CN1752295A - Liquid asphalt proportioning system flow and device - Google Patents

Liquid asphalt proportioning system flow and device Download PDF

Info

Publication number
CN1752295A
CN1752295A CN 200510200521 CN200510200521A CN1752295A CN 1752295 A CN1752295 A CN 1752295A CN 200510200521 CN200510200521 CN 200510200521 CN 200510200521 A CN200510200521 A CN 200510200521A CN 1752295 A CN1752295 A CN 1752295A
Authority
CN
China
Prior art keywords
pitch
mass flowmeter
valve
verification
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510200521
Other languages
Chinese (zh)
Other versions
CN100434572C (en
Inventor
谢志群
袁亮
李力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNB2005102005212A priority Critical patent/CN100434572C/en
Publication of CN1752295A publication Critical patent/CN1752295A/en
Application granted granted Critical
Publication of CN100434572C publication Critical patent/CN100434572C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Volume Flow (AREA)

Abstract

A system for proportioning liquid asphalt is composed of high-position tank, check tank, two-way valve connected between outlet of high-position tank and inlet of check tank, asphalt pump, another two-way valve connected between outlet of check tank and tree-way valve connected with asphalt pum, and mass flowmeter connected to asphalt pump. Its technological flow includes such steps as comparing the flow signal from mass flowmeter with the flow setting for regulating the rotation speed of asphalt pump, and calibrating the mass flowmeter by comparing the weighing result of check tank with the result displayed by mass flowmeter.

Description

Liquid asphalt proportioning system flow and equipment
Technical field:
The present invention relates to flow process and equipment that a kind of electrolytic aluminium anode is produced, particularly relate to a kind of liquid asphalt proportioning system flow and equipment.
Background technology:
In the anode production process, pinch production line for mixing continuously, the eu-bitumen batching mass flowmeter metering pitch flows that adopt more, thereby realize the bituminous quantitative ingredient through adjusting the bitumenpump rotating speed with the setting throughput ratio, for guaranteeing the Measuring Precision of mass flowmeter, must regularly carry out verification to mass flowmeter.The tradition calibration technology is: when needing the pitch of mass flowmeter outlet is guided to the verification groove, through the pitch amount in the verification groove weighing certain hour, utilize interior weighing result of verification groove unit time that mass flowmeter is tested, whether the Measuring Precision of the under meter of checking on the quality satisfies service requirements.The Measuring Precision of verification groove is then carried out verification through counterweight.Adopt this mode verification, owing to export to a segment pipe of verification groove from mass flowmeter, do not use during ordinary production, rest on ducted pitch As time goes on, temperature will reduce gradually, usually be in half curdled appearance and cause line clogging, and pitch can't be sent into the verification groove when the needs verification, the many users especially user of northern China have to discard mostly, cause verification and production process not to carry out simultaneously.
Summary of the invention:
The objective of the invention is: improve traditional asphalt batching flow process, eliminate the factor that causes line clogging, make Production Flow Chart unblocked, guarantee to carry out at any time in the production process Measuring Precision verification of mass flowmeter, thereby guarantee the accuracy of pitch batching.
When the present invention is achieved in that ordinary production, pitch in the pitch header tank (4) is through two-port valve (5), verification groove (3), two-port valve (7), T-valve (6), two-port valve (8), utilize bitumenpump (2) to extract out and deliver in the kneading machine through mass flowmeter (1), Controlling System compares detected flow signal of mass flowmeter (1) and setting flow, if comparative result is variant, the rotating speed of in time adjusting bitumenpump automatically is consistent with mass flowmeter (1) detected result with the pitch flow of guaranteeing to set; At this moment, verification groove (3) only conduct is carried the bituminous passage, and the pitch flow is not detected; When mass flowmeter (1) is carried out verification, pitch in the pitch header tank (4) enters verification groove (3) through two-port valve (5), earlier the pitch amount in the verification groove (3) is detected, pitch is by two-port valve (7), T-valve (6), bitumenpump (2), two-port valve (8) then, through delivering in the kneading machine behind mass flowmeter (1) the detection flow, the weighing result in verification groove (3) unit time and the detection flow of mass flowmeter (1) are compared check, thereby check whether the Measuring Precision of confirming mass flowmeter (1) satisfies service requirements.
The present invention constitutes like this: it comprises header tank (4), between the outlet that two-port valve (5) is connected header tank (4) and the import of verification groove (3), between two-port valve (7) outlet that is connected verification groove (3) and the T-valve (6), T-valve (6) is connected with bitumenpump (2), bitumenpump (2) is connected with mass flowmeter (1), more than connect to be pipe connection
Bitumenpump (2) is two and is connected in parallel; Import and export at bitumenpump (2) is connected with two-port valve (8); Header tank (4), verification groove (3) and T-valve (6) all pass through pipe connection with pitch storage tank.
The invention has the beneficial effects as follows: eliminated the reason that the pipeline generation is stopped up in the traditional asphalt batching flow process, made Production Flow Chart unblocked; Can guarantee to carry out in process of production the Measuring Precision verification of mass flowmeter, thereby guarantee the accuracy of pitch batching.
Description of drawings:
Fig. 1: synoptic diagram of the present invention.
Fig. 2: the synoptic diagram of prior art.
Embodiment:
Embodiments of the invention: according to bituminous feed flow and pressure requirement, design header tank 4, verification groove 3, select the specification of bitumenpump, various valve and pipeline, then they are coupled together in the following order: the outlet of header tank 4 is connected with an end of two-port valve 5, between the import of the other end of two-port valve 5 and verification groove 3, the outlet of verification groove 3 is connected with an end of two-port valve 7, the other end of two-port valve 7 is connected with an end of T-valve 6; The import and export of two bitumenpumps 2 all connects two-port valve 8 back parallel connections and is connected the pipeline of mass flowmeter 1 and kneading machine with T-valve 6 with mass flowmeter 1; The overflow port and the T-valve 6 of the overflow port of header tank 4, following row's mouth, verification groove 3 all pass through pipe connection with pitch storage tank.
During ordinary production, pitch in the pitch header tank 4 is through two-port valve 5, verification groove 3, two-port valve (7), T-valve 6, two-port valve 8, utilize bitumenpump 2 to extract out and deliver in the kneading machine through mass flowmeter 1, Controlling System compares mass flowmeter 1 detected flow signal and setting flow, if comparative result is variant, the rotating speed of in time adjusting bitumenpump automatically is consistent with mass flowmeter 1 detected result with the pitch flow of guaranteeing to set; At this moment, the bituminous passage is carried in 3 conducts of verification groove, and the pitch flow is not detected; When mass flowmeter 1 is carried out verification, pitch in the pitch header tank 4 enters verification groove 3 through two-port valve 5, earlier the pitch amount in the verification groove 3 is detected, pitch is through two-port valve 7, T-valve (6), two-port valve 8, bitumenpump 2 then, by delivering in the kneading machine behind the mass flowmeter 1 detection flow, the verification groove in 3 unit time the detection flow of weighing result and mass flowmeter 1 compare check, whether satisfy service requirements to check the Measuring Precision of confirming mass flowmeter 1; The Measuring Precision of verification groove 3 is carried out verification by legal metering outfit.
When flow is excessive, too much pitch is arranged automatically to pitch storage tank by the overflow port of header tank 4, the overflow port of verification groove 3.When not producing, pitch is arranged to pitch storage tank by kneading machine by T-valve 6.

Claims (5)

1. liquid asphalt proportioning system flow, it is characterized in that: during ordinary production, pitch in the pitch header tank (4) is through two-port valve (5), verification groove (3), two-port valve (7), T-valve (6), two-port valve (8), utilize bitumenpump (2) to extract out and deliver in the kneading machine through mass flowmeter (1), Controlling System compares detected flow signal of mass flowmeter (1) and setting flow, if comparative result is variant, the rotating speed of in time adjusting bitumenpump automatically is consistent with mass flowmeter (1) detected result with the pitch flow of guaranteeing to set; At this moment, verification groove (3) only conduct is carried the bituminous passage, and the pitch flow is not detected; When mass flowmeter (1) is carried out verification, pitch in the pitch header tank (4) enters verification groove (3) through two-port valve (5), earlier the pitch amount in the verification groove (3) is detected, pitch is by two-port valve (7), T-valve (6), bitumenpump (2), two-port valve (8) then, through delivering in the kneading machine behind mass flowmeter (1) the detection flow, the weighing result in verification groove (3) unit time and the detection flow of mass flowmeter (1) are compared check, thereby check whether the Measuring Precision of confirming mass flowmeter (1) satisfies service requirements; The Measuring Precision of verification groove (3) is carried out verification by legal metering outfit.
2. the equipment of liquid asphalt proportioning system flow as claimed in claim 1, it comprises header tank (4), it is characterized in that: between the outlet that two-port valve (5) is connected header tank (4) and the import of verification groove (3), between two-port valve (7) outlet that is connected verification groove (3) and the T-valve (6), T-valve (6) is connected with bitumenpump (2), bitumenpump (2) is connected with mass flowmeter (1), more than connect to be pipe connection.
3. liquid asphalt proportioning system flow equipment according to claim 2 is characterized in that: bitumenpump (2) is two and is connected in parallel.
4. according to claim 2 or 3 described liquid asphalt proportioning system flow equipment, it is characterized in that: the import and export at bitumenpump (2) is connected with two-port valve (8).
5. liquid asphalt proportioning system flow equipment according to claim 2 is characterized in that: header tank (4), verification groove (3) and T-valve (6) all pass through pipe connection with pitch storage tank.
CNB2005102005212A 2005-09-07 2005-09-07 Liquid asphalt proportioning system flow and device Active CN100434572C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005102005212A CN100434572C (en) 2005-09-07 2005-09-07 Liquid asphalt proportioning system flow and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005102005212A CN100434572C (en) 2005-09-07 2005-09-07 Liquid asphalt proportioning system flow and device

Publications (2)

Publication Number Publication Date
CN1752295A true CN1752295A (en) 2006-03-29
CN100434572C CN100434572C (en) 2008-11-19

Family

ID=36679298

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005102005212A Active CN100434572C (en) 2005-09-07 2005-09-07 Liquid asphalt proportioning system flow and device

Country Status (1)

Country Link
CN (1) CN100434572C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102589665A (en) * 2012-01-12 2012-07-18 三一重工股份有限公司 Control device for asphalt measurement
CN102921321A (en) * 2012-07-19 2013-02-13 天蓝颜料(山东)有限公司 Liquid sulfur/liquid asphalt quantitative material feeding system apparatus
CN104480834A (en) * 2014-11-27 2015-04-01 无锡华中科技有限公司 Feed metering structure of asphalt measuring hopper
CN107376765A (en) * 2017-09-05 2017-11-24 北京华索科技股份有限公司 A kind of charcoal element shaping kneading pot multiple spot spray filling pitch system
CN107992104A (en) * 2017-11-25 2018-05-04 蚌埠市鑫源机电设备有限公司 A kind of pump operation regulation and control method based on region detection
CN108254046A (en) * 2018-03-14 2018-07-06 山推建友机械股份有限公司 A kind of emulsified asphalt flowmeter rinses calibration system and its control method
CN108995044A (en) * 2018-09-07 2018-12-14 福建铁拓机械有限公司 A kind of continuous asphalt mixing plant powder Supply Method
CN112041056A (en) * 2018-04-24 2020-12-04 巴斯夫涂料有限公司 Method for preparing coating composition or its precursor for use in automobile industry

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2218507A1 (en) * 1971-04-30 1972-11-16 Közuti Gepellato Vallalat, Cegled (Ungarn) Dosing device for bitumen based on the principle of weight dosing
JPS6360303A (en) * 1986-08-28 1988-03-16 日本鋪道株式会社 Apparatus for mixing bitumen mixture
DE9402336U1 (en) * 1994-02-12 1994-03-31 Richard Wolf Gmbh, 75438 Knittlingen Stereo endoscope
CN2861162Y (en) * 2005-10-09 2007-01-24 贵阳铝镁设计研究院 Flow process apparatus for liquid asphalt batching system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102589665A (en) * 2012-01-12 2012-07-18 三一重工股份有限公司 Control device for asphalt measurement
CN102921321A (en) * 2012-07-19 2013-02-13 天蓝颜料(山东)有限公司 Liquid sulfur/liquid asphalt quantitative material feeding system apparatus
CN102921321B (en) * 2012-07-19 2015-04-01 天蓝颜料(山东)有限公司 Liquid sulfur/liquid asphalt quantitative material feeding system apparatus
CN104480834A (en) * 2014-11-27 2015-04-01 无锡华中科技有限公司 Feed metering structure of asphalt measuring hopper
CN107376765A (en) * 2017-09-05 2017-11-24 北京华索科技股份有限公司 A kind of charcoal element shaping kneading pot multiple spot spray filling pitch system
CN107992104A (en) * 2017-11-25 2018-05-04 蚌埠市鑫源机电设备有限公司 A kind of pump operation regulation and control method based on region detection
CN107992104B (en) * 2017-11-25 2020-02-11 蚌埠市鑫源机电设备有限公司 Pump operation regulation and control method based on region detection
CN108254046A (en) * 2018-03-14 2018-07-06 山推建友机械股份有限公司 A kind of emulsified asphalt flowmeter rinses calibration system and its control method
CN112041056A (en) * 2018-04-24 2020-12-04 巴斯夫涂料有限公司 Method for preparing coating composition or its precursor for use in automobile industry
CN108995044A (en) * 2018-09-07 2018-12-14 福建铁拓机械有限公司 A kind of continuous asphalt mixing plant powder Supply Method

Also Published As

Publication number Publication date
CN100434572C (en) 2008-11-19

Similar Documents

Publication Publication Date Title
CN1752295A (en) Liquid asphalt proportioning system flow and device
CN105909536A (en) Gas-liquid two-phase flow performance testing system and method for centrifugal pump
CN103837215B (en) Commutation valve type p.V.T.t method gas flow meter
CN202002684U (en) Metering device with wide measuring range
CN2702918Y (en) Automatic gas distribution apparatus
CN103900665B (en) Container combination and commutation valve type pVTt method gas flow meter
CN2861162Y (en) Flow process apparatus for liquid asphalt batching system
CN106584676A (en) Aluminum powder metering and burdening system and method
CN101872200B (en) Flow control device
CN116698162A (en) Gas flow error checking system, testing method thereof and gas meter error checking method
CN111467989A (en) Novel circulating dynamic online mixer
CN102562562A (en) Novel slurry pump test bench capable of adjusting inhaled slurry concentration
CN206713988U (en) A kind of online enzyme preparation add-on system of rice protein feed liquid multistage timesharing
CN201773324U (en) Flow control device
DK2842710T3 (en) DEVICE FOR EXACT MEASUREMENT OF A VOLUME FLOW OF A FLUID TO A POLYMER MIXTURE
CN211677234U (en) Novel circulating dynamic online mixer
CN211627506U (en) PH detection device
CN205650216U (en) Laboratory meter
CN208325713U (en) A kind of constant Dropping feeder
CN207974198U (en) Constant pressure water supply system for heat meter calibration
CN203703615U (en) Automatic gas distribution system for volume of sonic nozzle
CN106369282A (en) Odorant adding system
CN221803372U (en) Valve flow resistance test device
CN215619817U (en) Mold waterway flow detection device
CN214094021U (en) Automatic quantitative feeding control device for liquid materials

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.