CN1776195A - Three-phase foam preparing system for preventing coal self-ignition - Google Patents

Three-phase foam preparing system for preventing coal self-ignition Download PDF

Info

Publication number
CN1776195A
CN1776195A CN 200510095213 CN200510095213A CN1776195A CN 1776195 A CN1776195 A CN 1776195A CN 200510095213 CN200510095213 CN 200510095213 CN 200510095213 A CN200510095213 A CN 200510095213A CN 1776195 A CN1776195 A CN 1776195A
Authority
CN
China
Prior art keywords
foam
valve
preparing system
phase
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510095213
Other languages
Chinese (zh)
Other versions
CN100429380C (en
Inventor
王德明
秦波涛
任万兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CNB2005100952138A priority Critical patent/CN100429380C/en
Publication of CN1776195A publication Critical patent/CN1776195A/en
Application granted granted Critical
Publication of CN100429380C publication Critical patent/CN100429380C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A three-phase foam preparing system for preventing coal spontaneous combustion consists of agitator, foam generator, filter connected with agitator and foam generator, air inlet in wall of foam generator, nitrogen injection device, air compressor, bypass pipe on slurry injection pipe. The prepared slurry is filtered then pressed into air or nitrogen, foaming to form air-liquid-solid three-phase foam. Said invention has high foaming efficiency.

