CN1831784A - Testing device and method of computer - Google Patents

Testing device and method of computer Download PDF

Info

Publication number
CN1831784A
CN1831784A CN 200510053345 CN200510053345A CN1831784A CN 1831784 A CN1831784 A CN 1831784A CN 200510053345 CN200510053345 CN 200510053345 CN 200510053345 A CN200510053345 A CN 200510053345A CN 1831784 A CN1831784 A CN 1831784A
Authority
CN
China
Prior art keywords
computing machine
chronotron
measured
relay
computer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510053345
Other languages
Chinese (zh)
Inventor
乐瑾瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Dingxing Digital Network Technology Co Ltd
Original Assignee
Shenzhen Dingxing Digital Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Dingxing Digital Network Technology Co Ltd filed Critical Shenzhen Dingxing Digital Network Technology Co Ltd
Priority to CN 200510053345 priority Critical patent/CN1831784A/en
Publication of CN1831784A publication Critical patent/CN1831784A/en
Pending legal-status Critical Current

Links

Images

Abstract

A method for testing computer includes starting up computer to be tested and using automatic switching - off software to set test frequency and switching - off time, operating said software to let computer switch off automatically, utilizing test unit to carry out detection for making computer switch - on automatically, repeating steps of automatic switching - on and switching - off computer continuously till test is finished.

Description

The proving installation of computing machine and method
[technical field]
The present invention relates to a kind of proving installation and method of computing machine, specifically, relate to a kind of shutdown/standby/dormancy of computing machine, the proving installation and the method for start.
[technical background]
In the test of computing machine, need switching on and shutting down, the standby by continuous several times, the test of dormancy, to avoid potential problem such as computer system power supply degree of stability.Prior art adopts and tests manually, wastes time and energy, and as test start and close 100 times, standby 100 times, dormancy 100 times, if 30 computing machines are arranged, manually finishes these and tests minimum needs three days and a manpower, and efficient is low like this, cost is high.Be effectively to save manpower, time cost, in the switching on and shutting down of computing machine, standby, dormancy test, just press for a kind of effectively, proving installation and method easily.
[technology contents]
The technical matters that institute of the present invention desire solves provides a kind of proving installation of computing machine simple in structure, convenient and practical, with low cost.
The technical matters that institute of the present invention desire solves provides the testing method of computer of a kind of simple operation, convenient and practical, improved efficiency.
The technical solution adopted in the present invention is: the proving installation of computing machine comprises, a chronotron and the relay that links to each other with chronotron, and relay and chronotron are powered by power supply; Chronotron links to each other with computing machine to be measured, detecting opening computer to be measured, shutdown, standby or dormant state, and this status signal is sent to relay; Relay is connected with the power switch of computing machine to be measured, according to its signal controlling that receives computer booting to be measured.
The proving installation of described computing machine extends VGA interface or MINI-PCI interface by chronotron, to dock by VGA interface or MINI-PCI interface set on a lead and the computing machine to be measured.
The method that a kind of proving installation that utilizes described computing machine is tested computing machine to be measured may further comprise the steps:
The first step is opened computing machine to be measured, by automatic shutdown software set testing time and unused time;
Second step, move described software, make and calculate auto-shut-off, standby or dormancy;
The 3rd step, utilize proving installation to detect, make the computing machine Auto Power On;
The 4th step, then carry out the circulation in second step, the 3rd step, finish until test.
Described the 3rd step comprises:
Step 1 is carried out the low level detecting, after the chronotron delay adjustments time, sends signal to relay, and relay closes and controls computer power switch to be measured and press;
Step 2 is carried out the high level detecting, after the chronotron delay adjustments time, sends signal to relay, and relay disconnects and controls computer power switch to be measured and disconnects.
The delay time that chronotron is set in the described step 1 is 10 seconds.
The delay time that chronotron is set in the described step 2 is 1.5 seconds.
The technique effect that the present invention reached is: the proving installation of computing machine of the present invention and method adopt chronotron, the simple electronic component of relay to be equipped with the shirtsleeve operation software set, structure is extremely simple, method of testing is extremely simplified, only need one day time just can finish the computer testing project that to finish in three days originally, and the staff can do other work simultaneously, improved work efficiency greatly, shortened the test duration, saved cost.
[description of drawings]
The invention will be further described in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the synoptic diagram that the proving installation of computing machine of the present invention is received the application mode of computing machine (notebook computer).
Fig. 2 is the workflow block diagram of testing method of computer of the present invention.
[embodiment]
At first see also illustrated in figures 1 and 2ly, the proving installation of computing machine of the present invention comprises a circuit board 9, and electronic component relay 1, chronotron 2 etc. are installed on the circuit board 9, and relay 1 and chronotron 2 link to each other by circuit.Relay 1 extends attachment unit interface 4 by the circuit design on the circuit board 9, and chronotron 2 stretches out VGA interface 3 or MINI-PCI interface by the circuit design on the circuit board 9, and the embodiment of the invention is that example describes with the VGA interface.The proving installation of computing machine of the present invention also comprises a supply socket 7, and relay 1 links to each other with supply socket 7 by circuit with chronotron 2 simultaneously, and the design of supply socket 7 has been arranged, and can insert external dc power, thereby gives chronotron 2 and relay 1 power supply.
The proving installation of computing machine of the present invention is used for shutdown/standby/dormancy, the start test of computing machine (is example with the notebook computer) 8, only needs lead connection proving installation of the present invention and notebook computer 8 to get final product.The power switch 5 of attachment unit interface 4 and notebook computer 8 is inserted at one lead two ends respectively, thereby relay 1 is communicated with 5 of the power switches of notebook computer 8; The VGA interface 6 or the MINI-PCI slot of VGA interface 3 or MINI-PCI interface and notebook computer 8 inserted at another lead two ends respectively.The lead connection finishes, and is provided with power supply again, and the proving installation of computing machine of the present invention just can have been worked.
The course of work of utilizing proving installation of the present invention to test is that example is described as follows with the test process of start and close:
The first, open computing machine or notebook computer 8, by automatic shutdown software set shutdown number of times and unused time, for example we to set the shutdown number of times be that 100 times, unused time are 5 seconds, move this software then, then notebook computer 8 shutdown after 5 seconds;
Second, after notebook computer 8 shutdown, the 5VS signal that the chronotron 2 of proving installation of the present invention detects VGA interface 3 or MINI-PCI groove at once becomes low level, signal of output after then delaying time 10 seconds, trigger relay 1 closes it, because the power switch 5 of notebook computer 8 links to each other with the switch pin of relay 1, promptly be equivalent to press the power switch 5 of notebook computer 8 and started shooting; At this moment, the 5VS signal that the chronotron 2 of proving installation of the present invention detects VGA interface 3 or MINI-PCI interface becomes high level, sending a signal after delaying time 1.5 seconds disconnects relay 1 again, promptly be equivalent to disconnect after power switch 5 is connected 1.5s, thereby be maintained the open state of notebook computer 8.
So far, shutdown-start is just finished one and has been circulated, and next by shutdown software shutdown automatically, so continuous shutdown-start circulates 100 times, just can finish the test of switching on and shutting down.
Above-mentioned delay time also can be set different values according to different demands.
Finishing in like manner of standby and dormancy test.

Claims (8)

1. the proving installation of a computing machine is characterized in that: it comprises, a chronotron and the relay that links to each other with chronotron, and relay and chronotron are powered by power supply; Chronotron links to each other with computing machine to be measured, detecting opening computer to be measured, shutdown, standby or dormant state, and this status signal is sent to relay; Relay is connected with the power switch of computing machine to be measured, according to its signal controlling that receives computer booting to be measured.
2. the proving installation of computing machine as claimed in claim 1, it is characterized in that: described power supply is external direct supply.
3. the proving installation of computing machine as claimed in claim 1, it is characterized in that: described computing machine to be measured is a notebook computer.
4. the proving installation of computing machine as claimed in claim 1, it is characterized in that: the proving installation of described computing machine extends VGA interface or MINI-PCI interface by chronotron, to dock by VGA interface or MINI-PCI interface set on a lead and the computing machine to be measured.
5. method that the proving installation that utilizes computing machine as claimed in claim 1 is tested computing machine to be measured may further comprise the steps:
The first step is opened computing machine to be measured, by automatic shutdown software set testing time and unused time;
Second step, move described software, make and calculate auto-shut-off, standby or dormancy;
The 3rd step, utilize proving installation to detect, make the computing machine Auto Power On;
The 4th step, then carry out the circulation in second step, the 3rd step, finish until test.
6. testing method of computer as claimed in claim 5 is characterized in that: described the 3rd step comprises:
Step 1 is carried out the low level detecting, after the chronotron delay adjustments time, sends signal to relay, and relay closes and controls computer power switch to be measured and press;
Step 2 is carried out the high level detecting, after the chronotron delay adjustments time, sends signal to relay, and relay disconnects and controls computer power switch to be measured and disconnects.
7. testing method of computer as claimed in claim 6 is characterized in that: the delay time that chronotron is set in the described step 1 is 10 seconds.
8. testing method of computer as claimed in claim 6 is characterized in that: the delay time that chronotron is set in the described step 2 is 1.5 seconds.
CN 200510053345 2005-03-09 2005-03-09 Testing device and method of computer Pending CN1831784A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510053345 CN1831784A (en) 2005-03-09 2005-03-09 Testing device and method of computer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510053345 CN1831784A (en) 2005-03-09 2005-03-09 Testing device and method of computer

Publications (1)

Publication Number Publication Date
CN1831784A true CN1831784A (en) 2006-09-13

Family

ID=36994096

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510053345 Pending CN1831784A (en) 2005-03-09 2005-03-09 Testing device and method of computer

Country Status (1)

Country Link
CN (1) CN1831784A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101408791B (en) * 2007-10-12 2010-11-17 鈊象电子股份有限公司 Uninterruptible power supply device and operation method of protecting computer system in uninterruptible power supply device
CN102023912A (en) * 2009-09-11 2011-04-20 鸿富锦精密工业(深圳)有限公司 Dormancy wake-up testing system and method
CN101727369B (en) * 2008-10-15 2011-12-07 英业达股份有限公司 Method for automatically verifying environment variable settings
CN102346700A (en) * 2010-08-03 2012-02-08 神讯电脑(昆山)有限公司 System for testing stability of PDA (Personal Digital Assistant) and method
CN102375766A (en) * 2010-08-16 2012-03-14 鸿富锦精密工业(深圳)有限公司 On-off test device and method for electronic device
CN102520370A (en) * 2011-12-31 2012-06-27 曙光信息产业股份有限公司 Server switching power supply testing method and server switching power supply testing device
CN103049359A (en) * 2012-12-17 2013-04-17 浪潮电子信息产业股份有限公司 Testing method for automatic continuous refreshing PMON (process monitor) based on Loongson platform computer
CN104572366A (en) * 2013-10-18 2015-04-29 神讯电脑(昆山)有限公司 Automatic testing method of laptop closing sleep function
CN104699220A (en) * 2013-12-09 2015-06-10 慧荣科技股份有限公司 Sleep mode measuring method
CN106921775A (en) * 2015-12-28 2017-07-04 镇江坤泉电子科技有限公司 A kind of gsm module test system and method
CN108490289A (en) * 2018-03-12 2018-09-04 广东欧珀移动通信有限公司 Testing for electrical equipment method, apparatus and electronic equipment

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101408791B (en) * 2007-10-12 2010-11-17 鈊象电子股份有限公司 Uninterruptible power supply device and operation method of protecting computer system in uninterruptible power supply device
CN101727369B (en) * 2008-10-15 2011-12-07 英业达股份有限公司 Method for automatically verifying environment variable settings
CN102023912B (en) * 2009-09-11 2013-11-20 鸿富锦精密工业(深圳)有限公司 Dormancy wake-up testing system and method
CN102023912A (en) * 2009-09-11 2011-04-20 鸿富锦精密工业(深圳)有限公司 Dormancy wake-up testing system and method
CN102346700A (en) * 2010-08-03 2012-02-08 神讯电脑(昆山)有限公司 System for testing stability of PDA (Personal Digital Assistant) and method
CN102375766A (en) * 2010-08-16 2012-03-14 鸿富锦精密工业(深圳)有限公司 On-off test device and method for electronic device
CN102375766B (en) * 2010-08-16 2016-05-18 中山市云创知识产权服务有限公司 The on-off test device of electronic installation and method
CN102520370B (en) * 2011-12-31 2015-02-18 曙光信息产业股份有限公司 Server switching power supply testing method and server switching power supply testing device
CN102520370A (en) * 2011-12-31 2012-06-27 曙光信息产业股份有限公司 Server switching power supply testing method and server switching power supply testing device
CN103049359A (en) * 2012-12-17 2013-04-17 浪潮电子信息产业股份有限公司 Testing method for automatic continuous refreshing PMON (process monitor) based on Loongson platform computer
CN104572366A (en) * 2013-10-18 2015-04-29 神讯电脑(昆山)有限公司 Automatic testing method of laptop closing sleep function
CN104572366B (en) * 2013-10-18 2019-01-29 神讯电脑(昆山)有限公司 Laptop closes machine suspend mode automatic test approach
CN104699220A (en) * 2013-12-09 2015-06-10 慧荣科技股份有限公司 Sleep mode measuring method
CN104699220B (en) * 2013-12-09 2017-08-11 慧荣科技股份有限公司 Sleep mode measuring method
US10379594B2 (en) 2013-12-09 2019-08-13 Silicon Motion, Inc. Sleep-mode detection method thereof
CN106921775A (en) * 2015-12-28 2017-07-04 镇江坤泉电子科技有限公司 A kind of gsm module test system and method
CN108490289A (en) * 2018-03-12 2018-09-04 广东欧珀移动通信有限公司 Testing for electrical equipment method, apparatus and electronic equipment

Similar Documents

Publication Publication Date Title
CN1831784A (en) Testing device and method of computer
CN1167023C (en) Method for waking up signal control computer system power supply by using local area network and its equipment
CN101860266B (en) Photovoltaic inverter power saving control system and method
EP2592738A3 (en) Method and apparatus for implementing a power converter input terminal voltage discharge circuit
CN101788641A (en) Testing device and automatic testing method thereof
CN101046702A (en) Start control device and method for micro-controller
CN102314380A (en) Multi-hardware start control system and method
CN102368633A (en) Solar energy and mains supply complementation controller
CN109031104B (en) Relay contact performance detection device for relay protection device
CN1513224A (en) Power supply architecture with controlled power-on and power-off sequence
CN1869728A (en) Aging testing method and device for power-supply device
CN1430321A (en) Device and method for managing power source
CN111884498B (en) Power-down time sequence control circuit and method for multi-channel power supply of indoor distribution system
CN2610406Y (en) Opening and closedown testing device
CN102541228A (en) Startup and shutdown implementing method and device capable of preventing restart power failure of microprocessor
WO2023202077A1 (en) Photovoltaic system, inverter starting method and photovoltaic energy storage system
CN101047374A (en) Testing system
CN102968068B (en) Control circuit capable of achieving energy-saving working state
CN101287145A (en) Virtual lookout device of wireless communication
CN110908834A (en) Power failure restart device and method and electronic equipment
CN100530007C (en) Electricity-saving circuit of electronic device and its electricity-saving method
TWI465003B (en) Solar storage system and method of charge using the same
CN1314196C (en) Controlling method and apparatus of discontinuous power supply combined with star angle converting for motor of pumping unit
CN1472620A (en) Rapid discharge circuit
CN2572463Y (en) Controller for auxiliary power supply used in computer switching off state

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Li Aihua

Document name: Notification before expiration of term

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication