CN1837498A - 软土地基无砂垫层预压排水固结法 - Google Patents

软土地基无砂垫层预压排水固结法 Download PDF

Info

Publication number
CN1837498A
CN1837498A CN 200610033937 CN200610033937A CN1837498A CN 1837498 A CN1837498 A CN 1837498A CN 200610033937 CN200610033937 CN 200610033937 CN 200610033937 A CN200610033937 A CN 200610033937A CN 1837498 A CN1837498 A CN 1837498A
Authority
CN
China
Prior art keywords
preloading
soft soil
consolidation method
soil foundation
band drain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610033937
Other languages
English (en)
Other versions
CN100480471C (zh
Inventor
董志良
郑新亮
戚国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
CCCC Fourth Harbor Engineering Co Ltd
CCCC Fourth Harbor Engineering Institute Co Ltd
Original Assignee
GUANGZHOU SIHANG INSTITUTE OF ENGINEERING TECHNOLOGY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU SIHANG INSTITUTE OF ENGINEERING TECHNOLOGY filed Critical GUANGZHOU SIHANG INSTITUTE OF ENGINEERING TECHNOLOGY
Priority to CNB2006100339374A priority Critical patent/CN100480471C/zh
Publication of CN1837498A publication Critical patent/CN1837498A/zh
Application granted granted Critical
Publication of CN100480471C publication Critical patent/CN100480471C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种软土地基无砂垫层预压排水固结法,包括以下步骤:(A)在软基上直接放样,竖向施插塑料排水板;(B)铺设水平排水管路以实现水平排水,水平排水管与排水板靠地面端的板头相连,一行排水板对应铺设一根排水管。本发明利用水平管路连接排水板解决了软基水平排水的难题,取代了以往以中粗砂作为水平排水垫层的做法,从而使得软土地基预压排水固结法在无砂或少砂的情况下能够实施,使施工不受中粗砂供应的制约,在无砂或少砂的情况下能对软土地基进行预压排水固结法处理,节约了施工成本,缩短了工期。