Description

A kind of three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal
One, technical field
The present invention relates to the three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal with a kind of, be particularly useful for the spontaneous combustion and the fire extinguishing of mine control coal.
Two, background technology
Spontaneous combustionof coal is one of main natural calamity of China's mine.Engineers and technicians in this field have developed the three-phase froth device of spontaneous combustionof coal for this reason, be applied to on-the-spot actual, and obtained effect preferably, but this device can only stir the generation three-phase froth, be not a whole set of preparation system that forms three-phase froth, need other auxiliary ligand complete equipment when therefore using.In addition, because the particular surroundings and the condition in colliery contain impurity or big solid particle in the slurries, the plugging phenomenon usually takes place in device, causes to form three-phase froth continuously.Because the defective of above two conditions, three-phase froth is restricted in the promoting the use of of mine.
Three, summary of the invention
In view of the deficiency of prior art, the invention provides with air or nitrogen and be gas phase, simple in structure, be difficult for the three-phase foam preparing system of the control spontaneous combustionof coal of plugging.
A kind of three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal of the present invention, it comprises agitator and foam maker, it also comprises the strainer that is linked in sequence with agitator and foam maker, and the tube wall of described foam maker is provided with air inlet port, and air inlet port is connected with by air inlet pipe and annotates nitrogen machine or mining air compressor machine; The described Grouting Pipe that is connected the filter inlet place is provided with bypass pipe, and the bypass pipe afterbody links to each other with the siphunculus of foam maker outlet.
A kind of three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal of the present invention, described strainer is made of communicating pipe and the screen pack of establishing in communicating pipe, communicating pipe, the bottom was provided with the sewage draining exit by valve control, and communicating pipe is provided with pressure meter, and the mesh size of screen pack is 50mm 2~80mm 2The entrance of described strainer is provided with valve, and the exit of the foam maker that is communicated with it is provided with valve; The entrance and the exit of described bypass pipe are equipped with valve; The air inlet port place of described foam maker is sequentially with non retern valve, pressure meter and valve.
A kind of three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal of the present invention is best suited for and puts out fast under the coal mine and the high-efficiency prevention and control Conflagration Caused by Coal Self-ignition.Adopt strainer, agitator and foam maker to be linked in sequence, air inlet port is set on foam maker, the air that can produce with air compressor machine is as gas phase, also can be with nitrogen as the vapor phase production three-phase froth, be not subjected to the restriction of nitrogen resource, the three-phase froth coefficient of foaming can reach 30~100 times after using air, thereby cost is reduced significantly.The Grouting Pipe that links to each other with strainer is provided with bypass pipe, and the bypass pipe afterbody links to each other with the siphunculus of foam maker outlet, can be used as auxiliary slurry pipeline excessively with this.Strainer in this system can effectively be removed impurity in the slurries and big solid particle; The pressure meter that is provided with can clearly show the pressure in each pipeline; Non retern valve can be avoided flowing in the compressed air line owing to the little slurries that make of pressure of gas; Whole system is simple in structure, can compressed air or nitrogen be gas phase, it is easy to use, and is effective, the volume that takes up room is little, has practicality widely in the present technique field.
Four, description of drawings
Accompanying drawing is the three-phase foam preparing system schematic diagram that the present invention is used to prevent and treat spontaneous combustionof coal.
Among the figure: 1-Grouting Pipe 2-valve 3-strainer 4-screen pack 5-sewage draining exit 6-bypass pipe 7-pressure meter 8-agitator 9-foam maker 10-valve 11-non retern valve 12-air inlet pipe 13-air compressor machine or nitrogen making machine 14-valve 15-pressure meter 16-valve
Five, the specific embodiment
Below in conjunction with accompanying drawing one embodiment of the present of invention are described further:
A kind of three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal of the present invention, it mainly is made up of strainer 3, agitator 8, foam maker 9 and bypass pipe 6, bypass pipe 6 is connected the entrance that Grouting Pipe 1 is connected with strainer 3, bypass pipe 6 afterbodys link to each other with the siphunculus of foam maker 9 outlets, and the entrance of bypass pipe 6 and exit are equipped with valve 10.Strainer 3, agitator 8 and foam maker 9 are linked in sequence, and the entrance of strainer 3 is provided with valve 2, and strainer 3 is made of communicating pipe and the screen pack of establishing in communicating pipe 4, and strainer 3 external diameters are 20mm~400mm, and the mesh size of built-in screen pack 4 is 50mm 2~80mm 2The communicating pipe bottom of screen pack 4 front portions is provided with the sewage draining exit 5 by valve control, communicating pipe the exit be provided with pressure meter 7.Flow valve 14 is equipped with in the exit of foam maker 9, and the tube wall of foam maker 9 is provided with an air inlet port, and air inlet port connects by air inlet pipe 12 annotates nitrogen machine or mining air compressor machine 13, and the air inlet port place is equipped with non retern valve 11, pressure meter 15 and by-pass valve control 16 in proper order.
When operate as normal, close the valve 10 at bypass pipe 6 two, control valve 2 is controlled the slurry amount size in the grouting pipeline 1, the slurry stream for preparing in the grouting pipeline is through behind the filter 3, remove impurity and big solid particle, enter agitator 8 and foam maker 9, open valve 16, open air compressor 13 and in foam maker 9, be pressed into compressed air or nitrogen by air inlet pipe 12, it is the gas-liquid-solid three-phase froth of gas phase that the slurries foaming is formed with nitrogen or air, demonstration according to pressure meter 15, it is excessive or when not needing to annotate three-phase froth to clear up in strainer 3 or the slurry pipe line pressure if desired, open the valve 10 on the bypass pipe 6, close the valve 2 of strainer 3 and the valve 14 in foam maker 9 exits, slurries flow through from bypass pipe 6.

Claims (6)

1. three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal, it comprises agitator (8) and foam maker (9), it is characterized in that: it also comprises the strainer (3) that is linked in sequence with agitator (8) and foam maker (9), the tube wall of described foam maker (9) is provided with air inlet port, and air inlet port is connected with by air inlet pipe (12) and annotates nitrogen machine or mining air compressor machine (13); The Grouting Pipe (1) that described strainer (3) entrance connects is provided with bypass pipe (6), and bypass pipe (6) afterbody links to each other with the siphunculus of foam maker (9) outlet.
2. the three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal according to claim 1, it is characterized in that: described strainer (3) is made of communicating pipe and the screen pack of establishing in communicating pipe (4), communicating pipe, the bottom was provided with the sewage draining exit (5) by valve control, was provided with pressure meter (7) communicating pipe.
3. the three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal according to claim 2 is characterized in that: the mesh size of described screen pack (4) is 50mm 2~80mm 2
4. the three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal according to claim 1 and 2 is characterized in that: the entrance of described strainer (3) is provided with valve (2), and the exit of the foam maker that is communicated with it (9) is provided with valve (14).
5. the three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal according to claim 1 is characterized in that: the entrance of described bypass pipe (6) and exit are equipped with valve (10).
6. the three-phase foam preparing system that is used to prevent and treat spontaneous combustionof coal according to claim 1 is characterized in that: the air inlet port place of described foam maker (9) is sequentially with non retern valve (11), pressure meter (15) and valve (16).
CNB2005100952138A 2005-10-27 2005-10-27 Three-phase foam preparing system for preventing coal self-ignition Expired - Fee Related CN100429380C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100952138A CN100429380C (en) 2005-10-27 2005-10-27 Three-phase foam preparing system for preventing coal self-ignition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100952138A CN100429380C (en) 2005-10-27 2005-10-27 Three-phase foam preparing system for preventing coal self-ignition

Publications (2)

Publication Number Publication Date
CN1776195A true CN1776195A (en) 2006-05-24
CN100429380C CN100429380C (en) 2008-10-29

Family

ID=36765875

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100952138A Expired - Fee Related CN100429380C (en) 2005-10-27 2005-10-27 Three-phase foam preparing system for preventing coal self-ignition

Country Status (1)

Country Link
CN (1) CN100429380C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182497A (en) * 2011-03-21 2011-09-14 西安西科煤矿安全通风防灭火研究所有限公司 Foam preparation device for preventing and extinguishing coal mine fire
CN103161166A (en) * 2013-03-13 2013-06-19 长江三峡通航管理局 Wind-guiding chemical grouting device and grouting method of the same
CN103388483A (en) * 2012-05-08 2013-11-13 中国矿业大学(北京) Coal mine underground movable multi-component foam fire extinguishing system
CN103586981A (en) * 2013-11-08 2014-02-19 中国矿业大学 Mine foam slurry mixer
CN103599607A (en) * 2013-10-22 2014-02-26 中国矿业大学 Apparatus for generating solidified foam fluid for coal mine fire preventing and extinguishing
CN104514577A (en) * 2014-12-12 2015-04-15 中国矿业大学 Method for efficiently treating spontaneous ignition of remaining coal in large area goaf of shallow-buried coal bed
CN109057848A (en) * 2018-08-09 2018-12-21 湖南科技大学 The ventilation of Extra-long Highway Tunnel closed cycle divides wind to determine method than number maximum
CN113117281A (en) * 2021-03-09 2021-07-16 西南石油大学 Basalt three-phase foam extinguishing agent and preparation method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB681479A (en) * 1949-02-24 1952-10-22 Minimax Ag Apparatus for the production of air foam and air foam fire-extinguishing installations
SU1638315A1 (en) * 1988-11-04 1991-03-30 Всесоюзный Научно-Исследовательский И Проектно-Конструкторский Институт Охраны Окружающей Природной Среды В Угольной Промышленности Method of foam preparation
US6726849B2 (en) * 2002-02-01 2004-04-27 Construction Research & Technology Gmbh Method of dusting coal mine surfaces
CN1411876A (en) * 2002-12-02 2003-04-23 中国矿业大学 Technique for resisting coal self-combustion and extinguishing fire
CN2841966Y (en) * 2005-10-27 2006-11-29 中国矿业大学 Three-phase foam preparing apparatus for preventing and treating coal self-ignition

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102182497A (en) * 2011-03-21 2011-09-14 西安西科煤矿安全通风防灭火研究所有限公司 Foam preparation device for preventing and extinguishing coal mine fire
CN103388483A (en) * 2012-05-08 2013-11-13 中国矿业大学(北京) Coal mine underground movable multi-component foam fire extinguishing system
CN103161166A (en) * 2013-03-13 2013-06-19 长江三峡通航管理局 Wind-guiding chemical grouting device and grouting method of the same
CN103161166B (en) * 2013-03-13 2015-02-25 长江三峡通航管理局 Wind-guiding chemical grouting device and grouting method of the same
CN103599607B (en) * 2013-10-22 2016-02-24 中国矿业大学 A kind of cured foam fluid generating device for preventing and extinguishing fire of coal mine
CN103599607A (en) * 2013-10-22 2014-02-26 中国矿业大学 Apparatus for generating solidified foam fluid for coal mine fire preventing and extinguishing
CN103586981A (en) * 2013-11-08 2014-02-19 中国矿业大学 Mine foam slurry mixer
WO2015067065A1 (en) * 2013-11-08 2015-05-14 中国矿业大学 Mine foam slurry mixer
CN104514577A (en) * 2014-12-12 2015-04-15 中国矿业大学 Method for efficiently treating spontaneous ignition of remaining coal in large area goaf of shallow-buried coal bed
CN104514577B (en) * 2014-12-12 2016-04-20 中国矿业大学 The method of coal seam large area spontaneous combustion in goaf is hidden in a kind of efficient improvement shallow embedding
AU2015361774B2 (en) * 2014-12-12 2017-10-05 China University Of Mining And Technology Method for efficiently treating spontaneous ignition of remaining coal in large area goaf of shallow-buried coal bed
CN109057848A (en) * 2018-08-09 2018-12-21 湖南科技大学 The ventilation of Extra-long Highway Tunnel closed cycle divides wind to determine method than number maximum
CN109057848B (en) * 2018-08-09 2019-12-06 湖南科技大学 method for determining maximum value of wind ratio number of closed type circulation ventilation of extra-long road tunnel
CN113117281A (en) * 2021-03-09 2021-07-16 西南石油大学 Basalt three-phase foam extinguishing agent and preparation method thereof

Also Published As

Publication number Publication date
CN100429380C (en) 2008-10-29

Similar Documents

Publication Publication Date Title
CN100429380C (en) Three-phase foam preparing system for preventing coal self-ignition
CN2841966Y (en) Three-phase foam preparing apparatus for preventing and treating coal self-ignition
CN103527927A (en) Skid-mounted natural gas gathering and transportation device
CN202746938U (en) Ski-mounted gas collecting, metering and pipe cleaning device
CN201027546Y (en) Mining-used mobile gas variable pumping station
CN102230394B (en) Secondary hole sealing system for improving coal bed gas extraction concentration
CN102373942A (en) Air curtain and water mist linked system for preventing and controlling dust on comprehensive excavation surfaces
CN202767967U (en) Self-circulation gas lift drainage gas recovery process device suitable for well outside station
CN1740628A (en) Coal mine gas and fine spray mixed conveying method and apparatus
CN202746937U (en) Skid-mounted natural gas gathering and transportation device
CN105065908B (en) A kind of sulfur-containing gas gas collection integrated device
CN113982758A (en) Gas supply system, gas supply method, and equipment equipped with turbine engine
CN204962299U (en) User's gas pressure regulating cabinet system
CN108756836A (en) A kind of underground coal mine fluid injection nitrogen permeability-increasing gas pumping system
CN208845159U (en) A kind of extraction equipment for coal mine bet nitrogen anatonosis
CN206802758U (en) With gas collection, separation, metering and pigging ability the defeated sledge of coal bed gas collection
CN201672252U (en) Emptied natural gas injection recovery device for gas gathering station
CN202430106U (en) Natural gas supply guaranteeing system of glass tank furnace
CN201618472U (en) Gas-liquid separating device of well head of gas well
CN201288938Y (en) Compressed natural gas allotter
CN203905897U (en) Mining no-clean pneumatic grouting device
CN202348316U (en) Air screen and water mist linkage system for preventing fully mechanized excavation face dusts
CN202613048U (en) Gas transmission system for natural gas pipeline
CN203075859U (en) Foam generator for preventing and extinguishing fire
CN215891996U (en) Direct-buried underground pressure regulating box

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Xuzhou Anyun Mining Technology Co., Ltd.

Assignor: China University of Mining & Technology

Contract record no.: 2010320001131

Denomination of invention: Three-phase foam preparing system for preventing coal self-ignition

Granted publication date: 20081029

License type: Common License

Open date: 20060524

Record date: 20100920

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081029

Termination date: 20121027