CN1803327A - 一种用于热轧带钢生产线的冷却装置 - Google Patents
一种用于热轧带钢生产线的冷却装置 Download PDFInfo
- Publication number
- CN1803327A CN1803327A CN 200610045651 CN200610045651A CN1803327A CN 1803327 A CN1803327 A CN 1803327A CN 200610045651 CN200610045651 CN 200610045651 CN 200610045651 A CN200610045651 A CN 200610045651A CN 1803327 A CN1803327 A CN 1803327A
- Authority
- CN
- China
- Prior art keywords
- turbulent
- distributive pipe
- chamber
- turbulent chamber
- jet nozzle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Nozzles (AREA)
- Heat Treatment Of Strip Materials And Filament Materials (AREA)
Abstract
一种用于热轧带钢生产线的冷却装置,属于热轧带钢快速冷却装置技术领域。该装置包括分水管、紊流腔、射流喷嘴,分水管的一端设有分水管堵板,分水管下方为紊流腔,紊流腔为箱体,紊流腔侧板、紊流腔堵板均与分水管连接,在紊流腔底板上开有若干个带有螺纹的孔,孔中安装有射流喷嘴,射流喷嘴通过紊流腔底板伸入紊流腔中,在分水管上设有若干个分水孔,分水管通过分水孔与紊流腔内部相通;高压水通过分水管和紊流腔后,保持高压状态,从每个射流喷嘴均匀喷出。本发明的优点是冷却速度大幅度提高,各射流喷嘴喷出的高压水流流量及工作压力相同。
Description
技术领域
本发明属于热轧带钢冷却技术领域,特别是涉及一种用于热轧带钢生产线的冷却装置。
技术背景
为生产一类热轧带钢,需将带钢以200℃/s~400℃/s的冷却速度从600℃~700℃快速冷却至200℃以下。目前的热轧带钢生产线,包括常规流程和短流程,普遍采用层流冷却装置,最大冷却速度低于150℃/s,不能满足生产此种热轧带钢的工艺要求。
发明内容
为了满足生产一类热轧带钢的工艺要求,克服现有层流冷却装置冷却速度的不足,本发明提供一种用于热轧带钢生产线的冷却装置,该冷却装置可在1000℃~20℃的温度范围内,实现200℃/s~400℃/s以上的冷却速度,能够满足生产上述钢种的工艺要求。
本发明解决其技术问题所采用的技术方案是:该装置包括分水管、紊流腔、射流喷嘴,分水管的一端设有分水管堵板,分水管下方为紊流腔,紊流腔为箱体,紊流腔侧板、紊流腔堵板均与分水管连接,在紊流腔底板上开有若干个带有螺纹的孔,在紊流腔底板上所开孔的间距为10mm~20mm,孔中安装有射流喷嘴,射流喷嘴通过紊流腔底板伸入紊流腔中,射流喷嘴的中心为通长的圆孔,内径3mm~6mm,长度为40mm~70mm,射流喷嘴的头部置于紊流腔底板的外部,与紊流腔底板接触的射流喷嘴外径带有螺纹;在分水管的底板上设有若干个分水孔,分水管通过分水孔与紊流腔内部相通;紊流腔是由两个紊流腔堵板、两个紊流腔侧板及一个紊流腔底板焊接构成的箱体,分水管堵板、紊流腔侧板、紊流腔堵板分别与分水管焊接连接,各焊接处均采用密封焊接。
本发明的工作过程:水经加压泵加压成高压水,通过分水管上的分水孔进入到紊流腔紊流后,保持高压状态,经各个射流喷嘴均匀喷出。
本发明的有益效果是:在1000℃~20℃温度范围内,可使带钢实现冷却速度为200℃/s~400℃/s的温降;采用高压及高密式喷嘴,使钢板与冷却水直接接触,形成强制对流的换热方式,与层流冷却相比,冷却速度大幅度提高;采用分水管和紊流腔分流,使各射流喷嘴喷出的高压水流流量及工作压力相同。
附图说明
图1是本发明的整体结构示意图,
图2是图1的侧视局部剖视图,
图3是图1中分水管局部剖视图,
图4是本发明中射流喷嘴结构示意图,
图5是图4的左视图;
图中1.射流喷嘴,2.紊流腔堵板,3.分水管,4.分水管堵板,5.紊流腔侧板,6.紊流腔底板,7.分水孔,8.紊流腔,9进水口。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
实施例1:如图1~图5所示,本发明结构包括分水管3、紊流腔8、射流喷嘴1,分水管3的一端设有分水管堵板4,通过焊接连接,分水管3的下方为紊流腔8,紊流腔8由两个紊流腔堵板2、两个紊流腔侧板5及一个紊流腔底板6焊接构成,紊流腔侧板5、紊流腔堵板2与分水管3之间均为焊接连接,在紊流腔底板6上开有122个带有螺纹的孔,孔的间隔为10mm,孔中安装有射流喷嘴1,射流喷嘴1的内孔径为3mm,长度为40mm,射流喷嘴1通过紊流腔底板6伸入紊流腔8中,在分水管3上设有61个分水孔7,分水管3通过分水孔7与紊流腔8内部相通;高压水通过分水管3和紊流腔8后,保持高压状态,从每个射流喷嘴1均匀喷出。
其工作过程:水经加压泵加压成高压水,高压水的流量850M3/h,压力为0.2MPa,通过分水管3上的分水孔7进入到紊流腔8中紊流后,保持高压状态,经各个射流喷嘴1均匀喷出,各射流喷嘴喷出的高压水流流量,工作压力0.2MPa,使带钢实现冷却速度为200℃/s的温降。
实施例2:如图1~图5所示,本发明结构包括分水管3、紊流腔8、射流喷嘴1,分水管3的一端设有分水管堵板4,通过焊接连接,分水管3的下方为紊流腔8,紊流腔8由两个紊流腔堵板2、两个紊流腔侧板5及一个紊流腔底板6焊接构成,紊流腔侧板5、紊流腔堵板2与分水管3之间均为焊接连接,在紊流腔底板6上开有60个带有螺纹的孔,孔的间隔为20mm,孔中安装有射流喷嘴1,射流喷嘴1的内孔径为6mm,长度为70mm,射流喷嘴1通过紊流腔底板6伸入紊流腔8中,在分水管3上设有20个分水孔7,分水管3通过分水孔7与紊流腔8内部相通;高压水通过分水管3和紊流腔8后,保持高压状态,从每个射流喷嘴1均匀喷出。
其工作过程:水经加压泵加压成高压水,高压水的流量1200M3/h,压力为0.35MPa,通过分水管3上的分水孔7进入到紊流腔8中紊流后,保持高压状态,经各个射流喷嘴1均匀喷出,各射流喷嘴喷出的高压水流流量,工作压力0.35MPa,使带钢实现冷却速度为400℃/s的温降。
实施例3:如图1~图5所示,本发明结构包括分水管3、紊流腔8、射流喷嘴1,分水管3的一端设有分水管堵板4,通过焊接连接,分水管3的下方为紊流腔8,紊流腔8由两个紊流腔堵板2、两个紊流腔侧板5及一个紊流腔底板6焊接构成,紊流腔侧板5、紊流腔堵板2与分水管3之间均为焊接连接,在紊流腔底板6上开有104个带有螺纹的孔,孔的间隔为15mm,孔中安装有射流喷嘴1,射流喷嘴1的内孔径为5mm,长度为50mm,射流喷嘴1通过紊流腔底板6伸入紊流腔8中,在分水管3上设有52个分水孔7,分水管3通过分水孔7与紊流腔8内部相通;高压水通过分水管3和紊流腔8后,保持高压状态,从每个射流喷嘴1均匀喷出。
其工作过程:水经加压泵加压成高压水,高压水的流量1000M3/h,压力为0.3MPa,通过分水管3上的分水孔7进入到紊流腔8中紊流后,保持高压状态,经各个射流喷嘴1均匀喷出,各射流喷嘴喷出的高压水流流量,工作压力0.3MPa,使带钢实现冷却速度为300℃/s的温降。
Claims (4)
1、一种用于热轧带钢生产线的冷却装置,其特征在于包括分水管、紊流腔、射流喷嘴,分水管的一端设有分水管堵板,分水管下方为紊流腔,紊流腔为箱体,紊流腔侧板、紊流腔堵板均与分水管连接,在紊流腔底板上开有若干个带有螺纹的孔,孔中安装有射流喷嘴,射流喷嘴通过紊流腔底板伸入紊流腔中,在分水管上设有若干个分水孔,分水管通过分水孔与紊流腔内部相通。
2、根据权利要求1所述的一种用于热轧带钢生产线的冷却装置,其特征在于所述的射流喷嘴的结构:其中心为通长的圆孔,孔径为3mm~6mm,长度为40mm~70mm。
3、根据权利要求1所述的一种用于热轧带钢生产线的冷却装置,其特征在于所述的在紊流腔底板上所开孔的间距为10mm~20mm。
4、根据权利要求1所述的一种用于热轧带钢生产线的冷却装置,其特征在于所述的紊流腔是由两个紊流腔堵板、两个紊流腔侧板及一个紊流腔底板焊接构成的箱体,分水管堵板、紊流腔侧板、紊流腔堵板分别与分水管焊接连接,各焊接处均采用密封焊接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100456518A CN100369685C (zh) | 2006-01-13 | 2006-01-13 | 一种用于热轧带钢生产线的冷却装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100456518A CN100369685C (zh) | 2006-01-13 | 2006-01-13 | 一种用于热轧带钢生产线的冷却装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1803327A true CN1803327A (zh) | 2006-07-19 |
CN100369685C CN100369685C (zh) | 2008-02-20 |
Family
ID=36865548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006100456518A Expired - Fee Related CN100369685C (zh) | 2006-01-13 | 2006-01-13 | 一种用于热轧带钢生产线的冷却装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100369685C (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102615114A (zh) * | 2012-03-30 | 2012-08-01 | 南京钢铁股份有限公司 | 一种制链用窄带钢的控温轧制方法 |
CN102876874A (zh) * | 2012-09-17 | 2013-01-16 | 东北大学 | 一种钢管超快速淬火冷却装置 |
CN103025487A (zh) * | 2010-07-09 | 2013-04-03 | 圣戈班金刚石工具有限责任两合公司 | 用于冷却润滑剂的喷嘴 |
CN103316934A (zh) * | 2013-06-24 | 2013-09-25 | 中冶赛迪工程技术股份有限公司 | 一种多阻尼的可分离腔体的上喷层流冷却装置 |
CN103605390A (zh) * | 2013-10-16 | 2014-02-26 | 东北大学 | 一种热连轧线超快速冷却系统的供水控制方法 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE851382A (fr) * | 1977-02-11 | 1977-05-31 | Centre Rech Metallurgique | Perfectionnements aux procedes et aux dispositifs pour combattre le bombage des cylindres de laminoir |
NL9001462A (nl) * | 1990-06-27 | 1992-01-16 | Hoogovens Groep Bv | Koelsysteem voor het koelen van een bewegende metaalband. |
JPH0788531A (ja) * | 1993-09-22 | 1995-04-04 | Nkk Corp | スプレーノズル |
CN2334511Y (zh) * | 1998-06-16 | 1999-08-25 | 冶金工业部钢铁研究总院 | 一种用于中厚钢板或钢带热轧后的冷却装置 |
JP3613133B2 (ja) * | 2000-05-09 | 2005-01-26 | Jfeスチール株式会社 | 熱延鋼帯の冷却装置 |
CN2524851Y (zh) * | 2001-08-22 | 2002-12-11 | 任吉堂 | 热轧棒线材生产线用强力穿水冷却装置 |
CN1304133C (zh) * | 2002-08-08 | 2007-03-14 | 杰富意钢铁株式会社 | 热轧钢带的冷却装置、热轧钢带的制造方法以及热轧钢带的生产线 |
CN2871045Y (zh) * | 2006-01-13 | 2007-02-21 | 东北大学 | 一种用于热轧带钢生产线的冷却装置 |
-
2006
- 2006-01-13 CN CNB2006100456518A patent/CN100369685C/zh not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103025487A (zh) * | 2010-07-09 | 2013-04-03 | 圣戈班金刚石工具有限责任两合公司 | 用于冷却润滑剂的喷嘴 |
CN103025487B (zh) * | 2010-07-09 | 2015-04-08 | 圣戈班金刚石工具有限责任两合公司 | 用于冷却润滑剂的喷嘴 |
CN102615114A (zh) * | 2012-03-30 | 2012-08-01 | 南京钢铁股份有限公司 | 一种制链用窄带钢的控温轧制方法 |
CN102876874A (zh) * | 2012-09-17 | 2013-01-16 | 东北大学 | 一种钢管超快速淬火冷却装置 |
CN102876874B (zh) * | 2012-09-17 | 2013-09-25 | 东北大学 | 一种钢管超快速淬火冷却装置 |
CN103316934A (zh) * | 2013-06-24 | 2013-09-25 | 中冶赛迪工程技术股份有限公司 | 一种多阻尼的可分离腔体的上喷层流冷却装置 |
CN103316934B (zh) * | 2013-06-24 | 2016-01-06 | 中冶赛迪工程技术股份有限公司 | 一种多阻尼的可分离腔体的上喷层流冷却装置 |
CN103605390A (zh) * | 2013-10-16 | 2014-02-26 | 东北大学 | 一种热连轧线超快速冷却系统的供水控制方法 |
CN103605390B (zh) * | 2013-10-16 | 2015-11-11 | 东北大学 | 一种热连轧线超快速冷却系统的供水控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN100369685C (zh) | 2008-02-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1803327A (zh) | 一种用于热轧带钢生产线的冷却装置 | |
CN2524851Y (zh) | 热轧棒线材生产线用强力穿水冷却装置 | |
CN2871045Y (zh) | 一种用于热轧带钢生产线的冷却装置 | |
CN201605294U (zh) | 改进结构的喷雾式挤压型材水淬冷却装置 | |
CN103643181A (zh) | 铝合金挤压材在线强冷淬火装置 | |
CN101518788A (zh) | 一种用于热轧带钢生产线的冷却设备 | |
CN103264063A (zh) | 管段水冷却装置 | |
CN102513480A (zh) | 一种油-气两相射流式润滑冷却系统 | |
CN203245206U (zh) | 管段水冷却装置 | |
CN102950267A (zh) | 一种连铸用喷淋装置 | |
CN201394585Y (zh) | 一种用于热轧带钢生产线的冷却设备 | |
CN203034075U (zh) | 一种新型反向铝挤压机用淬火装置 | |
CN101244411A (zh) | 一种自清洗气水雾化喷嘴 | |
CN108676981A (zh) | 一种铝合金挤压材多功能在线淬火系统 | |
CN207904324U (zh) | 一种环形淬火装置 | |
CN205603637U (zh) | 一种淬火装置上风箱 | |
CN108070693A (zh) | 一种弧面多角度阵列射流喷嘴及其应用 | |
CN107442607B (zh) | 一种防止中厚板产品矫直凹坑缺陷的装置及生产方法 | |
CN113215377A (zh) | 一种铝棒材挤压在线穿水淬火装置及方法 | |
CN209222911U (zh) | 一种工字铝型材在线水冷挤压成型装置 | |
CN202701179U (zh) | 一种适用于高线夹送辊后弯管的冷却装置 | |
CN203076547U (zh) | 结晶器冷却装置 | |
CN204747072U (zh) | 立轧轧槽专用的冷却装置 | |
CN211199253U (zh) | 一种高炉熔渣粒化的高压喷水装置 | |
CN220468052U (zh) | 一种热处理淬火机冷却用防堵塞喷嘴 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |