CN1840782A - 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺 - Google Patents
预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺 Download PDFInfo
- Publication number
- CN1840782A CN1840782A CN 200510019993 CN200510019993A CN1840782A CN 1840782 A CN1840782 A CN 1840782A CN 200510019993 CN200510019993 CN 200510019993 CN 200510019993 A CN200510019993 A CN 200510019993A CN 1840782 A CN1840782 A CN 1840782A
- Authority
- CN
- China
- Prior art keywords
- concrete
- initial tensioning
- stress
- prestressing
- design
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100199938A CN100420794C (zh) | 2005-12-12 | 2005-12-12 | 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100199938A CN100420794C (zh) | 2005-12-12 | 2005-12-12 | 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1840782A true CN1840782A (zh) | 2006-10-04 |
CN100420794C CN100420794C (zh) | 2008-09-24 |
Family
ID=37029956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005100199938A Active CN100420794C (zh) | 2005-12-12 | 2005-12-12 | 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100420794C (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102168407A (zh) * | 2011-03-23 | 2011-08-31 | 中交三航局第三工程有限公司 | 长大节段支架悬浇箱梁结构裂缝的预防和控制方法 |
CN102785290A (zh) * | 2011-05-19 | 2012-11-21 | 中铁二十三局集团轨道交通工程有限公司 | 一种先张法预应力u形梁用穿心牵引式台座及其施工方法 |
CN103147388A (zh) * | 2013-03-01 | 2013-06-12 | 青岛宝基利工程技术咨询有限公司 | 一种预应力箱梁梁底横向裂缝发生时间的判定方法 |
CN109093823A (zh) * | 2018-10-19 | 2018-12-28 | 浙江大学宁波理工学院 | 大尺寸混凝土块的贯穿式裂缝的制造方法 |
CN110132349A (zh) * | 2019-05-06 | 2019-08-16 | 山东大学 | 预应力混凝土梁温度梯度识别有效预应力的系统及方法 |
CN110670593A (zh) * | 2019-10-16 | 2020-01-10 | 四川国恒建筑设计有限公司 | 一种解决超长结构应力的方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100503698B1 (ko) * | 2003-05-07 | 2005-07-22 | 대림산업 주식회사 | 프리스트레스트 콘크리트 보의 연속화공법 |
JP3847758B2 (ja) * | 2004-03-26 | 2006-11-22 | 朝日エンヂニヤリング株式会社 | Pc床版橋の補修構造 |
-
2005
- 2005-12-12 CN CNB2005100199938A patent/CN100420794C/zh active Active
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102168407A (zh) * | 2011-03-23 | 2011-08-31 | 中交三航局第三工程有限公司 | 长大节段支架悬浇箱梁结构裂缝的预防和控制方法 |
CN102168407B (zh) * | 2011-03-23 | 2012-06-13 | 中交三航局第三工程有限公司 | 长大节段支架悬浇箱梁结构裂缝的预防和控制方法 |
CN102785290A (zh) * | 2011-05-19 | 2012-11-21 | 中铁二十三局集团轨道交通工程有限公司 | 一种先张法预应力u形梁用穿心牵引式台座及其施工方法 |
CN102785290B (zh) * | 2011-05-19 | 2014-11-19 | 中铁二十三局集团轨道交通工程有限公司 | 一种先张法预应力u形梁用穿心牵引式台座及其施工方法 |
CN103147388A (zh) * | 2013-03-01 | 2013-06-12 | 青岛宝基利工程技术咨询有限公司 | 一种预应力箱梁梁底横向裂缝发生时间的判定方法 |
CN109093823A (zh) * | 2018-10-19 | 2018-12-28 | 浙江大学宁波理工学院 | 大尺寸混凝土块的贯穿式裂缝的制造方法 |
CN110132349A (zh) * | 2019-05-06 | 2019-08-16 | 山东大学 | 预应力混凝土梁温度梯度识别有效预应力的系统及方法 |
CN110132349B (zh) * | 2019-05-06 | 2021-11-23 | 山东大学 | 预应力混凝土梁温度梯度识别有效预应力的系统及方法 |
CN110670593A (zh) * | 2019-10-16 | 2020-01-10 | 四川国恒建筑设计有限公司 | 一种解决超长结构应力的方法 |
CN110670593B (zh) * | 2019-10-16 | 2021-06-11 | 四川国恒建筑设计有限公司 | 一种解决超长结构应力的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN100420794C (zh) | 2008-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101481930B (zh) | 纤维编织网复合钢筋增强混凝土的建筑结构及其制备方法 | |
CN100420794C (zh) | 预应力混凝土梁采用低强初张措施控制梁体裂缝施工工艺 | |
Hasan et al. | An experimental investigation on mechanical behavior of macro synthetic fiber reinforced concrete | |
RU2122985C1 (ru) | Бетонная смесь, бетонный элемент и способ его отверждения | |
CN109747037A (zh) | 一种先后张预应力结合施工的大跨度u型梁预制施工工艺 | |
CN105926440A (zh) | 钢—混凝土组合连续梁桥桥面板及制作方法和应用 | |
ITMI960426A1 (it) | Metodo per la realizzazione di una trave composita e trave cosi' realizzata | |
Ardeshana et al. | Durability of fiber reinforced concrete of marine structures | |
CN107269295A (zh) | 一种pva‑ecc套衬结构及施工方法 | |
CN107673690A (zh) | 带pva纤维的水泥基复合材料及其制备方法 | |
CN101503915B (zh) | 超大面积、超薄无粘结预应力整体水池底板的施工方法 | |
CN101994291A (zh) | 一种钢-混凝土组合连续梁施加预应力的工艺方法 | |
CN109468958A (zh) | 一种主塔塔柱施工工艺 | |
CN102168407A (zh) | 长大节段支架悬浇箱梁结构裂缝的预防和控制方法 | |
CN103628605A (zh) | 一种大跨度肋型预应力混凝土板及其施工方法 | |
CN105113352B (zh) | 一种抗冲耐磨混凝土预装道路 | |
CN105064160B (zh) | 一种抗折强度高的混凝土预装道路 | |
CN109291240A (zh) | 一种粗骨料活性粉末混凝土预制桥面板制备工艺 | |
CN202936949U (zh) | 一种智能frp-混凝土复合结构 | |
CN107795071A (zh) | 一种非粘结性超高韧性水泥基复合材料功能梯度梁及方法 | |
CN107724241B (zh) | 一种配重施工斜拉桥桥面附属结构的施工方法 | |
Oad et al. | flexural behavior of rc beams made with recycled aggregates under 12-month long term loading | |
CN206486822U (zh) | 一种桥梁加固用高强预应力钢丝批量张拉锚固装置 | |
JP2002004219A (ja) | ケミカルプレストレスを使用した連続合成桁およびその製造方法 | |
Arya et al. | 27 FRP REBARS AND THE ELIMINATION OF REINFORCEMENT CORROSION IN CONCRETE STRUCTURES |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: No.1 Engineering Co., Ltd., Zhongtie Bridge Bureau Group Assignor: China Zhongtie Major Bridge Engineering Co., Ltd. Contract fulfillment period: 2008.10.20 to 2013.10.19 contract change Contract record no.: 2009410000081 Denomination of invention: Construction process for controlling crack of prestressed concrete beam by low strength pre-stressed method Granted publication date: 20080924 License type: Exclusive license Record date: 2009.5.4 |
|
LIC | Patent licence contract for exploitation submitted for record |
Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2008.10.20 TO 2013.10.19; CHANGE OF CONTRACT Name of requester: CHINA RAILWAY BRIDGE BUREAU GROUP FIRST ENGINEERIN Effective date: 20090504 |
|
ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150213 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20150213 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau Address before: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd. |