CN1719466A - Be used to support the counter managing and control system and the method for timely production shipment - Google Patents

Be used to support the counter managing and control system and the method for timely production shipment Download PDF

Info

Publication number
CN1719466A
CN1719466A CN 200410028015 CN200410028015A CN1719466A CN 1719466 A CN1719466 A CN 1719466A CN 200410028015 CN200410028015 CN 200410028015 CN 200410028015 A CN200410028015 A CN 200410028015A CN 1719466 A CN1719466 A CN 1719466A
Authority
CN
China
Prior art keywords
cabinet
parking lot
manufacturing enterprise
empty cabinet
empty
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200410028015
Other languages
Chinese (zh)
Inventor
杨维新
冯继光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Original Assignee
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongfujin Precision Industry Shenzhen Co Ltd, Hon Hai Precision Industry Co Ltd filed Critical Hongfujin Precision Industry Shenzhen Co Ltd
Priority to CN 200410028015 priority Critical patent/CN1719466A/en
Publication of CN1719466A publication Critical patent/CN1719466A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of counter managing and control system and method are used to support the timely production shipment of manufacturing enterprise.This system comprises that one is arranged near the logistics parking lot of manufacturing enterprise, is used to this manufacturing enterprise in time to provide the production shipment required empty cabinet.This logistics parking lot comprises an application server, it links to each other with described manufacturing enterprise production scene and at least one shipping company that has logistics business to come and go with this manufacturing enterprise by network, can monitor production scene putting up working situation in real time, and and manufacturing enterprise and shipping company between mutually transmit empty cabinet demand information.When a certain cargo pier of manufacturing enterprise was prepared shipment, application server produced container-supplying list, and empty cabinet is in time supplied to this cargo pier in indication logistics parking lot, extracts empty cabinet from this shipping company and be supplemented to the logistics parking lot after heavy cabinet is transported to corresponding shipping company.This logistics parking lot is provided with a certain amount of empty cabinet safety inventory, can prevent that fortuitous event from taking place, and guarantees that the timely production of manufacturing enterprise can continue to carry out.

Description

Be used to support the counter managing and control system and the method for timely production shipment
[technical field]
The present invention relates to a kind of production shipment managing and control system and method, relate in particular to a kind of counter managing and control system and method that is used to support the timely production shipment of manufacturing enterprise.
[background technology]
Container transport occupies more and more important position in the modern transportation system, it can not only be simplified goods packing and carrying program, reduce the freight, improves conevying efficiency, and can guarantee safe, the impaired or stolen chance of minimizing goods of goods.General common container transport mode can be divided into following two kinds: 1. container transport station (Container Freight Station, CFS) mode, be to be transported to the container transport station of carrier's appointment from being about to goods by the consignor, after the Customs Officer of customs customs examination in the station, by the carrier with pack into counter and sealing up of consignor's goods, then counter is loaded and go on board, this mode generally is applicable to non-whole cabinet transportation; 2. container yard (Container Yard, CY) mode, be the empty cabinet that carrier (as shipping company) is provided to be dragged to the shipment place voluntarily by the consignor, pack in the counter from being about to goods, then this counter is dragged container yard (as harbour) toward carrier's appointment, add through customs's customs examination of Customs Officer in the field and to be honored as a queen, counter is loaded the means of transportation of going on board, typically refer to whole cabinet transportation by the carrier.
Large-scale manufacturing enterprise, (Just-in-Time, large-scale manufacturing enterprise JIT) generally adopt the container yard mode that its product is put in order the cabinet transportation particularly to implement production in time.Fast because of its speed of response, output is big, needs the consignor that counter is frequently transported, the heavy cabinet of filling goods is in time dragged the container yard of past carrier's appointment, in time supply manufacturing enterprise's cargo pier required empty cabinet simultaneously,, cause unnecessary stock to avoid the production scene product overloading.Yet, generally, because it is far away to be separated by between manufacturing enterprise and the container yard, must cause haulage time long too high with transportation cost, the possibility that situations such as unpredictable factor therebetween such as traffic jam, harbour crowd take place increases, and causes the consignor many times can not in time empty cabinet be transported to the manufacturing enterprise production scene.On the other hand, lack the appearance of exception factors such as cabinet because of shipping company, the consignor can not extract required empty cabinet from shipping company and be supplemented to manufacturing enterprise's cargo pier, thereby causes the production scene product to overstock in a large number.Traditional container yard method of shipment can not address the above problem well, thereby can not effectively support the timely production shipment of manufacturing enterprise.
[summary of the invention]
Fundamental purpose of the present invention is to provide a kind of counter managing and control system and method, and it can monitor manufacturing enterprise's production scene shipment situation in real time, in time supplies manufacturing enterprise's production shipment required empty cabinet.
Another object of the present invention is to provide a kind of counter managing and control system and method, it can be according to the empty cabinet plan of needs of manufacturing enterprise, set in advance a certain amount of empty cabinet safety inventory, avoiding owing to the appearance of some the unexpected factor counter shortage taking place, thereby the timely production that guarantees manufacturing enterprise can continue to carry out.
For achieving the above object, the invention provides a kind of counter managing and control system, it is provided with a logistics parking lot near manufacturing enterprise, be used to this manufacturing enterprise in time to supply the production shipment required empty cabinet, and the heavy cabinet that storage wouldn't shipment.This logistics parking lot comprises an application server, it links to each other with described manufacturing enterprise production scene and at least one shipping company that has logistics business to come and go with this manufacturing enterprise by network, be used to manage the empty cabinet and the temporary heavy cabinet in logistics parking lot, and and described manufacturing enterprise and shipping company between transmit empty cabinet demand information mutually.
This application server comprises: an empty cabinet plan of needs module, a site work monitoring module, an empty cabinet appearance management and control module, an empty cabinet march into the arena a management and control module and a temporary heavy cabinet management and control module.Empty cabinet plan of needs module receives current empty cabinet plan of needs from manufacturing enterprise, and adjusts the current empty cabinet demand status in logistics parking lot according to this sky cabinet plan of needs, sets the current empty cabinet stock maximum in logistics parking lot, minimum value and safety stock.Fully consider the various exception factors that may occur in this production period when setting empty cabinet safety inventory, as produce unusual, traffic jam, harbour is crowded, shipping company lacks cabinet, inclement weather etc. influence, to avoid generation as far as possible owing to these unexpected factors, empty cabinet can not be in time supplied in the logistics parking lot, cause manufacturing enterprise to produce and overstock the situation of product shipment in time.Empty cabinet plan of needs module is used to also judge that whether the current empty cabinet stock in logistics parking lot is less than current stock's minimum value of setting or greater than current stock's maximal value, if the current empty cabinet stock in logistics parking lot is less than current stock's minimum value of setting, then empty cabinet plan of needs module generates one and carries the cabinet list, and short empty cabinet is extracted from corresponding shipping company in indication logistics parking lot.The site work monitoring module is by the production shipment situation of each cargo pier of network real-time monitoring manufacturing enterprise, if the empty cabinet of a certain cargo pier is filled the preparation shipment, then the cabinet signal of sending that sends according to manufacturing enterprise generates a container-supplying list automatically, and indication yardwork personnel prepare empty cabinet in time to be supplied to this cargo pier.Empty cabinet appearance management and control module is used for record, safeguards the empty cabinet information that appears on the scene.The empty cabinet management and control module of marching into the arena is used for record, safeguards the empty cabinet information of marching into the arena.Temporary heavy cabinet management and control module is used to write down, safeguard the relevant information of the heavy cabinet that manufacturing enterprise wouldn't shipment.
The present invention also provides a kind of method of utilizing above-mentioned counter managing and control system management and control manufacturing enterprise counter, and it comprises the steps: to receive the current empty cabinet plan of needs of manufacturing enterprise; Set empty cabinet stock maximum, minimum value and the safety stock of logistics parking lot in during this period according to this sky cabinet plan of needs; Judge that whether the current empty cabinet stock in logistics parking lot is less than current stock's minimum value of setting; If the current empty cabinet stock in logistics parking lot, produces one less than current stock's minimum value of setting and carries the cabinet list, short empty cabinet is extracted from corresponding shipping company in indication logistics parking lot; Judge that whether the current empty cabinet stock in logistics parking lot is greater than current stock's maximal value of setting; If the current empty cabinet stock in logistics parking lot then sends an alarm signal greater than current stock's maximal value of setting, the current temporary no empty cabinet demand in indication logistics parking lot; The production shipment situation of the manufacturing enterprise of monitoring in real time production scene; When a certain cargo pier in manufacturing enterprise production scene is prepared shipment, produce a container-supplying list automatically, empty cabinet is in time supplied to this cargo pier in indication logistics parking lot.
Because counter managing and control system application server of the present invention is provided with a site work monitoring module, it can monitor manufacturing enterprise's production shipment in real time, send container-supplying list indication logistics parking lot when needing empty cabinet and supply immediately, thereby effectively supported the timely production of manufacturing enterprise in the production scene.In addition, a certain amount of empty cabinet safety inventory is set according to the empty cabinet plan of needs of manufacturing enterprise in the logistics parking lot, has avoided can not in time providing the situation of required empty cabinet to manufacturing enterprise because the appearance of some unexpected factor causes the counter shortage of logistics parking lot.
[description of drawings]
Fig. 1 is used to support the hardware structure figure of the counter managing and control system of timely production shipment for the present invention.
Fig. 2 is the software function module figure of logistics of the present invention parking lot application server.
Fig. 3 adjusts the particular flow sheet of the empty cabinet Inventory Performance in logistics parking lot according to the empty cabinet plan of needs of manufacturing enterprise for the empty cabinet plan of needs of application server of the present invention module.
Fig. 4 in time supplies the concrete implementing procedure figure of the required empty cabinet of manufacturing enterprise's production shipment for logistics of the present invention parking lot.
[embodiment]
Fig. 1 is used to support the hardware structure figure of the counter managing and control system (hereinafter to be referred as " system ") of timely production shipment for the present invention.This system comprises a logistics parking lot 10, a manufacturing enterprise 20 and a harbour 30.Described logistics parking lot 10, manufacturing enterprise 20 and harbour 30 transmit the counter demand information each other by an external network 40.Typically, this logistics parking lot 10 is positioned near the manufacturing enterprise 20, with the required empty cabinet of timely supply manufacturing enterprise's 20 production shipment, and the heavy cabinet that storage manufacturing enterprise 20 wouldn't shipment.Harbour 30 is separated by a distance with logistics parking lot 10 and manufacturing enterprise 20, and it comprises a plurality of shipping companies 300 that have logistics business to come and go with manufacturing enterprise 20, and each shipping company 300 provides the empty cabinet and the specific logistics transportation service of some for manufacturing enterprise 20.
Logistics parking lot 10 comprises an application server 100, a counter warehouse 102, at least one parking lot client computer 104 and a database 106.Said apparatus links to each other by a network 110.Wherein, application server 100 comprises a plurality of software function modules (knowing clearly as shown in Figure 2), be used to receive manufacturing enterprise's 20 empty cabinet plans of needs, adjust the empty cabinet Inventory Performance in logistics parking lot 10 according to this sky cabinet plan of needs, monitoring manufacturing enterprise 20 production site operation situations, and write down, safeguard logistics parking lot 10 empty cabinets of turnover and temporary heavy cabinet relevant information.102 storages of counter warehouse are used to support the empty cabinet that manufacturing enterprise's 20 timely production shipment are required and keep in heavy cabinet.Parking lot client computer 104 can be any general purpose computing device, as personal computer, laptop computer, portable handheld device such as PDA etc., it provides an interactive user interface, is convenient to the yardwork personnel counter information is carried out necessary input, output and maintenance.The various information that database 106 is used for that storage system is used or produces comprise manufacturing enterprise's empty cabinet plans of needs of 20 each phase, empty cabinet Inventory Performances of 10 each phase of logistics parking lot, carry the cabinet list, container-supplying list, empty cabinet appear on the scene record, empty cabinet is marched into the arena record etc.
Manufacturing enterprise 20 comprises many production lines 200, each bar production line 200 corresponding cargo pier 204, and the cabinet (not shown) has been placed at each cargo pier 204 place, is used to load the product of production line 200.Manufacturing enterprise 20 sets up a packing district 202 in addition in the production scene, be used for the product that each production line 200 is produced is packed, and the corresponding empty cabinet of packing into then is transported to harbour 30 by designated vehicle, will weigh cabinet by corresponding shipping company 300 at last and be transported to the appointed place.Manufacturing enterprise 20 also is provided with many supervisory control comuters 206 in the production scene district, and it links to each other with described production line 200 and cargo pier 204 by internal network 210, is used to monitor production shipment and empty cabinet loading operation situation.Supervisory control comuter 206 also links to each other with the application server 100 in logistics parking lot 10 by external network 40, send one cabinet signal when finishing to application server 100 when a certain cargo pier 204 empty cabinets are about to load, require logistics parking lot 10 in time to supply empty cabinet to this cargo pier 204.
Fig. 2 is the software function module figure of native system application server 100.This application server 100 has comprised cabinet plan of needs module 1002, a site work monitoring module 1004, one empty cabinet appearance management and control module 1006, one empty cabinet march into the arena a management and control module 1008 and a temporary heavy cabinet management and control module 1010.Empty cabinet plan of needs module 1002 receives current empty cabinet plan of needs from manufacturing enterprise 20, and adjusts the current empty cabinet Inventory Performance in logistics parking lot 10 according to this sky cabinet plan of needs.Described " current " be manufacturing enterprise 20 according to its long-term production scheduling determine from a production schedule cycle that begins at present till following certain period, it can be a couple of days, all or ten days etc.Empty cabinet plan of needs module 1002 is set current empty cabinet stock maximum, minimum value and the safety stock in logistics parking lot 10 according to current empty cabinet plan of needs, when setting safety inventory, fully consider the various exception factors that may occur in this production period, as produce unusual, traffic jam, harbour is crowded, shipping company lacks cabinet, inclement weather etc. influence, to avoid generation as far as possible owing to unexpected factor, required empty cabinet can not be in time supplied in logistics parking lot 10, cause manufacturing enterprise 20 to produce and overstock the situation of product shipment in time.Whether whether the current empty cabinet stock that empty cabinet plan of needs module 1002 also is used to judge logistics parking lot 10 less than current stock's minimum value of setting, perhaps greater than current stock's maximal value of setting.If current empty cabinet stock is less than current stock's minimum value of setting, then empty cabinet plan of needs module 1002 generates one and puies forward the cabinet single transmit to parking lot client computer 104, is prepared to extract short empty cabinet from corresponding shipping company 300 by the yardwork personnel.If current empty cabinet stock is greater than current stock's maximal value of setting, then empty cabinet plan of needs module 1002 produces an alarm signal, prompting logistics parking lot 10 current temporary no empty cabinet demands.Information such as the described number-plate number of carrying shipping company's title that the cabinet list comprises sky cabinet shortage quantity, the empty cabinet of supply, empty cabinet extraction time, haulage vehicle and driver's title.
Site work monitoring module 1004 links to each other with the supervisory control comuter 206 of manufacturing enterprise 20 by external network 40, can monitor the production shipment situation of each cargo pier 204 in real time.If a certain cargo pier 204 empty cabinets are filled the preparation shipment, then supervisory control comuter 206 sends one cabinet signal, site work monitoring module 1004 sends the empty cabinet stock in cabinet signal and counter warehouse 102, idle haulage vehicle and driver's situation to generate a container-supplying list automatically according to this, and this container-supplying list is sent to parking lot client computer 104, join vehicle and the driver in time is supplied to this cargo pier 204 with empty cabinet by yardwork personnel group.Described container-supplying list comprises the information such as cargo pier sequence number of appearance counter number, the number-plate number of sending cabinet time, haulage vehicle and driver's title, the empty cabinet of demand.
Empty cabinet appearance management and control module 1006 is used for record, safeguards the empty cabinet relevant information that appears on the scene.When empty cabinet transports logistics parking lot 10, empty cabinet appearance management and control module 1006 receives the yardwork personnel by the empty cabinet information of the appearance of parking lot client computer 104 inputs, generated cabinet appearance record, it comprises the information such as cargo pier sequence number of the number-plate number of the empty cabinet number of actual appearance, time for competiton, haulage vehicle and driver's title, the empty cabinet of demand.
The empty cabinet management and control module 1008 of marching into the arena is used to write down, safeguard the empty cabinet relevant information that is transported to logistics parking lot 10 by harbour 30, and generating the empty cabinet record of marching into the arena according to this, it comprises the information such as shipping company's title of the number-plate number of march into the arena sky cabinet number, the time of marching into the arena, haulage vehicle and driver's title, the empty cabinet of supply.
Temporary heavy cabinet management and control module 1010 is used to write down, safeguard the heavy cabinet relevant information that manufacturing enterprise 20 wouldn't shipment, and generates heavy the cabinet single and heavy cabinet list that appears on the scene of marching into the arena when heavy cabinet turnover logistics parking lot 10 respectively.The heavy cabinet information such as single number-plate number that mainly comprises heavy cabinet number, loading stocks description and quantity, the time of marching into the arena, haulage vehicle and driver's title, heavy cabinet cargo pier sequence number of marching into the arena.Heavy cabinet appear on the scene single number-plate number that then mainly comprises heavy cabinet number, loading stocks description and quantity, time for competiton, haulage vehicle and driver's title, heavy cabinet cargo pier sequence number etc.
Fig. 3 is empty cabinet plan of needs module 1002 is adjusted logistics parking lot 10 empty cabinet Inventory Performances according to the empty cabinet plan of needs of manufacturing enterprise's 20 transmissions a particular flow sheet.At first, manufacturing enterprise 20 works out the required empty cabinet plan of needs of current production shipment according to its production schedule, and sends it to the application server 100 (step S300) in logistics parking lot 10.Empty cabinet plan of needs module 1002 is set its current empty cabinet stock maximum, minimum value and safety stock (step S302) according to the current empty cabinet demand in the empty cabinet plan of needs adjustment logistics parking lot 10 that receives.The current empty cabinet stockpile number in logistics parking lot 10 in empty cabinet plan of needs module 1002 Query Databases 106 judges that whether it is less than current stock's minimum value (step S304) of setting.If logistics parking lot 10 current empty cabinet stocks are less than current stock's minimum value of setting, then empty cabinet plan of needs module 1002 generates one according to empty cabinet shortage quantity and carries the cabinet list, this is put forward the cabinet single transmit to parking lot client computer 104, carry the cabinet list by logistics parking lot 10 according to this and extract short empty cabinet (step S306) from corresponding shipping company.If logistics parking lot 10 current empty cabinet stocks are not less than current stock's minimum value of setting, then empty cabinet plan of needs module 1002 judges that further whether logistics parking lot 10 current empty cabinet stocks are greater than current stock's maximal value (step S308) of setting.If current empty cabinet stock is greater than current stock's maximal value of setting, then empty cabinet plan of needs module 1002 produces an alarm signal, prompting logistics parking lot 10 current temporary no empty cabinet demands (step S310).Otherwise if current empty cabinet stock is not more than current stock's maximal value of setting, flow process finishes.
Fig. 4 in time supplies the concrete implementing procedure figure of the required empty cabinet of manufacturing enterprise's 20 production shipment for logistics parking lot 10.At first, the supervisory control comuter 206 of manufacturing enterprise 20 is monitored the production shipment situation (step S400) of each production line 200 and cargo pier 204 thereof in real time.When a certain cargo pier 204 empty cabinets were about to fill the preparation shipment, supervisory control comuter 206 produced one cabinet signal, and it is sent to application server 100 (step 402) by external network 40.On-site supervision module 1004 sends the cabinet signal to generate a container-supplying list according to this, sends it to parking lot client computer 104 (step 404).Haulage vehicle and driver are joined according to this container-supplying list group in logistics parking lot 10, and empty cabinet appearance management and control module 1006 receives the empty cabinet information of appearance of yardwork personnel input when empty cabinet transports logistics parking lot 10, generated cabinet appearance record (step S406).Empty cabinet is transported to specifies cargo pier 204, through a period of time, and the product of corresponding production line 200 this sky cabinet of after 202 packings of packing district, packing into.The heavy cabinet of loading stocks is transported to shipping company's harbour (step S408) of appointment from cargo pier 204.Haulage vehicle extracts empty cabinet from this shipping company 300, is transported to logistics parking lot 10 and stores, with supply manufacturing enterprise's 20 subsequent production shipment required (step S410).The empty cabinet module 1008 of marching into the arena receives the sky cabinet information of marching into the arena that parking lot client computer 104 send, and has generated the cabinet recording storage (step S412) in database 106 of marching into the arena.

Claims (11)

1. counter managing and control system, be used to support the timely production shipment of manufacturing enterprise, this system comprises that one is arranged near the logistics parking lot of described manufacturing enterprise, be used to this manufacturing enterprise in time to provide the production shipment required empty cabinet, and storage wouldn't shipment heavy cabinet, this logistics parking lot comprises an application server, it passes through a network and links to each other with described manufacturing enterprise production scene and at least one shipping company, it is characterized in that this application server comprises:
One empty cabinet plan of needs module, be used to receive the current empty cabinet plan of needs that described manufacturing enterprise sends, set empty cabinet stock maximum, minimum value and the safety stock of logistics parking lot in during this period according to this sky cabinet plan of needs, and judge that whether the current empty cabinet stock in logistics parking lot is less than current stock's minimum value of setting or greater than current stock's maximal value of setting;
One site work monitoring module is used for monitoring in real time manufacturing enterprise's production shipment situation, produces a container-supplying list when it prepares shipment, and empty cabinet is in time supplied to this cargo pier in indication logistics parking lot.
2. counter managing and control system as claimed in claim 1 is characterized in that the manufacturing enterprise production scene comprises many production lines, the corresponding cargo pier of each bar production line, and deposit one at least and be used to load the empty cabinet of production line shipment product at this cargo pier place.
3. counter managing and control system as claimed in claim 1 is characterized in that the manufacturing enterprise production scene is provided with at least one supervisory control comuter, and it links to each other with logistics parking lot application server, is used to monitor production line production operation and cargo pier counter and loads the shipment situation.
4. counter managing and control system as claimed in claim 1 is characterized in that, described shipping company provides the empty cabinet and the specific logistics transportation service of some for manufacturing enterprise.
5. counter managing and control system as claimed in claim 1, it is characterized in that, empty cabinet plan of needs module also is used for carrying the cabinet list when the current empty cabinet stock in logistics parking lot produces one during less than current stock's minimum value of setting, indicates the logistics parking lot to extract short empty cabinet by corresponding shipping company.
6. counter managing and control system as claimed in claim 1 is characterized in that, empty cabinet plan of needs module also is used for producing an alarm signal, the current temporary no empty cabinet demand in prompting logistics parking lot during greater than current stock's maximal value of setting as the current empty cabinet stock in logistics parking lot.
7. counter managing and control system as claimed in claim 1 is characterized in that, application server has also comprised cabinet appearance management and control module, is used for receiving when empty cabinet transports the logistics parking lot the empty cabinet information of yardwork personnel input, has generated cabinet appearance record.
8. counter managing and control system as claimed in claim 1, it is characterized in that, application server has also comprised the cabinet management and control module of marching into the arena, and is used for receiving when empty cabinet is transported to the logistics parking lot by shipping company the empty cabinet information of yardwork personnel input, and has generated the cabinet record of marching into the arena.
9. counter managing and control system as claimed in claim 1 is characterized in that, application server also comprises a temporary heavy cabinet administration module, is used to write down, safeguard the heavy cabinet relevant information that manufacturing enterprise wouldn't shipment.
10. counter management-control method, be used to support the timely production shipment of manufacturing enterprise, this method is provided with a logistics parking lot near described manufacturing enterprise, it in time provides the production shipment required counter for manufacturing enterprise, this logistics parking lot comprises an application server, and it links to each other with described manufacturing enterprise production scene and at least one shipping company by a network, is used to implement described counter management-control method, it is characterized in that this method comprises the steps:
Receive the current empty cabinet plan of needs of manufacturing enterprise;
Set empty cabinet stock maximum, minimum value and the safety stock of logistics parking lot in during this period according to this sky cabinet plan of needs;
Judge that whether the current empty cabinet stock in logistics parking lot is less than current stock's minimum value of setting;
If the current empty cabinet stock in logistics parking lot, produces one less than current stock's minimum value of setting and carries the cabinet list, short empty cabinet is extracted from corresponding shipping company in indication logistics parking lot;
The production shipment situation of the manufacturing enterprise of monitoring in real time production scene;
When a certain cargo pier in manufacturing enterprise production scene is prepared shipment, produce a container-supplying list automatically, empty cabinet is in time supplied to this cargo pier in indication logistics parking lot.
11. counter management-control method as claimed in claim 10 is characterized in that, and is further comprising the steps of:
Judge that whether the current empty cabinet stock in logistics parking lot is greater than current stock's maximal value of setting;
If the current empty cabinet stock in logistics parking lot then sends an alarm signal greater than current stock's maximal value of setting, the current temporary no empty cabinet demand in indication logistics parking lot.
CN 200410028015 2004-07-06 2004-07-06 Be used to support the counter managing and control system and the method for timely production shipment Pending CN1719466A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410028015 CN1719466A (en) 2004-07-06 2004-07-06 Be used to support the counter managing and control system and the method for timely production shipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410028015 CN1719466A (en) 2004-07-06 2004-07-06 Be used to support the counter managing and control system and the method for timely production shipment

Publications (1)

Publication Number Publication Date
CN1719466A true CN1719466A (en) 2006-01-11

Family

ID=35931292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410028015 Pending CN1719466A (en) 2004-07-06 2004-07-06 Be used to support the counter managing and control system and the method for timely production shipment

Country Status (1)

Country Link
CN (1) CN1719466A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113537917A (en) * 2020-04-17 2021-10-22 长荣海运股份有限公司 Container management auxiliary system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113537917A (en) * 2020-04-17 2021-10-22 长荣海运股份有限公司 Container management auxiliary system and method

Similar Documents

Publication Publication Date Title
CN114004571B (en) Intelligent three-dimensional storage shelf goods position distribution system and method thereof
CN109636135B (en) Sharing-based digital supply chain management system
CN102360463A (en) Logistic information real-time management method and system
CN104463537A (en) Third-party logistics cloud warehousing system
CN103942670A (en) Steel strand finished product storage and distribution system and method
CN103366265A (en) Station beat type distribution method based on enterprise internal logistics
CN109508885A (en) Concocting method and device, storage medium, the processor of spare part
US6560508B1 (en) Standard parts metering system
US20020169698A1 (en) WIP management warehouse system
CN114118921B (en) System and method for realizing integration of material allocation based on ERP system
CN114548614A (en) Intelligent manufacturing MES system
US20030004839A1 (en) Computerized automatic management system and method for logistics control
Deng et al. Development of automated warehouse management system
CN1801200A (en) Order form goods providing system and method
CN1719466A (en) Be used to support the counter managing and control system and the method for timely production shipment
Väätäinen et al. Improving the logistics of biofuel reception at the power plant of Kuopio city
CN111598500A (en) Production material management system based on micro-service architecture
CN202331554U (en) Equipment management system
CN115193753A (en) Intelligent matching goods picking method in vertical warehouse
CN1395199A (en) Computer automation management system for warehouse-in and warehouse-out and its method
Sokolov et al. Integrated planning and scheduling of enterprise information system modernization
CN1508732A (en) Production capacity simulating system and method
CN1395202A (en) Warehousing and storage system with optimum management process
CN1549176A (en) Supply merchant management inventory system and method
CN1553386A (en) Supplier managing stock system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20060111