CN1840782A - 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺 - Google Patents

预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺 Download PDF

Info

Publication number
CN1840782A
CN1840782A CN 200510019993 CN200510019993A CN1840782A CN 1840782 A CN1840782 A CN 1840782A CN 200510019993 CN200510019993 CN 200510019993 CN 200510019993 A CN200510019993 A CN 200510019993A CN 1840782 A CN1840782 A CN 1840782A
Authority
CN
China
Prior art keywords
concrete
initial tensioning
stress
prestressing
design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510019993
Other languages
English (en)
Other versions
CN100420794C (zh
Inventor
赵剑发
谭国顺
秦顺全
王发先
王贵明
徐怀安
徐英红
徐敬淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CNB2005100199938A priority Critical patent/CN100420794C/zh
Publication of CN1840782A publication Critical patent/CN1840782A/zh
Application granted granted Critical
Publication of CN100420794C publication Critical patent/CN100420794C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

预应力混凝土梁在制作时采取低强初张拉工艺涉及现浇及预制预应力梁的施工过程中的裂缝控制方案。本发明是在梁体混凝土灌注后,混凝土强度达到设计强度40~55%时,梁体内混凝土水化温度变化较大,此时对部分预应力束施加一定的预应力(此预应力为设计张拉力的25~35%,经检算控制锚下应力和其它有关应力并使梁体断面均匀受压),用此预施应力来弥补混凝土凝聚过程中早期抗拉强度的不足,从而达到控制其早期温度等裂缝的目的,并不影响梁体最终的任何质量。本发明是利用设计的预应力体系采取的一个中间工艺措施,费用低、安全可靠,控制梁体混凝土早期温度等裂缝效果显著,对梁体裂缝控制和提高桥梁使用寿命十分有效,具有极大的推广价值。

Description

预应力混凝土梁采用低强初张措施 控制梁体裂缝施工工艺
一、技术领域
本发明涉及预应力混凝土桥梁上部结构施工采用低强张拉措施控制梁体施工温度等裂缝产生的施工工艺。
二、技术背景
目前,公路预应力混凝土梁朝着大跨度、超宽、大体积、整体预制及整体吊装的方向发展,特别是由于跨海大桥的建造,其独特的海洋环境和超常规的设计使用寿命的要求混凝土梁的耐久性很高(现在最高要求到上百年),因此对混凝土的裂缝控制提出了新的更高的要求。要求混凝土的密实度、抗氯离子渗透性能等都有一些更高的指标,即所谓高性能海工耐久混凝土,而混凝土的裂缝直接影响其耐久性能(此施工工艺也同样适用于普通预应力混凝土梁)。
特别是现在发展使用的高性能海工耐久混凝土,它需要掺入除水泥以外其它一些如矿粉、粉煤灰、甚至硅灰等胶凝材料;需要使用性能更优的外加剂,以及低水胶比。也正是由于这些要求使混凝土梁在施工过程中更容易产尘裂缝。在以往施工的许多类似桥梁中,都不同程度地存在箱梁顶板收缩裂缝、翼缘板横向裂缝(裂缝严重时会贯穿翼缘板)、箱梁腹板内外侧竖向裂缝等现象,对预应力混凝土“T”梁也一样存在同样的问题。这些裂缝的产生无疑是对混凝土的耐久性及桥梁使用寿命的一个极大的威胁。为此,对裂缝形成及控制必须进行研究和探讨。
三、发明内容
本发明是针对预应力梁体施工中常见的梁体裂缝问题,旨在提供一种施工工期短、费用低、安全、质量可靠的控制梁体裂缝施工方法。其具体施工工艺为:
混凝土裂缝控制,通常的对策是:1、优化混凝土配合比。如尽量避免早强、超强,优选抗裂性能良好的混凝土原材料和配比,控制混凝土水化热的最高温度及温度梯度、控制水胶比,还要进行不同龄期混凝土强度、弹模试验;2、优化混凝土生产及施工工艺。如准确测定砂石料的含水率、确保计量准确、控制原材料的入机温度从而控制混凝土的入模温度等;3、及时进行混凝土的保温保湿养护。
然而,采取上述措施后,并不能完全避免混凝土产尘裂缝,必须采取其它一些工艺措施方可完全避免预应力混凝土产尘裂缝。为此,我们根据裂缝产生和形成机理,提出了“低强初张措施控制混凝土裂缝施工工艺”。其原理及施工工艺如下:
在混凝土浇注初期,水化热引起混凝土内部温度升高,在此过程中,由于水化热变化较大,而此时混凝土还没有终凝,其抗拉强度及弹模非常低,极易产生裂缝。如果此时我们利用已有的预应力梁的预应力束采取初张拉,给其施加一定的压应力,以补偿由于早期混凝土弹模及强度不足(特别是抗拉强度的不足),这样就可以有效地控制混凝土早期裂缝的出现。
从理论上来说初张拉的时间是越早越好,但考虑到混凝土早期强度和弹性模量的不足,若锚下应力过大则反而会造成锚下混凝土局部开裂等其它负面的问题,因此说初张拉的时间并非越早越好。根据我们对箱梁混凝土进行的温度监测,混凝土在浇注12h到50h时之间其温度始终处于变化较大的阶段,七天后接近环境温度。再根据我们在配合比设计阶段对混凝土的早期强度增长统计情况,以及针对梁体本身及锚下应力推算得出了初张拉的预应力束及初张拉时的应力值(此值最好使断面均匀受压)。我们控制初张拉时混凝土的强度在40%~55%的设计强度,对应的弹模值也不小于40%~50%,此值要经设计核算并通过。初张拉力及初张拉预应力束的选择最好能使梁体断面均匀受力。此方法是通过大量的试验数据提出来的,不同的工程应根据自身的混凝土配合比及早期的强度、弹性模量等增长曲线而定,同时根据预应力的布置不同而变化。施工时必须注意:张拉值需经设计检算,另外由于内模、锯齿块和变截面段混凝土收缩产生约束作用,为了保证初张拉的有效应力,因此必须在内模快速拆除之后方可进行。
当混凝土强度达到终张拉强度要求时,再对所有预应力束进行张拉(张拉至设计的应力值)。
本工艺主要包括如下内容:初张拉时梁体混凝土强度或弹模为设计强度的40%~55%,此时梁体混凝土水化温度变化较大,此时施加一定的张拉力(即初张拉力,通常为设计张拉力的25%~35%),以弥补此时混凝土的抗拉强度(或弹模)的不足,从而控制混凝土施工时温度裂缝等的产生。初张拉的预应力束分布(最好能使梁体断面处于均匀受压状态)、初张拉的预应力值(通常为设计张拉力的25%~35%,此值不得过大,否则会使锚下应力过大反而会造成锚下混凝土局部开裂等其它负面的问题)。
低强初张措施主要是针对预应力梁体的竖向温度应力裂缝和早期收缩裂缝而采取的。实践证明,这一工艺措施是非常有效的。这一发明对控制预应力梁的梁体裂缝具有很强的适用性,对提高预应力桥梁的使用寿命十分有利,具有极强的推广应用前景。

Claims (2)

1、预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺,具体施工步骤为:
(1)根据工程特点,事先确定好具体的初张拉时的混凝土强度、弹模,以及经设计检算的初张拉值。初张拉时混凝土的强度控制范围为40%~55%的设计强度,相应的弹模按设计终值的40%~50%,初张拉时以混凝土强度控制为主、弹模控制为辅。初张拉应尽量使预应力混凝土梁断面均匀受压;
(2)按常规的预制工艺浇注预应力混凝土梁;
(3)快速拆除端模和内模;
(4)穿预应力束钢绞线,并将梁体养护至初张拉强度;
(5)安装预应力工作锚和预应力张拉千斤顶;
(6)按常规张拉工艺对预先确定的初张拉束进行初张拉,直至达到计算的初张拉控制应力(此值一般为终张应力的20%~35%);
(7)对梁体养护至终张拉强度;
(8)对所有预应力束张拉至设计的终张拉控制应力值。
2、根据权利要求1所述的施工方法,其特征在于:
(1)混凝土处于较低强度时,就对梁体预施应力。该低强控制范围为设计强度的40%~50%,相应的弹模按设计终值的40%~50%,初张拉时以混凝土强度控制为主、弹模控制为辅;
(2)仅对部分预应力束施加应力即可。如梁体预应力束少,也可对所有预应力束进行初张拉;
(3)所施加的预施应力值应经设计检算,不致使锚下应力过大,张拉值一般为终张拉断面预应力的20%~50%;
(4)将端模和内模快速拆除,然后实施初张拉;
(5)最后还须对所有的预应力束进行张拉,张拉至设计的终张拉控制应力值。
CNB2005100199938A 2005-12-12 2005-12-12 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺 Active CN100420794C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100199938A CN100420794C (zh) 2005-12-12 2005-12-12 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100199938A CN100420794C (zh) 2005-12-12 2005-12-12 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺

Publications (2)

Publication Number Publication Date
CN1840782A true CN1840782A (zh) 2006-10-04
CN100420794C CN100420794C (zh) 2008-09-24

Family

ID=37029956

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100199938A Active CN100420794C (zh) 2005-12-12 2005-12-12 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺

Country Status (1)

Country Link
CN (1) CN100420794C (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168407A (zh) * 2011-03-23 2011-08-31 中交三航局第三工程有限公司 长大节段支架悬浇箱梁结构裂缝的预防和控制方法
CN102785290A (zh) * 2011-05-19 2012-11-21 中铁二十三局集团轨道交通工程有限公司 一种先张法预应力u形梁用穿心牵引式台座及其施工方法
CN103147388A (zh) * 2013-03-01 2013-06-12 青岛宝基利工程技术咨询有限公司 一种预应力箱梁梁底横向裂缝发生时间的判定方法
CN109093823A (zh) * 2018-10-19 2018-12-28 浙江大学宁波理工学院 大尺寸混凝土块的贯穿式裂缝的制造方法
CN110132349A (zh) * 2019-05-06 2019-08-16 山东大学 预应力混凝土梁温度梯度识别有效预应力的系统及方法
CN110670593A (zh) * 2019-10-16 2020-01-10 四川国恒建筑设计有限公司 一种解决超长结构应力的方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100503698B1 (ko) * 2003-05-07 2005-07-22 대림산업 주식회사 프리스트레스트 콘크리트 보의 연속화공법
JP3847758B2 (ja) * 2004-03-26 2006-11-22 朝日エンヂニヤリング株式会社 Pc床版橋の補修構造

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102168407A (zh) * 2011-03-23 2011-08-31 中交三航局第三工程有限公司 长大节段支架悬浇箱梁结构裂缝的预防和控制方法
CN102168407B (zh) * 2011-03-23 2012-06-13 中交三航局第三工程有限公司 长大节段支架悬浇箱梁结构裂缝的预防和控制方法
CN102785290A (zh) * 2011-05-19 2012-11-21 中铁二十三局集团轨道交通工程有限公司 一种先张法预应力u形梁用穿心牵引式台座及其施工方法
CN102785290B (zh) * 2011-05-19 2014-11-19 中铁二十三局集团轨道交通工程有限公司 一种先张法预应力u形梁用穿心牵引式台座及其施工方法
CN103147388A (zh) * 2013-03-01 2013-06-12 青岛宝基利工程技术咨询有限公司 一种预应力箱梁梁底横向裂缝发生时间的判定方法
CN109093823A (zh) * 2018-10-19 2018-12-28 浙江大学宁波理工学院 大尺寸混凝土块的贯穿式裂缝的制造方法
CN110132349A (zh) * 2019-05-06 2019-08-16 山东大学 预应力混凝土梁温度梯度识别有效预应力的系统及方法
CN110132349B (zh) * 2019-05-06 2021-11-23 山东大学 预应力混凝土梁温度梯度识别有效预应力的系统及方法
CN110670593A (zh) * 2019-10-16 2020-01-10 四川国恒建筑设计有限公司 一种解决超长结构应力的方法
CN110670593B (zh) * 2019-10-16 2021-06-11 四川国恒建筑设计有限公司 一种解决超长结构应力的方法

Also Published As

Publication number Publication date
CN100420794C (zh) 2008-09-24

Similar Documents

Publication Publication Date Title
CN101481930B (zh) 纤维编织网复合钢筋增强混凝土的建筑结构及其制备方法
CN100420794C (zh) 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺
Hasan et al. An experimental investigation on mechanical behavior of macro synthetic fiber reinforced concrete
RU2122985C1 (ru) Бетонная смесь, бетонный элемент и способ его отверждения
CN109747037A (zh) 一种先后张预应力结合施工的大跨度u型梁预制施工工艺
CN105926440A (zh) 钢—混凝土组合连续梁桥桥面板及制作方法和应用
ITMI960426A1 (it) Metodo per la realizzazione di una trave composita e trave cosi' realizzata
Ardeshana et al. Durability of fiber reinforced concrete of marine structures
CN107269295A (zh) 一种pva‑ecc套衬结构及施工方法
CN107673690A (zh) 带pva纤维的水泥基复合材料及其制备方法
CN101503915B (zh) 超大面积、超薄无粘结预应力整体水池底板的施工方法
CN101994291A (zh) 一种钢-混凝土组合连续梁施加预应力的工艺方法
CN109468958A (zh) 一种主塔塔柱施工工艺
CN102168407A (zh) 长大节段支架悬浇箱梁结构裂缝的预防和控制方法
CN103628605A (zh) 一种大跨度肋型预应力混凝土板及其施工方法
CN105113352B (zh) 一种抗冲耐磨混凝土预装道路
CN105064160B (zh) 一种抗折强度高的混凝土预装道路
CN109291240A (zh) 一种粗骨料活性粉末混凝土预制桥面板制备工艺
CN202936949U (zh) 一种智能frp-混凝土复合结构
CN107795071A (zh) 一种非粘结性超高韧性水泥基复合材料功能梯度梁及方法
CN107724241B (zh) 一种配重施工斜拉桥桥面附属结构的施工方法
Oad et al. flexural behavior of rc beams made with recycled aggregates under 12-month long term loading
CN206486822U (zh) 一种桥梁加固用高强预应力钢丝批量张拉锚固装置
JP2002004219A (ja) ケミカルプレストレスを使用した連続合成桁およびその製造方法
Arya et al. 27 FRP REBARS AND THE ELIMINATION OF REINFORCEMENT CORROSION IN CONCRETE STRUCTURES

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: No.1 Engineering Co., Ltd., Zhongtie Bridge Bureau Group

Assignor: China Zhongtie Major Bridge Engineering Co., Ltd.

Contract fulfillment period: 2008.10.20 to 2013.10.19 contract change

Contract record no.: 2009410000081

Denomination of invention: Construction process for controlling crack of prestressed concrete beam by low strength pre-stressed method

Granted publication date: 20080924

License type: Exclusive license

Record date: 2009.5.4

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2008.10.20 TO 2013.10.19; CHANGE OF CONTRACT

Name of requester: CHINA RAILWAY BRIDGE BUREAU GROUP FIRST ENGINEERIN

Effective date: 20090504

ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150213

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150213

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.