CN1835334A CN 200510024379 CN200510024379A CN1835334A CN 1835334 A CN1835334 A CN 1835334A CN 200510024379 CN200510024379 CN 200510024379 CN 200510024379 A CN200510024379 A CN 200510024379A CN 1835334 A CN1835334 A CN 1835334A
Authority
CN
China
Prior art keywords
feeder terminal
terminal unit
fault
open loop
separating brake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510024379
Other languages
Chinese (zh)
Other versions
CN100376069C (en
Inventor
胡大良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SUNRISE POWER TECHNOLOGY CO LTD
Original Assignee
ZHONGRUI POWER AUTOMATION TECH Co Ltd SHANGHAI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGRUI POWER AUTOMATION TECH Co Ltd SHANGHAI filed Critical ZHONGRUI POWER AUTOMATION TECH Co Ltd SHANGHAI
Priority to CNB2005100243790A priority Critical patent/CN100376069C/en
Publication of CN1835334A publication Critical patent/CN1835334A/en
Application granted granted Critical
Publication of CN100376069C publication Critical patent/CN100376069C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The method includes following steps: (1) fault detection: relevant feeding terminal units detect trouble powers, and fault information is sent to all feeding terminal units; (2) fault location: based on fault information, feeding terminal units locate fault points; (3) fault isolation: feeding terminal units of fault nodes turn switches off, and instructing their lower feeding terminal units to turn off switches; (4) report of switching off: feeding terminal units of fault nodes and their lower feeding terminal units send state information; (5) switching on: switching on switches; (6) recovering power supply: switching on open loop nodes. Since computer in main station is not adopted in the method, thus, even communication fault happened in individual feeding terminal units, the control algorithm could isolate faults to minimum automatically; not causing whole network cannot be recovered.

Description

A kind of transmission and distribution networks control method of not having main website
Technical field
The present invention relates to the power transmission and distribution technical field, specifically, relate to a kind of transmission and distribution networks control method of not having main website.
Background technology
(no matter being thermal power generation, hydroelectric power generation or nuclear energy power generation) arrives user side to electric power from the power station, must pass through electrical power trans mission/distribution system.
At present in electrical power trans mission/distribution system, the line feed terminals unit is as the terminal equipment of transmission line, is installed on the electric pole that transmission line is equipped with on-load switch.Each line feed terminals unit instantaneous acquiring flows through the semaphores such as electric current, voltage and on off state of on-load switch, by calculating the operating power of on-load switch, and the statistics of loading, again these data by delivering to the master station computer of transformer station on the communication network.The data that master station computer transmits according to each line feed terminals unit on the whole transmission and distribution networks, carry out analyzing and processing, and to line feed terminals unit remote control transmission order, according to circumstances send different instructions to the remote control of line feed terminals unit, make the line feed terminals unit carry out the on/off switch operation of on-load switch, make the network loss minimum of transmission and distribution networks system, whole electrical power trans mission/distribution system operate as normal, and run on best state.When electrical power trans mission/distribution system breaks down, master station computer is summarized the data that the line feed terminals unit is uploaded, judge the zone that fault takes place, and pass through remote control command, carry out the on/off switch operation of corresponding on-load switch by the line feed terminals unit, faulty section is isolated, and recover the power supply in fault-free zone, thereby make the power supply interrupted district minimum.
From as can be seen above-mentioned, in whole control process, master station computer plays a part indispensable.Whole fault location, Fault Isolation, service restoration process all are to finish under the control of master station computer.When the communication of master station computer and each line feed terminals unit was broken down, because master station computer can't be carried out above-mentioned control immediately, the reliability of power supply greatly reduced.At this moment if supply line's fault, will hinder for some reason that the zone can't be isolated, power supply can't recover and cause great power outage, so will cause heavy losses to national economy.
Summary of the invention
Edge this, the object of the present invention is to provide a kind of transmission and distribution networks control method of not having main website, with exist in the control method that overcomes the master station computer that tradition has because of going wrong with communicating by letter of master station computer, and the great power outage that causes.
According to above-mentioned purpose, of the present inventionly provide a kind of transmission and distribution networks control method, can be used for not having the transmission and distribution networks system of main website, the transmission and distribution networks system of described no main website comprises: a plurality of power supplys at the output of each power supply, are provided with a circuit breaker; And
A plurality of feeder terminal units, each feeder terminal unit includes on-load switch and communicator, and described communicator is with the communication between each feeder terminal unit;
Connect into transmission and distribution networks by tree between described a plurality of power supply and the described a plurality of feeder terminal unit;
On the branch between per two power supplys, setting a feeder terminal unit is open loop point feeder terminal unit, and under the normality, the on-load switch of this open loop point feeder terminal unit is in gate-dividing state;
Described transmission and distribution networks control method comprises:
Failure detection steps: described a plurality of feeder terminal units detect the operating current of the described on-load switch in it at any time, when breaking down in the network, for providing the circuit breaker of the power end of electric power, this fault point opens circuit, simultaneously corresponding feeder terminal unit detects fault current, and sends fault message by communicator in it to all feeder terminal units;
Fault location step: the fault message that described a plurality of feeder terminal units send according to each feeder terminal unit that obtains, the fault point is positioned, positioning principle is if a feeder terminal unit detects fault current, but this feeder terminal unit next-door neighbour's sub-feeder terminal unit does not detect fault current, then the fault point detects between the feeder terminal unit and this feeder terminal unit that does not detect fault current of fault current at this, and this feeder terminal unit that detects fault current is called the fault point feeder terminal unit;
Fault Isolation step: the on-load switch separating brake in the feeder terminal unit of described fault point, and send separating brake instruction by its communicator all next-door neighbour's feeder terminal units to its downstream, all next-door neighbour's feeder terminal units in described downstream instruct its internal loading switch separating brake after receiving the instruction of described separating brake;
The separating brake reporting step: all next-door neighbour's feeder terminal units in described fault point feeder terminal unit and described downstream are after separating brake action is finished, and the communicator by separately is to other feeder terminal unit send state information;
Combined floodgate step: the breaker closing of described separating brake.
Preferably, in control method of the present invention,, when breaking down, before corresponding feeder terminal unit sends fault message, earlier circuit breaker is closed once in described failure detection steps.
Preferably, in control method of the present invention, also comprise:
The service restoration step: the downstream feeder terminal unit of described separating brake sends reclosing command by its communicator to the open loop point feeder terminal unit that is adjacent, after described open loop point feeder terminal unit receives this reclosing command, instruct its interior on-load switch to close a floodgate, recover the downstream electric load of the downstream feeder terminal unit of described separating brake with this.
Preferably, in control method of the present invention, also comprise:
Service restoration step: the open loop point feeder terminal unit of specifying an acquiescence for feeder terminal unit, the downstream feeder terminal unit of described separating brake sends reclosing command by its communicator to the open loop point feeder terminal unit with its acquiescence, after the open loop point feeder terminal unit of described acquiescence receives this reclosing command, instruct the on-load switch in it to close a floodgate, with the downstream electric load of the downstream feeder terminal unit that recovers described separating brake.
Owing to do not adopt master station computer in the control method of the present invention, even the communication of therefore indivedual feeder terminal units is broken down, control algolithm of the present invention also can the minimize on use isolated fault, and can not cause whole network to recover.
More detailed technical characterictic of the present invention, advantage and effect will be for a more detailed description below in conjunction with appended accompanying drawing.
Description of drawings
Fig. 1 is the structural representation of power transmission and distribution network system of the present invention.
Embodiment
In the power transmission and distribution network system, as shown in Figure 1, generally include power supply S1, S2 and S3 and feeder terminal unit FTU1... etc. at present.Certainly also include equipment such as transformer station,, therefore, in drawings and Examples, do not mark and describe, only described relevant parts because the present invention does not relate to these equipment.
In the present embodiment, only drawn power supply S1, S2 and S3, but should be appreciated that the quantity of power supply can be decided according to the actual requirements, the quantity that should not be limited in the present embodiment to be exemplified.At the output of each power supply, all be provided with circuit breaker DL1, a DL2, DL3.Connect into transmission and distribution networks by tree between power supply S1, S2, S3, circuit breaker DL1, DL2 and DL3 and each feeder terminal unit, present embodiment is the convenient example that shows a better simply tree network of describing.In the practice, this network can be very complicated, and can adopt the network configuration of various types, the looped network of for example radial net, tree network, open loop operation etc.Method of the present invention all is applicable to these networks.
Because the operation rule of China's electric power regulation, transmission and distribution networks does not allow the cyclization operation, therefore, go up (on the branch between two power supplys) in the whole transmission and distribution networks in position and be provided with the open loop point, be positioned under the normality of the feeder terminal unit on the open loop point and be in gate-dividing state, and the feeder terminal unit on this open loop point is called open loop point feeder terminal unit, thereby transmission and distribution networks is separated into the several separate power supply area, and promptly any one load area is simultaneously only by a power supply power supply.Please cooperate referring to Fig. 1, in the embodiment in figure 1, FTU3 and FTU7 are set to open loop point feeder terminal unit, are in gate-dividing state under normal conditions.So whole transmission and distribution networks is separated into three zones:
Zone by power supply S1 power supply comprises: FTU1, FTU2, four common feeder terminal units of FTU5, FTU6 and FTU3, two open loop point terminals of FTU7 unit;
Zone by power supply S2 power supply comprises: common feeder terminal unit of FTU4 and an open loop point terminal of FTU3 unit;
Zone by power supply S3 power supply comprises: FTU8, FTU9, four common feeder terminal units of FTU10, FTU11 and an open loop point terminal of FTU7 unit.
Suppose that fault has taken place the A point among Fig. 1, as can be seen from Figure 1, this fault point A is in the zone of power supply S1 power supply, and according to convention, all the feeder terminal unit FTU1 and the FTU2 of A upstream, this fault point all can detect trouble power.Simultaneously, the circuit breaker DL1 in this zone is with automatic trip, with the protection transmission and distribution networks.From Fig. 1 analysis as can be known, the positioning principle of fault point is if a feeder terminal unit detects fault current, but this feeder terminal unit next-door neighbour's sub-feeder terminal unit does not detect feeder terminal unit, and then the fault point detects between the feeder terminal unit and this feeder terminal unit that does not detect fault current of fault current at this.According to this principle, we can do reverse judgement to the embodiment of Fig. 1, promptly having only feeder terminal unit FTU1 and FTU2 to detect fault current, and other feeder terminal unit, when for example FTU3, FTU5, FTU6 all do not detect fault current, according to mentioned above principle, can judge, the fault point is between the FTU5 of feeder terminal unit FTU2 and its next-door neighbour's downstream.
In the present invention, each feeder terminal unit all contains a communicator (not shown), be used for and other feeder terminal unit between communicate.After feeder terminal unit FTU1 and FTU2 detect fault current, send fault message by each other feeder terminal unit of the communicator in it at once.All preserve an information table in each feeder terminal unit, store the distributing position information of all feeder terminal units in the whole transmission and distribution networks system and whether detect fault and divide-shut brake information.After receiving fault message, each feeder terminal unit is according to this information table of information updating that receives.
For fear of the short-duration failure that causes owing to various accidentalia, can also increase a breaker closing step, when promptly in network, breaking down, behind the circuit breaker trip, the feeder terminal unit that detects fault current does not send earlier fault message at once, and circuit breaker closes a floodgate once earlier, if this moment, fault still existed, then circuit breaker will trip once more, and at this moment, the feeder terminal unit that detects trouble power then outwards sends information at once.
After above-mentioned fault detect, enter the fault location step.Because each feeder terminal unit is all preserved the information table of all feeder terminal units in the record network, therefore,,, can judge that and be the fault point feeder terminal unit by above-mentioned fault location principle according to information table.In the embodiment in figure 1, FTU2 is judged as the fault point feeder terminal unit.
After fault location, enter the Fault Isolation step, be judged as the on-load switch separating brake in the feeder terminal unit FTU2 of fault point, and send separating brake by the communicator in it to all next-door neighbours' in its downstream feeder terminal unit FTU5 and instruct, Jin Lin feeder terminal unit FTU3, FTU6 do not send out the separating brake instruction.Downstream feeder terminal unit FTU5 instructs on-load switch separating brake in it after receiving separating brake instruction, so far finish Fault Isolation.
After having isolated fault, fault point feeder terminal unit FTU2 and downstream feeder terminal unit FTU5 are after the separating brake action is finished, communicator by separately is to other feeder terminal unit send state information, the information table so that each feeder terminal unit upgrades in time.
At last, the circuit breaker DL1 of automatic brake separating closes a floodgate when breaking down, and (combined floodgate of circuit breaker DL1 generally is automatic, automatic closing can be realized by dual mode: a kind ofly come automatic closing by setting time-delay, delay time can be set by calculating the Fault Isolation time.Another kind can be installed feeder terminal unit FTU at power supply point, and after power supply point feeder terminal unit FTU received the sub-gate signal of fault point feeder terminal unit, circuit breaker DL1 automatically closed)
After above-mentioned circuit breaker DL1 closed a floodgate, the power supply to the upstream, fault point can recover in the transmission and distribution networks system.For the power supply in downstream, fault point, can restore electricity by following mode.As shown in Figure 1,, just whole network is divided into a plurality of power supply areas by power supply, has only a power supply in each power supply area by open loop point feeder terminal unit owing in present transmission and distribution networks system, have a plurality of power supplies.The network system of this layout after breaking down and this fault having been carried out isolate, exist by Iterim Change open loop point reconfigure power supply area may.
In the embodiment in figure 1, in Fault Isolation after, the downstream feeder terminal unit FTU5 of separating brake can send reclosing command to the open loop point feeder terminal unit FTU3 that is adjacent by its communicator, after open loop point feeder terminal unit FTU3 receives this reclosing command, on-load switch in it is closed a floodgate, enter normally off, become a common feeder terminal unit, the feeder terminal unit FTU5 and the FTU6 in A downstream, fault point are put under in the zone that is powered by power supply S2, thereby finish the service restoration step in downstream, fault point.
Can also adopt following mode for downstream service restoration mode:, be the open loop point feeder terminal unit that each feeder terminal unit is specified an acquiescence initially.At the embodiment of Fig. 1, for the acquiescence open loop point feeder terminal unit of feeder terminal unit FTU5 appointment is FTU7.Need to prove that above-mentioned appointment only is an embodiment, the open loop point feeder terminal unit of specify default can be decided according to the network configuration and the actual needs of reality, no longer is explained in detail at this.
Situation for the acquiescence open loop point feeder terminal unit of appointment, the downstream feeder terminal unit FTU5 of separating brake sends reclosing command by its communicator to the open loop point feeder terminal unit FTU7 with its acquiescence, after the open loop point feeder terminal unit FTU7 of acquiescence receives this reclosing command, instruct its interior on-load switch to close a floodgate, thereby recover electric load power supply feeder terminal unit FTU5, FTU6 downstream.
No main website transmission and distribution networks control method for the invention described above remakes some supplementary notes:
Control method of the present invention can adopt traditional feeder terminal unit with detection failure electric current, and this feeder terminal unit includes the on-load switch of traditional structure.
Corresponding to the improvement of method of the present invention, these feeder terminal units also include corresponding memory module, control analysis module and communication module.Memory module is used to store above-mentioned information table, and tableau format does not limit at this for information about, and those skilled in the art can design the information table form that can reach requirement of the present invention fully according to prior art.The control analysis module can adopt microprocessing unit, is realized that with the form of software concrete implementation also is that those skilled in the art also know.Communication module can adopt mature ethernet technology, to realize instant network service.

Claims (4)

1, a kind of power transmission and distribution control method can be used for not having the transmission and distribution networks system of main website, and the transmission and distribution networks system of described no main website comprises: a plurality of power supplys at the output of each power supply, are provided with a circuit breaker; And
A plurality of feeder terminal units, each feeder terminal unit includes on-load switch and communicator, and described communicator is with the communication between each feeder terminal unit;
Connect into transmission and distribution networks by tree between described a plurality of power supply and the described a plurality of feeder terminal unit;
On the branch between per two power supplys, setting a feeder terminal unit is open loop point feeder terminal unit, and under the normality, the on-load switch of this open loop point feeder terminal unit is in gate-dividing state;
Described power transmission and distribution control method comprises:
Failure detection steps: described a plurality of feeder terminal units detect the operating current of the described on-load switch in it at any time, when breaking down in the network, for providing the circuit breaker of the power end of electric power, this fault point opens circuit, simultaneously corresponding feeder terminal unit detects fault current, and sends fault message by communicator in it to all feeder terminal units;
Fault location step: the fault message that described a plurality of feeder terminal units send according to each feeder terminal unit that obtains, the fault point is positioned, positioning principle is if a feeder terminal unit detects fault current, but this feeder terminal unit next-door neighbour's sub-feeder terminal unit does not detect fault current, then the fault point detects between the feeder terminal unit and this feeder terminal unit that does not detect fault current of fault current at this, and this feeder terminal unit that detects fault current is called the fault point feeder terminal unit;
Fault Isolation step: the on-load switch separating brake in the feeder terminal unit of described fault point, and send separating brake instruction by its communicator all next-door neighbour's feeder terminal units to its downstream, all next-door neighbour's feeder terminal units in described downstream instruct its internal loading switch separating brake after receiving the instruction of described separating brake;
The separating brake reporting step: all feeder terminal units in described fault point feeder terminal unit and described downstream are after separating brake action is finished, and the communicator by separately is to other feeder terminal unit send state information;
Combined floodgate step: the breaker closing of described separating brake.
2, control method as claimed in claim 1 is characterized in that, in described failure detection steps, when breaking down, before corresponding feeder terminal unit sends fault message, earlier circuit breaker is closed once.
3, control method as claimed in claim 2 is characterized in that, also comprises:
The service restoration step: the downstream feeder terminal unit of described separating brake sends reclosing command by its communicator to the open loop point feeder terminal unit that is adjacent, after described open loop point feeder terminal unit receives this reclosing command, instruct its interior on-load switch to close a floodgate.
4, control method as claimed in claim 2 is characterized in that, also comprises:
Service restoration step: the open loop point feeder terminal unit of specifying an acquiescence for feeder terminal unit, the downstream feeder terminal unit of described separating brake sends reclosing command by its communicator to the open loop point feeder terminal unit with its acquiescence, after the open loop point feeder terminal unit of described acquiescence receives this reclosing command, instruct its interior on-load switch to close a floodgate.
CNB2005100243790A 2005-03-14 2005-03-14 Non-master station transinission and distribution network control method Expired - Fee Related CN100376069C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100243790A CN100376069C (en) 2005-03-14 2005-03-14 Non-master station transinission and distribution network control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100243790A CN100376069C (en) 2005-03-14 2005-03-14 Non-master station transinission and distribution network control method

Publications (2)

Publication Number Publication Date
CN1835334A true CN1835334A (en) 2006-09-20
CN100376069C CN100376069C (en) 2008-03-19

Family

ID=37002985

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100243790A Expired - Fee Related CN100376069C (en) 2005-03-14 2005-03-14 Non-master station transinission and distribution network control method

Country Status (1)

Country Link
CN (1) CN100376069C (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102005746A (en) * 2010-11-30 2011-04-06 南京南瑞继保电气有限公司 Method based on topology protection of distributing network
CN102185300A (en) * 2011-05-24 2011-09-14 安徽中兴继远信息技术有限公司 On-spot feeder automation equipment and realizing method thereof
CN103761625A (en) * 2014-02-13 2014-04-30 国家电网公司 Outage management system based on information exchange bus and data processing method thereof
CN103872660A (en) * 2014-02-18 2014-06-18 北京科锐配电自动化股份有限公司 Network type protection method based on closed-loop mode operation of power network
CN103872662A (en) * 2014-02-18 2014-06-18 北京科锐配电自动化股份有限公司 Network type protection method for hybrid networking based on closed-loop model operation
CN104701823A (en) * 2014-09-01 2015-06-10 凯里供电局 Networking intelligent switch protection system for feeders of power distribution networks
CN105140894A (en) * 2015-08-07 2015-12-09 许继电气股份有限公司 Phase difference principle based power distribution network differential protection method
CN105207346A (en) * 2015-09-10 2015-12-30 广东电网有限责任公司珠海供电局 Area backup automatic switch method and system
CN113644742A (en) * 2021-08-16 2021-11-12 国网河北省电力有限公司电力科学研究院 Power supply switching method, terminal and system for power distribution network load
CN113746206A (en) * 2021-11-03 2021-12-03 赫兹曼电力(广东)有限公司 Grid-shaped power system comprehensive domain self-healing method and system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102213735B (en) * 2011-03-04 2015-04-29 中国电力科学研究院 Typical test network with power distribution automation
CN102707198B (en) * 2012-06-21 2014-11-19 国家电网公司 Feeder automation failure positioning method based on failure backcasting

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000333362A (en) * 1999-05-19 2000-11-30 Mitsubishi Electric Corp Distribution controller
JP3830699B2 (en) * 1999-11-11 2006-10-04 株式会社東芝 Accident location system
CN1112589C (en) * 1999-11-20 2003-06-25 深圳市中兴通讯股份有限公司 Method for determining position of failure in dectric distribution network
JP4104341B2 (en) * 2002-02-08 2008-06-18 東光電気株式会社 Accident location system

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102005746A (en) * 2010-11-30 2011-04-06 南京南瑞继保电气有限公司 Method based on topology protection of distributing network
CN102185300A (en) * 2011-05-24 2011-09-14 安徽中兴继远信息技术有限公司 On-spot feeder automation equipment and realizing method thereof
CN103761625A (en) * 2014-02-13 2014-04-30 国家电网公司 Outage management system based on information exchange bus and data processing method thereof
CN103872662B (en) * 2014-02-18 2015-06-24 北京科锐配电自动化股份有限公司 Network type protection method for hybrid networking based on closed-loop model operation
CN103872662A (en) * 2014-02-18 2014-06-18 北京科锐配电自动化股份有限公司 Network type protection method for hybrid networking based on closed-loop model operation
CN103872660A (en) * 2014-02-18 2014-06-18 北京科锐配电自动化股份有限公司 Network type protection method based on closed-loop mode operation of power network
CN104701823A (en) * 2014-09-01 2015-06-10 凯里供电局 Networking intelligent switch protection system for feeders of power distribution networks
CN105140894A (en) * 2015-08-07 2015-12-09 许继电气股份有限公司 Phase difference principle based power distribution network differential protection method
CN105140894B (en) * 2015-08-07 2018-09-25 许继电气股份有限公司 A kind of power distribution network differential protecting method based on Phase Difference Principle
CN105207346A (en) * 2015-09-10 2015-12-30 广东电网有限责任公司珠海供电局 Area backup automatic switch method and system
CN113644742A (en) * 2021-08-16 2021-11-12 国网河北省电力有限公司电力科学研究院 Power supply switching method, terminal and system for power distribution network load
CN113644742B (en) * 2021-08-16 2023-07-28 国网河北省电力有限公司电力科学研究院 Power supply switching method, terminal and system for power distribution network load
CN113746206A (en) * 2021-11-03 2021-12-03 赫兹曼电力(广东)有限公司 Grid-shaped power system comprehensive domain self-healing method and system
CN113746206B (en) * 2021-11-03 2022-08-23 赫兹曼电力(广东)有限公司 Grid-shaped power system comprehensive domain self-healing method and system

Also Published As

Publication number Publication date
CN100376069C (en) 2008-03-19

Similar Documents

Publication Publication Date Title
CN1835334A (en) Non-master station transinission and distribution network control method
CN110148930B (en) Method for fault location and automatic topology identification in power distribution network
CN103840439B (en) Main website coordinates the power distribution automation guard method realized with distributed terminal
CN109149575B (en) Ring network unit and double-ring network type power distribution network
CN102213735B (en) Typical test network with power distribution automation
CN103872660B (en) Network type protection method based on closed-loop mode operation of power network
CN204538802U (en) Middle pressure power transmission and distribution automatic switching control system
CN105281304A (en) Quick feeder fault positioning and isolating method
CN102386614A (en) Method for sharing standby protecting device by power equipment in intelligent transformer substation
CN102290863A (en) Distributed-feeder-automation-system-based remote monitoring terminal and implementation method
CN111244919B (en) Distribution network topology self-adaptive identification method suitable for intelligent distributed FA
CN113013851B (en) Distributed intelligent power distribution automation system
CN111555458B (en) Distributed feeder automation system of looped network circuit architecture
CN202550668U (en) Distributed power distribution network management terminal
CN210780224U (en) Distribution network fault self-healing device
CN104124749B (en) The dual-ring network distribution line failure processing method that prepared auto restart coordinates with power distribution automation
CN111786383B (en) Spare power automatic switching device and method for realizing mutual backup of multiple power incoming lines
CN209516723U (en) A kind of 10KV high pressure 0.5s prepared auto restart fling-cut system
CN106787216A (en) It is a kind of for many power supply ring network structures in intelligent distributed FA systems
CN113659551A (en) Intelligent fault isolation method and device for power distribution network based on synchronization module
CN108493928B (en) Distributed feeder automation distribution line topology ad hoc network method
Wang et al. Research on Application of New Intelligent Distributed Feeder Automation
CN105703478A (en) Electrical power distribution terminal system
CN110943535A (en) Power supply control system
CN101499679B (en) Connection method for electricity of ring network station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI SHENRUI ELECTRIC SCIENCE CO., LTD.

Free format text: FORMER NAME OR ADDRESS: SHANGHAI SHENRUI POWER TECHNOLOGY CO., LTD.

Owner name: SHANGHAI SHENRUI POWER TECHNOLOGY CO., LTD.

Free format text: FORMER NAME OR ADDRESS: SHENRUI POWER AUTOMATION TECH CO LTD, SHANGHAI

CP03 Change of name, title or address

Address after: Shanghai Tianzhou Road No. 159 15 unit 1301 rooms zip code: 200000

Patentee after: SHANGHAI SUNRISE POWER AUTOMATION Co.,Ltd.

Address before: No. 15, 481 Guiping Road, Shanghai, building 6, post code: 200000

Patentee before: Shanghai Shen Rui Electric Power Technology Co.,Ltd.

Address after: No. 15, 481 Guiping Road, Shanghai, building 6, post code: 200000

Patentee after: Shanghai Shen Rui Electric Power Technology Co.,Ltd.

Address before: No. 15, 481 Guiping Road, Shanghai, building 6, post code: 200000

Patentee before: ZHONGRUI POWER AUTOMATION TECH

ASS Succession or assignment of patent right

Owner name: SHANGHAI SUNRISE PROTECTIVE RELAY ELECTRIC CO.,LTD

Free format text: FORMER OWNER: SHANGHAI SUNRISE POWER AUTOMATION CO., LTD.

Effective date: 20130626

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200000 XUHUI, SHANGHAI CITY TO: 200000 XUHUI, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20130626

Address after: 200000, building 12, building 470, No. 5, Guiping Road, Shanghai, Xuhui District

Patentee after: SHANGHAI SUNRISE POWER TECHNOLOGY Co.,Ltd.

Address before: 200000 Shanghai Tennessee Road No. 159 room 1301 unit 15

Patentee before: SHANGHAI SUNRISE POWER AUTOMATION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080319

Termination date: 20180314

CF01 Termination of patent right due to non-payment of annual fee