Description

软土地基无砂垫层预压排水固结法
技术领域
本发明涉及土木建筑领域的地基处理技术领域,尤其涉及预压排水固结法施工技术领域。
背景技术
预压排水固结法主要包括堆载预压法和真空预压法,都需要竖向排水带和水平排水垫层。竖向排水带应用最多的是塑料排水板。水平排水垫层为中粗砂垫层或卵石垫层。目前围海造陆工程较多,在珠江三角洲和长江三角洲一带,由于级配良好的中粗砂供应日益紧张,价格不断上涨,使得预压排水固结法加固软基的成本越来越高。而且由于软土地基承载力低,特别是滨海相淤泥和新吹填淤泥等软弱土层含水量大,极限承载力低,如是应用传统预压工艺施工,砂垫层无论吹填或堆填都无法正常实施,机械设备由于易发生沉陷也无法进场施工,从而使得工期延长。如果在无砂或少砂的情况下能够对软土地基进行预压排水固结法处理,将极大地节约成本和缩短工期,并使设计和施工方案不受中粗砂供应的制约。
发明内容
本发明的目的在于提供一种在无砂或少砂的情况下对软土地基应用预压排水固结施工处理的方法,可极大地节约成本和缩短工期,并使施工不受中粗砂供应的制约。
为了达到上述目的,本发明采用了以下技术方案:一种软土地基无砂垫层预压排水固结法,包括以下步骤:
(A)在软基上直接放样,竖向施插塑料排水板;
(B)铺设水平排水管路以实现水平排水,水平排水管与排水板靠地面端的板头相连,一行排水板对应铺设一根排水管。
上述步骤A中排水板的布置为梅花型或正方形,板头外露于地面20~30cm,插板机后退施插排水板,以免插板机把排水板板芯压入地面。
上述步骤B中所述排水管外壁包裹有一层无纺布,剪去与排水板板头连接部位的无纺布,并将排水板板头包裹于所述排水管外壁,再在连接部位外部包裹一层无纺布,以免淤泥渗入排水管中,污染排水管滤膜,从而保证排水畅通。
在完成上述两步骤后,可在原地面上铺设密封薄膜,利用三通管接头将水平排水管与抽真空系统连接进行真空预压施工。或进行堆载施工,堆载分层施加,分层压实,其中第一层堆载使用石粉等散粒材料,避免对排水板和排水管破坏。还可以在抽真空恒载约10天后,进行真空联合堆载预压施工,所述密封膜4上先铺设一层无纺土工布,第一级堆载料使用粉细砂等细颗粒材料,堆载分层填筑、分层压实。
塑料排水板提供了土体中孔隙水的纵向通道,可将滤层渗进来的水向上排出;而水平排水管提供了孔隙水的横向通道,塑料排水板用插板机插入软土地基,在上部预压荷载作用下,软土中空隙水由塑料排水板向上排到与排水板相连的水平排水管中,向下游排出,以加速软基固结。本发明利用水平管路连接排水板解决了软基水平排水的难题,取代了以往以中粗砂作为水平排水垫层的做法,从而使得软土地基预压排水固结法在无砂或少砂的情况下能够实施,使施工不受中粗砂供应的制约,在无砂或少砂的情况下能对软土地基进行预压排水固结法处理,节约了施工成本,缩短了工期。
附图说明
图1是淤泥插板机结构示意图。
图2是水平管路与排水板的连接示意图。
图3是水平管路与真空泵的连接示意图。
图4是排水板布置方式示意图。
具体实施方式
实施例1
以下为本技术的施工步骤:
1、根据软土层厚度和工程的设计要求确定塑料排水板的施插深度,同时根据地基承载力采用适用的淤泥插板机7。如图1所示,淤泥插板机7由行走设备和桩架组成,行走设备选用水陆两用挖掘机71改装而成,72桩架由角钢焊接制作,挖掘机型号根据泥面承载力和桩架高度等因素综合考虑,桩架可自行组装。
2、根据设计要求,选择相应的排水板型号,用竹签或废旧排水板板芯放样。排水板8布置方式可以是梅花型或正方形,如图4所示,相邻排水板8之间的距离控制在1米左右。根据对塑料排水板的施插密度的改变,可实现软土层内排水通道的调节,从而增加土体的有效排水途径,缩短排水距离,再通过上部荷载的作用,加速孔隙水的排出和地基的固结,减少工后沉降,从而提高地基土的承载力。
3、插板施工时,插板机边施工边后退,排水板外露于地面的板头大于20cm,一般为20~30cm,插板机7履带不得碾压已插板头,避免将板头压入泥土而丧失排水效果。
4、铺设水平排水管路。如图2所示,水平管路依据步骤2中排水板间距大小布置,一行排水板8对应铺设一根水平排水管6。水平排水管可以选用PVD管制作的滤管、塑料盲沟、软式透水管等。排水板8露出于地面一端的板头卷于排水管6管壁外。为了防止淤泥污染和堵塞管路上的滤膜,在铺设前先在排水管管路外包裹一层无纺布。将排水管与排水板连接部位的无纹布剪掉,及时将排水板板头包覆于排水管路与管路相连接,其后再在连接部位包裹一层无纺布。施工过程应尽量避免淤泥污染排水管滤膜,保证排水畅通。
5、进行真空预压施工。如图3所示,在原地面上铺设密封薄膜4,地面以下的水平排水管6经波纹管5套接,并通过三通出膜器3与真空水箱2连接,真空水箱2管路连接真空泵1。通过抽真空,实现真空预压。为了避免施工困难,密封膜4一次加工面积不宜过大,可在现场粘结满足面积要求,利用三通出膜器3与真空泵1相连通。在施工过程中应铺设施工简易通道。
实施例2
如实施例1完成步骤1~步骤4后,进行堆载预压施工。
水平排水管路6行列连接后,在其上进行堆载施工,堆载分层施加,分层压实,第一层堆载使用石粉等散粒材料,避免对排水板和排水管破坏。
实施例3
如实施例1完成步骤1~步骤4后,进行真空联合堆载预压施工。在抽真空恒载约10天后,在密封膜4上进行堆载施工。为了保护密封膜4,其上先铺设一层无纺土工布,第一级堆载料使用粉细砂等细颗粒材料,堆载分层填筑、分层压实。

Claims (6)

1、软土地基无砂垫层预压排水固结法,包括以下步骤:
(A)在软基上直接放样,竖向施插塑料排水板;
(B)铺设水平排水管路以实现水平排水,水平排水管与排水板靠地面端的板头相连,一行排水板对应铺设一根排水管。
2、根据权利要求1所述的软土地基无砂垫层预压排水固结法,其特征在于:步骤A中排水板的布置为梅花型或正方形,板头外露于地面20~30cm,插板机后退施插排水板。
3、根据权利要求1所述的软土地基无砂垫层预压排水固结法,其特征在于:步骤B中所述排水管外壁包裹有一层无纺布,剪去与排水板板头连接部位的无纺布,并将排水板板头包裹于所述排水管外壁,再在连接部位外部包裹一层无纺布。
4、根据权利要求1至3任一权利要求所述的软土地基无砂垫层预压排水固结法,其特征在于还包括以下步骤:在原地面上铺设密封薄膜,利用三通管接头将水平排水管与抽真空系统连接进行真空预压施工。
5、根据权利要求1至3任一权利要求所述的软土地基无砂垫层预压排水固结法,其特征在于还包括以下步骤:进行堆载施工,堆载分层施加,分层压实,其中第一层堆载使用石粉等散粒材料,避免对排水板和排水管破坏。
6、根据权利要求4所述的软土地基无砂垫层预压排水固结法,其特征在于还包括以下步骤:在抽真空恒载约10天后,进行真空联合堆载预压施工,所述密封膜4上先铺设一层无纺土工布,第一级堆载料使用粉细砂等细颗粒材料,堆载分层填筑、分层压实。
CNB2006100339374A 2006-02-28 2006-02-28 软土地基无砂垫层预压排水固结法 Expired - Fee Related CN100480471C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100339374A CN100480471C (zh) 2006-02-28 2006-02-28 软土地基无砂垫层预压排水固结法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100339374A CN100480471C (zh) 2006-02-28 2006-02-28 软土地基无砂垫层预压排水固结法

Publications (2)

Publication Number Publication Date
CN1837498A true CN1837498A (zh) 2006-09-27
CN100480471C CN100480471C (zh) 2009-04-22

Family

ID=37014995

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100339374A Expired - Fee Related CN100480471C (zh) 2006-02-28 2006-02-28 软土地基无砂垫层预压排水固结法

Country Status (1)

Country Link
CN (1) CN100480471C (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009070984A1 (fr) * 2007-11-02 2009-06-11 Yonggen Liang Procédé de précontrainte sous vide sans couche de coussin de sable de drainage
CN102116021A (zh) * 2011-01-13 2011-07-06 中港基业(北京)岩土技术有限公司 一种真空横向排水软地基处理方法
CN102704458A (zh) * 2012-06-27 2012-10-03 河海大学 一种软地基无砂垫层真空-堆载联合预压加固装置及方法
CN102733370A (zh) * 2012-07-18 2012-10-17 王军 真空-堆载联合预压加固软土地基新方法
CN104652409A (zh) * 2014-12-24 2015-05-27 中交天津港湾工程研究院有限公司 一种连续强排水联合夯密软基处理技术方法
CN107724374A (zh) * 2017-04-29 2018-02-23 连云港力源泵业有限公司 一种复合软基础加固处理施工方法及组合排水装置
CN112502159A (zh) * 2020-11-24 2021-03-16 安徽省城建设计研究总院股份有限公司 一种基坑外围土体固化的方法
CN114032875A (zh) * 2021-12-14 2022-02-11 广东省源天工程有限公司 一种软土地基的砂层淤泥超载预压装置及其方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009070984A1 (fr) * 2007-11-02 2009-06-11 Yonggen Liang Procédé de précontrainte sous vide sans couche de coussin de sable de drainage
CN102116021A (zh) * 2011-01-13 2011-07-06 中港基业(北京)岩土技术有限公司 一种真空横向排水软地基处理方法
CN102116021B (zh) * 2011-01-13 2012-03-21 中港基业(北京)岩土技术有限公司 一种真空横向排水软地基处理方法
CN102704458A (zh) * 2012-06-27 2012-10-03 河海大学 一种软地基无砂垫层真空-堆载联合预压加固装置及方法
CN102733370A (zh) * 2012-07-18 2012-10-17 王军 真空-堆载联合预压加固软土地基新方法
CN104652409A (zh) * 2014-12-24 2015-05-27 中交天津港湾工程研究院有限公司 一种连续强排水联合夯密软基处理技术方法
CN104652409B (zh) * 2014-12-24 2016-08-24 中交天津港湾工程研究院有限公司 一种连续强排水联合夯密软基处理技术方法
CN107724374A (zh) * 2017-04-29 2018-02-23 连云港力源泵业有限公司 一种复合软基础加固处理施工方法及组合排水装置
CN107724374B (zh) * 2017-04-29 2019-12-06 连云港力源泵业有限公司 一种复合软基础加固处理施工方法及组合排水装置
CN112502159A (zh) * 2020-11-24 2021-03-16 安徽省城建设计研究总院股份有限公司 一种基坑外围土体固化的方法
CN114032875A (zh) * 2021-12-14 2022-02-11 广东省源天工程有限公司 一种软土地基的砂层淤泥超载预压装置及其方法
CN114032875B (zh) * 2021-12-14 2022-06-24 广东省源天工程有限公司 一种软土地基的砂层淤泥超载预压装置及其方法

Also Published As

Publication number Publication date
CN100480471C (zh) 2009-04-22

Similar Documents

Publication Publication Date Title
CN100480471C (zh) 软土地基无砂垫层预压排水固结法
CN100554596C (zh) 无排水砂垫层真空预压法
CN101302757B (zh) 一种快速处理厚层软土地基的方法
CN102817348B (zh) 新近吹填淤泥地基处理方法
CN100480472C (zh) 超软弱土快速加固方法及其加固装置
CN101718089A (zh) 联合真空预压法地基处理施工方法
CN108532581A (zh) 一种具有综合处理功能的模块式土体施压成型装置
CN101748721A (zh) 大面积软土地基“复式负压固结”处理方法
CN108385659A (zh) 一种拼装结构的模块式土体施压成型装置
CN102220757A (zh) 超软弱土浅表层空间排水固结快速处理方法
CN105804007A (zh) 一种基于滩涂软基的加筋土岸墙结构
CN1884709A (zh) 快速“填水预压、动力压差排水”软地基固结方法
CN110485405B (zh) 一种软土地基的加固系统及加固方法
CN101591907B (zh) 吹填流泥地基的连体真空预压快速处理方法
CN111501727A (zh) 一种排水板的真空预压处理废弃泥浆的装置及其施工工艺
CN101413262A (zh) 土工布滤管真空预压法地基处理排水结构
CN208803456U (zh) 一种采用砂桩以及排水板加固泥炭土的结构
CN207469222U (zh) 吹填造地区预埋真空排水体系
CN212001021U (zh) 一种吹填土区域软土地基加固结构
CN201317936Y (zh) 砂沟法真空预压地基处理排水结构
CN1293263C (zh) 新型高真空变能量交叉击密软地基处理的方法
KR100429370B1 (ko) 토목섬유를 이용한 호안 제체 축조를 위한 수중과 지상단위 재하재 및 이를 이용한 축조방법
CN220377246U (zh) 一种真空预压排水固结系统
CN215165449U (zh) 一种基于水平排水垫的排水固结系统
CN206438495U (zh) 自排水后固结充填砂袋复合桩体系

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CCCC FOURTH HARBOR ENGINEERING BUREAU LTD.; APPLI

Free format text: FORMER OWNER: ZHONGJIAOSIHANG ENGINEERING RESEARCH INST., CO., LTD.

Effective date: 20080530

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080530

Address after: 163 zip Road, Guangzhou City, post code: 510230

Applicant after: China exchange fourth Aeronautical Engineering Bureau Co., Ltd.

Co-applicant after: Zhongjiao Sihang Engineering Inst. Co., Ltd.

Address before: No. 157 Qianjin Road, Guangzhou, 504, postcode: 510230

Applicant before: Zhongjiao Sihang Engineering Inst. Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHONGJIAO SIHANG ENGINEERING INST. CO., LTD. GUANG

Free format text: FORMER OWNER: ZHONGJIAO SIHANG ENGINEERING INST. CO., LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110628

Address after: 510230 No. 163 Qianjin Road, Guangzhou

Co-patentee after: Zhongjiao Sihang Engineering Inst. Co., Ltd.

Patentee after: CCCC Fourth Harbor Engineering Co., Ltd.

Co-patentee after: Guangzhou Sihang Geotechnical Engineering Co., Ltd.

Address before: 510230 No. 163 Qianjin Road, Guangzhou

Co-patentee before: Zhongjiao Sihang Engineering Inst. Co., Ltd.

Patentee before: CCCC Fourth Harbor Engineering Co., Ltd.

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 510231 Guangzhou Qianjin Road, Guangdong, No. 163

Patentee after: CCCC Fourth Harbor Engineering Co., Ltd.

Patentee after: Zhongjiao Sihang Engineering Inst. Co., Ltd.

Patentee after: CCCC Fourth Harbor Geotechnical Engineering Co., Ltd.

Address before: 510231 Guangzhou Qianjin Road, Guangdong, No. 163

Patentee before: CCCC Fourth Harbor Engineering Co., Ltd.

Patentee before: Zhongjiao Sihang Engineering Inst. Co., Ltd.

Patentee before: Guangzhou Sihang Geotechnical Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090422

Termination date: 20170228