CN1766400A - Method for reinforcing defective pipeline and composite material therefor - Google Patents

Method for reinforcing defective pipeline and composite material therefor Download PDF

Info

Publication number
CN1766400A
CN1766400A CN 200410084164 CN200410084164A CN1766400A CN 1766400 A CN1766400 A CN 1766400A CN 200410084164 CN200410084164 CN 200410084164 CN 200410084164 A CN200410084164 A CN 200410084164A CN 1766400 A CN1766400 A CN 1766400A
Authority
CN
China
Prior art keywords
component
defective
epoxy resin
composite material
curing agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410084164
Other languages
Chinese (zh)
Other versions
CN100363678C (en
Inventor
白真权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Tubular Goods Research Institute
Original Assignee
China National Petroleum Corp
CNPC Tubular Goods Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, CNPC Tubular Goods Research Institute filed Critical China National Petroleum Corp
Priority to CNB2004100841643A priority Critical patent/CN100363678C/en
Publication of CN1766400A publication Critical patent/CN1766400A/en
Application granted granted Critical
Publication of CN100363678C publication Critical patent/CN100363678C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pipe Accessories (AREA)

Abstract

The invention discloses a defect pipe reinforced method and composite material, which is characterized by the following: adapting reinforced composite material, defect filling material and interlaminar adhesive agent to restore and reinforce the defect position; disposing the defect surface only; filling the defect position with the reinforced filling material; wrapping the reinforced film on the pipe; adapting interlaminar adhesive agent and hardening agent among layers, wherein the reinforced composite material piece is high-strength glass fiber unidirectional cloth or carbon fiber unidirectional cloth, which is composed of 593 hardening agent or triethanolamine hardening agent, epoxide-resin glue of acrylate liquid rubber and interlaminar adhesive agent. The invention can restore the defect pipe of more than half thickness without welding, leakage and cracking, which displays normal pipe after restoring the explosion-hole.

Description

A kind of method of reinforcing defective pipeline and composite material thereof
Technical field
The present invention relates to a kind of composite material that utilizes realizes the outer wall corrosion defective of pipe-line is repaired method and composite material thereof with the reinforcing defective pipeline of reinforcement.
Background technique
Contain the outer wall corrosion defective and be pipe-line one of ubiquitous defect type in the process under arms, the existence of these defectives and development thereof can have a strong impact on the Security of pipeline operation, and how to carry out renovation reinforced effectively to this class corrosion default is to guarantee pipeline safety operation and the key technology measure that improves the oil-gas gathering and transportation benefit.To the repairing of this class defective, at present domestic main employing field welding is mended scar, oversleeve or section and is cut off the method for welding new pipeline section again, but because (1) welding causes the tough brittle transition temperature of the pipeline section of delivery pipe repairing to reduce, reduces the Security of pipeline operation; (2) high renewal expense; (3) easily produce problems such as hydrogen embrittlement, residual stress in the welding process; (4) welding operator technical merit is required height, need carry out necessary scene flaw detection after the welding; (5) conveyance conduit needs out of servicely during repairing sometimes, and oil gas needs emptying in the pipe, tracheae line particularly, thereby cause the tremendous economic loss, so to the reparation of outer wall corrosion defective conveyance conduit must development of new the repairing enhancement technique.The method that adopts " firmly special " board glass fibre reinforced plastics reinforcement sheet material pipe-repairing defective that CLOCK SPRING COMPANY L P (US) company produces is abroad arranged, and (this product patent number is: US5683530), but this method cost higher (about 500 dollars of every reparation one place's defective cost), intensity is on the low side, and the product key component easily lost efficacy (storage life is half a year), failed to apply.Domesticly launching some researchs aspect glass fibre reinforced plastics reinforcement technology and the product development, but in general, the glass fibre reinforced plastics reinforcement is repaired research work and is carried out lessly, and the performance of some products and renovation technique instability, intensity are difficult to satisfy the requirement of line transportation pressure.And polymer resin that the technology of fw frp reinforcement is outside adopted and the matching aspect between pipeline material and resin and reinforcing fiber, comprise not further investigation as yet such as expansion coefficient, Young's modulus and intensity, this has also influenced glass fibre reinforced plastics reinforcement technology greatly and has applied.For defective pipeline, the thickness of outer fw frp is by rule of thumb more than 10mm, and then consumption is too much to the pipeline of little defective, causes the unnecessary raising of rehabilitation expense; To the pipeline of big defective, then do not reach the purpose that safety is repaired.
Summary of the invention
The objective of the invention is at containing outer wall corrosion defective pipeline rehabilitation reinforcement problems such as volume type defective, develop the renovation reinforced used composite material of multicomponent defect of pipeline, on mechanics, chemical property, have good matching, the bearing capacity when making defective pipeline meet or exceed zero defect between each component of this composite material and between composite material and steel pipe.
1. be raw material with some other auxiliary material such as epoxy resin and glass fibre, carbon fiber and interlaminated adhesive, curing agent, thixotropic agent, obtain having epoxy resin and the glass fiber compound material sheet material or the carbon fiber composite sheet of higher-strength, the high tensile of glass fiber compound material sheet material can reach 903MPa, and the carbon fiber composite sheet maximum pulling strength can reach 1480Mpa.
Epoxy resin and glass fibre or carbon fiber composite sheet material are to be made of following raw material and proportioning:
(1) epoxy resin adds 593 curing agent or triethanolamine curing agent, with the flexural strength of epoxy resin reinforcing agent 651 more as can be known, the former flexural strength height, and viscosity is little, environmental protection and economy, select 593 to be curing agent for epoxy resin, and its Recipe has been carried out optimizing research by following formula.
A=(molecular weight/active hydrogen number) * epoxide number
Wherein a is the consumption of per 100 parts of epoxy resin 593.Consider that epoxy resin or triethanolamine curing agent and 593 raw materials are industrial goods, actual amount when combination property is best should be about 30phr, curing process is 30 ℃/4h+100 ℃/2h (reprocessing), combination property: tensile strength is that 63.4Mpa, stretch modulus are that 2.53Gpa, fracture rate elongation are 2.92%, flexural strength is that 100Mpa, impact strength are that 22.1KJ/m2, heat distortion temperature are 65 ℃.
(2) since epoxy resin to add toughness indexs such as impact strength that 593 curing agent and epoxy resin adds the triethanolamine curing agent, fracture elongation lower, and the toughness of the body material key factor of decision tree resin-based composite tensile strength just.Therefore acrylic liquid rubber has good toughening effect to epoxy resin by studying as can be known, and addition is that the liquid rubber of 5-15phr carries out toughening modifying in two systems.Both impact strengths have improved respectively about 20% and 120% as a result.
(3) composite material sheet preparation process is: the preparation of reinforcing material cutting and resin adhesive liquid, patrix shop layer (control length, a thickness and a width), gluing (epoxy resin-base), with the mould rolling, according to setting the curing in the heating plant frock of curing process temperature, reprocessing, mould unloading, repairing corner, encapsulation etc.
(4) kind of the kind of resin matrix and curing agent is very big to the performance of composites influence in the material preparation, epoxy resin is than the better effects if of unsaturated polyester resin as matrices of composite material, and flexural strength and tensile strength are corresponding to have improved 22.5% and 25.7%; 593 curing agent are better than 651 curing agents, and the flexural strength of composite material and tensile strength have improved 32.4% and 84.6%; Epoxy resin-593 (30phr)/S-glass fibre unidirectional cloth composite material combination property the best, room temperature tensile intensity is that 903Mpa, flexural strength are 810Mpa, to cut intensity be 51.5Mpa to layer, cryogenic tensile intensity raises to some extent, when temperature is 0~5 ℃, tensile strength reaches 1029Mpa, and stretch modulus reaches 39.3GPa.
(5) matching performance of strengthening course and steel pipe after the reinforcement: the resiliently deformable of the performance test shows pipeline that expands with heat and contract with cold in temperature is 5 ℃~95 ℃ scopes can not have influence on the combination force of strengthening course and matrix.
(6) tensile strength values of carbon fiber one-way cloth reinforced composite effective than glass fibre unidirectional cloth reinforced composite materials is that 1480Mpa, flexural strength are that 930Mpa, interlaminar shearing strength are 51.Mpa for epoxy resin-593/ carbon fiber one-way cloth composite material tensile strength.
2. composite material interlayer adhesive: in the time of 25 ℃, be 30 minutes curing time, and in the time of 18 ℃, be 45 minutes curing time.
(1) the base-material kind of interlaminated adhesive is an epoxy resin, and curing agent is 593; Prepared two component room curing interlaminated adhesives: the A component is epoxy resin (30phr), acrylic liquid rubber (10phr), thixotropic agent aerosil (0.62phr); The B component is curing agent 593 (30phr), promoter 2,4,6-three [(dimethylamino) methyl] phenol (15phr); Press the A component: B component=100: 26 (weight ratio) is mixed.Curing process is 18 ℃/12h, and 18 ℃ of test tensile shear strengths (aluminium-aluminium) are 26.0Mpa; Tensile shear strength (glass steel-glass reinforced plastic) is 16.0Mpa; Tensile shear strength (steel-steel) is 16.8Mpa.
(2) adhesive solidification temperature: gel time is 30 minutes during 60 ℃ of middle temperature, and gel time is 66 minutes during 30 ℃ of room temperatures, and gel time is 240 minutes in the time of 15 ℃, and gel time is 400 minutes in the time of 10 ℃.By regulating promoter 2,4,6-three [(dimethylamino) methyl] phenol (DMP-30) consumption, the gel solidification time of the cured adhesive that can regulate the room temperature: gel time is between 60~30 minutes in the time of 30 ℃, 15 ℃ 240~110 minutes just between, in the time of 10 ℃ between 400~150 minutes.
3. the defective packing material is to adopt 593# curing agent, ethanolamines epoxy resin, and silica, quartz flour, titanium dioxide etc. adopt bisphenol A modified as auxiliary packing simultaneously.
(1) the loading transfer material is two components system, and the A component is epoxy resin (100 parts), filler quartz flour flicker stone (200 parts), thixotropic agent aerosil (5 parts); The B component is curing agent 593 (100 parts), altax P-30 (40 parts).The flexural strength of transmitting material is that 41.0Mpa, impact strength are 6.KJ/m 2, draw that to cut strength steel-steel be 7.9Mpa.Full-scale hydraulic bursting test result shows that pipeline is after surrender and breaking, and the variation of loading transfer material is very little, shows good toughness and intensity.
4. determined and contained defective steel pipe reinforcement process parameter, on-the-spot reinforcing construction technical specification etc.
(1) preparation of construction
Preparation of construction work mainly comprises to be carried out required all kinds of reinforcing materials of reinforcement repair and construction auxiliary equipment, contains the measurement of the excavation cleaning of defective pipeline section and defective and record etc.Each construction stage material requested, facility are as shown in table 1 below.Except type of material, also should determine the specification and the quantity (record also capable of taking pictures in case of necessity) of material therefor, and confirm the quality of product according to supply of material proof and quality of product certificate.
Table 1 material that each construction stage uses, instrument Schedule
Operation Material Instrument and other supporting facility
The steel tube surface cleaning Gasoline, special-purpose derusting cleaning liquid, acetone etc. Labour protection apparatus such as jetting tool, rubber gloves, protective spectacles
The reinforcement area identification Autoadhesion adhesive tape Marking tool such as plummet, marking pen etc.
Defective is filled The special-purpose putty of filling Rubber spatula, measurement instrument, rubber gloves, protective spectacles
The primer brushing Special-purpose adhesive Adhesive application roller, plastic container, measurement instrument, Hygrothermograph, hand blender, rubber gloves, protective spectacles etc.
Out-of-flatness face is repaired The special-purpose putty of filling Rubber spatula, rubber gloves, protective spectacles
The glass fibre reinforced plastics roll film The glass fibre reinforced plastics roll film, Glass fibre reinforced plastics roll film support, adhesive application roller, Sheng glue hold
Volume pastes and coats Special-purpose adhesive Device, measurement instrument, Hygrothermograph, hand blender, rubber gloves, protective spectacles, glass fibre reinforced plastics roll film parting tool etc.
Fastening before strengthening course solidifies Autoadhesion adhesive tape Fastened tools
The strengthening course end face is filled and led up coating Adhesive, pyrocondensation belt Adhesive application roller, plastic container, measurement instrument, heating tool, rubber gloves, protective spectacles etc.
The site of storage of material should be avoided the daylight direct irradiation, and water and contamination by dust can not be arranged.Should notice that material deposits the temperature conditions in place because fill materials such as putty, adhesive except meeting is subjected to the influence of construction temperature, deposit the place variation of temperature can the time material great changes will take place working life.In addition, construction equipment and cleaning solvent etc. will keep fire away.
In addition, if necessary, before construction, begin to repair after the pipeline operating pressure need being reduced, so not only help operator's safety, and after the pipeline operating pressure returns to normal condition, can make pipeline and glass fibre reinforced plastics strengthening course in conjunction with tightr, help the transmission of load.
(2) steel tube surface cleaning
Big and humidity is greater than 75% o'clock at dust storm, as do not have the reliable protective measures should not the brushing primer.In order to guarantee best bond effect, the removing surface operation of steel pipe is one step of key that reinforcement is repaired.Be repaired the surface and should guarantee not have oil, anhydrous, remove impurity such as the dirt of rejected region and scale fully, expose the steel pipe body.
(3) reinforcement zone line sign
For guaranteeing that follow-up defective filling, primer brushing and glass fibre reinforced plastics roll film are coated on the tram, need determine the reinforcement repair region according to rejected region, defective effect district size, and adopt line or autoadhesion adhesive tape that the reinforcement zone is marked.Should adopt eye-catching color to indicate.
(4) adopt special-purpose defective packing material filling defect
If the defective of steel tube surface is not filled, after the glass fibre reinforced plastics roll film was coated on the steel pipe, rejected region can not contact with strengthening course, and load can not evenly be delivered on the strengthening course, and then rejected region still can exist stress to concentrate, and does not reach reinforcing effect.
(5) brushing primer
Defective fill putty reach dry tack free and confirm the steel tube surface drying, pollution-free after, can begin the brushing primer.
(6) out-of-flatness face is repaired
At primer with after filling the putty gel, rejected regions such as sagging or other depression, cavity are repaired.
(7) glass fibre reinforced plastics roll film volume pastes and coats
After the primer surface gel, (harden) with the finger contact, confirming does not have moisture and dust to adhere to, glass fibre reinforced plastics roll film volume is attached to the defect of pipeline position that mark is good, in volume subsides coating process, is coated with between glass fibre reinforced plastics roll film layer and the layer and brushes special-purpose adhesive with roller.When flaw size to be repaired surpasses the limit reparation size of glass fibre reinforced plastics web material, can carry out continuous winding reinforcing reparation, the spacing between adjacent roll film is exceeded so that overlap joint not to take place, and fill with interlaminated adhesive in the space between roll film.
(8) the strengthening course end face is filled and led up the repaired mouth of coating and overlapping part
The sloping is smeared in the glue spatula, treat that surface of pressure-sensitive adhesive solidifies after, carry out repaired mouth with head position, thermal shrinkage type adhesive tape opposite end.
(9) backfilling of pipe canal
After treating that strengthening course solidifies substantially, can carry out backfill to pipe trench and handle.
(10) carry out construction note
The site operation record comprises on-the-spot preceding repair engineering, method of construction, weather condition, the check of temperature and humidity, enforcement and the some other necessary item etc. of mending.A complete construction note is very important to the manager of pipeline operation, and it helps the progress that the manager holds engineering, determine whether to have or not abnormal conditions and finish as construction after reference etc.Therefore in each mending course and repairing all need to carry out abundant construction note after finishing.Essential record comprises:
1. the main contents of reinforcement repair, method of construction and process thereof;
2. quality inspection record;
3. reprocessing record should comprise and reprocess position, reason, method, quantity;
4. other relevant data data.
(11) safety control notice
Any one link in work progress all needs to observe some necessary security clauses.Adopt the glass fibre reinforced plastics roll film to repair defective pipeline, material therefor comprises multiple materials such as special-purpose surface cleaning agent, defective filling putty, special-purpose adhesive, glass fibre reinforced plastics reinforcement sheet material, therefore for construction safety, need the operator to be familiar with the feature of used various materials, note execution conditions and operating environment.
Adopt the renovation reinforced product of composite material of the present invention the pipeline reparation that contains different defectives to be had following advantage with technology:
(1) adopts the renovation reinforced product of being developed of composite material the pipeline that contains different defectives to be repaired, the pipeline bearing capacity is enhanced, reach the bearing capacity under the trouble-free state with technology; The degree of depth is reached pipe thickness defective over half, after adopting special-purpose packing material filling and composite material reinforcement sheet material to repair, seepage and cracking do not take place in rejected region during the full-scale hydraulic pressure demolition of pipeline, seam broken appears at pipeline zero defect position, the description defect place suffered stress of pipeline is lower than pipeline zero defect place stress value, that is the fault location bearing capacity is greater than zero defect pipeline bearing capacity.
(2) adopt the composite material roll film that defective pipeline is repaired and reinforcement, the main material of its reinforcement can machine indoor.Only need during reinforcement rejected region is carried out suitable surface treatment, again rejected region is filled and led up with the reinforcement packing material, then the reinforcement roll film is wrapped on the pipeline, adopt the sticking and curing agent of special-purpose adhesive between sheet layer, need not welding, need not special-purpose machines and tools, operation gets final product.
(3) the used performance of composites (table 2 and table 3 and Fig. 1) of reinforcement.
Table 2 epoxy resin-593#/carbon fiber composite performance
Project Epoxy resin+593#
Carbon fiber (T-300) Carbon fiber (T-700S) unidirectional cloth
Tensile strength (MPa) flexural strength (MPa) layer is cut intensity (MPa) Vf (%) 623.0 1063.0 39.8 40 1480.0 930.0 44.1 51.1
Table 3 epoxy resin-593#-ethanolamine/glass fiber compound material performance
Project Epoxy resin+25phr593#+5phr ethanolamine
Carbon fiber (T-300) Carbon fiber (T-700S) unidirectional cloth
Hot strength (MPa) bending strength (MPa) layer is cut intensity (MPa) Vf (%) cryogenic tensile intensity (MPa) (0 ~ 5 ℃) cryogenic tensile modulus (GPa) (0 ~ 5 ℃) 623.0 1063.0 39.8 40 1331.0 1138.0 70.0 46.9 1484.0 101.3
Fig. 1 is the bend tension intensity and the resin matrix system graph of a relation of carbon fiber one-way composite material.As can be seen from Figure 3, the tensile strength values of composite material has improved much than the tensile strength of glass fibre unidirectional cloth reinforced composite materials, and for epoxy resin-593 system, tensile strength has improved 63.9%, reach 1480Mpa, flexural strength is 930Mpa, to cut intensity be 51.Mpa to layer.
(2) performance of loading transfer material
Test and select by experiment suitable kind and consumption (performance index see Table 4) at the important indicators such as impact strength, shear strength, adhesion and workability that improve material.
Table 4 loading transfer material performance index
Test event Performance Test method
Solid content (%) 96.3 GB/T1725
Preliminary sclerosis (minute) 10 ℃ 160 Actual measurement
Sclerosis fully (minute) 10 ℃ 220 Actual measurement
Preliminary sclerosis (minute) 25 ℃ 100 Actual measurement
Sclerosis fully (minute) 25 ℃ 150 Actual measurement
Flexural strength (Mpa) 41.0 GB/T2570-1995
Impact strength (KJ/m 2) 6.2 GB/T2571-1995
Draw and cut intensity (MPa) [steel-steel] 7.9 GB/7124-86
100 ℃ of heat resistances 24 hours No change GB/T1725
(4) optimize glass fibre reinforced composion sheet material and steel pipe matching performance
When the matching performance of test sheet material and pipeline to be repaired, adopt the sheet material coil diameter greater than outer diameter tube to be wound, twining used roll film specification is that 1mm is thick, the test outer diameter of steel pipes is 105mm, probe temperature is 5 ℃~95 ℃, testing procedure is: the sample that is cured is placed 95 ℃ of hot water, soaked 12 hours, place 5 ℃ cold water after the taking-up immediately, place hot water to take out after 10 minutes afterwards again and immerse cold water, 3 times so repeatedly, observe combining and the situation of change of strengthening course of strengthening course and body.The result shows that the combination force between strengthening course and steel pipe matrix does not have any variation before and after the test.
(5) mechanical property of adhesive
Epoxy resin-diethylenetriamine base glycerol n-butyl ether system solidfied material toughness is relatively poor, in splicing and solidification process, can produce bigger internal stress, cause the tensile shear strength of adhesive lower, three kinds of material test piece tensile and shear property test values see 5 after adding acrylic liquid rubber plasticizer, add promoter and thixotropic agent simultaneously for improving workability.
Table 5 adhesive tensile and shear property
(6) adhesive antikathode stripping performance
The Bond of epoxy resin+593+ thixotropic agent as glass fibre reinforced plastics reinforcement sheet material and steel pipe adopted in test, by antikathode stripping ability between Canadian standard CAN/CSA-Z245.21-M92 test adhesive layer and body.Test conditions and the results are shown in Table 6.
The antikathode stripping performance of table 6 adhesive
Test event Test conditions Code requirement Test result Reference standard
Cathodic disbonding Test temperature: 65 ℃; Cathodic polarization potential: 3.5V; Testing liquid: 3.5% NaCl solution; Test period: 48 hours ≤10mm Average out to 2mm CAN/CSA- Z245.21-M92
(7) hydrostatics testing condition and result
Employing is from the advanced person's of U.S.'s introduction hydrostatics testing system.System's maximum pressure reaches 210MPa, and pumping rate can be controlled automatically, control accuracy≤1%.To the zero defect pipeline section, adopt directly pressurization to explode mode; Pipeline section is repaired in the reinforcement that contains defectiveness, in the hydrostatic test process, all adopted the cascade load mode, i.e. segmentation voltage stabilizing.The test temperature of test body is 12 ℃ in the test.
Fig. 2 be the zero defect pipe and contain in defective pipeline section 2 hydrostatic test processes in press change curve in time, obviously passed through the plastic history that ruptures from surrendering to from the pressure-time curve pipe.Pairs of 3 pipe yield pressures of table 7 and burst pressure tests value and theoretical value have been done contrast, and the result shows that the test value of yield pressure and bursting pressure and calculated value are identical substantially.Table 8 provides test front and back pipe girth test result.
Table 7 pipe yield pressure and burst pressure tests value and theoretical value (unit: MPa)
The pipe number Yield pressure Bursting pressure
Theoretical value Measured value Theoretical value Measured value
The zero defect pipe 18.4 19.7 19.9 23.3
Contain the defective pipeline section No. 1 18.4 20.0 19.9 23.2
Contain the defective pipeline section No. 2 18.4 20.6 19.9 23.7
Dimensional changes situation (mm of unit) before and after the full-scale hydrostatic test pipeline section test of table 8
The pipe number D t L External diameter of pipe when not suppressing Suppress the back external diameter of pipe
Looping place not Glass fibre (L1, L2) Carbon fiber (L3)
The zero defect pipeline section 273 6 3000 867 910
Contain defective pipeline section 1 273 6 3000 866 911 871
Contain defective pipeline section 2 273 6 3000 867 870 868
Description of drawings
The bend tension intensity of Fig. 1 carbon fiber one-way composite material and resin matrix system graph of a relation
Pressure time curve in Fig. 2 hydrostatic test process
Fig. 3 contains defective steel pipe stress interference range size computation model
Fig. 4 contains defective steel pipe stress interference range size computation model
Fig. 5 contains the reinforcement of defective steel pipe glass fibre reinforced plastics and repairs computation model
Fig. 6 glass fibre reinforced plastics sheet material reinforcement defective pipeline stress distribution cloud atlas (interior pressure: 5.5Mpa)
(flaw size: 30 * 30 * 2mm, 4 synusia materials)
Fig. 7 glass fibre reinforced plastics sheet material reinforcement defective pipeline stress distribution cloud atlas (interior pressure: 5.5Mpa)
(flaw size: 30 * 30 * 2mm, 6 synusia materials)
Fig. 8 carbon fiber plate reinforcement defective pipeline stress distribution cloud atlas (interior pressure: 5.5Mpa)
(flaw size: 30 * 30 * 2mm, 4 synusia materials)
Embodiment
1. the preparation of reinforcement composite material sheet
(1) cutting reinforced composite
Composite material sheet sample reinforcing material is the high-strength glass fibre unidirectional cloth, and the Dimensions of composite material sheet will be decided according to used raw material and pipe condition to be repaired.Generally speaking, the coil diameter of composite material sheet is 50~80% of an outer diameter tube to be repaired, and the thickness of individual layer roll film is decided on the rigidity of sheet material between 0.5~1.5mm, is advisable slightly firmly can roll up to be attached on the pipeline; The width of sheet material and length will be decided according to flaw size, and generally between 200~400mm, length is between 400cm~1000cm for width; To adopt metering method (every layer of fibre weight and resin matrix usage ratio are by setting value) with the control gel content in the gluing process, and determine the reinforcement number of plies by FEM (finite element) calculation.
(2) resin glue configuration
Adopt epoxy resin/593=100/30.94 as resin matrix, and add acrylic liquid rubber it is carried out toughening modifying, liquid rubber addition scope is 5-15phr.Curing process is: room temperature was solidified 4 hours for 30 ℃, 100 ℃ of reprocessings,
(3) with mould rolling and curing
With in the process of mould rolling on reinforced composite the brushing resin glue, solidify in the heating plant frock according to the curing process temperature of setting then.Curing process is: room temperature was solidified 100 ℃ of reprocessings 4 hours for 30 ℃.
(3) carry out mould unloading after, repair corner and encapsulation.
2. the preparation of defective packing material and construction
(1) prescription
Prepared loading transfer material is two components system, and the A component is epoxy resin (100 parts), filler quartz flour flicker stone (200 parts), thixotropic agent aerosil (5 parts); The B component is curing agent 593 (100 parts), altax P-30 (40 parts).
(2) construction process
Surface treatment: should eliminate rust to Sa2.5 level or St3 level in processed surface, requires the surface not have oil, rustless, dry cleansing;
Form of construction work: adopt the trowelling mode, press the A component: B component=100: 10 (weight ratio) is mixed A and B component, once is no more than 500 grams, and slaking was constructed with spatula after 30~60 minutes;
Notice: being repaired the material surface temperature should need heat during operation below 5 ℃ more than 5 ℃, and the job site be protected and be handled to the rainy day will, avoids sneaking into of water.
3. the preparation of interlaminated adhesive
(1) prescription
Prepared adhesive is two component room curing interlaminated adhesives: the A component is epoxy resin (100 parts), acrylic liquid rubber (10 parts), thixotropic agent aerosil (5 parts); The B component is curing agent 593 (100 parts), promoter (40); Press the A component: B component=100: 26 (weight ratio) is mixed.Curing process is 18 ℃/12h, 18 ℃.
(2) preparation
The surface treatment of test piece: the aluminum alloy test piece is handled (the treatment fluid proportioning is: 1 part of sodium dichromate, 5 parts of the concentrated sulphuric scids, 20 parts of distilled water) with sulfuric acid-sodium dichromate solution, treatment process: clean-70 ℃ of oven dry of 66~71 ℃/15min-washing; The glass fibre reinforced plastics test piece is cleaned with anhydrous alcohol, 70 ℃ of oven dry.
The preparation of adhesive: the A component is epoxy resin, acrylic liquid rubber, filler, thixotropic agent; The B component is curing agent, promoter
The preparation of glued part: under the room temperature, cold is put behind the gluing, closes up the back and adopts the contact pressure pressurization, and the control bondline thickness is conventional thickness, 1~3 hour gel, test performance after 24 hours.
4. FEM (finite element) model and computational methods
Adopt three-dimensional finite element to calculate.According to symmetry properties, be symmetric points with the central point of rejected region, get 1/4 of pipeline section and analyze; For eliminating the St.Venant effect, length of pipe section is got 4~5 times of tube outer diameter; Element adopts the three-dimensional linear element of four node tetrahedrons, carries out the unit refinement in defective edge, finds the solution by numerical approximation algorithm.
Calculating used steel pipe specification is external diameter 273mm, and wall thickness 6mm, grade of steel are X42.Getting tube length is 500mm.Computation model is divided into two classes: the first kind is to contain defective steel pipe stress interference range size calculation, is intended to obtain the width of reinforcement with the glass fibre reinforced plastics sheet material, and this class model length direction is got 50 unit, each unit 10mm; Circumferentially get 20 unit, the about 10mm in each unit, radially get two-layer, interior bed thickness 5mm, skin is defect layer thickness 1mm, computation model is shown in Fig. 5,6; Another kind of model is the calculating that contains loss of defective steel strength and glass fibre reinforced plastics reinforcement reparation thickness, is used to obtain the thickness size of reinforcement with the glass fibre reinforced plastics sheet material, and the model length direction is got 50 unit, each unit 10mm; Circumferentially get 20 unit, the about 10mm in each unit radially gets three layers, and internal layer 4mm is thick, and middle level 2mm is thick, and skin is the frp layer thickness of being mended.Computation model is seen Fig. 7.
5. reinforcement glass fibre reinforced plastics THICKNESS CALCULATION
Reinforcement adopts second class model to calculate with the thickness of glass fibre reinforced plastics sheet material.With the defective that is of a size of 30mm * 30mm * 2mm is example, calculates equivalent stress that pipeline bore and circumference stress value under different glass steel sheets and the carbon fiber plate reinforcement thickness situation, and result of calculation is as shown in table 8 below.
Wherein, element number is 509,510,511, at the internal layer of computation model, under the defective.Element number is 830,831, and at the internal layer of computation model, glass fibre reinforced plastics is mended the outer 120~140mm place of layer.Fig. 7~8 are pipe stress cloud atlas under the different strengthening course thickness of part.
(interior pressure: P=5.5Mpa) (flaw size is 30 * 30 in table 8 glass fibre reinforced plastics roll film thickness reinforcement calculating
×2mm)
The sheet material number of plies Equivalent stress Circumference stress Annotate
Maximum value (MPa) Element number Maximum value (MPa) Element number
2 layers of glass fibre reinforced plastics sheet material 132.66 510 143.92 511 Can not use
4 layers of glass fibre reinforced plastics sheet material 117.94 510 128.01 511 Critical
6 layers of glass fibre reinforced plastics sheet material 115.54 509 113.59 511 Available
7 layers of glass fibre reinforced plastics sheet material 111.34 831 110.64 832 Available
2 layers of carbon fiber plate 112.03 511 121.91 511 Critical
4 layers of carbon fiber plate 112.30 830 114.52 831 Available

Claims (5)

1. the method for a reinforcing defective pipeline is characterized in that:
(1) adopt the reinforcement composite material sheet, the reinforcement composite material sheet is by high-strength glass fibre unidirectional cloth or carbon fiber one-way cloth and contains 593 curing agent or the epoxy resin glue of triethanolamine curing agent, acrylic liquid rubber that interlaminated adhesive constitutes;
(2) adopt the defective packing material, the defective packing material is two components system, and the A component is 100 parts of epoxy resin, 200 parts in stone of filler quartz flour flicker, 5 parts of thixotropic agent aerosils; The B component is 100 parts in 593 curing agent, 40 parts of altax P-30 promoter;
(3) adopt interlaminated adhesive, interlaminated adhesive is to be mixed by two component room curing interlaminated adhesives: the A component is epoxy resin 30phr, acrylic liquid rubber 10phr, thixotropic agent aerosil 0.62phr; The B component is 593 curing agent 30phr, promoter 2,4,6-three [(dimethylamino) methyl] phenol 15phr; Press the A component: B component=100: 26 (weight ratio) is mixed, and curing process is 18 ℃/12h.
(4) reparation, reinforcement rejected region,
At first carrying out surface treatment: should eliminate rust to Sa2.5 level or St3 level in processed surface, requires the surface not have oil, rustless, dry cleansing,
Adhesive adopts interlaminated adhesive trowelling mode, presses the A component: B component=100: 10 (weight ratio) is mixed A and B component, once is no more than 500 grams, and slaking was constructed with spatula after 30~60 minutes,
The surface treatment of test piece: the aluminum alloy test piece is handled with sulfuric acid-sodium dichromate solution, and the treatment fluid proportioning is: 1 part of sodium dichromate, 5 parts of the concentrated sulphuric scids, 20 parts of distilled water, treatment process: clean-70 ℃ of oven dry of 66~71 ℃/15min-washing; The glass fibre reinforced plastics test piece is cleaned with anhydrous alcohol, 70 ℃ of oven dry; The preparation of glued part: under the room temperature, cold is put behind the gluing, closes up the back and adopts the contact pressure pressurization, and the control bondline thickness is conventional thickness, 1~3 hour gel, test performance after 24 hours.
2. the method for a kind of reinforcing defective pipeline according to claim 1, it is characterized in that: high-strength glass fibre unidirectional cloth or its coil diameter of carbon fiber one-way cloth are 50~80% of outer diameter tube to be repaired, the thickness of individual layer roll film is between 0.5~1.5mm, the width of sheet material and length will be decided according to flaw size, generally between 200~400mm, length is between 400cm~1000cm for width.
3. the method for a kind of reinforcing defective pipeline according to claim 1, it is characterized in that: epoxy resin glue adopts epoxy resin and 593 curing agent or triethanolamine curing agent, 100: 30.94 as resin matrix in proportion, the acrylic liquid rubber addition is 5-15phr, curing process is: room temperature was solidified 100 ℃ of reprocessings 4 hours for 30 ℃.
4. the method for a kind of reinforcing defective pipeline according to claim 1 is characterized in that: the reinforcement composite material sheet is with the mould rolling and solidifies that curing process is: room temperature was solidified 100 ℃ of reprocessings 4 hours for 30 ℃.
5. the composite material of a reinforcing defective pipeline, it is characterized in that: it is by high-strength glass fibre unidirectional cloth or carbon fiber one-way cloth, with the epoxy resin glue that contains 593 curing agent or triethanolamine curing agent, acrylic liquid rubber, the sheet material that interlaminated adhesive constitutes, the defective packing material, interlaminated adhesive constitutes.
CNB2004100841643A 2004-10-27 2004-10-27 Method for reinforcing defective pipeline and composite material therefor Expired - Fee Related CN100363678C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100841643A CN100363678C (en) 2004-10-27 2004-10-27 Method for reinforcing defective pipeline and composite material therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100841643A CN100363678C (en) 2004-10-27 2004-10-27 Method for reinforcing defective pipeline and composite material therefor

Publications (2)

Publication Number Publication Date
CN1766400A true CN1766400A (en) 2006-05-03
CN100363678C CN100363678C (en) 2008-01-23

Family

ID=36742441

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100841643A Expired - Fee Related CN100363678C (en) 2004-10-27 2004-10-27 Method for reinforcing defective pipeline and composite material therefor

Country Status (1)

Country Link
CN (1) CN100363678C (en)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008086737A1 (en) * 2007-01-15 2008-07-24 Beijing Safetech Pipeline Co., Ltd. A technique for repairing, strengthening and crack arrest of pipe
CN100429451C (en) * 2006-11-22 2008-10-29 中国石油天然气股份有限公司 Joint coating method for oil gas pipeline after repairing the corrosion detection
CN101929168A (en) * 2010-06-04 2010-12-29 上海久坚加固工程有限公司 Reinforcing method for wrapping water pile post by using reinforced fiber composite cloth
CN101967619A (en) * 2010-11-01 2011-02-09 成都东丽补强科技有限公司 Method for reinforcement repair of pipeline by using metal hot spraying and fibrous composite
CN101579774B (en) * 2008-05-15 2011-06-22 中国石油天然气股份有限公司 On-line repairing-reinforcing structure for oil pipelines
CN101575420B (en) * 2008-05-09 2011-08-03 中国石油天然气股份有限公司 Prepreg for repairing pipelines containing defects
CN102296647A (en) * 2011-06-13 2011-12-28 鲁毅 Method for permanently repairing leaked sinking caisson of offshore oil platform
CN102464861A (en) * 2010-11-18 2012-05-23 中国石油天然气集团公司 Pipeline repairing carbon fiber composite material system and application thereof
CN103819876A (en) * 2014-03-07 2014-05-28 南京海拓复合材料有限责任公司 Sizing glue for widening carbon fibers
CN104251363A (en) * 2013-06-26 2014-12-31 上海梅山钢铁股份有限公司 Gas pipeline bellows plugging method
CN104514943A (en) * 2013-09-30 2015-04-15 宝山钢铁股份有限公司 Method for repairing pressure pipeline burying defects
CN104555147A (en) * 2015-01-06 2015-04-29 北京力强基业工程技术有限公司 Method for repairing floating roof tank through composite material
CN105090677A (en) * 2015-09-30 2015-11-25 山东钢铁股份有限公司 Leakage stoppage method for root leakage of storage tank
CN105837732A (en) * 2016-03-31 2016-08-10 九牧厨卫股份有限公司 Repair material and regeneration process for high-pressure resin mold
CN106118002A (en) * 2016-07-02 2016-11-16 黄绍华 A kind of composite repairing material and application thereof and construction method
CN106523847A (en) * 2016-10-31 2017-03-22 彩虹(合肥)液晶玻璃有限公司 Low-pressure pipeline pressurized leakage removing method
CN107069142A (en) * 2017-06-12 2017-08-18 华霆(合肥)动力技术有限公司 Pipeline heat management device and system
CN108591673A (en) * 2018-06-11 2018-09-28 中海油安全技术服务有限公司 A kind of pipeline corrosion defect fast repairing method and a kind of safe emergency toolbox
CN109058648A (en) * 2018-06-29 2018-12-21 中国石油天然气集团有限公司 A method of with composite material to the continuous pipe reinforcement recovery of surface damage
CN110043748A (en) * 2019-03-27 2019-07-23 北京京燕水务有限公司 Glass reinforced plastic pipe ruptures emergency action method
CN110198624A (en) * 2019-05-29 2019-09-03 浙江康廷电子科技有限公司 Heat-insulated thermally conductive suction wave material of one kind and preparation method thereof
CN110951433A (en) * 2019-12-09 2020-04-03 武汉鼎业环保工程技术有限公司 Formula and preparation method of adhesive for pipeline sealing
CN114456634A (en) * 2020-11-09 2022-05-10 中国石油天然气股份有限公司 Repair process for filling putty and pipeline defects
CN114811261A (en) * 2022-04-14 2022-07-29 中国电建集团山东电力建设有限公司 RTR pipeline forming and repairing construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU650423B2 (en) * 1990-03-14 1994-06-23 Norman C. Fawley Method of and apparatus for reinforcing pipe
FR2683889B1 (en) * 1991-11-15 1995-01-13 Chomarat Cie Ets Fils Auguste TUBULAR MATERIAL FOR REPAIRING PIPES, DUCTS OR THE LIKE.
IT1254723B (en) * 1992-03-18 1995-10-09 Snam Spa PROCEDURE FINALIZED FOR THE INTERVENTIONS OF REPAIR OF DAMAGES LOCATED TO THE CONDUCT THROUGH THE APPLICATION OF ARMOR WITH AN INTERPOSED PROTECTIVE SHEATH
US6399199B1 (en) * 1999-12-28 2002-06-04 Toray Industries Inc. Prepeg and carbon fiber reinforced composite materials
RU2177582C1 (en) * 2000-07-13 2001-12-27 Дедешко Виктор Никифорович Method for pipe repairing
CN1276024C (en) * 2004-09-30 2006-09-20 北京科技大学 Strengthening carbon fiber composite material and method for repairing defective pipeline

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100429451C (en) * 2006-11-22 2008-10-29 中国石油天然气股份有限公司 Joint coating method for oil gas pipeline after repairing the corrosion detection
WO2008086737A1 (en) * 2007-01-15 2008-07-24 Beijing Safetech Pipeline Co., Ltd. A technique for repairing, strengthening and crack arrest of pipe
CN101575420B (en) * 2008-05-09 2011-08-03 中国石油天然气股份有限公司 Prepreg for repairing pipelines containing defects
CN101579774B (en) * 2008-05-15 2011-06-22 中国石油天然气股份有限公司 On-line repairing-reinforcing structure for oil pipelines
CN101929168A (en) * 2010-06-04 2010-12-29 上海久坚加固工程有限公司 Reinforcing method for wrapping water pile post by using reinforced fiber composite cloth
CN101967619B (en) * 2010-11-01 2012-10-31 成都东丽补强科技有限公司 Method for reinforcement repair of pipeline by using metal hot spraying and fibrous composite
CN101967619A (en) * 2010-11-01 2011-02-09 成都东丽补强科技有限公司 Method for reinforcement repair of pipeline by using metal hot spraying and fibrous composite
CN102464861B (en) * 2010-11-18 2013-07-31 中国石油天然气集团公司 Pipeline repairing carbon fiber composite material system and application thereof
CN102464861A (en) * 2010-11-18 2012-05-23 中国石油天然气集团公司 Pipeline repairing carbon fiber composite material system and application thereof
CN102296647B (en) * 2011-06-13 2013-08-14 深圳市百安百科技有限公司 Method for permanently repairing leaked sinking caisson of offshore oil platform
CN102296647A (en) * 2011-06-13 2011-12-28 鲁毅 Method for permanently repairing leaked sinking caisson of offshore oil platform
CN104251363A (en) * 2013-06-26 2014-12-31 上海梅山钢铁股份有限公司 Gas pipeline bellows plugging method
CN104514943A (en) * 2013-09-30 2015-04-15 宝山钢铁股份有限公司 Method for repairing pressure pipeline burying defects
CN103819876B (en) * 2014-03-07 2016-08-31 南京海拓复合材料有限责任公司 A kind of sizing glue for broadening carbon fiber
CN103819876A (en) * 2014-03-07 2014-05-28 南京海拓复合材料有限责任公司 Sizing glue for widening carbon fibers
CN104555147A (en) * 2015-01-06 2015-04-29 北京力强基业工程技术有限公司 Method for repairing floating roof tank through composite material
CN105090677A (en) * 2015-09-30 2015-11-25 山东钢铁股份有限公司 Leakage stoppage method for root leakage of storage tank
CN105090677B (en) * 2015-09-30 2017-04-19 山东钢铁股份有限公司 Leakage stoppage method for root leakage of storage tank
CN105837732A (en) * 2016-03-31 2016-08-10 九牧厨卫股份有限公司 Repair material and regeneration process for high-pressure resin mold
CN106118002A (en) * 2016-07-02 2016-11-16 黄绍华 A kind of composite repairing material and application thereof and construction method
CN106523847A (en) * 2016-10-31 2017-03-22 彩虹(合肥)液晶玻璃有限公司 Low-pressure pipeline pressurized leakage removing method
CN107069142B (en) * 2017-06-12 2023-03-07 华霆(合肥)动力技术有限公司 Pipeline heat management device and system
CN107069142A (en) * 2017-06-12 2017-08-18 华霆(合肥)动力技术有限公司 Pipeline heat management device and system
CN108591673A (en) * 2018-06-11 2018-09-28 中海油安全技术服务有限公司 A kind of pipeline corrosion defect fast repairing method and a kind of safe emergency toolbox
CN109058648A (en) * 2018-06-29 2018-12-21 中国石油天然气集团有限公司 A method of with composite material to the continuous pipe reinforcement recovery of surface damage
CN110043748A (en) * 2019-03-27 2019-07-23 北京京燕水务有限公司 Glass reinforced plastic pipe ruptures emergency action method
CN110198624A (en) * 2019-05-29 2019-09-03 浙江康廷电子科技有限公司 Heat-insulated thermally conductive suction wave material of one kind and preparation method thereof
CN110198624B (en) * 2019-05-29 2021-07-13 浙江康廷电子科技有限公司 Heat-insulation heat-conduction wave-absorbing material and preparation method thereof
CN110951433A (en) * 2019-12-09 2020-04-03 武汉鼎业环保工程技术有限公司 Formula and preparation method of adhesive for pipeline sealing
CN114456634A (en) * 2020-11-09 2022-05-10 中国石油天然气股份有限公司 Repair process for filling putty and pipeline defects
CN114811261A (en) * 2022-04-14 2022-07-29 中国电建集团山东电力建设有限公司 RTR pipeline forming and repairing construction method

Also Published As

Publication number Publication date
CN100363678C (en) 2008-01-23

Similar Documents

Publication Publication Date Title
CN1766400A (en) Method for reinforcing defective pipeline and composite material therefor
CN102464861B (en) Pipeline repairing carbon fiber composite material system and application thereof
CN1276024C (en) Strengthening carbon fiber composite material and method for repairing defective pipeline
Rohem et al. Development and qualification of a new polymeric matrix laminated composite for pipe repair
CN105670556B (en) A kind of petrochemical plant corrosion and protection carbon fiber reinforcement technique
CN101680591B (en) System and method for pipe repair
CN104534221A (en) Method for repairing and reinforcing pipeline by means of composite materials
CN109058648A (en) A method of with composite material to the continuous pipe reinforcement recovery of surface damage
US20100147409A1 (en) Technique for repairing, strengthening and crack arrest of pipe
CN105090676B (en) Bearing pipe injury repair technique
CN1853847A (en) Carbon-fibre composite material for repairing and reinforcing weld seam defect and its method
CN105650400B (en) Method for reinforcing and reinforcement combining structure inside PCCP fracture of wires pipe
CN1425730A (en) Method for reinforcing and repairing steel structure using fibre reinforced composite material
CN101967619A (en) Method for reinforcement repair of pipeline by using metal hot spraying and fibrous composite
de Barros et al. Using blister test to predict the failure pressure in bonded composite repaired pipes
CN102391814B (en) Abrasion-resistant repair agent
JP2006342538A (en) Concrete structure repairing method and concrete structure
CN102503256B (en) Healant for wetted surface
CN110030457A (en) Fluid-transporting tubing does not stop production renovation reinforced method
CN106032859A (en) Rigid composite pipeline structure and production method thereof
Tazi et al. Experimental evaluation of interface adhesion of a flax fiber composite patch with epoxy and polyurethane adhesives for the reinforcement of steel structures
CN207500646U (en) A kind of reinforced pipeline
Kessler et al. Evaluation of carbon/epoxy composites for structural pipeline repair
Mohabeddine Enhanced fatigue and seismic performance of metallic structures retrofitted with CFRP
KR20160123407A (en) A repairing method of a pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080123