CN1824597B - Elevator maintaining evaluating apparatus - Google Patents

Elevator maintaining evaluating apparatus Download PDF

Info

Publication number
CN1824597B
CN1824597B CN2005100088899A CN200510008889A CN1824597B CN 1824597 B CN1824597 B CN 1824597B CN 2005100088899 A CN2005100088899 A CN 2005100088899A CN 200510008889 A CN200510008889 A CN 200510008889A CN 1824597 B CN1824597 B CN 1824597B
Authority
CN
China
Prior art keywords
mentioned
maintenance
elevator
time
action
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2005100088899A
Other languages
Chinese (zh)
Other versions
CN1824597A (en
Inventor
绀谷雅宏
中井干夫
石本弘文
中岛康人
石田礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to CN2005100088899A priority Critical patent/CN1824597B/en
Publication of CN1824597A publication Critical patent/CN1824597A/en
Application granted granted Critical
Publication of CN1824597B publication Critical patent/CN1824597B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Maintenance And Inspection Apparatuses For Elevators (AREA)
  • Indicating And Signalling Devices For Elevators (AREA)

Abstract

The present invention provides an elevator maintenance operation evaluation equipment. Said equipment includes a communication device, said communication device is connected with maintenance operation data base of maintenance company by means of external line and is used for transmitting and receiving information, a memory device for storing various preset maintenance operation information and a contrast device for contrasting the maintenance result with preset maintenance information so as to make maintenance operation evaluation.

Description

Elevator maintaining evaluating apparatus
Technical field
The present invention relates to the elevator maintaining evaluating apparatus of the metering production time in the elevator maintaining operation.
Background technology
The region of long-term, elevator running of increase, the running year number of elevator machine is considered in the elevator maintaining operation, and the variations such as measurement project of necessary management value are kept in operational method, running.In addition, in the maintenance worker,, need promptly to learn the skilled of more knowledge, technical ability owing to will carry out diversified maintenance operation.Moreover, wish to exist the restriction of production time according to the client, so must plan the combination of operation practical matter purpose best.
Therefore, in the technical ability of the optimization of maintaining operation, worker is estimated, the production time of the labor maintenance to need.
As the metering device of maintenance needed time of operation, known structure is to have: the drive controlling elevator control device; To send the communicator of cintralized monitoring device from the action message of elevator control device to; And the timekeeping circuit in this communicator; When the mainteinance repair operation of beginning elevator, by opening the operation switch of maintenance person's operation, start timekeeping circuit, begin the metering of production time.When the metering effluxion during Looking Out Time of regulation, will take place to transmit messages to maintenance person unusually, and the occasion that the operation switch has turn-offed in Looking Out Time is judged as the maintenance operation and finishes rightly and finishes to measure.Then,, judge and carried out the maintenance operation rightly, initialization is carried out in the metering of timekeeping circuit according to the elevator action state that in the maintenance operation, obtains by controlling apparatus for lifts door.(with reference to patent documentation 1)
(with reference to patent documentation 1) Japanese publication spy opens flat 6-16354 communique (paragraph 0013~0019)
Summary of the invention
(problem that invention will solve)
But, in the above-mentioned existing technology, during production time metering, judge behind the elevator operating state when be appropriate operation, there is such problem: be about to that timekeeping circuit has initially melted and consider to learn and maintain the required time of operation.
In addition, also there is such problem: judge according to the state variation of elevator operating state that obtains by elevator control gear or elevator whether operation is appropriate, this elevator operating state, do not having to consider to be that worker is wished the action carried out, still be used for keeping under the situation of management value measurement etc. of performance, the Detailed Inspection of carrying out operation is difficult.
The present invention, in view of the actual state of above-mentioned prior art proposes, its purpose is, a kind of like this elevator maintaining evaluating apparatus is provided, promptly can at length check the appropriate property of operation, the production time when metering is implemented to finish after the maintenance operation rightly.
Be used to reach the invention that above-mentioned purpose the present invention relates to claim 1, it is a kind of maintaining evaluating apparatus, it begins the input startup according to the measurement of the carried terminal of holding from the maintenance worker, in addition, also have according to measuring and finish the time meter that input stops, the metering maintenance needed time of operation, it adopts the structure with following apparatus:
Communicator, it is via the emm message data bank reception transmission information of outside line with maintenance company;
Memory storage, the elevator action that it automatically stores according to the operation predetermined action that takes place in the maintenance operation of storage in advance and the controlling apparatus for lifts door during by the maintenance operation obtains operation history historical and that form by input information from carried terminal;
Comparison device contrasts above-mentioned operation predetermined action and the above-mentioned action history and the aforesaid operations history of above-mentioned memory storage.
In the invention that relates to claim 1 that so constitutes, above-mentioned comparison device is logined the metering time of above-mentioned time meter in above-mentioned maintenance work data storehouse as the production time of end-of-job message in all consistent occasion of results of comparison; In the inconsistent occasion of results of comparison, the above-mentioned time meter that resets will maintain that job content is incomplete to be notified to above-mentioned carried terminal, thus, can reach target.
According to the present invention, can at length check the appropriate property of operation, metering implements to maintain the production time of the occasion that is through with after the operation rightly.
Description of drawings
Fig. 1 is the instruction diagram of expression elevator maintaining evaluating apparatus;
Fig. 2 is the action specification figure of the action of expression maintenance evaluating apparatus.
Among the figure
1 controlling apparatus for lifts door
2 Long-Range Surveillance Units
3 carried terminals
4 outside lines
5 maintenance work data storehouses
21 communicators
22 time meters
23 memory storages (memory device)
24 comparison devices (CPU)
The 23a operation history
23b moves historical
23c operates predetermined action
31 operations begin input
32 ends of job input
33 operation inputs
The specific embodiment
Below, according to figure the preferred forms that is used to implement elevator maintaining evaluating apparatus of the present invention is described.
Fig. 1 is the instruction diagram that expression the present invention relates to the elevator maintaining evaluating apparatus of embodiment, and Fig. 2 is the instruction diagram of expression maintaining evaluating apparatus action.
In Fig. 1, in the controlling apparatus for lifts door 1 of control elevator running, Long-Range Surveillance Unit 2 is set, the carried terminal of during the maintenance operation worker being held 3 is connected with Long-Range Surveillance Unit 2, carries out reception transmission, the elevator action indication of information.In addition, Long-Range Surveillance Unit 2 possesses communicator 21, is connected via the maintenance work data storehouse of outside line 4 with maintenance company.
And, in Long-Range Surveillance Unit 2, possess:
Time meter 22, it begins to import the metering of 31 time openings according to the operation from carried terminal 3, according to import the metering of 32 concluding times from the end of job of carried terminal 3;
Memory storage (memory device) 23; With
Comparison device (CPU) 24, the content of its contrast memory storage 23.
Memory storage 23, to store as operation history 23a from the operation of carried terminal 3 input 33, to store as the historical 23b of action from the elevator action of controlling apparatus for lifts door 1, in addition, will store as operation predetermined action 23c from the information in maintenance work data storehouse 5.Comparison device 24 is according to the control of content results of comparison time meter 22, the expression information on carried terminal 3 in addition of memory storage 23.
With Fig. 2 the action of the elevator maintaining evaluating apparatus of formation like this is described.At first, before maintenance operation this production time from maintenance data storehouse 5, will maintain the operation action of events in operation and operation generation thus etc. by communicator 21 via outside line 4, be stored in (S1) in the storing apparatus 23 as operation predetermined action 23c.When maintenance operator arrive in this elevator and carried terminal 3 with Long-Range Surveillance Unit 2 be connected, on carried terminal 3 represent the operation item (S2) on the same day thereafter.Behind this operation item, when the operator manual manipulation, beginning (S3) at 31 o'clock, 22 time openings of time meter meterings (S4) by carried terminal 3 input operations.The history 23 of the operation that will produce according to operation then,, elevator action is stored in (S5) in the memory storage 23 successively as the operation history 23a and the historical 23b that moves respectively.In this operation history 23a, also comprise the management value result of a measurement input that is used to keep performance.Then, the operator finishes operation, by the carried terminal 3 input ends of job 32 time, and 22 concluding times of time meter meterings (S7).After time meter 22 meterings finish, will contrast (S8) with the operation predetermined action 23c that is stored in the memory storage 23 according to the operation history 23a and the historical 23b that moves that operation produces by comparison device 24.In all consistent occasion of the results of comparison that obtains by comparison device, with the variable of time meter 22 as production time 25, as end-of-job message 26, send to maintenance work data storehouse (S9) with the operation history 23a of memory storage, the historical 23b of action.In the inconsistent occasion of the results of comparison that obtains by comparison device 23, the situation that do not carry out appropriate operation as existing incomplete in the operation, notice carried terminal 3: operation is incomplete, will implement operation (S10) once again, and reset timer 22 (S11).
In the embodiment, can at length check the appropriate property of operation as constituted above, the production time when metering is implemented to finish after the maintenance operation rightly.

Claims (1)

1. the maintaining evaluating apparatus of an elevator, it measurement that possesses according to the carried terminal of holding from the maintenance worker begins to import startups, finishes the time meter that input stops according to measuring, and is used for measuring and maintains the required time of operation, it is characterized in that,
Have:
Communicator, it is via the emm message data bank reception transmission information of outside line with maintenance company;
Memory storage, it automatically stores the operation predetermined action that is produced by the maintenance operation that obtains from described emm message data bank through described communicator in advance, the action history of the elevator that is obtained by controlling apparatus for lifts door when maintaining operation and the operation history that is formed by the input information from described carried terminal; With
Comparison device, it contrasts above-mentioned action history and the historical above-mentioned operation predetermined action with above-mentioned memory storage of aforesaid operations;
Above-mentioned comparison device, in all consistent occasion of results of comparison, the metering time of above-mentioned time meter is logined in above-mentioned emm message data bank as the production time of end-of-job message, in the inconsistent occasion of results of comparison, the above-mentioned time meter that resets also will maintain the above-mentioned carried terminal of the incomplete advisory of job content.
CN2005100088899A 2005-02-24 2005-02-24 Elevator maintaining evaluating apparatus Active CN1824597B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2005100088899A CN1824597B (en) 2005-02-24 2005-02-24 Elevator maintaining evaluating apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2005100088899A CN1824597B (en) 2005-02-24 2005-02-24 Elevator maintaining evaluating apparatus

Publications (2)

Publication Number Publication Date
CN1824597A CN1824597A (en) 2006-08-30
CN1824597B true CN1824597B (en) 2010-09-08

Family

ID=36935470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2005100088899A Active CN1824597B (en) 2005-02-24 2005-02-24 Elevator maintaining evaluating apparatus

Country Status (1)

Country Link
CN (1) CN1824597B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104076809B (en) * 2013-03-26 2017-01-04 三菱电机株式会社 Data processing equipment and data processing method
JP2015009938A (en) * 2013-06-28 2015-01-19 株式会社日立ビルシステム Elevator management device, system, and method
JP7051662B2 (en) * 2018-10-30 2022-04-11 三菱電機ビルテクノサービス株式会社 Safety management system

Also Published As

Publication number Publication date
CN1824597A (en) 2006-08-30

Similar Documents

Publication Publication Date Title
CA2807338C (en) Concrete material dispensing system
US9678496B2 (en) Concrete material dispensing system
US7712095B2 (en) Remote control server, center server, and system constituted them
CN101482735B (en) Power supply controlling apparatus and computer readable medium
CN104750016B (en) Communication control unit and communication control method
KR101865773B1 (en) System for managing production using location-based service and method therefor
CN105378810A (en) Remote sharing of measurement data
CN1824597B (en) Elevator maintaining evaluating apparatus
CN105988401B (en) Method, arithmetic unit, subscriber unit and the system of electrical equipment parametrization
DE102013109096A1 (en) Tamper-proof electronic device
CN101864945A (en) Multi-oil-well continuous metering system based on programmable controller, and metering method thereof
JP2016105031A (en) Operation management system of grain dryer
JP2022124845A (en) Work result management system and work result management method
JP5993598B2 (en) Simultaneous meter reading method for handy wireless meter reading system
DE102015114839A1 (en) System and method for transmitting at least one information generated by a field device of automation technology
JP2004326468A (en) Operation maintenance support system of environmental plant facility
JP2023158366A (en) production management system
JP2019052844A (en) Operation information management system for crop dryers
CN203799379U (en) Sample information acquisition and storage system
CN219609465U (en) Smart pipe gallery monitoring system based on STM32
JP7287537B2 (en) Grain dryer operation information management system
CN103606105B (en) Method and system for reliability check and evaluation index statistics of engineering agricultural full-set machinery product
Silva-Díaz et al. Design of an Automation System for the Silage Plant “Héctor Molina”
Singh et al. Implementation of Automated Urban Drinking Water Supply and Leakage Identification System
CN111262165A (en) Intelligent operation and maintenance device for field metering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant