CN1730838A - Longitudinally inserted horizontally wedged construction pile and its construction method - Google Patents
Longitudinally inserted horizontally wedged construction pile and its construction method Download PDFInfo
- Publication number
- CN1730838A CN1730838A CN 200510041343 CN200510041343A CN1730838A CN 1730838 A CN1730838 A CN 1730838A CN 200510041343 CN200510041343 CN 200510041343 CN 200510041343 A CN200510041343 A CN 200510041343A CN 1730838 A CN1730838 A CN 1730838A
- Authority
- CN
- China
- Prior art keywords
- stake
- pin
- pile
- hole
- longitudinally inserted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The present invention is one kind of building pile with improved structure and its construction process. The longitudinally inserted and transversely wedged pile includes pile pipe with conic head and pin holes in its side wall and holding outwards extendable pile pins. During construction, the pile pipe is first pressed into foundation said the pile pins are then pushed out transversely, so that the whole pile forms one toothed structure in the ground and possesses longitudinal inserting force, side friction and transverse wedging force on the ground soil and possesses great withdrawn resisting force and greatly increased bearing force.
Description
Technical field
The present invention relates to a kind of architecture advances of building stake, also relate to simultaneously, belong to construction engineering technical field because the job practices that this architecture advances causes changes.
Background technology
Build before the high-lager building, laying earlier the building stake on ground is present common construction techniques.No matter be solid pricker stake, or hollow pile for prestressed pipe (being commonly called as static pressed pile), after hammering or being pressed into building lot, owing to hammer into blockishness, soil all around there is squeezing action, therefore not only than the casting stake work efficiency height that digs a well as nail, and frictional force is big, and is more solid firm.
Yet above-mentioned existing building stake can't further produce the wedging function of horizontal direction except the side friction of vertical direction, so its solid steadiness is limited.
In order to improve the solid steadiness of building stake, the utility model patent that application number is 03218638, the applying date is on March 24th, 2003 has proposed a kind of integral type drilling expanding pallet pile.This stake comprises that guide pillar, pallet, drilling bucket and one group revolve and expands mechanism, guide pillar links to each other movingly with position-arresting disk and pallet coaxial line respectively, the lower surface of pallet is provided with drilling bucket, the mouth edge of drilling bucket upper port and peripheral fastening the linking to each other of pallet lower surface, its bottom is provided with drill bit, its periphery wall equal distribution is provided with one group and revolves expansion mechanism, and it revolves the relative perisporium place of expansion mechanism and is respectively equipped with a wall groove and groove along axis direction, revolves expansion mechanism and comprises a rotary-expanding arm, a slider bracket and a connecting rod.After the construction, can prop up dish by pile and carry jointly, thereby obviously improve supporting capacity and sidewall friction power with the stake root.
Yet this drilling expanding pallet pile structure and constructing operation are all comparatively complicated, and because stake pipe perisporium is offered wall groove and groove, so the intensity of pile body self weakens to some extent.
Summary of the invention
The present invention wants the technical solution problem to be: at the shortcoming of above prior art existence, propose a kind of except that the vertical direction side friction, also have a longitudinally inserted horizontally wedged construction pile of horizontal direction wedging function, thereby significantly improve the solid steadiness of building stake, and this stake should structure comparatively simple, easy construction, the present invention simultaneously also will provide corresponding construction method.
In order to solve above technical problem, longitudinally inserted horizontally wedged construction pile of the present invention comprises hollow stake pipe, one end of described stake pipe is equipped with the taper pile crown, and its improvements are: the sidewall of described stake pipe is shaped on pin-and-hole, and being equipped with in the described pin-and-hole can outward extending stake pin.
Basic job practices of the present invention may further comprise the steps:
1), pile crown is downward, contracts in the stake pin, and the stake pipe vertically is pressed into ground;
2), treat that stake pipe is in place after, the stake pin is laterally ejected from inside to outside.
This shows that before the construction, pile lining is not stretched out in stake pin outer end, therefore can be pressed into foundation soil by static pressure equipment as common prestressing pipe pile construction, finishes vertical inserting.Afterwards, from the centre bore of stake pipe, the stake pin is outwards ejected, finish transverse wedge.Finally, the stake of whole building is embedded in underground just as wolf pressure bar shape, and not only has vertical termination bearing capacity and the side friction that produces of inserting between the foundation soil, and exist since transverse wedge produce agree with power.This agrees with power not only can produce the resistance to plucking active force more much bigger than side friction, and the supporting capacity of building stake is also increased substantially.And it is simple in structure, and easy construction is little, easy to utilize to the influence of stake pipe self intensity.
Description of drawings
The present invention is further illustrated below in conjunction with accompanying drawing.
Fig. 1 is the structural representation of the embodiment of the invention one.
Fig. 2 is the structural representation after Fig. 1 construction.
Fig. 3 is the structural representation of the embodiment of the invention two.
Fig. 4 is the structural representation of the embodiment of the invention three.
The specific embodiment
Embodiment one
The longitudinally inserted horizontally wedged construction pile of present embodiment mainly is made of hollow cylindrical stake pipe 2, conical pile crown 3 and some pins 1 as shown in Figure 1.The lower end of the shank plug-in mounting stake pipe 2 of taper pile crown 3, the sidewall of stake pipe is shaped on some pin-and-holes, is lined with the reinforcing bar lining 4 that can improve tube wall strength in the pin-and-hole, and plug-in mounting length is greater than the stake pin 1 of pipe thickness in the cover.The outer end of this pin is shaped on spearhead, and the rear end is shaped on the inclined-plane.
Before the construction, as shown in Figure 1, pile lining is not stretched out in stake pin outer end, and the first step of therefore constructing is identical with existing pile for prestressed pipe, and promptly pile crown is downward, by static pressure equipment, the stake pipe vertically is pressed into ground.Treat that a pipe is pressed into after the foundation soil, by the conehead stem stem 5 that can insert a tube hub hole, press down stem stem again, utilize the ramp effect of its conehead with the same static pressure equipment of piling, stake pin in the tube wall pin-and-hole is ejected pile lining one by one, and the final wolf's fang that forms as shown in Figure 2 is bar-shaped.As a result, owing to exist transverse wedge to agree with power between stake pin and the foundation soil, this agrees with power and not only side friction can be become the order of magnitude to improve, and makes simultaneously and has also improved supporting capacity greatly.And it is simple in structure, and easy construction is to the almost not influence of stake pipe self intensity.
Embodiment two
The longitudinally inserted horizontally wedged construction pile basic structure of present embodiment is identical with embodiment one, and difference is that described pin-and-hole is staggered along helix at stake pipe sidewall, as shown in Figure 3 from top to bottom.During construction, after the stake pipe vertically is pressed into ground, relends and help the spiral stem stem that inserts stake tube hub hole, similar spiral propeller, by the rotation extruding, utilize the ramp effect of spiral, the stake pin in the tube wall pin-and-hole is ejected pile lining one by one, the wolf's fang that forms as shown in Figure 2 is bar-shaped.
The characteristics of present embodiment are that the length of stake pin can be longer, thereby produce stronger horizontal wedging function, improves the solid steadiness of building stake greatly.
Embodiment three
The longitudinally inserted horizontally wedged construction pile basic structure of present embodiment is also identical with embodiment one, and difference is that stake pin 1 is arranged relatively on stake pipe 2, and the inner is sleeved in the blasting cartridge 7 relatively, and explosive 8 is housed in the blasting cartridge 7, and draws fuse 6, as shown in Figure 4.
During construction, after the stake pipe vertically is pressed into ground, light fuse, utilize the ejection effect of blast, the stake pin in the tube wall pin-and-hole is ejected pile lining, the wolf's fang that forms as shown in Figure 2 is bar-shaped.
In addition to the implementation, the present invention can also have other embodiments.For example, the both sides stake pin among the embodiment 1 is in the pin-and-hole that " eight " font is inserted into stake pipe sidewall slope; And for example, be similar to the structure of embodiment 3, the ejection end of air pressure or hydraulic means be arranged on the inner face of stake pin, thus can stake manage in place after, by air pressure or hydraulic action, the stake pin is directly ejected pile lining; For another example, also the ejection end of mechanical screw mechanism can be arranged on the inner face of stake pin, thereby, the stake pin directly be ejected pile lining by screw action; These all help avoid the stake pin are produced the bending or twisting active force.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of requirement of the present invention.
Claims (9)
1. a longitudinally inserted horizontally wedged construction pile comprises hollow stake pipe, and an end of described stake pipe is equipped with the taper pile crown, it is characterized in that: the sidewall of described stake pipe is shaped on pin-and-hole, and being equipped with in the described pin-and-hole can outward extending stake pin.
2. according to the described longitudinally inserted horizontally wedged construction pile of claim 1, it is characterized in that: be lined with the reinforcing bar lining in the described pin-and-hole.
3. according to claim 1 or 2 described longitudinally inserted horizontally wedged construction piles, it is characterized in that: the outer end of described stake pin is shaped on spearhead, and the rear end is shaped on the inclined-plane.
4. according to claim 1 or 2 described longitudinally inserted horizontally wedged construction piles, it is characterized in that: described pin-and-hole is staggered along helix from top to bottom at stake pipe sidewall.
5. according to claim 1 or 2 described longitudinally inserted horizontally wedged construction piles, it is characterized in that: described stake pin is arranged on the stake pipe relatively, and the inner is sleeved in the blasting cartridge relatively, in the described blasting cartridge explosive is housed, and draws fuse.
6. according to the job practices of the described longitudinally inserted horizontally wedged construction pile of claim 1, it is characterized in that may further comprise the steps:
1), pile crown is downward, contracts in the stake pin, and the stake pipe vertically is pressed into ground;
2), treat that stake pipe is in place after, the stake pin is laterally ejected from inside to outside.
7. according to the job practices of the described longitudinally inserted horizontally wedged construction pile of claim 6, it is characterized in that: the outer end of described stake pin is shaped on spearhead, and the rear end is shaped on the inclined-plane; Described step 2) presses down the conehead stem stem that inserts stake tube hub hole, utilize the ramp effect of its conehead that the stake pin in the tube wall pin-and-hole is ejected pile lining one by one.
8. according to the job practices of the described longitudinally inserted horizontally wedged construction pile of claim 6, it is characterized in that: described pin-and-hole is staggered along helix from top to bottom at stake pipe sidewall, described step 2) can insert the spiral stem stem in a tube hub hole by screwing in, utilize the ramp effect of spiral that the stake pin in the tube wall pin-and-hole is ejected pile lining one by one.
9. according to the job practices of the described longitudinally inserted horizontally wedged construction pile of claim 6, it is characterized in that: described stake pin is arranged on the stake pipe relatively, and the inner is sleeved in the blasting cartridge relatively, in the described blasting cartridge explosive is housed, and draws fuse; Described step 2) for lighting fuse, utilizes the ejection effect of blast, the stake pin in the tube wall pin-and-hole is ejected pile lining.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100413433A CN100408759C (en) | 2005-08-04 | 2005-08-04 | Longitudinally inserted horizontally wedged construction pile and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2005100413433A CN100408759C (en) | 2005-08-04 | 2005-08-04 | Longitudinally inserted horizontally wedged construction pile and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1730838A true CN1730838A (en) | 2006-02-08 |
CN100408759C CN100408759C (en) | 2008-08-06 |
Family
ID=35963253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005100413433A Expired - Fee Related CN100408759C (en) | 2005-08-04 | 2005-08-04 | Longitudinally inserted horizontally wedged construction pile and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100408759C (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590396A (en) * | 2013-11-26 | 2014-02-19 | 江苏中设工程咨询集团有限公司 | Pre-fabricated pipe pile structure with inner supports added |
CN104963337A (en) * | 2015-07-06 | 2015-10-07 | 徐俊 | Rib-line-shaped prestressed concrete pipe pile |
CN105544507A (en) * | 2015-11-24 | 2016-05-04 | 江苏省电力公司连云港供电公司 | Steel pipe pile device with overhanging arms |
CN105544525A (en) * | 2015-12-11 | 2016-05-04 | 陈明 | Uplift pile with unfolding barb and construction method thereof |
CN105862857A (en) * | 2016-05-25 | 2016-08-17 | 浙江乔兴建设集团有限公司 | Width-adjustable building pile |
CN107653873A (en) * | 2017-08-29 | 2018-02-02 | 薛江炜 | Hermaphroditic stake |
CN108222002A (en) * | 2017-12-25 | 2018-06-29 | 同济大学 | A kind of self-balancing type root key jacking mechanism shunk based on vertical jack |
CN109853528A (en) * | 2019-03-22 | 2019-06-07 | 深圳宏业基岩土科技股份有限公司 | The construction method of concrete tubular pile |
CN109853568A (en) * | 2019-03-22 | 2019-06-07 | 深圳宏业基岩土科技股份有限公司 | The fit structure of grouting tube and pile body |
CN112049104A (en) * | 2020-09-27 | 2020-12-08 | 桂林电子科技大学 | Extensible soft soil area pile foundation structure and construction method thereof |
CN112252825A (en) * | 2020-10-23 | 2021-01-22 | 宿迁学院 | Assembled enclosure convenient to install and construction method thereof |
CN113585262A (en) * | 2021-08-16 | 2021-11-02 | 河北兴国防汛设备科技有限公司 | Pile driver for flood control emergency |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1056897C (en) * | 1994-02-07 | 2000-09-27 | 韩增寿 | Pile with side support and pile-sinking method |
CN2398333Y (en) * | 1999-11-02 | 2000-09-27 | 刘次西 | Pile body containing thorn pile |
CN2584668Y (en) * | 2002-08-28 | 2003-11-05 | 天津大学 | Concrete vertical bearing pile with overhanging wedge fin |
JP3792208B2 (en) * | 2003-03-26 | 2006-07-05 | 株式会社エムエルティーソイル | Friction pile for soft ground and construction method of friction pile |
-
2005
- 2005-08-04 CN CNB2005100413433A patent/CN100408759C/en not_active Expired - Fee Related
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590396A (en) * | 2013-11-26 | 2014-02-19 | 江苏中设工程咨询集团有限公司 | Pre-fabricated pipe pile structure with inner supports added |
CN104963337A (en) * | 2015-07-06 | 2015-10-07 | 徐俊 | Rib-line-shaped prestressed concrete pipe pile |
CN105544507A (en) * | 2015-11-24 | 2016-05-04 | 江苏省电力公司连云港供电公司 | Steel pipe pile device with overhanging arms |
CN105544507B (en) * | 2015-11-24 | 2018-01-05 | 江苏省电力公司连云港供电公司 | A kind of steel pipe pile device with overhanging arm |
CN105544525A (en) * | 2015-12-11 | 2016-05-04 | 陈明 | Uplift pile with unfolding barb and construction method thereof |
CN105862857A (en) * | 2016-05-25 | 2016-08-17 | 浙江乔兴建设集团有限公司 | Width-adjustable building pile |
CN105862857B (en) * | 2016-05-25 | 2024-03-22 | 浙江乔兴建设集团有限公司 | Width-adjustable building pile |
CN107653873A (en) * | 2017-08-29 | 2018-02-02 | 薛江炜 | Hermaphroditic stake |
CN108222002B (en) * | 2017-12-25 | 2019-07-05 | 同济大学 | A kind of self-balancing type root key jacking mechanism shunk based on vertical jack |
CN108222002A (en) * | 2017-12-25 | 2018-06-29 | 同济大学 | A kind of self-balancing type root key jacking mechanism shunk based on vertical jack |
CN109853528A (en) * | 2019-03-22 | 2019-06-07 | 深圳宏业基岩土科技股份有限公司 | The construction method of concrete tubular pile |
CN109853568B (en) * | 2019-03-22 | 2021-01-05 | 深圳宏业基岩土科技股份有限公司 | Matching structure of grouting perforated pipe and pile body |
CN109853568A (en) * | 2019-03-22 | 2019-06-07 | 深圳宏业基岩土科技股份有限公司 | The fit structure of grouting tube and pile body |
CN112049104A (en) * | 2020-09-27 | 2020-12-08 | 桂林电子科技大学 | Extensible soft soil area pile foundation structure and construction method thereof |
CN112252825A (en) * | 2020-10-23 | 2021-01-22 | 宿迁学院 | Assembled enclosure convenient to install and construction method thereof |
CN112252825B (en) * | 2020-10-23 | 2022-03-29 | 宿迁学院 | Assembled enclosure convenient to install and construction method thereof |
CN113585262A (en) * | 2021-08-16 | 2021-11-02 | 河北兴国防汛设备科技有限公司 | Pile driver for flood control emergency |
Also Published As
Publication number | Publication date |
---|---|
CN100408759C (en) | 2008-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1730838A (en) | Longitudinally inserted horizontally wedged construction pile and its construction method | |
CN100513745C (en) | Construction method for mechanical hole reaming of anchor rod | |
CN101761074B (en) | Method for improving bearing capacity and tensile capacity of tubular pile end | |
KR102014125B1 (en) | 3-axis seismic pile structure and method | |
CN1693670A (en) | Three-anchor coupling supporting method for high stress tunnel break wall rock | |
KR20080075098A (en) | Tamper heads and method of use | |
CN1904307B (en) | Improved structure of spiral anger and profiled semi screw pole body | |
CN2723681Y (en) | Inner anchor external injection type anchor rod | |
CN1141461C (en) | Method for anchor bolt construction by double sleeve | |
CN1240910C (en) | Immersed tube grout pile construction process and pile tip bearing capacity reinforcement equipment | |
CN108360978B (en) | Combined construction method of short spiral soil-squeezing bored concrete pile and assembled drilling tool | |
CN202989913U (en) | Pointless spiral pile | |
CN212671827U (en) | Integrated rapid installation and anchor withdrawal anchorage device | |
CN206386141U (en) | Easily pull out type anchor pole | |
CN2828142Y (en) | Wolf tooth bar building pile | |
CN212690069U (en) | Double-cylinder installation and anchor withdrawal integrated anchorage device | |
CN110700255B (en) | Snake-shaped armor anchor rod and construction method thereof | |
CN204982874U (en) | Anchor rope construction system of dismouting many times | |
CN205116168U (en) | End grout static pressure tubular pile construction equipment is expanded in drilling | |
CN208023566U (en) | A kind of screw thread rammed bulb pile | |
CN112360524A (en) | Advanced support method for plate-bonded residual ore pile roadway | |
CN201158819Y (en) | Self-propelling anchoring-rob capable of exhaustion | |
CN1245558C (en) | Pipe pile construction method and pile tip bearing capacity reinforcement equipment | |
CN221000964U (en) | Claw-shaped screw body steel pile drill | |
CN212612455U (en) | Anchor rod for municipal works |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080806 Termination date: 20180804 |