CN1880591A - Precast splice type cable manhole and construction method therefor - Google Patents

Precast splice type cable manhole and construction method therefor Download PDF

Info

Publication number
CN1880591A
CN1880591A CN 200510026722 CN200510026722A CN1880591A CN 1880591 A CN1880591 A CN 1880591A CN 200510026722 CN200510026722 CN 200510026722 CN 200510026722 A CN200510026722 A CN 200510026722A CN 1880591 A CN1880591 A CN 1880591A
Authority
CN
China
Prior art keywords
well
prefabricated component
component blocks
member piece
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510026722
Other languages
Chinese (zh)
Other versions
CN100593273C (en
Inventor
曹雪峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiulong Electric Power Group Co Ltd
State Grid Shanghai Electric Power Co Ltd
Original Assignee
Shanghai Jiulong Electric Power Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiulong Electric Power Group Co Ltd filed Critical Shanghai Jiulong Electric Power Group Co Ltd
Priority to CN200510026722A priority Critical patent/CN100593273C/en
Publication of CN1880591A publication Critical patent/CN1880591A/en
Application granted granted Critical
Publication of CN100593273C publication Critical patent/CN100593273C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Sewage (AREA)

Abstract

The invention relates to a preformed assemble cable working well in rectangle, square or arc gallery shape and a relative construction, wherein the working well comprises a preformed element, a sealing element and a connector; the preformed element comprises a head up block, a head down block, a transition up block, a transition down block, a well up block, a well down block, and a water well block; the joints between the elements are padded with sealing element, while the elements are connected via connectors.

Description

Precast splice type cable active well and job practices thereof
Technical field
The present invention relates to underground utilities active well technology, be specifically related to a kind of precast splice type cable active well and job practices thereof.
Background technology
Existing underground utilities active well has several like this forms: active well and splicing prefabricated components formula active well that active well, cast-in-situ concrete active well, concrete block formula active well, splicing prefabricated components and the reinforced concrete cast-in-situ mode that adopts loam brick to be built into combines.The active well of wherein preceding four kinds of forms or have that intensity is low, easy to leak, non-resistant shortcoming, or the deficiency of long, workmanship poor reliability of construction period is arranged.With splicing prefabricated components mode construction work well do not need to carry out at the scene that a large amount of cast-in-situ concrete operations, speed of application are fast, easily backfill, antidetonation and barrier performance be good, is one of constructure scheme of constantly exploring of cable work technology and constructor.
But, at home, still do not have the precast splice type active well so far and occur.Abroad, the precast splice type active well is more common in Japan and Europe.Existing precast splice type active well is taked round drawer formula structure, and promptly the well type is got circle, is folded to fall to forming by the prefabricated ring of multilayer.This round shaft structure, carry out prefabricated units production though be convenient to utilize the mould and the technology of producing tubing, and the lateral pressure and the vertical pressure that acts on the well body of the soil body can be used or also can bear without reinforcing bar to prefabricated units less, but the shape choice of this active well is too little, be difficult to satisfy various occasions and use, especially be difficult to the needs of the various active wells in the appropriate cable construction.
Summary of the invention:
The purpose of this invention is to provide cable work well and job practices thereof by the assembled approximate rectangular build of some prefabricated component blocks, square build or dome gallery type.
Precast splice type cable active well provided by the invention comprises prefabricated component blocks, seal and connector, it is characterized in that: the cable work well that forms with splicing prefabricated components can be approximate rectangular build, square build or dome gallery type, described prefabricated component blocks shape is as approximate rectangular build, the block of the cable work well well body of square build or dome gallery type, its dividing method is for being divided into the well body two parts up and down earlier, longitudinally be that the cable direction of travel is divided into some building blocks more then, described prefabricated component blocks comprises termination upper member piece, termination lower member piece, changeover portion upper member piece, changeover portion lower member piece, well head section upper member piece, well head section lower member piece, ponding well building block is in each mutual pairing, height after the stack of lower member piece is the height of well body; The seam crossing that all prefabricated component blocks are spliced mutually all is lined with seal; Connect with connector between the prefabricated component blocks.
In order to improve the splicing intensity of active well, the vertical height of adjacent building block is different before and after on the horizontal direction, promptly makes the horizontal direction seam of adjacent building block up and down not be on the same horizon.
Job practices provided by the invention is carried out as follows:
I. cable work well bracing of foundation pit construction;
Ii. excavation of foundation pit;
Iii. concrete cushion is built;
Iv. at the impervious processing coating of the native face brushing of meeting of prefabricated component blocks concrete surface, paste the hydro-expansive rubber waterstop;
V. by getting on, get off, order assembly unit prefabricated component blocks is from front to back put seal at the seam crossing pad of contiguous prefabricated building block again, connects each prefabricated component blocks with connector;
Vi. cut off the prefabricated component blocks drop hanger, mend the impervious processing coating of brush concrete surface at former drop hanger position;
Vii. cable duct bank interface construction;
Viii. backfill.
Precast splice type cable active well provided by the invention and job practices thereof, it is little effectively to have overcome existing round drawer formula structure precast splice type active well shape choice, is difficult to the deficiency of the needs of various active wells in the appropriate cable construction.
Description of drawings
Fig. 1 is the structural representation of precast splice type cable active well provided by the invention.
The specific embodiment
The invention will be further described below in conjunction with drawings and Examples.
As shown in Figure 1, the precast splice type cable active well can be approximate rectangular build, square build or dome gallery type; Cable work well comprises prefabricated component blocks, seal 7 and bolt group 8; Described prefabricated component blocks comprises two termination upper member pieces 1, two termination lower member pieces 1 ', four changeover portion upper member pieces 2, four changeover portion lower member pieces 2 ', two well head section upper member pieces 3, well head section lower member piece 3 ', well head section lower member piece 5, ponding well building block 6, changeover portion upper member piece 4, a changeover portion lower member piece 4 '; Height after each upper and lower building block stack of matching mutually is the height of well body; In order to improve the splicing intensity of active well, the vertical height of adjacent building block is different in the horizontal direction, be that termination upper member piece 1 is unequal with changeover portion upper member piece 2 vertical heights, changeover portion upper member piece 2 and well head section upper member piece 3, changeover portion upper member piece 4 vertical heights are unequal, termination lower member piece 1 ' is unequal with changeover portion lower member piece 2 ' vertical height, changeover portion lower member piece 2 ' and well head section lower member piece 3 ' and 5, changeover portion lower member piece 4 ' vertical height is unequal, makes the horizontal direction seam of adjacent building block up and down not be on the same horizon thus.The seam crossing that all prefabricated component blocks are spliced mutually all is lined with seal 7; Connect with bolt group 8 between the prefabricated component blocks.If need to change well body longitudinal length, can realize by the upper and lower building block of increase and decrease changeover portion.
Present embodiment is constructed with method as follows:
I. cable work well bracing of foundation pit construction;
Ii. excavation of foundation pit;
Iii.C10 plain concrete cushion layer 9 is built;
Iv. at the impervious processing coating of the native face brushing of meeting of prefabricated component blocks concrete surface, paste the hydro-expansive rubber waterstop;
V. by getting on, get off, order assembly unit prefabricated component blocks is from front to back put seal 7 at the seam crossing pad of contiguous prefabricated building block again, connects each prefabricated component blocks with bolt group 8;
Vi. cut off the prefabricated component blocks drop hanger, mend the impervious processing coating of brush concrete surface at former drop hanger position;
Vii. cable duct bank interface construction;
Viii.. backfill.

Claims (3)

1. precast splice type cable active well, comprise prefabricated component blocks, seal and connector, it is characterized in that: can be approximate rectangular build with the assembled cable work well of prefabricated component blocks, square build or dome gallery type, described prefabricated component blocks shape is as approximate rectangular build, the block of the cable work well well body of square build or dome gallery type, its dividing method is for being divided into the well body two parts up and down earlier, longitudinally be that the cable direction of travel is divided into some building blocks more then, described prefabricated component blocks comprises termination upper member piece, termination lower member piece, changeover portion upper member piece, changeover portion lower member piece, well head section upper member piece, well head section lower member piece, ponding well building block is in each mutual pairing, height after the stack of lower member piece is the height of well body; The seam crossing that all prefabricated component blocks are spliced mutually all is lined with seal; Connect with connector between the prefabricated component blocks.
2. precast splice type cable active well according to claim 1 is characterized in that: the vertical height of adjacent prefabricated component blocks is different before and after on the horizontal direction, and the horizontal direction seam of promptly adjacent upper and lower building block is not on the same horizon.
3. the job practices of the described precast splice type cable active well of claim 1 is characterized in that: carry out with step as follows:
I. cable work well bracing of foundation pit construction;
Ii. excavation of foundation pit;
Iii. concrete cushion is built;
Iv. at the impervious processing coating of the native face brushing of meeting of prefabricated component blocks concrete surface, paste the hydro-expansive rubber waterstop;
V. by getting on, get off, order assembly unit prefabricated component blocks is from front to back put seal at the seam crossing pad of contiguous prefabricated building block again, connects each prefabricated component blocks with connector;
Vi. cut off the prefabricated component blocks drop hanger, mend the impervious processing coating of brush concrete surface at former drop hanger position;
Vii. cable duct bank interface construction;
Viii. backfill.
CN200510026722A 2005-06-14 2005-06-14 Precast splice type cable manhole and construction method therefor Active CN100593273C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200510026722A CN100593273C (en) 2005-06-14 2005-06-14 Precast splice type cable manhole and construction method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200510026722A CN100593273C (en) 2005-06-14 2005-06-14 Precast splice type cable manhole and construction method therefor

Publications (2)

Publication Number Publication Date
CN1880591A true CN1880591A (en) 2006-12-20
CN100593273C CN100593273C (en) 2010-03-03

Family

ID=37518930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200510026722A Active CN100593273C (en) 2005-06-14 2005-06-14 Precast splice type cable manhole and construction method therefor

Country Status (1)

Country Link
CN (1) CN100593273C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392459A (en) * 2011-10-31 2012-03-28 上海电信工程有限公司 Construction method for straight manhole
CN102535515A (en) * 2012-01-19 2012-07-04 北京隆科兴非开挖工程有限公司 Supporting device and supporting method for working well
CN110858707A (en) * 2018-08-24 2020-03-03 深圳市德春水电工程有限公司 Construction method of distribution transformer heavy-load engineering
CN111287219A (en) * 2020-03-24 2020-06-16 温州市维同电力设计有限公司 Prefabricated assembled cable working well and construction method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2500716Y (en) * 2001-10-15 2002-07-17 赵宝章 Underground pipeline manhole shaft
CN2613589Y (en) * 2003-04-28 2004-04-28 上海市隧道工程轨道交通设计研究院 Installation structure for tunnel pump station
CN2799671Y (en) * 2005-06-14 2006-07-26 上海加晟管材有限公司 Precast splice type cable manhole

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392459A (en) * 2011-10-31 2012-03-28 上海电信工程有限公司 Construction method for straight manhole
CN102535515A (en) * 2012-01-19 2012-07-04 北京隆科兴非开挖工程有限公司 Supporting device and supporting method for working well
CN102535515B (en) * 2012-01-19 2014-03-19 聂树军 Supporting device and supporting method for working well
CN110858707A (en) * 2018-08-24 2020-03-03 深圳市德春水电工程有限公司 Construction method of distribution transformer heavy-load engineering
CN111287219A (en) * 2020-03-24 2020-06-16 温州市维同电力设计有限公司 Prefabricated assembled cable working well and construction method thereof
CN111287219B (en) * 2020-03-24 2021-07-23 温州市维同电力设计有限公司 Prefabricated assembled cable working well and construction method thereof

Also Published As

Publication number Publication date
CN100593273C (en) 2010-03-03

Similar Documents

Publication Publication Date Title
CN105256838B (en) Pipe gallery prefabricated members and prefabricated comprehensive pipe gallery
CN1837512A (en) Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same
CN102306225A (en) Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel
CN104313967B (en) Row's water-seepage type is mated formation combining structure
CN104514227B (en) The spatial intersecting mutually-embedded ecological building block retaining wall system on a kind of variable slope and construction method thereof
CN203755341U (en) Geogrid retaining wall
CN1880591A (en) Precast splice type cable manhole and construction method therefor
CN104652470B (en) Light-duty self-anchored type prefabricated reinforced concrete retaining wall and construction method
CN203066104U (en) H-shaped plain concrete brick and small ecological soil-blocking wall bricked by same
CN110777850A (en) Existing pipe gallery underground space, supporting structure thereof and construction method of supporting structure
CN2799671Y (en) Precast splice type cable manhole
CN201817958U (en) Plastic brick with pipe/line groove
CN206768860U (en) A kind of multi-arch type retaining wall
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN1431375A (en) Wall module of well walls and method for building wall bodies of well walls by using module
CN201696055U (en) Multi-span flat arch tunnel structure
CN101881033A (en) Underground engineering reverse construction method and device
CN2538839Y (en) Fastened steel coffer for pier foundation construction in water
CN1876971A (en) Cable work well and construction method thereof
CN214755296U (en) Prefabricated concrete cable row pipe for on-site assembly construction
CN206189456U (en) Three cabin piping lanes
CN205712124U (en) Stack can prop up protection slab by assembly type
CN205591210U (en) Formula cast member and construction assembly are spliced to underground
CN211421179U (en) Existing pipe gallery underground space and supporting construction thereof
CN209509014U (en) A kind of Prefabricated composite guide wall of underground continuous wall structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID SHANGHAI ELECTRIC POWER COMPANY

Effective date: 20131025

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131025

Address after: 200070 people in Shanghai City Road No. 183

Patentee after: Shanghai Jiulong Electric Power (Group) Co., Ltd.