CN1584290A - 盾构三维姿态精密监测系统 - Google Patents

盾构三维姿态精密监测系统 Download PDF

Info

Publication number
CN1584290A
CN1584290A CNA2004100247053A CN200410024705A CN1584290A CN 1584290 A CN1584290 A CN 1584290A CN A2004100247053 A CNA2004100247053 A CN A2004100247053A CN 200410024705 A CN200410024705 A CN 200410024705A CN 1584290 A CN1584290 A CN 1584290A
Authority
CN
China
Prior art keywords
total powerstation
signal controlling
power supply
computer
signal control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2004100247053A
Other languages
English (en)
Other versions
CN1584290B (zh
Inventor
岳秀平
郑金淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No2 Municipal Engineering Co Ltd
Original Assignee
Shanghai No2 Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No2 Municipal Engineering Co Ltd filed Critical Shanghai No2 Municipal Engineering Co Ltd
Priority to CN 200410024705 priority Critical patent/CN1584290B/zh
Publication of CN1584290A publication Critical patent/CN1584290A/zh
Application granted granted Critical
Publication of CN1584290B publication Critical patent/CN1584290B/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

一种盾构三维姿态精密监测系统,用于隧道施工领域。包括:计算机、动态站全站仪、两只信号控制箱、自动归平基座、电源、通讯电缆、固定站全站仪、后视棱镜,计算机通过通讯电缆与第一信号控制箱一端连接,第一信号控制箱另一端一方面连接动态站全站仪,另一方面串联到第二只信号控制箱,第二只信号控制箱另一端与固定站全站仪连接,两只信号控制箱都连接到电源,动态站全站仪设置在自动归平基座上,自动归平基座通过第一信号控制箱与电源连接,固定站全站仪、后视棱镜成基准线。本发明构成简单,精度高,两台全站仪的两级传导方式解决了在弯道处推进时不能很好适应的缺点,选点的较大任意性使点位设置简单方便,系统能智能化调整运行状态。

Description

盾构三维姿态精密监测系统
技术领域
本发明涉及一种自动化监测系统,具体是一种,对盾构机空间姿态直接进行确定的盾构三维姿态精密监测系统。用于隧道施工领域。
背景技术
确定盾构机在掘进施工中的姿态,历来是隧道工程中的关键技术之一,目前在国际国内有数种盾构姿态监测系统在施工中应用。
经检索发现,具有代表性的是由英国ZED公司生产的ZED261盾构姿态测试仪,这是一种实时盾构机掘进导向系统。刘骏发表的文章“地铁盾构机掘进导向系统( www.stec.net/stectech/xis-1114.htm)”,该文介绍了ZED261盾构姿态测试仪的硬件构成、工作原理、定位方法、技术性能等,它由六大部分组成:1)小型终端机、2)控制单元、3)分配箱、4)倾斜(传感器)单元、5)目标单元、6)全站仪与激光枪。其工作原理是:激光束通过前部透明屏幕进入目标单元(部分散射),部分光击中安装在单元底部和侧面的传感器,传感器可以探测光束进入屏幕时的位置;其余的光束通过透镜到达安装在轴心上的传感器,此传感器装在单元的后部,用来测量光束的倾角。后部的传感器与前部透明屏幕距离较大。因此,如果激光束很弱或因距离长而显著衰减,就会造成读数不精确。从传感器出来的信号被转换成电子信号,并通过单元后部的电缆输入到控制单元。该测试仪构成中有4个倾斜单元。陀螺方向控制仪依靠的是方向感知感应器。
由于开发原理的差别和依托的设备选型特点,使得上述系统构成偏于复杂、成本很高;另有一些系统(如:陀螺仪方向控制系统)功能单一、精度偏低。这些系统在运行上是稳定的,但除上述问题之外尚有欠缺和不足:其一,它们的维护量均很大,而且其系统从不同设备(仪器和传感器)获得的数据相互之间匹配性不够强,有的测量要素精度不够高;其二,对于隧道急曲线转向时适应性不好,不能自动调变;其三,也有的采用累积计算里程而使其误差偏大。再者,引进的国外姿态监测设备价格高昂,掌握不易,在实际应用中对操作人员要求很高。上述种种原因,造成了自动姿态监测难以推广使用的局面。
发明内容
本发明针对背景技术中存在的不足和缺陷,提供一种盾构三维姿态精密监测系统,使其不依靠测倾和测斜装置,故而也省去了对它们的连接。包括千斤顶行程传感器也可免用(与其无关)。也就是说,本发明在数据采集装置、方式、方法等方面与其它系统不同,这里采用空间几何直接定位的方式,是一种新的隧道盾构掘进机(刚体)姿态测量系统,在得到结果的方式方法和手段上,是完全独立的、是简捷而有效的。
本发明是通过以下技术方案实现的,本发明包括:计算机、动态站全站仪、两只信号控制箱、自动归平基座、电源、通讯电缆、固定站全站仪、后视棱镜,其连接关系为:计算机通过通讯电缆与第一信号控制箱一端连接,第一信号控制箱的另一端一方面连接动态站全站仪,另一方面串联到第二只信号控制箱,第二只信号控制箱另一端与固定站全站仪连接,两只信号控制箱都连接到电源,动态站全站仪设置在自动归平基座上,自动归平基座通过第一信号控制箱与电源连接。后视棱镜单独设置,固定站全站仪、后视棱镜成基准线。
计算机是系统控制部分的主体,发出的控制指令通过电缆的直接连接到达信号控制箱,并且由第一只信号控制箱串联连接到第二只信号控制箱。两信号控制箱均接到电源,在为动态站全站仪和自动归平基座提供电源的同时,也将计算机的控制指令送达动态站全站仪。计算机、动态站全站仪、两只信号控制箱之间的通讯方式为半双工和RS-232标准九针串口。
计算机可以是专为配置本系统运行的工业控制计算机,也可以是盾构机操作控制系统的计算机,本发明工作在隧道环境,工况条件较差,推荐使用IPC工业控制计算机完成系统控制,对于起监视和数据与指令处理的计算机:满足防震动、抗潮湿、耐高低温(50℃)等要求。最低配置不低于:
——VGA显示器、102键盘、鼠标
——Pentium-MMX233MHz处理器(CPU)
——32M以上内存
——5G硬盘空间
——PCI和ISA扩展槽各一个
——COM1、COM2串行口
作为系统可选,优选推荐CONTECIPC-RT/L600S和研华AWS8259工业控制计算机,能在震动状态、5℃~50℃及低于80%湿度环境中正常运行。
系统控制部分完成数据与相关信息的输入、输出与观测结果的分析处理和显示,也包括运行动作的指令发出等。
信号控制箱、通讯电缆构成本发明的通讯组件,担负计算机与动态站全站仪之间数据(指令)的传输。
动态站全站仪、固定站全站仪和自动归平基座构成本发明的自动测量工作站,动态站全站仪、固定站全站仪担负来自计算机遥控指令任务的具体操作、完成目标点(盾构机特征点)测定,自动归平基座作为辅助部件,确保动态站全站仪、固定站全站仪正常工作状态(仪器竖轴铅直)。
自动测量工作站是系统测量动作的执行者。动态站全站仪、固定站全站仪是自动测量工作站的主体,作为当前同业中技术最为先进的徕卡品牌,选用TCA1800全站仪(俗称测量机器人)不仅功能上满足自动搜索、自动照准、自动测量以及遥控通讯的能力要求,而且在防水、防震、耐高低温等方面表现出优良性能。
本发明安装时,第一项安装工作,即安置自动测量工作站,包括固定站全站仪与同步跟进的动态站全站仪,以及设置供动态站全站仪、固定站全站仪观测的基准点棱镜和盾构机上三个目标点P1、P2、P3。它们选位和安装的原则是尽可能避免运行中环境对其干扰(如视线阻挡等)。尤其是动态站全站仪的安置,其仪器的基座是自动归平式,以便在同步动态跟进过程中确保仪器时刻处于归平的工作状态。第二项安装工作,即把动态站全站仪、固定站全站仪与计算机之间连接构成通信链路。通讯电缆采用20芯DYZ-RVV防水通信缆;信号控制箱为专用设备,它不仅完成通信任务,还为动态站全站仪和自动归平基座提供稳压电源。
本发明使用220V的交流照明电源。从计算机到每一仪器均需220V电流供给。必须安装专用供电线路,电源电压稳定,并配有相应的保险设备和接插头。
本发明系统的测量方法和原理是,以固定站全站仪与基准点棱镜为固定边作为基线,按支导线形式由固定站全站仪测得动态站全站仪的坐标,再由动态站全站仪测定盾构机上三目标点P1、P2、P3的坐标。
在运行过程中,动态站全站仪随盾构前行,渐渐远离固定站全站仪,其通信电缆要逐节放出。当相距接近限值时,固定站全站仪向前迁站,同时收起部分通信缆。这样的放缆收缆工作会随着盾构的推进不断重复。
安装要求与注意事项:1)、在基准点棱镜和固定站全站仪必须稳定,不得有任何松动。2)、动态站全站仪安装在车架顶上,考虑能在一定范围内移动为原则设定其具体位置。3)、计算机安装在操作室内,盾构司机从屏幕上一目了然当前盾构机的姿态信息。
本发明系统的创新点有以下几方面:1)、硬件构成简单:动态站全站仪、固定站全站仪完成全部测量数据的采集,不需要其它的辅助,维护简便。2)、动态同步跟进:运行方式上依靠全站仪的高级功能,两台全站仪的两级传导方式解决了其他系统(激光指向式)在弯道处推进时不能很好适应的缺点。3)、盾构机(刚体)三点空间定位:几何原理严密准确,选点的较大任意性使点位设置简单方便。4)、理论方法新:向量法直接得出盾构机刚体的空间姿态,六个自由度高精度全部同时给出。5)、智能化运行:对遇到视线障碍、怠速(停止)推进等不同工况,系统将调整运行状态,报告系统运行情况并适当延迟监测频度。
采用本发明能为盾构推进施工带来很多好处:首先,替代价格高昂的进口设备,且操作维护很简便;其次,为达到信息化施工、科学化管理提供了支持要素;再者,系统不仅提供了连续准确的施工状态信息,达到高级专业人员水平,同时替代了大部分隧道内姿态观测人工作业,这也体现了以人为本的精神。另外,系统所提供数据的精度比人工测量结果提高一个量级,达到2毫米以内。
附图说明
图1为本发明结构示意图
具体实施方式
如图1所示,本发明包括:计算机1、动态站全站仪2、信号控制箱3、8自动归平基座4、电源5、通讯电缆6、固定站全站仪7、后视棱镜9,其连接关系为:计算机1通过通讯电缆6与号控制箱3一端连接,号控制箱3的另一端一方面连接动态站全站仪2,另一方面串联到信号控制箱8,信号控制箱8另一端与固定站全站仪7连接,两只信号控制箱3、8都连接到电源5,动态站全站仪2设置在自动归平基座4上,自动归平基座4通过信号控制箱3与电源5连接。后视棱镜9单独设置,固定站全站仪7、后视棱镜9成基准线。
计算机1是工业控制计算机,或者是盾构机操作控制系统的计算机,推荐使用IPC工业控制计算机,优选推荐CONTECIPC-RT/L600S和研华AWS8259工业控制计算机。
计算机1、动态站全站仪2、信号控制箱3、8之间的通讯方式为半双工和RS-232标准九针串口。
动态站全站仪2、固定站全站仪7选用瑞士徕卡TCA1800全站仪。
通讯电缆6采用20芯DYZ-RVV防水通信缆。
信号控制箱3同时为全站仪2和自动归平基座4提供稳压电源。
使用时,动态站全站仪2设置在车架顶上,随其同步前行,计算机1设置在盾构机操作室内。
后视棱镜9与固定站全站仪7、固定站全站仪7与动态站全站仪2、动态站全站仪2与盾构机上三目标点P1、P2、P3保持视线通视良好。

Claims (4)

1、一种盾构三维姿态精密监测系统,包括:计算机(1)、电源(5)、固定站全站仪(7),其特征在于,还包括:动态站全站仪(2)、信号控制箱(3、8)、自动归平基座(4)、通讯电缆(6)、后视棱镜(9),其连接关系为:计算机(1)通过通讯电缆(6)与号控制箱(3)一端连接,号控制箱(3)的另一端一方面连接动态站全站仪(2),另一方面串联到信号控制箱(8),信号控制箱(8)另一端与固定站全站仪(7)连接,两只信号控制箱(3、8)都连接到电源(5),动态站全站仪(2)设置在自动归平基座(4)上,自动归平基座(4)通过信号控制箱(3)与电源(5)连接,后视棱镜(9)单独设置,(7、9)构成基准线。
2、根据权利要求1所述的盾构三维姿态精密监测系统,其特征是,计算机(1)、动态站全站仪(2)、信号控制箱(3、8)之间的通讯方式为半双工和RS-232标准九针串口。
3、根据权利要求1或2所述的盾构三维姿态精密监测系统,其特征是,使用时,动态站全站仪(2)设置在车架顶上,计算机(1)设置在盾构机操作室内。
4、根据权利要求1或2所述的盾构三维姿态精密监测系统,其特征是,信号控制箱(3)为动态站全站仪(2)和自动归平基座(4)提供稳压电源。
CN 200410024705 2004-05-27 2004-05-27 盾构三维姿态监测系统 Expired - Fee Related CN1584290B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410024705 CN1584290B (zh) 2004-05-27 2004-05-27 盾构三维姿态监测系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410024705 CN1584290B (zh) 2004-05-27 2004-05-27 盾构三维姿态监测系统

Publications (2)

Publication Number Publication Date
CN1584290A true CN1584290A (zh) 2005-02-23
CN1584290B CN1584290B (zh) 2010-05-05

Family

ID=34600957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410024705 Expired - Fee Related CN1584290B (zh) 2004-05-27 2004-05-27 盾构三维姿态监测系统

Country Status (1)

Country Link
CN (1) CN1584290B (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101684731A (zh) * 2008-09-27 2010-03-31 上海市机械施工有限公司 一种隧道盾构姿态测量方法
CN101148989B (zh) * 2007-08-09 2010-05-19 上海港机重工有限公司 盾构掘进机本地及远程监控方法
CN101916082A (zh) * 2010-08-17 2010-12-15 中铁隧道装备制造有限公司 一种盾构远程监控系统
CN102102522A (zh) * 2010-12-30 2011-06-22 浙江大学 盾构掘进过程中的轨迹姿态复合控制方法
CN102419433A (zh) * 2011-11-25 2012-04-18 三一重型装备有限公司 一种掘进机姿态定位系统
CN102679974A (zh) * 2012-05-30 2012-09-19 上海隧道工程股份有限公司 高速定位免换站式盾构掘进姿态实时测量方法及系统
CN102809374A (zh) * 2011-05-30 2012-12-05 同济大学 一种铰接盾构机自动导向测量方法及装置
CN103335647A (zh) * 2013-07-02 2013-10-02 华中科技大学 一种盾构机姿态测量系统及其测量方法
CN102046920B (zh) * 2008-05-30 2014-03-05 罗宾斯公司 用于监视隧道掘进效率的装置和方法
CN104878701A (zh) * 2015-06-26 2015-09-02 东南大学 一种下穿既有线桥涵顶进水平导向纠偏系统
CN105518253A (zh) * 2013-11-29 2016-04-20 株式会社小松制作所 隧道掘进装置及其控制方法
CN107269276A (zh) * 2017-06-19 2017-10-20 中国矿业大学 一种用于弯道施工的掘进定位系统及方法
CN113982600A (zh) * 2021-10-22 2022-01-28 中铁一局集团有限公司 一种基于怠速扭矩的异常工况预警方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107449407A (zh) * 2017-08-16 2017-12-08 上海市基础工程集团有限公司 用于土压平衡盾构机的自动测量导向系统及方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1063826C (zh) * 1994-03-07 2001-03-28 藤田株式会社 盾构设备
JP3289512B2 (ja) * 1994-09-19 2002-06-10 村田機械株式会社 無声音検出による自動利得制御装置

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101148989B (zh) * 2007-08-09 2010-05-19 上海港机重工有限公司 盾构掘进机本地及远程监控方法
CN102046920B (zh) * 2008-05-30 2014-03-05 罗宾斯公司 用于监视隧道掘进效率的装置和方法
CN101684731B (zh) * 2008-09-27 2013-02-27 上海市机械施工有限公司 一种隧道盾构姿态测量方法
CN101684731A (zh) * 2008-09-27 2010-03-31 上海市机械施工有限公司 一种隧道盾构姿态测量方法
CN101916082A (zh) * 2010-08-17 2010-12-15 中铁隧道装备制造有限公司 一种盾构远程监控系统
CN102102522A (zh) * 2010-12-30 2011-06-22 浙江大学 盾构掘进过程中的轨迹姿态复合控制方法
CN102809374A (zh) * 2011-05-30 2012-12-05 同济大学 一种铰接盾构机自动导向测量方法及装置
CN102419433A (zh) * 2011-11-25 2012-04-18 三一重型装备有限公司 一种掘进机姿态定位系统
CN102679974A (zh) * 2012-05-30 2012-09-19 上海隧道工程股份有限公司 高速定位免换站式盾构掘进姿态实时测量方法及系统
CN102679974B (zh) * 2012-05-30 2015-10-14 上海隧道工程股份有限公司 高速定位免换站式盾构掘进姿态实时测量方法及系统
CN103335647A (zh) * 2013-07-02 2013-10-02 华中科技大学 一种盾构机姿态测量系统及其测量方法
US10006285B2 (en) 2013-11-29 2018-06-26 Komatsu Ltd. Tunnel boring device, and control method therefor
CN105518253A (zh) * 2013-11-29 2016-04-20 株式会社小松制作所 隧道掘进装置及其控制方法
CN104878701A (zh) * 2015-06-26 2015-09-02 东南大学 一种下穿既有线桥涵顶进水平导向纠偏系统
CN107269276A (zh) * 2017-06-19 2017-10-20 中国矿业大学 一种用于弯道施工的掘进定位系统及方法
WO2018233721A1 (zh) * 2017-06-19 2018-12-27 中国矿业大学 一种用于弯道施工的掘进定位系统及方法
WO2018233390A1 (zh) * 2017-06-19 2018-12-27 中国矿业大学 一种用于弯道施工的掘进定位系统及方法
CN107269276B (zh) * 2017-06-19 2019-09-06 中国矿业大学 一种用于弯道施工的掘进定位系统及方法
GB2573652A (en) * 2017-06-19 2019-11-13 Univ China Mining Boring and positioning system and method for constructing winding underpass
AU2018289881B2 (en) * 2017-06-19 2020-03-05 China University Of Mining And Technology Excavation positioning system and method for curved roadway construction
GB2573652B (en) * 2017-06-19 2022-02-16 Univ China Mining Excavation positioning system and method for curved roadway construction
CN113982600A (zh) * 2021-10-22 2022-01-28 中铁一局集团有限公司 一种基于怠速扭矩的异常工况预警方法
CN113982600B (zh) * 2021-10-22 2023-12-22 中铁一局集团有限公司 一种基于怠速扭矩的异常工况预警方法

Also Published As

Publication number Publication date
CN1584290B (zh) 2010-05-05

Similar Documents

Publication Publication Date Title
CN1584290B (zh) 盾构三维姿态监测系统
CN104023906B (zh) 操作管理装置及操作管理系统
US8218131B2 (en) Position measuring system, position measuring method and position measuring program
Feng et al. Measuring fracture orientation at exposed rock faces by using a non-reflector total station
CN100368765C (zh) 机器人系统中再校准三维视觉传感器的方法和设备
CN201749187U (zh) 一种激光扫描仪的检校系统
CN101923163B (zh) 一种激光扫描仪的检校方法及检校系统
CN1218177A (zh) 用于大型零件的便携式激光数字化系统
CA2269281C (en) Telemetric spacial data recorder
US20110178763A1 (en) Use of inclinometers to improve relocation of a portable articulated arm coordinate measuring machine
CN104797907A (zh) 用于物体自动测量的测量器和测量方法
CN201653373U (zh) 三轴非接触式影像测量系统
WO2008124713A2 (en) A system and method capable of navigating and/or mapping any multi-dimensional space
CN1793780A (zh) 基于拼接靶的大型三维形体形貌测量拼接方法和装置
CN113781576B (zh) 多自由度位姿实时调整的双目视觉检测系统、方法、装置
CN105509702A (zh) 光电惯性校靶系统三维空间角度测量仪
CN112476395A (zh) 一种面向工业机器人的三维视觉划线设备及方法
CN208254413U (zh) 一种移动式三坐标激光测量装置
Kyle et al. Automated part positioning with the laser tracker
CN102128635A (zh) 一种光电测距仪周期误差自动检定系统
TW469392B (en) Computer-aided synchronous measuring method
CN216432980U (zh) 盾构机靶标、盾构机前盾的位姿测量系统
US11631184B2 (en) Feature inspection system
CN210741450U (zh) 一种经纬仪检定装置及一种辅助读数采集装置
KR100258405B1 (ko) 터널공사시 발파위치 및 내공측정방법 및 장치

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100505