CN1594827A - Water shut off technological process for viscous crude well - Google Patents

Water shut off technological process for viscous crude well Download PDF

Info

Publication number
CN1594827A
CN1594827A CN 200410020825 CN200410020825A CN1594827A CN 1594827 A CN1594827 A CN 1594827A CN 200410020825 CN200410020825 CN 200410020825 CN 200410020825 A CN200410020825 A CN 200410020825A CN 1594827 A CN1594827 A CN 1594827A
Authority
CN
China
Prior art keywords
water
blocking agent
blocking
shut
water shut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200410020825
Other languages
Chinese (zh)
Inventor
杨双虎
徐凤廷
白云渡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200410020825 priority Critical patent/CN1594827A/en
Publication of CN1594827A publication Critical patent/CN1594827A/en
Pending legal-status Critical Current

Links

Landscapes

  • Sealing Material Composition (AREA)

Abstract

The present invention relates to a thick oil well water shut off technological process for thick oil well water shut off layer and improving exploitation effect. The process bases on 'deep move shallow shut off' principal, first selectively shutting off the big diameter for the oil layer by degradable organic shut off additives, then sealing the opening by high temperature resistant inorganic shut off additives, and realizing selective water shut off by pressure control and degradation of organic matter. The water shut off process is reasonable in design, reliable in criterion, and has the characteristic of small construction risk, high success rate and long validity period compared with other thick oil well water shut off processes, and provides a new effective process for solving the water shut off problem for thick oil especially middle thick oil well.

Description

A kind of heavy oil wells water-plugging technology method
Technical field:
The present invention relates to a kind of be used for oil well particularly heavy oil wells shutoff water layer improve the process of exploitation effect.
Background technology:
Along with the continuity of oil field development process, crude oil water containing, oil well aquifer yield improve constantly, and crude output and exploitation effect are constituted adverse effect.The shutoff water layer, improve the important topic that exploitation effect just becomes heavy oil wells exploitation.Because common chemical water shutoff can not be high temperature resistant, therefore conventional at present viscous crude water blockoff is mainly taked water pack off and cement baffle water blockoff dual mode.Yet, the heat extraction by steam injection heavy oil wells is handled up owing to many rounds, usually there is the outer groove of scurrying of pipe, make water pack off to implement, the then influence of factor such as mobile variation after the dehydration in the stratum of cement baffle water blockoff because of time of theing cement solidifies and cement paste, blocking radius is little, and construction risk is big, and effective time is short.In order to strengthen blocking radius, multiple high temperature resistant inorganic blocking agent was once tested at the scene, but this type of blocking agent is to the stratum heavy contamination, caused the oil well output of handling up to descend significantly, can not satisfy fully and produce needs.
Summary of the invention:
The object of the present invention is to provide the heavy oil wells water-plugging technology method that a kind of water plugging effect is good, construction risk is little and period of validity is long.
Process technical scheme provided by the invention is as follows: this kind heavy oil wells water-plugging technology method was utilized degradable organic blocking agent that oil reservoir is carried out the selective shut-off of long radius before this according to the principle of " transfer deeply shallow stifled " and was placed a heat insulating belt thereafter, utilize resistant to elevated temperatures inorganic blocking agent to seal then, realize selective water plugging by pressure control and organic degraded simultaneously.Dark timing determines that according to oilwell water shutoff construction pump-in pressure needs clamp-on the concrete consumption of blocking agent, reaches the purpose of thoroughly carrying out the deep shutoff; Dark to transfer the back that the inorganic blocking agent of water-yielding stratum squeeze note is carried out shallow stifled, shallowly determines plug agent amount according to core intersection and blocking radius when stifled.
The implementation step of this water shutoff technology is as follows:
1, adopt the gel-like blocking agent to carry solid phase particles, squeeze note first slug carries out the shutoff of selectivity deep.This blocking agent by 0.3~0.5% polyacrylamide, 1.5~2.5% rubber grain, 1.0~3.0% resin fibre is plain or other labile organic compound particle adds water and is mixed and forms, consumption is 300~400m 3, squeeze pressure is controlled at 16~17MPa;
2, adopt native powder class blocking agent squeeze note second slug, form heat insulating belt.This blocking agent is the aqueous solution of 30% native powder+20% cement (all the other are water) preparation, calculates consumption 40~50m by blocking radius 1.5m 3, pump-in pressure is controlled at below the 14MPa;
3, adopt cement class or resin and shallow blocking agent squeeze note the 3rd slug of water glass class to seal, finish shallow stifled.This plug agent amount determines that according to core intersection blocking radius should reach more than the 1m, and design formulas is Q=π r 2. Φ h (in the formula, Q-plug agent amount, m 3The h-core intersection, m; The r-blocking radius, m; Φ-oil reservoir degree of porosity) pump-in pressure is controlled at below the 10MPa.
The present invention is reasonable in design, according to reliable, compare with other viscous crude shutoff method and to have characteristics such as construction risk is little, success rate is high, period of validity is long, for solve heavy oil wells particularly in deeply heavy oil wells water blockoff problem new effective ways are provided.
The specific embodiment: enforcement of the present invention provides with the following example.
Embodiment 1: certain oil field 81-598 heavy oil wells water blockoff.According to above-mentioned implementation step construction, wherein, first slug adopts 1.2 tons of polyacrylamides, and 5 tons of rubber grains, elm bark powder add water for 4 tons and be mixed consumption 360m 3, pump-in pressure is raised to 16.5Mpa and stops annotating, and stablizes half an hour; Calculate by blocking radius 1.5m, second slug adopts 30 tons of swell soils, cement to be made into 50m for 20 tons 3The aqueous solution, it is heat insulation to clamp-on the stratum, and pump-in pressure is 13Mpa; Calculate by blocking radius 1m, the 3rd slug is made into aqueous solution 12m for 15 tons with cement 3Seal, pump-in pressure is 10Mpa.
Embodiment 2: certain oil-field thick-oil well 77-5100 well water blockoff, construction sequence is the same.Wherein, first slug: adopt 1.5 tons of polyacrylamides, rubber grain to add water for 5 tons and be made into consumption 400m 3, pump-in pressure is 16Mpa; Second slug: adopt 30 tons of swell soils, 20 tons of cement are made into 50m 3The aqueous solution, it is heat insulation to clamp-on the stratum, and pump-in pressure is 11Mpa; The 3rd slug: be made into 50m for 30 tons with water glass 3The aqueous solution seals, and pump-in pressure is 11Mpa.

Claims (1)

1, a kind of heavy oil wells water-plugging technology method, it is characterized in that: this method is according to the principle of " transferring shallow stifled deeply ", utilized degradable organic blocking agent that oil reservoir is carried out the selective shut-off of long radius before this and a heat insulating belt was set thereafter, utilize resistant to elevated temperatures inorganic blocking agent to seal then, realize selective water plugging by pressure control and organic degraded simultaneously; Dark timing determines that according to oilwell water shutoff construction pump-in pressure needs clamp-on the concrete consumption of blocking agent, reaches the purpose of thoroughly carrying out the deep shutoff; Dark to transfer the back that the inorganic blocking agent of water-yielding stratum squeeze note is carried out shallow stifled, shallowly determines plug agent amount according to core intersection and blocking radius when stifled; The implementation step of this water shutoff technology is as follows:
(1), adopt the gel-like blocking agent to carry solid phase particles; squeeze note first slug; carry out the shutoff of selectivity deep: this blocking agent is by 0.3~0.5% polyacrylamide, 1.5~2.5% rubber grain, 1.0~3.0% resin fibre element; or other labile organic compound particle is mixed and forms, and consumption is 300~400m 3, squeeze pressure is controlled at 16~17MPa;
(2), adopt native powder class blocking agent squeeze note second slug, formation heat insulating belt: this blocking agent is 30% native powder, all the other aqueous solution for the water preparation of 20% cement, calculates consumption 40~50m by blocking radius 1.5m 3, pump-in pressure is controlled at below the 14MPa;
(3), adopt cement class or resin and shallow blocking agent squeeze note the 3rd slug of water glass class to seal, finish shallow stifled: this plug agent amount determines that according to core intersection blocking radius should reach more than the 1m, and design formulas is Q=π r 2. Φ h, in the formula, Q-plug agent amount, m 3, h-core intersection, m, r-blocking radius, m, Φ-degree of porosity;
Pump-in pressure is controlled at below the 10MPa.
CN 200410020825 2004-06-23 2004-06-23 Water shut off technological process for viscous crude well Pending CN1594827A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410020825 CN1594827A (en) 2004-06-23 2004-06-23 Water shut off technological process for viscous crude well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410020825 CN1594827A (en) 2004-06-23 2004-06-23 Water shut off technological process for viscous crude well

Publications (1)

Publication Number Publication Date
CN1594827A true CN1594827A (en) 2005-03-16

Family

ID=34663249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410020825 Pending CN1594827A (en) 2004-06-23 2004-06-23 Water shut off technological process for viscous crude well

Country Status (1)

Country Link
CN (1) CN1594827A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101135237B (en) * 2007-10-17 2010-08-18 吐哈石油勘探开发指挥部工程技术研究院 Method for preparing down-hole gel valve and construction method thereof
WO2010145189A1 (en) * 2009-06-18 2010-12-23 东营泰尔石油技术有限公司 Compressible and highly flexible plugging agent
CN101487384B (en) * 2009-02-20 2012-03-21 天津实发中科百奥工业生物技术有限公司 Method for oil well water-shutoff by utilizing scleroglucan fermentation liquor
CN101273183B (en) * 2005-06-20 2012-06-20 普拉德研究及开发股份有限公司 Degradable fiber system for production increase
CN102690441A (en) * 2011-03-22 2012-09-26 北京格瑞迪斯石油技术有限公司 Resin fiber, plugging agent for petroleum drilling and processing technology of plugging agent
CN103484086A (en) * 2012-06-13 2014-01-01 中国石油化工股份有限公司 Gel-particle type water plugging agent and preparation method thereof
CN103498643A (en) * 2013-10-23 2014-01-08 天津亿利科能源科技发展股份有限公司 Composite slug deep water plugging method for oil pool with high water content
CN101314711B (en) * 2008-07-18 2014-08-27 中国石油大学(华东) Elastic particle oil displacement profile control agent, displacement of reservoir oil system and displacement of reservoir oil method
CN104100224A (en) * 2013-04-03 2014-10-15 中国石油天然气股份有限公司 Oil well water plugging method
CN104847302A (en) * 2015-03-25 2015-08-19 中国石油天然气股份有限公司 Heavy oil reservoir cone-pressing water plugging method
CN105484697A (en) * 2015-12-22 2016-04-13 中国石油天然气股份有限公司 Profile control channeling sealing method for super heavy oil reservoir
CN105733536A (en) * 2016-02-02 2016-07-06 天津亿利科能源科技发展股份有限公司 Biological self-healing deep profile control slug combination and using method thereof
CN106761548A (en) * 2016-12-30 2017-05-31 中国石油天然气股份有限公司 Method for injecting plugging agent into thick oil layer to plug strong water washing strip by fracturing
CN109653707A (en) * 2019-01-29 2019-04-19 安东柏林石油科技(北京)有限公司 A kind of fractured reservoirs oil/gas well filling packer particle decreasing water cut and increasing oil method
CN112746829A (en) * 2019-10-30 2021-05-04 中国石油化工股份有限公司 Water-plugging viscosity-reducing exploitation method for thick oil in high water-cut period

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101273183B (en) * 2005-06-20 2012-06-20 普拉德研究及开发股份有限公司 Degradable fiber system for production increase
CN101135237B (en) * 2007-10-17 2010-08-18 吐哈石油勘探开发指挥部工程技术研究院 Method for preparing down-hole gel valve and construction method thereof
CN101314711B (en) * 2008-07-18 2014-08-27 中国石油大学(华东) Elastic particle oil displacement profile control agent, displacement of reservoir oil system and displacement of reservoir oil method
CN101487384B (en) * 2009-02-20 2012-03-21 天津实发中科百奥工业生物技术有限公司 Method for oil well water-shutoff by utilizing scleroglucan fermentation liquor
WO2010145189A1 (en) * 2009-06-18 2010-12-23 东营泰尔石油技术有限公司 Compressible and highly flexible plugging agent
CN102690441A (en) * 2011-03-22 2012-09-26 北京格瑞迪斯石油技术有限公司 Resin fiber, plugging agent for petroleum drilling and processing technology of plugging agent
CN102690441B (en) * 2011-03-22 2014-03-12 北京格瑞迪斯石油技术有限公司 Resin fiber, plugging agent for petroleum drilling and processing technology of plugging agent
CN103484086B (en) * 2012-06-13 2016-04-13 中国石油化工股份有限公司 Gel particle type plugging agent and preparation method
CN103484086A (en) * 2012-06-13 2014-01-01 中国石油化工股份有限公司 Gel-particle type water plugging agent and preparation method thereof
CN104100224A (en) * 2013-04-03 2014-10-15 中国石油天然气股份有限公司 Oil well water plugging method
CN104100224B (en) * 2013-04-03 2016-12-28 中国石油天然气股份有限公司 Oil well water plugging method
CN103498643A (en) * 2013-10-23 2014-01-08 天津亿利科能源科技发展股份有限公司 Composite slug deep water plugging method for oil pool with high water content
CN103498643B (en) * 2013-10-23 2016-05-25 天津亿利科能源科技发展股份有限公司 A kind of composite slug deep shutoff method for high water-cut reservoir
CN104847302A (en) * 2015-03-25 2015-08-19 中国石油天然气股份有限公司 Heavy oil reservoir cone-pressing water plugging method
CN105484697A (en) * 2015-12-22 2016-04-13 中国石油天然气股份有限公司 Profile control channeling sealing method for super heavy oil reservoir
CN105484697B (en) * 2015-12-22 2018-04-06 中国石油天然气股份有限公司 Profile control channeling sealing method for super heavy oil reservoir
CN105733536A (en) * 2016-02-02 2016-07-06 天津亿利科能源科技发展股份有限公司 Biological self-healing deep profile control slug combination and using method thereof
CN105733536B (en) * 2016-02-02 2021-06-15 高立红 Biological self-repairing deep profile control slug combination and use method thereof
CN106761548A (en) * 2016-12-30 2017-05-31 中国石油天然气股份有限公司 Method for injecting plugging agent into thick oil layer to plug strong water washing strip by fracturing
CN106761548B (en) * 2016-12-30 2019-02-12 中国石油天然气股份有限公司 Method for injecting plugging agent into thick oil layer to plug strong water washing strip by fracturing
CN109653707A (en) * 2019-01-29 2019-04-19 安东柏林石油科技(北京)有限公司 A kind of fractured reservoirs oil/gas well filling packer particle decreasing water cut and increasing oil method
WO2020155861A1 (en) * 2019-01-29 2020-08-06 安东柏林石油科技(北京)有限公司 Method for filling oil-gas well of fractured oil-gas reservoir with isolation particles to reduce water and increase oil production
CN109653707B (en) * 2019-01-29 2023-11-07 安东柏林石油科技(北京)有限公司 Method for dewatering and increasing oil by filling packing body particles in oil and gas well of fractured oil and gas reservoir
US11898414B2 (en) 2019-01-29 2024-02-13 Anton Bailin Oilfield Technology (Beijing) Co., Ltd Method for filling oil-gas well of fractured oil-gas reservoir with isolation particles to reduce water and increase oil production
CN112746829A (en) * 2019-10-30 2021-05-04 中国石油化工股份有限公司 Water-plugging viscosity-reducing exploitation method for thick oil in high water-cut period

Similar Documents

Publication Publication Date Title
CN1594827A (en) Water shut off technological process for viscous crude well
CN102516974B (en) Foam profile control agent suitable for oil field deep profile control
Seright Use of preformed gels for conformance control in fractured systems
CN103740353B (en) A kind of composite blockage relieving agent and tight sandstone reservoir fracturing production horizontal well composite blockage relieving method
CN101555404B (en) Environment-friendly low-damage solidfree well control fluid and applications thereof
CN110551491B (en) Coating plugging agent, preparation method thereof and plugging slurry
CN102002351B (en) Selective chemical water shutoff agent for gravel-packed well
CN107575183B (en) Process is made in a kind of tune-uncoupling for water injection well
CN102562012B (en) Method for improving recovery ratio of water-flooding developed common heavy oil reservoir
CN103396774A (en) Plugging agent and preparation method thereof
CN103881673B (en) A kind of injection well oxidation gel breaker and preparation method thereof
CN109372466A (en) The temporary stifled forward method of liquid-solid-liquid phase state conversion is realized using natural Temperature Field
CN102618228B (en) Plugging agent for clastic rock oil reservoir horizontal well, preparation method and water plugging method
RU2012103925A (en) METHOD FOR CORRECTING A ZONE INSIDE THE UNDERGROUND CONTAINING HYDROCARBON HYDROGEN (OPTIONS)
CN103343675B (en) A kind of composite deblocking process method for offshore oilfield injection well
CN101139920A (en) Dibasic composite horizontal well bottom water plugging technique
CN102704902A (en) Natural gas hydrate exploiting method
CN103773335B (en) Acidificable consolidation type plugging agent
CN102926701B (en) Continuous mixed type water plugging process method
CN103087699A (en) Sand-carrying profile control agent composition of fracture-cave type oil deposit and profile control method of profile control agent
CN103952133A (en) Resistance reducing agent for fracturing fluid and preparation method thereof
CN110593806A (en) Large-dose multi-slug water plugging method
CN103628846A (en) Method for improving CO2 displacement efficiency of low-permeability reservoir
CN106837284A (en) A kind of pressure break connection of handling up for improving Recovery Factor of Low-Permeability Reservoirs makees method
CN113389533B (en) CO (carbon monoxide)2Integrated method for collecting, reservoir reforming and extracting crude oil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication