at first preserves the difference configuration data of element configuration data, the difference configuration data being sent to network element afterwards carries out batch and comes into force again, compare with the dynamic-configuration operating process of prior art, configuration operation of the every execution of the dynamic-configuration operating process of prior art, webmaster will send to network element with the element configuration data of revising and come into force, and the present invention is a difference configuration data of just preserving element configuration data behind configuration operation of execution, after repeating many configuration operations, webmaster sends to the difference configuration data network element again to carry out batch and comes into force, after having reduced configuration operation of every execution like this, webmaster need send to the reciprocal process that network element comes into force with the element configuration data of revising, thereby has improved the efficient of webmaster and network element configuration operation.
Secondly, owing at first send the difference configuration data to network element among the present invention by webmaster, the variance data administration module of network element carries out batch to the difference configuration data again and comes into force afterwards, initiation parameter and operational factor are made amendment, compare with the initial configuration operating process of prior art, the initial configuration operating process network element that needs to reset after carrying out many configuration operations just can make the element configuration data of modification come into force, and to interrupt the normal operation of network element, and the present invention at first sends the difference configuration data in batches to network element, network element carries out batch to the difference configuration data again and comes into force afterwards, makes the present invention just can improve the efficient of webmaster and network element configuration operation like this under webmaster does not reset the situation of network element.
At last, because the present invention sends to network element with element configuration data to come into force in batches, the present invention can be made amendment to a large amount of element configuration datas, and be fit to network element is carried out dilatation, and then also can improve the efficient of webmaster and network element configuration operation greatly.
Description of drawings
Fig. 1 is a kind of block diagram of realizing configuration operation of the present invention;
Fig. 2 is a flow chart of realizing the inventive method embodiment;
Fig. 3 is a schematic diagram of realizing system embodiment of the present invention.
Embodiment
The invention provides a kind of realization webmaster and network element configuration method of operating and system, with reference to Fig. 1, Fig. 1 is a kind of block diagram of realizing configuration operation of the present invention, the graphic user interface of webmaster (GUI) operational module sends to data management module with the element configuration data of revising, data management module is revised the element configuration data that is kept on the webmaster, the element configuration data of revising does not send to network element and comes into force, and forms the difference configuration data of element configuration data.
Data management module sends to the difference configuration data variance data administration module of webmaster again, the variance data administration module is preserved the difference configuration data of element configuration data, the data management module of webmaster sends to the configuration operation result graphic user interface (GUI) operational module again, after webmaster repeats many configuration operations, graphic user interface (GUI) operational module sends the operational order that comes into force in batches to the variance data administration module, the variance data administration module of webmaster sends to the difference configuration data variance data administration module of network element more in batches, the variance data administration module of the network element network element difference configuration data that comes into force in batches, the initiation parameter and the operational factor of network element are made amendment, variance data administration module to webmaster sends the result that comes into force in batches again, the variance data administration module of webmaster sends the result that comes into force in batches to graphic user interface (GUI) operational module, and network element moves with amended element configuration data.
Wherein, the difference configuration data is exactly the different piece that is kept between the configuration data of element configuration data on the webmaster and the current operation of network element, also refer to only revise the element configuration data that is kept on the webmaster, but do not send to that part of configuration data that network element comes into force.
Implementation procedure according to above-mentioned configuration operation, the invention provides a kind of realization webmaster and network element configuration method of operating, the thought of this method is: revise element configuration data, form the difference configuration data of element configuration data, and preserve described difference configuration data; Webmaster sends to network element in batches with the difference configuration data and comes into force, and network element moves with the element configuration data after coming into force again.
According to the thought of said method, in conjunction with the accompanying drawings the concrete technical scheme of the inventive method is elaborated again below.With reference to Fig. 2, Fig. 2 is a flow chart of realizing the inventive method embodiment, and described method specifically may further comprise the steps:
Step 201, operator be selected network element on graphic user interface (GUI) the operational module interface of webmaster;
Step 202, operator carry out dynamic-configuration operation in batches to selected network element, and the graphic user interface operational module of webmaster sends to data management module with the element configuration data of revising again;
The data management module of step 203, webmaster is revised the element configuration data that is kept on the webmaster, and the element configuration data of revising not being sent to network element comes into force, thereby form the difference configuration data of element configuration data, more described difference configuration data is sent to the variance data administration module;
The variance data administration module of step 204, webmaster is preserved the difference configuration data of element configuration data;
The graphic user interface operational module of step 205, webmaster sends the operational order that comes into force in batches to the variance data administration module again, repeated execution of steps 202~step 204, finish many configuration operations, the operator carries out the operational order that comes into force in batches to selected network element again;
The variance data administration module of step 206, webmaster sends the variance data administration module of difference configuration data to network element in batches, and the variance data administration module of the network element difference configuration data that comes into force is in batches again made amendment the initiation parameter and the operational factor of network element;
The variance data administration module of step 207, network element sends the result that comes into force in batches to the variance data administration module of webmaster;
The variance data administration module of step 208, webmaster sends the result that comes into force in batches to the graphic user interface operational module, and the graphic user interface operational module sends the result that comes into force in batches to the operator again, and network element moves with amended element configuration data.
In addition, according to said method, the present invention also provides a kind of realization webmaster and network element configuration operated system, the basic thought of described system is: system comprises webmaster and network element, webmaster is used for element configuration data is made amendment, and the difference configuration data of preservation element configuration data, webmaster sends to network element with the difference configuration data again; Network element is used to receive the difference configuration data, and the described difference configuration data that comes into force in batches, moves with the element configuration data after coming into force again.
According to the basic thought of said system, in conjunction with the accompanying drawings the concrete technical scheme of system of the present invention is elaborated again below.With reference to Fig. 3, Fig. 3 is a schematic diagram of realizing system embodiment of the present invention, and this system comprises webmaster 300 and network element 301.
Wherein, described webmaster 300 comprises:
Graphic user interface (GUI) operational module 302 is used to receive the configuration operation instruction, again network element 301 configuration datas of revising is sent to data management module 303;
Data management module 303, be used to receive the configuration operation instruction of graphic user interface operational module 302, and modification is kept at network element 301 configuration datas on the webmaster 300, amended network element 301 configuration datas do not send to network element 301 and come into force, thereby form the difference configuration data, again described network element 301 difference configuration datas are sent to variance data administration module 304, data management module 303 sends the configuration operation result to graphic user interface operational module 302 then;
Variance data administration module 304, be used to receive and preserve the difference configuration data that data management module 303 sends, variance data administration module 304 is after the batch that receives graphic user interface operational module 302 comes into force order, network element 301 difference configuration datas are sent to the variance data administration module 305 of network element 301 in batches, and the batch that the variance data administration module 305 of network element 301 the is returned result that comes into force is transmitted to graphic user interface operational module 302 again.
Wherein, network element 301 comprises variance data administration module 305, be used to receive the network element 301 difference configuration datas that webmaster 300 sends, network element 301 difference configuration datas more in batches come into force, initiation parameter and operational factor are made amendment, after the operation that comes into force is in batches finished, the batch that the variance data administration module 305 of network element 301 sends network elements 301 difference configuration datas to the variance data administration module 304 of the webmaster 300 again result that comes into force.
300 pairs of selected network elements of webmaster 301 are carried out dynamic-configuration operation in batches, the graphic user interface operational module 302 of webmaster 300 sends to data management module 303 with network element 301 configuration datas of revising, data management module 303 is revised network element 301 configuration datas that are kept on the webmaster 300, amended network element 301 configuration datas do not send to network element 301 and come into force, thereby form the difference configuration data.The data management module 303 of webmaster 300 sends described difference configuration data to variance data administration module 304, variance data administration module 304 receives and preserves described difference configuration data, data management module 303 turns back to graphic user interface operational module 302 with the configuration operation result again, after webmaster 300 repeated many configuration operations, data management module 303 sent to network element 301 difference configuration datas the variance data administration module 304 of webmaster 300 more in batches.
Graphic user interface operational module 302 sends to variance data administration module 304 with the batch operational order that comes into force, variance data administration module 304 sends the difference configuration data variance data administration module 305 of network element 301 again, the variance data administration module 305 difference configuration data that comes into force in batches, the initiation parameter and the operational factor of network element 301 are made amendment, variance data administration module 305 sends the result that comes into force in batches to the variance data administration module 304 of webmaster 300 again, the variance data administration module 304 of webmaster 300 then sends the result that comes into force in batches to graphic user interface operational module 302, and network element 301 moves with 301 configuration datas of the network element after coming into force again.
By the execution mode of said method and system as can be known, the implementation procedure of webmaster and network element configuration operation is dynamic-configuration operating process in batches among the present invention, when described batch dynamic-configuration operation is exactly the network element operation, webmaster is revised the initiation parameter and the operational factor of network element, and the element configuration data of revising is not sent to network element and come into force, again the element configuration data of revising is come into force in batches after configuration operation is finished.The present invention compares with the initial configuration operating process of prior art, and when in batches a large amount of configuration operation was carried out in the dynamic-configuration operation, the network element that do not need to reset came into force the element configuration data of modification, also need not interrupt network element and normally move; Compare with the dynamic-configuration operating process of prior art, when the dynamic-configuration operation does not need configuration operation of every execution in batches, webmaster sends to the reciprocal process that network element comes into force with the element configuration data of revising, thereby has improved the efficient of webmaster and network element configuration operation.In addition, the present invention also is fit to network element dilatation and a large amount of application scenarios of revising element configuration data.
More than a kind of equipment configuration method provided by the present invention and device and plant maintenance method and apparatus are described in detail, used specific case herein principle of the present invention and execution mode are set forth, the explanation of above embodiment just is used for helping to understand method of the present invention and core concept thereof; Simultaneously, for one of ordinary skill in the art, according to thought of the present invention, the part that all can change in specific embodiments and applications, in sum, this description should not be construed as limitation of the present invention.