CN104100224A - Oil well water plugging method - Google Patents

Oil well water plugging method Download PDF

Info

Publication number
CN104100224A
CN104100224A CN201310114412.3A CN201310114412A CN104100224A CN 104100224 A CN104100224 A CN 104100224A CN 201310114412 A CN201310114412 A CN 201310114412A CN 104100224 A CN104100224 A CN 104100224A
Authority
CN
China
Prior art keywords
water
stratum
agent
polyacrylamide
water shutoff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310114412.3A
Other languages
Chinese (zh)
Other versions
CN104100224B (en
Inventor
张营
张煜
曹瑛
金玉俊
徐艳丽
龙永福
刘向伟
王涛
景文杰
王伟华
刘秀华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201310114412.3A priority Critical patent/CN104100224B/en
Publication of CN104100224A publication Critical patent/CN104100224A/en
Application granted granted Critical
Publication of CN104100224B publication Critical patent/CN104100224B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention relates to a water plugging method for an oil well; injecting polyacrylamide, LJ-2 cross-linking agent and large-particle water-swelling water shutoff agent into stratum for 3-5 m, wherein the injection amount is 18-40m per 1 m perforation section thickness3(ii) a And a second slug, injecting polyacrylamide and the small-particle water-swelling water shutoff agent into the stratum for 3-5 m, wherein the injection amount is 25-45m per 1 m perforation section thickness3(ii) a Thirdly, injecting polyacrylamide and LJ-2 cross-linking agent water shutoff agent into the stratum for 7-9 m, wherein the injection amount is 35-55m per 1 m of perforation section thickness3(ii) a Fourthly, the polyacrylamide, the acrylamide, the cross-linking agent, the oil-soluble resin and the OP-10 surface are coatedThe active agent and the sodium bisulfite water shutoff agent are injected into the stratum for 1-2 m, and the injection amount per 1 m perforation section thickness is 2-4m3(ii) a The method realizes the plugging of cracks and large pore passages of the water flooded oil well, enables oil flow to flow out from other small pore passages around, reduces the water content, and improves the single well liquid production and the single well daily oil yield.

Description

A kind of oilwell water shutoff method
Technical field
The present invention relates to a kind of oilwell water shutoff method, especially relate to plugging function and the intensity of four slugs of oilwell water shutoff.
Background technology
The three existing oilwell water shutoff methods of factory of recovering the oil are to rely on producer and colleges and universities to study and field conduct, because shutoff method is of a great variety, different blocks shutoff method used lacks specific aim, do not form rounded system, be not suitable with the effective exploitation of low permeability oil field, cause construction after efficient on the low side, the cycle that takes effect is short, individual well day oil increment low.The powder performance evaluation simultaneously relating in oilwell water shutoff method also lacks monitoring means.Therefore, invent a kind of oilwell water shutoff method that cost is low, effective, the cycle is long, be not only applicable to LOW PERMEABILITY OILFIELD DEVELOPMENT demand, and after site of deployment, crack and the macropore of effective shutoff water logging oil well, oil stream is flowed out from other aperture road around, thereby reduce moisturely, improve single well liquid measure, individual well day produce oil.
Summary of the invention
The object of this invention is to provide a kind of oilwell water shutoff method, this oilwell water shutoff method is to be divided into four slugs oilwell water shutoff agent is injected to oil well, slug one is the temperature by stratum, plastic under the regular hour, crack in shutoff stratum and macropore, slug two is to guarantee that blocking agent effectively enters earth formation deep, slug one is protected simultaneously, slug three is migrations continuously in reservoir of porous medium, utilize formation temperature, further effective shutoff is carried out in fracture duct, slug four enters behind stratum under the impact of formation temperature, become fast the colloid of jelly shape, realize the sealing of final step, preventing that blocking agent that leading portion injects from returning tells.
Oilwell water shutoff method of the present invention is to be divided into four slugs oilwell water shutoff agent is injected to oil well:
Slug one, according to mass percent concentration, in water, add the acrylamide bulky grain hydroexpanding body preparation water shutoff agent that 0.3% polyacrylamide, 0.35%LJ-2 crosslinking agent, 4% particle diameter are 5-15mm, after preparing, inject 3-5 rice to stratum, every 1 meter of perforated interval thickness injection rate is 18-40m 3;
Slug two adds the acrylamide granule hydroexpanding body preparation water shutoff agent that 0.2% polyacrylamide and 2% particle diameter are 2-5mm according to mass percent concentration in water, after preparing, injects 3-5 rice to stratum, and every 1 meter of perforated interval thickness injection rate is 25-45m 3;
Slug three adds 0.3% polyacrylamide and 0.4%LJ-2 crosslinking agent preparation water shutoff agent according to mass percent concentration in water, after preparing, injects 7-9 rice, every 1 meter of perforated interval thickness injection rate 35-55m to stratum 3;
Slug four, according to mass percent concentration, in water, add 0.3% polyacrylamide, 8% acrylamide, 0.2% crosslinking agent, 8% oil-soluble resin, 0.2%OP-10 surfactant and 0.1% sodium hydrogensulfite preparation water shutoff agent, after preparing, to stratum, inject 1-2 rice, every 1 meter of perforated interval thickness injection rate is 2-4m 3.
The present invention has following effect:
(1) the present invention is specially adapted to the effective exploitation of low permeability oil field.
(2) measure effect is good, instant effect, and after using at the scene, oil well instant effect, the moisture range of decrease is large, and liquid measure rises many, and innage increases day by day.
(3) cost is low, economically feasible.The water blockoff medicament expense that a bite oil well needs is 11.5 ten thousand yuan, and operating expenses is 50,000 yuan, adds up to 16.5 ten thousand yuan, than other shutoff methods, saves 8.5 ten thousand yuan.
(4) life cycle is long.This oilwell water shutoff method is used at the scene and is reached rear effective period more than 200 days, than general shutoff method, extends 110 days effective period.
The specific embodiment
Field conduct is to utilize cementing truck to divide following step to inject stratum four slugs:
Step 1, after slug one prepares according to the ratio of 0.3% polyacrylamide, 0.35%LJ-2 crosslinking agent, 4% bulky grain hydroexpanding body, injects 3-5 rice to stratum, every 1 meter of perforated interval thickness injection rate is 18-40m 3.
Step 2, after slug two prepares according to 0.2% polyacrylamide and 2% granule hydroexpanding body ratio, injects to stratum and to stratum, injects 3-5 rice, and every 1 meter of perforated interval thickness injection rate is 25-45m 3.
Step 3, after slug three prepares according to 0.3% polyacrylamide and 0.4%LJ-2 crosslinking agent ratio, injects 7-9 rice, every 1 meter of perforated interval thickness injection rate 35-55m to stratum 3.
Step 4, after slug four prepares according to 0.3% polyacrylamide, 8% acrylamide, 0.2% crosslinking agent, 8% oil-soluble resin, 0.2% surfactant and 0.1% sodium hydrogensulfite ratio, injects 1-2 rice to stratum, every 1 meter of perforated interval thickness injection rate is 2-4m 3.

Claims (1)

1. an oilwell water shutoff method, is characterized in that: be divided into four slugs oilwell water shutoff agent is injected to oil well:
Slug one, according to mass percent concentration, in water, add the acrylamide bulky grain hydroexpanding body preparation water shutoff agent that 0.3% polyacrylamide, 0.35%LJ-2 crosslinking agent, 4% particle diameter are 5-15mm, after preparing, inject 3-5 rice to stratum, every 1 meter of perforated interval thickness injection rate is 18-40m 3;
Slug two adds the acrylamide granule hydroexpanding body preparation water shutoff agent that 0.2% polyacrylamide and 2% particle diameter are 2-5mm according to mass percent concentration in water, after preparing, injects 3-5 rice to stratum, and every 1 meter of perforated interval thickness injection rate is 25-45m 3;
Slug three adds 0.3% polyacrylamide and 0.4%LJ-2 crosslinking agent preparation water shutoff agent according to mass percent concentration in water, after preparing, injects 7-9 rice, every 1 meter of perforated interval thickness injection rate 35-55m to stratum 3;
Slug four, according to mass percent concentration, in water, add 0.3% polyacrylamide, 8% acrylamide, 0.2% crosslinking agent, 8% oil-soluble resin, 0.2%OP-10 surfactant and 0.1% sodium hydrogensulfite preparation water shutoff agent, after preparing, to stratum, inject 1-2 rice, every 1 meter of perforated interval thickness injection rate is 2-4m 3.
CN201310114412.3A 2013-04-03 2013-04-03 Oil well water plugging method Active CN104100224B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310114412.3A CN104100224B (en) 2013-04-03 2013-04-03 Oil well water plugging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310114412.3A CN104100224B (en) 2013-04-03 2013-04-03 Oil well water plugging method

Publications (2)

Publication Number Publication Date
CN104100224A true CN104100224A (en) 2014-10-15
CN104100224B CN104100224B (en) 2016-12-28

Family

ID=51668729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310114412.3A Active CN104100224B (en) 2013-04-03 2013-04-03 Oil well water plugging method

Country Status (1)

Country Link
CN (1) CN104100224B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104610950A (en) * 2014-12-31 2015-05-13 中国石油天然气股份有限公司 Suspended gel particle plugging agent and application thereof
CN105733545A (en) * 2016-01-20 2016-07-06 陕西海山环保能源科技有限公司 Profile control and displacement agent for oily sludge profile control and displacement plugging and technique thereof
CN106468152A (en) * 2015-08-14 2017-03-01 中国石油化工股份有限公司 A kind of thick oil horizontal well intensity adjustable shutoff method
CN108019192A (en) * 2016-11-01 2018-05-11 中国石油化工股份有限公司 A kind of hydroexpanding body blocking agent profile control blocks removal of bridge formation method
CN111087997A (en) * 2018-10-24 2020-05-01 中国石油化工股份有限公司 Method for blocking water in oil reservoir and oil well

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4009755A (en) * 1976-03-17 1977-03-01 Union Oil Company Of California Selectively controlling the flow of fluids through subterranean formations
US4657944A (en) * 1984-02-09 1987-04-14 Phillips Petroleum Company CO2 -induced in-situ gelation of polymeric viscosifiers for permeability contrast correction
DD268493A1 (en) * 1988-02-01 1989-05-31 Freiberg Brennstoffinst MEDIUM FOR REGULATING / BLOCKING FLUIDS OR GAS FLOWS IN DRILLING STORAGE STORES
GB2255360A (en) * 1991-05-03 1992-11-04 British Petroleum Co Plc Method for the production of oil
CN1103885A (en) * 1993-12-17 1995-06-21 新疆石油管理局油田工艺研究所 Graft polymer and its use for oil well or water well for sealing purpose
US6474413B1 (en) * 1999-09-22 2002-11-05 Petroleo Brasileiro S.A. Petrobras Process for the reduction of the relative permeability to water in oil-bearing formations
CN1594827A (en) * 2004-06-23 2005-03-16 杨双虎 Water shut off technological process for viscous crude well
CN1752403A (en) * 2004-09-22 2006-03-29 中国石油天然气股份有限公司 Composite slug method large channel oil reservoir deep profile control method
CN1828010A (en) * 2006-03-06 2006-09-06 大庆油田有限责任公司 Multi-block equal-fluidity energy-gathering parallel synchronous oil displacement method for heterogeneous oil reservoir
CN1888374A (en) * 2005-06-28 2007-01-03 中国石油天然气股份有限公司 High-temperature-resistant high-salt-resistant gel water plugging method
CN101012744A (en) * 2006-10-30 2007-08-08 大庆油田有限责任公司 Nitrogen foam adjusting-actuating segment plug injection technique
CN101086210A (en) * 2007-07-13 2007-12-12 辽河石油勘探局 Profile control and water plugging technology for coal bed gas
CN101280678A (en) * 2008-05-09 2008-10-08 大庆汇联技术开发有限公司 Oil well chemical gorge and disgorge yield increasing and inverse direction regulating block connection working process
CN101787864A (en) * 2010-03-15 2010-07-28 中国石油集团川庆钻探工程有限公司 Water plugging method for fractured water-flooded oil well for water injection development of oil reservoir in low-permeability reservoir
CN101975051A (en) * 2010-10-19 2011-02-16 大庆油田有限责任公司 Chemical flooding alternate injection method
CN102373914A (en) * 2010-08-25 2012-03-14 中国石油天然气股份有限公司 Deep profile control method for fractured reservoir
CN102767353A (en) * 2012-07-26 2012-11-07 新疆华油技术服务股份有限公司 Comprehensive mining technology of drowned well

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4009755A (en) * 1976-03-17 1977-03-01 Union Oil Company Of California Selectively controlling the flow of fluids through subterranean formations
US4657944A (en) * 1984-02-09 1987-04-14 Phillips Petroleum Company CO2 -induced in-situ gelation of polymeric viscosifiers for permeability contrast correction
DD268493A1 (en) * 1988-02-01 1989-05-31 Freiberg Brennstoffinst MEDIUM FOR REGULATING / BLOCKING FLUIDS OR GAS FLOWS IN DRILLING STORAGE STORES
GB2255360A (en) * 1991-05-03 1992-11-04 British Petroleum Co Plc Method for the production of oil
CN1103885A (en) * 1993-12-17 1995-06-21 新疆石油管理局油田工艺研究所 Graft polymer and its use for oil well or water well for sealing purpose
US6474413B1 (en) * 1999-09-22 2002-11-05 Petroleo Brasileiro S.A. Petrobras Process for the reduction of the relative permeability to water in oil-bearing formations
CN1594827A (en) * 2004-06-23 2005-03-16 杨双虎 Water shut off technological process for viscous crude well
CN1752403A (en) * 2004-09-22 2006-03-29 中国石油天然气股份有限公司 Composite slug method large channel oil reservoir deep profile control method
CN1888374A (en) * 2005-06-28 2007-01-03 中国石油天然气股份有限公司 High-temperature-resistant high-salt-resistant gel water plugging method
CN1828010A (en) * 2006-03-06 2006-09-06 大庆油田有限责任公司 Multi-block equal-fluidity energy-gathering parallel synchronous oil displacement method for heterogeneous oil reservoir
CN101012744A (en) * 2006-10-30 2007-08-08 大庆油田有限责任公司 Nitrogen foam adjusting-actuating segment plug injection technique
CN101086210A (en) * 2007-07-13 2007-12-12 辽河石油勘探局 Profile control and water plugging technology for coal bed gas
CN101280678A (en) * 2008-05-09 2008-10-08 大庆汇联技术开发有限公司 Oil well chemical gorge and disgorge yield increasing and inverse direction regulating block connection working process
CN101787864A (en) * 2010-03-15 2010-07-28 中国石油集团川庆钻探工程有限公司 Water plugging method for fractured water-flooded oil well for water injection development of oil reservoir in low-permeability reservoir
CN102373914A (en) * 2010-08-25 2012-03-14 中国石油天然气股份有限公司 Deep profile control method for fractured reservoir
CN101975051A (en) * 2010-10-19 2011-02-16 大庆油田有限责任公司 Chemical flooding alternate injection method
CN102767353A (en) * 2012-07-26 2012-11-07 新疆华油技术服务股份有限公司 Comprehensive mining technology of drowned well

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
于波等: "低渗透油田提高采收率技术研究及应用", 《石油化工应用》 *
曹瑛等: "新型油井堵水剂技术研究及试验", 《石油化工应用》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104610950A (en) * 2014-12-31 2015-05-13 中国石油天然气股份有限公司 Suspended gel particle plugging agent and application thereof
CN104610950B (en) * 2014-12-31 2017-12-01 中国石油天然气股份有限公司 Suspended gel particle plugging agent and application thereof
CN106468152A (en) * 2015-08-14 2017-03-01 中国石油化工股份有限公司 A kind of thick oil horizontal well intensity adjustable shutoff method
CN106468152B (en) * 2015-08-14 2018-10-19 中国石油化工股份有限公司 A kind of thick oil horizontal well intensity adjustable shutoff method
CN105733545A (en) * 2016-01-20 2016-07-06 陕西海山环保能源科技有限公司 Profile control and displacement agent for oily sludge profile control and displacement plugging and technique thereof
CN105733545B (en) * 2016-01-20 2018-08-24 陕西海山能源发展有限公司 A kind of formula and its preparation process of greasy dirt transfer drive closure transfer drive medicament
CN108019192A (en) * 2016-11-01 2018-05-11 中国石油化工股份有限公司 A kind of hydroexpanding body blocking agent profile control blocks removal of bridge formation method
CN108019192B (en) * 2016-11-01 2019-11-08 中国石油化工股份有限公司 A kind of hydroexpanding body blocking agent profile control blocking removal of bridge formation method
CN111087997A (en) * 2018-10-24 2020-05-01 中国石油化工股份有限公司 Method for blocking water in oil reservoir and oil well

Also Published As

Publication number Publication date
CN104100224B (en) 2016-12-28

Similar Documents

Publication Publication Date Title
CN104100224A (en) Oil well water plugging method
CN104087275B (en) A kind of high-temperature-resistant high-salt tiny gels granular profile control agent and its preparation method and application
CN105298438B (en) More fine profile control methods in round polymer gel deep
CN103725274B (en) Fluid bridging plug of high pressure resistant controlled degradation chemistry forming and its production and use
US9366125B2 (en) Carbonate based slurry fracturing using solid acid for unconventional reservoirs
CN103321606A (en) Water plugging shielding method for low-permeability fractured reservoir oil well
CN104675371A (en) Complex oil displacement experimental method by means of alternately injecting gel and polymer solution after polymer flooding and follow-up water flooding
CN106194105B (en) Launch profile control method in blocking agent deep
CN108166960A (en) Low-permeability oil reservoir step-by-step profile control and flooding process
CN103087699B (en) Sand-carrying profile control agent composition of fracture-cave type oil deposit and profile control method of profile control agent
CN108533238B (en) Method for plugging dominant seepage channel after polymer flooding
CN103306659A (en) Fracturing technology for implementing ultrahigh flow conductivity
CN103589408A (en) High temperature and high salinity resistant plugging control system and plugging control method by using same
CN101993684B (en) Temporary acidizing plugging agent for low-permeability oilfield water injection well
CN102926701B (en) Continuous mixed type water plugging process method
CN104762072A (en) Penetrating selective plugging agent and preparation method and application method thereof
CN103411804A (en) Heterogeneous cemented rock core model with high-permeability layer and manufacturing method thereof
CN109439306A (en) Extra permeability oilfield selectivity Application of weak gel profile agent
CN105625981A (en) Composite profile control method for middle-high permeability oil reservoirs
CN105385429A (en) Heterogeneous system for oil displacement or profile control of heterogeneous reservoirs and preparation method for heterogeneous system
CN103694977B (en) A kind of anti-shearing delay cross linking organic profile control agent
CN106468152B (en) A kind of thick oil horizontal well intensity adjustable shutoff method
CN103790560A (en) Fractured reservoir profile control process
CN101747879B (en) Baffle for thin layer oilfield controlling coning of bottom water and injection method thereof
CN109751028A (en) A kind of fracturing process and construction process for carbonate rock

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant