CN1599291A - 用gps测量远动系统传输延时的方法 - Google Patents

用gps测量远动系统传输延时的方法 Download PDF

Info

Publication number
CN1599291A
CN1599291A CNA031509908A CN03150990A CN1599291A CN 1599291 A CN1599291 A CN 1599291A CN A031509908 A CNA031509908 A CN A031509908A CN 03150990 A CN03150990 A CN 03150990A CN 1599291 A CN1599291 A CN 1599291A
Authority
CN
China
Prior art keywords
time
gps
terminal
delay
sawtooth waveforms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA031509908A
Other languages
English (en)
Other versions
CN100452684C (zh
Inventor
岑宗浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Grid Co Ltd
Original Assignee
East China Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Grid Co Ltd filed Critical East China Grid Co Ltd
Priority to CNB031509908A priority Critical patent/CN100452684C/zh
Publication of CN1599291A publication Critical patent/CN1599291A/zh
Application granted granted Critical
Publication of CN100452684C publication Critical patent/CN100452684C/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

为了准确测定电站端发出的信号,经过许多信号接口到主控站之间的延迟时间,本发明采用GPS卫星定位接收技术,测量该系统的延迟时间,模似量变化延时测试是利用信号发生器模似变送器的输出并且接入输入模块,利用锯齿波信号的下跃,记录监控与数据采集系统库中发生的大数据跳变的时刻,即系统的模似量变化传输的延迟时间。GPS接收装置的同步佃出信号和信号发生器的同步输出信号同时接入双迹示波器,用以计算信号发生器锯齿波信号下跃沿的绝对时间,经GPS对时间的SCADA库中记录下的发生大数据跳变的绝对时间,二者的差值,就是所要测量的延迟时间,优点是测量精确度高。

Description

用GPS测量远动系统传输延时的方法
技术领域
本发明涉及一种用卫星定位系统,测量运动系统传输延时的方法,主要用于大型电(厂)站和主控站之间,电站突然发生事故的信号,传输到主控站延时的时间,以便主站迅速反应,采取相应控制措施,该延时间要求越小越好,它是检查该传输装置是否达标的重要指标。
背景技术
随着计算机技术的迅猛发展,电力系统的运动装置由原先集中式远方终端装置,发展到后来的分布式RTU。近年来大型电站和发电厂的监控系统建设,已取代了传统的RTU装置,其系统结构之复杂和信息传接口之多,使人们越来越重视信息传输实时性问题,信号被复杂的传输系统延时越长,越不利于主控部门迅速采取调控措施,因此,对信号传输系统规定了一个时间延迟的标准,但是,如何检查该系统的延迟时间,目前尚没有一个科学的方法,现在一般采用秒表,用口令通过电话测定电站与主控站之间的信号延迟时间,很不准确。
发明内容
为了准确测定电站端发出的信号,经过许多信号接口到主控站之间的延迟时间,本发明采用GPS卫星定位接收技术,测量该系统的延迟时间,模似量变化延时测试是利用信号发生器模似变送器的输出并且接入输入模块,利用锯齿波信号的下跃,记录监控与数据采集系统库中发生的大数据跳变的时刻,即系统的模似量变化传输的延迟时间。GPS接收装置的同步佃出信号和信号发生器的同步输出信号同时接入双迹示波器,用以计算信号发生器锯齿波信号下跃沿的绝对时间,经GPS对时间的SCADA库中记录下的发生大数据跳变的绝对时间,二者的差值,就是所要测量的延迟时间。具体方法是:
1,在传输起始端和传输终端分别引入GPS卫星定位时钟信号,在起始端引入的GPS时钟信号输入一双迹示波器,终端引入的GPS时钟信号与数据处理机SCADA时钟同步;
2,起始端设一信号发生器,分别产生一方波和锯齿波,方波的下跃沿与锯齿波的下跃沿同步,方波输入至前述双迹示波器另一端口,锯齿波送至RTU主控单元,经调制后传输至终端;
3,在双迹示波器时间轴上,获得方波后沿对应的时间t0,GPS同步信号脉冲对应时间ts,两者差值为ts-t0=Δt;
4,在终端测得起始端传输来的锯齿波下跃沿时间为ts1
5,锯齿波延时的时间为ts1-ts+Δt=td
本发明的优点是,本发明测量精度高,避免了传统人工测量造成的误差,若主站计算机与GPS接收器通过IRIG-B编码接口实现时钟同步,则能保证到毫秒级对时精度,否则至少保证秒级精度。厂站的便携式GPS接收器能保证毫秒级的对时精度,这样,测量结果的时间准确度至少能保证到秒级,这样的精确度能满足工程量精度需要。
另外,本发明还可适用于各种监控系统和各类RTU,也能适用于变送器输入和交流采样,可进行模似量变化及状态量变位传输延时测试。
附图说明
附图1是本发明的方块图。
附图2是信号发生器的方波和GPS同步时钟信号在双迹示波器上的随机位置示意图。
具体实施方式
请参阅附图1、2所示,信号发生器1输出二路信号,一路是锯齿波,一路是方波,方波与GPS卫星定位接收器的时钟信号11输入双迹示波器2,方波的下跃沿与锯齿波的下跃沿同步,在双迹示波器2上可见到方波的下跃沿在示波器的时间轴上为t0,GPS的时钟脉冲对应时间轴上为ts,两者之差为ts-t0=Δt,在终端测得起始端传输来的锯齿波下跃时间为ts1,这样模量变化传输延时为ts1-ts+Δt。状态量变位延时测试是利用GPS接收装置的分钟同步输出信号触发模似状态量变位并经过一继电器的输出节点接入输入模块,同时也接入双迹示波器的其中一路输入,该继电器受GPS接收器的分钟同步信号在ts时刻的触发,经经Δt执行延时后在t0时刻继电器输出动作,GPS对时的SCADA库中记录下发生的状态量变位的绝对时间ts1,在双迹示波器上测得的绝对时间ts+Δt=t0,该状态量的传输延迟时间为ts1-ts--Δt。
附图1方块图中,锯齿波先送入测控单元3,经主单元4、调制器5后,到主站区的解调器6、前置机7,最后到数据库8、人机介面9、显示屏10;在前置机输入GPS接收装置的时钟同步信号,使GPS时钟信号与SCADA对时。

Claims (6)

1,一种用GPS测量远动系统传输延时的方法,其特征在于:
1,在传输起始端和传输终端分别引入GPS卫星定位时钟信号,在起始端引入的GPS时钟信号输入一双迹示波器,终端引入的GPS时钟信号与数据处理机SCADA时钟同步;
2,起始端设一信号发生器,分别产生一方波和锯齿波,方波的下跃沿与锯齿波的下跃沿同步,方波输入至前述双迹示波器另一端口,锯齿波送至RTU测控单元,并经主控单元,经调制后传输至终端;
3,在双迹示波器时间轴上,获得方波后沿对应的时间t0,GPS同步信号脉冲对应时间ts,两者差值为ts-t0=Δt;
4,在终端测得起始端传输来的锯齿波下跃沿时间为ts1
5,锯齿波延时的时间为ts1-ts+Δt=td
CNB031509908A 2003-09-15 2003-09-15 用gps测量远动系统传输延时的方法 Expired - Lifetime CN100452684C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB031509908A CN100452684C (zh) 2003-09-15 2003-09-15 用gps测量远动系统传输延时的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB031509908A CN100452684C (zh) 2003-09-15 2003-09-15 用gps测量远动系统传输延时的方法

Publications (2)

Publication Number Publication Date
CN1599291A true CN1599291A (zh) 2005-03-23
CN100452684C CN100452684C (zh) 2009-01-14

Family

ID=34659816

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031509908A Expired - Lifetime CN100452684C (zh) 2003-09-15 2003-09-15 用gps测量远动系统传输延时的方法

Country Status (1)

Country Link
CN (1) CN100452684C (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101316160B (zh) * 2008-06-11 2010-12-15 南京磐能电力科技股份有限公司 多节点同步采样和数据传输方法
CN101995530A (zh) * 2010-11-18 2011-03-30 四川九洲电器集团有限责任公司 一种闭环自适应测距工作方法
CN101710845B (zh) * 2009-05-22 2012-03-28 北京荣达千里科技有限公司 利用gps系统进行单向传输时延测试的方法
CN104914853A (zh) * 2015-05-25 2015-09-16 南京国电南自美卓控制系统有限公司 一种主辅控制器切换时间的测量方法及系统
CN111064532A (zh) * 2019-12-23 2020-04-24 北京航天益森风洞工程技术有限公司 无人平台遥控、遥测数据系统传输延时测试方法及系统

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2873872B2 (ja) * 1990-09-06 1999-03-24 株式会社ソキア Gpsにおけるc/aコード除去形周波数ダイバーシティ相関受信方式
US6137433A (en) * 1999-03-18 2000-10-24 The United States Of America As Represented By The Secretary Of Commerce Scatterometer with adaptable spatial resolution
DE19944302A1 (de) * 1999-09-15 2001-04-12 Siemens Ag Verfahren zur Synchronisation
EP1243082A1 (en) * 1999-12-17 2002-09-25 Nokia Corporation A delay measurement system in a packet network
JP3473698B2 (ja) * 2001-06-01 2003-12-08 日本電気株式会社 Atm−ponシステムにおける距離測定方法及びプログラム

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101316160B (zh) * 2008-06-11 2010-12-15 南京磐能电力科技股份有限公司 多节点同步采样和数据传输方法
CN101710845B (zh) * 2009-05-22 2012-03-28 北京荣达千里科技有限公司 利用gps系统进行单向传输时延测试的方法
CN101995530A (zh) * 2010-11-18 2011-03-30 四川九洲电器集团有限责任公司 一种闭环自适应测距工作方法
CN101995530B (zh) * 2010-11-18 2013-01-23 四川九洲电器集团有限责任公司 一种闭环自适应测距工作方法
CN104914853A (zh) * 2015-05-25 2015-09-16 南京国电南自美卓控制系统有限公司 一种主辅控制器切换时间的测量方法及系统
CN111064532A (zh) * 2019-12-23 2020-04-24 北京航天益森风洞工程技术有限公司 无人平台遥控、遥测数据系统传输延时测试方法及系统
CN111064532B (zh) * 2019-12-23 2022-08-12 北京航天益森风洞工程技术有限公司 无人平台遥控、遥测数据系统传输延时测试方法及系统

Also Published As

Publication number Publication date
CN100452684C (zh) 2009-01-14

Similar Documents

Publication Publication Date Title
CN103605023B (zh) 一种合并单元时间特性测量方法及测量装置
CN103490504B (zh) 一种利用变电所测控装置遥信量测试系统对站间soe测试的方法
CN101534003B (zh) 数字化光纤差动保护装置的数据同步方法
JP5373260B2 (ja) 送配電系統の事故点標定方法およびシステム
CN109462452B (zh) 一种提高暂态录波型故障指示器采样同步精度的方法
CN103293414A (zh) 一种基于gps精确对时技术的智能变电站保护装置同步性能测试系统及方法
EP2365651A2 (en) System and method for providing time synchronization
CN102621512A (zh) 一种合并单元守时性能的动态模拟测试方法
CN110943881A (zh) 一种基于就地化保护工厂化调试的测试系统及方法
CN100452684C (zh) 用gps测量远动系统传输延时的方法
CN102457956A (zh) 一种基准时钟信号的获取方法和系统
CN201185428Y (zh) 时间综合测量仪
CN202353575U (zh) 一种时间同步实时监测装置
CN201740861U (zh) 一种基于iec 61850标准的电流互感器校验仪
CN106027334A (zh) 一种手持式交换机报文传输延时测试装置及测试方法
CN107425934B (zh) 智能变电站在线监测的时间同步装置
JP2007188299A (ja) 多点計測システム及び多点計測方法
CN201887543U (zh) 采样值时间标定装置
CN101710845B (zh) 利用gps系统进行单向传输时延测试的方法
CN103236916A (zh) 数字化继电保护装置sv组网接入网络延时动态补偿方法
CN111338204B (zh) 一种去中心化综合原子时系统及其建立方法
Houlei et al. Development of GPS synchronized digital current differential protection
CN114205066B (zh) 一种基于采集终端b码对时的时间同步检测方法
JP2001109781A (ja) データ収集システム
CN201369730Y (zh) 继电保护通道故障检测设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090114