CN1564912A - 用于优化一天然气压缩站的多个压缩机组的运行状况的方法 - Google Patents

用于优化一天然气压缩站的多个压缩机组的运行状况的方法 Download PDF

Info

Publication number
CN1564912A
CN1564912A CNA028196740A CN02819674A CN1564912A CN 1564912 A CN1564912 A CN 1564912A CN A028196740 A CNA028196740 A CN A028196740A CN 02819674 A CN02819674 A CN 02819674A CN 1564912 A CN1564912 A CN 1564912A
Authority
CN
China
Prior art keywords
compressor
rotating speed
gas compression
station
compressor bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA028196740A
Other languages
English (en)
Inventor
迪特尔·劳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Publication of CN1564912A publication Critical patent/CN1564912A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D27/00Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
    • F04D27/02Surge control
    • F04D27/0261Surge control by varying driving speed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D27/00Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
    • F04D27/02Surge control
    • F04D27/0269Surge control by changing flow path between different stages or between a plurality of compressors; load distribution between compressors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Positive-Displacement Air Blowers (AREA)
  • Control Of Positive-Displacement Pumps (AREA)
  • Separation By Low-Temperature Treatments (AREA)
  • Compressors, Vaccum Pumps And Other Relevant Systems (AREA)
  • Pipeline Systems (AREA)

Abstract

本发明公开了一种用于优化天然气压缩站的多个压缩机组的运行状况的方法,其中,在第二个或另一压缩机组开始运行后,所述处于运行状态的压缩机组的转速与为每个压缩机组对应存储的特性曲线族数据成一固定转速比,接着,通过与所述转速成正比的流量调节机构来改变该固定转速比,直到所述天然气压缩站的泵保护阀关闭为止,接下来,将所述各压缩机组在其特性曲线族中的工作点尽可能地引导到其最大的效率曲线上,随后,在所述天然气压缩站的连续运行方式中,通过交替地调整或相互协调地改变所述各压缩机组的转速额定值并在监控所述天然气压缩站的燃料消耗量的情况下测出最优的转速额定值以及根据如此测得的最优转速额定值来相应地调整所述被存储的固定转速比并且将其储存起来。

Description

用于优化一天然气压缩站的多个压缩机组 的运行状况的方法
本发明涉及一种用于优化一天然气压缩站的多个压缩机组的运行状况的方法。
这类天然气压缩站借助于一种所谓的压缩站自动化控制装置来控制或调节,该压缩站自动化控制装置的功能是,将由一调度中心预先规定的、用于该天然气压缩站的某些特征参数的额定值作为实际值来实现。作为这类额定值的可以是压缩站流通量(即流过所述天然气压缩站的天然气流量)、天然气压缩站的入口侧的吸气压力、天然气压缩站的出口侧的排气压力或天然气压缩站的出口侧的排气温度。
这类天然气压缩站的压缩机组的区别通常在于极其不同地设计的驱动机和不同的工作轮。天然气借助于这些工作轮被输送通过所述天然气压缩站。
本发明所要解决的技术问题在于提供一种用于优化一天然气压缩站的多个压缩机组的运行状况的方法,借助该方法以最佳的方式通过调整所述各压缩机组的特性曲线族自动使天然气压缩站的多个压缩机组相互协调工作,在此,所述各压缩机组的特性曲线族相互之间可以具有明显的差别。
上述技术问题按照本发明是这样来解决的,即,在所述天然气压缩站的第二个或另一压缩机组开始运行后,所述处于运行状态的压缩机组的转速与为每个压缩机组对应存储的特性曲线族数据成一固定转速比,接着,通过与所述转速成正比的流量调节机构来改变该固定转速比,直到所述天然气压缩站的泵保护阀关闭为止,接下来,将所述各压缩机组在其特性曲线族中的工作点尽可能地引导到其最大的效率曲线上,随后,在所述天然气压缩站的连续运行方式中,通过交替地调整或相互协调地改变所述各压缩机组的转速额定值,在监控所述天然气压缩站的燃料消耗量的情况下测出最优的转速额定值以及根据如此测得的最优转速额定值来调整所述被存储的固定转速比并且将其储存起来。
通过交替调整所述不同压缩机组的转速额定值,使所述各压缩机组的不同特性曲线族中的各个工作点达到其最佳位置,且由此使天然气压缩站所要求的压缩机功率只需最小的燃料消耗量。基于如此达到的最低燃料消耗量,减小了废气排放量以及由此减小了NOX和CO2的排放量。
上述用于减小天然气压缩站的燃料消耗量的过程控制比较有利地可在为所述天然气压缩站的运行所装入的自动化程序的基础上实现,因此不再需要单独的优化程序或别的程序模块。在考虑到使所述天然气压缩站的燃料消耗达到最小的情况下的最优化在按照本发明的方法中是通过相互协调地移动所述各个压缩机组的特性曲线来实现。
在本发明方法的一个有利的实施方式中,通过所述天然气压缩站的一压缩站调节器将用于所述各压缩机组的转速额定值输送到各压缩机组的各转速调节器上,其中,多个调整参数中的那个具有最小的正调整偏差的调整参数作为用于所述压缩站调节器的调整参数。
所述压缩站流通量或天然气压缩站的天然气流量、吸气压力、排气压力或排气温度都可以作为调整参数。
在考虑到使整个天然气压缩站有最小燃料消耗的情况下,比较有利地可借助于一个设置在所述压缩站调节器与所述各压缩机组的各转速调节器之间的优化计算机来实现所述天然气压缩站的各压缩机组的转速额定值的交替调整和相互协调的变化。
下面借助一实施方式对本发明予以详细说明,附图中:
图1表示压缩机组的压缩机-特性曲线族;
图2表示一用于控制天然气压缩站的PC-监视器的操作及观察面。
一个天然气压缩站具有大量的单个压缩机组,这些压缩机组至少部分具有不同的驱动机和不同的工作轮,其原因例如在于:有的压缩机组要针对满足基本负荷运行要求来设计,而有的压缩机组要针对满足最大负荷运行要求来设计。
为了优化一天然气压缩站的多个压缩机组的运行状况,在该天然气压缩站的第二个或另一压缩机组成功启动后,该天然气压缩站的一个压缩站调节器将使该天然气压缩站的从现在起处于运行状态的压缩机组的转速与为每个压缩机组对应存储的特性曲线族数据成一固定转速比。
接着通过与所述各个的压缩机组转速成等百分比的流量调节机构来改变该固定转速比,直到所述天然气压缩站的泵保护阀关闭为止。通过关闭所述泵保护阀完成在天然气压缩站运行时的第一次燃料减少。同时通过关闭所述泵保护阀减少通过所述天然气压缩站来压缩或输送的天然气被加热的程度,由此更有利于在天然气压缩站中构成能量平衡。
当所述天然气压缩站的所有泵保护阀都关闭了,则将所述各个压缩机组在其特性曲线族中的工作点尽可能地引导到其最大的效率曲线上。
在所述天然气压缩站随后的连续运行方式中,通过交替地调整或相互协调地改变所述各个压缩机组的转速额定值,在监控所述天然气压缩站的燃料消耗量的情况下寻求用于所述各个压缩机组的转速额定值的最佳值。在测得这些关于所述各个压缩机组的转速额定值的最优值后,根据所测得的最优转速额定值调整前面提到的、关于所存储的特性曲线族数据的固定转速比并且随后将该调整后的固定转速比储存起来。
具有最小的正调整偏差的调整参数作为用于所述天然气压缩站的压缩站调节器的调整参数。在所述压缩站调节器的输出例提供所述用于各个压缩机组的转速额定值。将这些在压缩站调节器的输出侧提供的转速额定值转换成所述各压缩机组的实际转速可通过一些转速调节器来实现。这些转速调节器与所述各压缩机组的各控制单元相配置。
为了考虑到对于所述各压缩机组的不同设计,所述转速额定值在输送到各压缩机组的转速调节器之前,先通过一个连接在所述压缩站调节器与所述各转速调节器之间的一优化计算机来调整。

Claims (5)

1.一种用于优化一天然气压缩站的多个压缩机组的运行状况的方法,其中,在第二个或另一压缩机组开始运行后,所述处于运行状态的压缩机组的转速与为每个压缩机组对应存储的特性曲线族数据成一固定转速比,接着,借助一个与转速成正比的流量调节机构来改变该固定转速比,直到所述天然气压缩站的泵保护阀关闭为止,接下来,将所述各压缩机组在其特性曲线族中的工作点尽可能地引导到其最大的效率曲线上,随后,在所述天然气压缩站的连续运行方式中,通过交替地调整或相互协调地改变所述各压缩机组的转速额定值,在监控所述天然气压缩站的燃料消耗量的情况下测出最优的转速额定值以及根据如此测得的最优转速额定值来调整所述存储的固定转速比并且将其储存起来。
2.如权利要求1所述的方法,其中,该方法的过程控制是在为所述天然气压缩站的运行所装入的自动化程序的基础上实现的。
3.如权利要求1或2所述的方法,其中,通过一压缩站调节器将用于所述各压缩机组的转速额定值输送到各压缩机组的转速调节器上,其中,多个调整参数中的那个具有最小的正的调整偏差的调整参数作为用于所述压缩站调节器的调整参数。
4.如权利要求1至3中任一项所述的方法,其中,所述天然气压缩站的流通量或天然气流量、吸气压力、排气压力或排气温度都作为调整参数。
5.如权利要求3或4所述的方法,其中,所述天然气压缩站的各压缩机组的转速额定值的交替调整和相互协调的变化借助于一个设置在所述压缩站调节器与所述各压缩机组的转速调节器之间的优化计算机来实现。
CNA028196740A 2001-10-16 2002-10-11 用于优化一天然气压缩站的多个压缩机组的运行状况的方法 Pending CN1564912A (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10151032A DE10151032A1 (de) 2001-10-16 2001-10-16 Verfahren zur Optimierung des Betriebs mehrerer Verdichteraggregate einer Erdgasverdichtungsstation
DE10151032.2 2001-10-16

Publications (1)

Publication Number Publication Date
CN1564912A true CN1564912A (zh) 2005-01-12

Family

ID=7702670

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA028196740A Pending CN1564912A (zh) 2001-10-16 2002-10-11 用于优化一天然气压缩站的多个压缩机组的运行状况的方法

Country Status (12)

Country Link
US (1) US7600981B2 (zh)
EP (1) EP1436510B1 (zh)
CN (1) CN1564912A (zh)
AT (1) ATE423909T1 (zh)
CA (1) CA2463662C (zh)
DE (2) DE10151032A1 (zh)
ES (1) ES2320537T3 (zh)
MX (1) MXPA04003495A (zh)
NO (1) NO20042046L (zh)
RU (1) RU2294460C2 (zh)
UA (1) UA80687C2 (zh)
WO (1) WO2003036096A1 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112797014A (zh) * 2019-11-13 2021-05-14 中国石油天然气股份有限公司 站场启动方法、装置及存储介质

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1015460A3 (nl) * 2003-04-04 2005-04-05 Atlas Copco Airpower Nv Werkwijze voor het sturen van een persluchtinstallatie met meerdere compressoren, stuurdoos daarbij toegepast, en persluchtinstallatie die deze werkwijze toepast.
DE102005006410A1 (de) 2005-02-11 2006-08-17 Siemens Ag Verfahren zur Optimierung des Betriebs mehrerer Verdichteraggregate und Vorrichtung hierzu
EP1984628B1 (en) * 2006-02-13 2014-12-17 Ingersoll-Rand Company Multi-stage compression system and method of operating the same
NO329451B1 (no) * 2008-11-03 2010-10-25 Statoil Asa Fremgangsmate for a opprettholde trykket i eksportgassen fra en bronn
CN101956710B (zh) * 2010-10-27 2012-05-23 江苏大学 一种基于损失的离心泵多工况水力优化方法
CN102184305A (zh) * 2011-05-17 2011-09-14 江苏建筑职业技术学院 泵站技术改造数学模型
JP2013231396A (ja) * 2012-04-27 2013-11-14 Anest Iwata Corp 圧縮気体供給ユニット
US9605886B2 (en) * 2013-01-30 2017-03-28 Trane International Inc. Axial thrust control for rotary compressors
CN104968939B (zh) * 2013-02-08 2018-01-09 株式会社日立产机系统 流体压缩系统及其控制装置
DE102014006828A1 (de) * 2014-05-13 2015-11-19 Wilo Se Verfahren zur energieoptimalen Drehzahlregelung eines Pumpenaggregats
US10590937B2 (en) * 2016-04-12 2020-03-17 Toyota Motor Engineering & Manufacturing North America, Inc. Compressed air system and method of operating same

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4142838A (en) * 1977-12-01 1979-03-06 Compressor Controls Corporation Method and apparatus for preventing surge in a dynamic compressor
US4486148A (en) * 1979-10-29 1984-12-04 Michigan Consolidated Gas Company Method of controlling a motive power and fluid driving system
US4330237A (en) * 1979-10-29 1982-05-18 Michigan Consolidated Gas Company Compressor and engine efficiency system and method
DE3544822A1 (de) * 1985-12-18 1987-06-19 Gutehoffnungshuette Man Verfahren zur pumpgrenzregelung von turbokomporessoren
US4807150A (en) * 1986-10-02 1989-02-21 Phillips Petroleum Company Constraint control for a compressor system
DE3937152A1 (de) * 1989-11-08 1991-05-16 Gutehoffnungshuette Man Verfahren zum optimierten betreiben zweier oder mehrerer kompressoren im parallel- oder reihenbetrieb
US5347467A (en) * 1992-06-22 1994-09-13 Compressor Controls Corporation Load sharing method and apparatus for controlling a main gas parameter of a compressor station with multiple dynamic compressors
US5743715A (en) * 1995-10-20 1998-04-28 Compressor Controls Corporation Method and apparatus for load balancing among multiple compressors
US5743714A (en) * 1996-04-03 1998-04-28 Dmitry Drob Method and apparatus for minimum work control optimization of multicompressor stations
EP1069314A1 (de) * 1999-07-16 2001-01-17 Abb Research Ltd. Regelung einer Kompressoreinheit
US6394120B1 (en) * 2000-10-06 2002-05-28 Scales Air Compressor Method and control system for controlling multiple compressors
US6602057B2 (en) * 2001-10-01 2003-08-05 Dresser-Rand Company Management and optimization of load sharing between multiple compressor trains for controlling a main process gas variable

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112797014A (zh) * 2019-11-13 2021-05-14 中国石油天然气股份有限公司 站场启动方法、装置及存储介质

Also Published As

Publication number Publication date
RU2294460C2 (ru) 2007-02-27
WO2003036096A1 (de) 2003-05-01
EP1436510A1 (de) 2004-07-14
DE50213320D1 (de) 2009-04-09
US7600981B2 (en) 2009-10-13
RU2004114846A (ru) 2005-05-20
DE10151032A1 (de) 2003-04-30
NO20042046L (no) 2004-05-18
MXPA04003495A (es) 2004-07-30
US20040265133A1 (en) 2004-12-30
CA2463662C (en) 2011-01-11
CA2463662A1 (en) 2003-05-01
ATE423909T1 (de) 2009-03-15
ES2320537T3 (es) 2009-05-25
EP1436510B1 (de) 2009-02-25
UA80687C2 (en) 2007-10-25

Similar Documents

Publication Publication Date Title
CN1564912A (zh) 用于优化一天然气压缩站的多个压缩机组的运行状况的方法
US6652240B2 (en) Method and control system for controlling multiple throttled inlet rotary screw compressors
RU2084704C1 (ru) Способ регулирования компрессорной станции (варианты), способ регулирования основного параметра газа компрессорной станции и устройство для регулирования компрессорной станции (варианты)
CN102493945B (zh) 用于系统的控制器和用于控制制冷系统的方法
EP0570114B1 (en) Control system for prime driver of compressor and method
US20020170606A1 (en) Method and control system for controlling multiple compressors
CN106150996A (zh) 基于需求用气量计算的空压机群控控制系统及方法
CN102159815B (zh) 用于带有废气涡轮增压器的内燃机的新鲜气体供给装置及其控制方法
CN114784342B (zh) 一种防喘振燃料电池空气供给控制方法及系统、装置
US4486148A (en) Method of controlling a motive power and fluid driving system
CN101815875A (zh) 压缩机控制的改进
US6860103B2 (en) Multiple-compressor system having base and trim compressors
CN106460844A (zh) 包括液力耦合器的多级压缩机设备
CN107525348B (zh) 一种用于空分装置的多变量预测控制方法
CN104420991A (zh) 双轴燃气轮机
CN108691768A (zh) 用于控制旋转式螺杆压缩机的方法
CN105570112A (zh) 一种天然气集气增压机的工况优化方法及应用于其的气量调节控制系统
CN114109823B (zh) 一种螺杆压缩机变频和容调滑阀结合的控制方法
CN113389742B (zh) 一种空分的增压工艺
CN112947609B (zh) 一种滑压运行机组的主蒸汽压力设定控制策略和系统
US11913445B2 (en) Method for designing, gauging and optimizing a multiple compressor system with respect to energy efficiency
CN118188443B (zh) 一种储气库压缩机集群控制方法和系统
RU2819130C1 (ru) Способ снижения потребления топливного газа последовательно работающими очередями газоперекачивающих агрегатов дожимной компрессорной станции
Bryant Complex compressor station modeling
JP4538875B2 (ja) 圧縮機の運転制御方法および装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication