CN1545837A - Gypsum earth vegetation constructional materials and construction method thereof - Google Patents

Gypsum earth vegetation constructional materials and construction method thereof Download PDF

Info

Publication number
CN1545837A
CN1545837A CNA2003101111944A CN200310111194A CN1545837A CN 1545837 A CN1545837 A CN 1545837A CN A2003101111944 A CNA2003101111944 A CN A2003101111944A CN 200310111194 A CN200310111194 A CN 200310111194A CN 1545837 A CN1545837 A CN 1545837A
Authority
CN
China
Prior art keywords
water
gypsum
flyash
fertilizer
loss reducer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2003101111944A
Other languages
Chinese (zh)
Other versions
CN1263362C (en
Inventor
钱觉时
唐祖全
史才军
王智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN 200310111194 priority Critical patent/CN1263362C/en
Publication of CN1545837A publication Critical patent/CN1545837A/en
Application granted granted Critical
Publication of CN1263362C publication Critical patent/CN1263362C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention relates to a gypsum soil plant building material and construction method thereof, wherein the gypsum soil plant building material comprises two constituents of base material and straw seeds, and the base material mainly comprises gypsum, soil, coal ash, plant fiber, fertilizer, water-loss reducer and water.

Description

Gypsisol vegetation construction material and construction method
Technical field
The invention belongs to vegetation construction material and construction method, particularly the vegetation construction material and the construction method of turf establishment and side slope protection and greening.
Background technology
Along with the raising of living standards of the people and the enhancing of environmental consciousness, people are more and more higher to the requirement of living environment quality.Lawn planting is one of important measures of beautifying the environment, purify air, conserving water and soil.Lawn planting mainly adopts the seminal propagation method at present, though cost is low, labour's influence wasteful, that be subjected to weather is big, the maintenance management workload is big etc., and requires to have the soil of suitable grass seeds growth.
China is in the process of construction of infrastructure such as highway, railway and water conservancy, because a large amount of embankment and excavations that cuts into a mountain, form a lot of exposed slight slope and rock slopes, cause highway, railway vegetation deterioration along the line, water and soil loss, ecological disequilibrium, even cause massif to cave in and come down.Therefore need take technical measures that side slope is protected and afforested.To the effect that side slope is protected and afforested, be that side slope is carried out supporting and reinforcing on the one hand, make side slope keep stable; Be that side slope is afforested on the other hand, make its restore vegetation, ecology recovering balance, conserve water and soil.The method of at present side slope being protected and afforesting is: the thick and good side slope of soil property to soil layer, extensively adopt direct greening method, and be subjected to deficiencies such as weather effect is big, the maintenance management workload is big but mainly contain; To rock slope, its key is to provide the artificial soil that is beneficial to vegetation growth on domatic, and make this soil can be permanently affixed at rock domatic on.It is a kind of technology of rock slope being carried out ecological protection and greening of developing both at home and abroad at present that the thick-layer base material sprays bank protection.Its basic principle is that greening a base material, stabilizing agent, an agent and grass seed mix are added the water uniform mixing, then with the special-purpose ejecting machine with the mixture of uniform mixing on request thickness be ejected into domatic on.Through the maintenance management of certain hour, domatic go up will grow careless bud also progressively cover domatic, thereby reach the purpose of ecological revetment.This technology mainly contains following weak point:
(1) influences the grass seeds germinating growth.The thick-layer base material sprays the present stabilizing agent that uses of bulkhead tech and mainly contains portland cement, emulsified asphalt, synthetic resin and high molecular polymer.Wherein make base material be alkaline environment behind the silicate cement hydration, be unfavorable for growth and development of plants; To emulsified asphalt, when seed touches pitch, can hinder germination.
(2) substrate intensity is low.When stabilizing agent dosage was low, substrate intensity was low, be unfavorable for base material be fixed on rock domatic on, also be subject to rain erosion and wash away.When if stabilizing agent dosage is high, grass seeds germinates and the growth difficulty.
(3) construction costs height.Because synthetic resin and high molecular polymer price in the stabilizing agent are more expensive, make construction costs higher; Because substrate intensity is low, and particularly early strength is low, base material is difficult to fix on domatic again.Need on domatic linked network as last and fix at sprayed construction, after construction, need with coverings such as nonwoven, in case rain drop erosion with anchor pole.Thereby the work progress complexity, construction costs is raise.
The construction method of existing slope vegetation protection technology is wanted linked network before the construction as mentioned above, to cover after the construction, and the method complexity, time-consuming, the construction costs height is not easy to wide popularization and application.
Summary of the invention
The objective of the invention is at the deficiencies in the prior art, a kind of Gypsisol vegetation construction material and construction method are provided, have the vegetation construction material and form simply, the substrate intensity height, cost of material is cheap, grass seeds germination rate height; Construction method is simple, and characteristics such as saving of work and time are applicable to level land, hillside fields, riprap, mine, slag field, garbage disposal plant lawn planting and greening, also are applicable to various rocks, Protection of Soil Slope and greening.
The object of the present invention is achieved like this: a kind of Gypsisol vegetation construction material, to form by base material and grass seeds two parts, and it cooperates the percentage by weight of ratio to be: base material 96~99.95, grass seeds 0.05~4, form simple.Base material is the matrix of growth and development of plants and side slope protection, and grass seeds is the plant seed of turf establishment and slope protection greening.Wherein base material is made up of gypsum, earth, vegetable fiber, fertilizer, water-loss reducer and water, and it cooperates the percentage by weight of ratio to be: gypsum 5~40, earth 20~50, vegetable fiber 4~25, fertilizer 0.03~0.5, water-loss reducer 0.01~0.5, water 30~60; Or form by gypsum, flyash, vegetable fiber, fertilizer, water-loss reducer and water, it cooperates the percentage by weight of ratio to be: gypsum 5~40, flyash 18~50, vegetable fiber 4~25, fertilizer 0.03~0.5, water-loss reducer 0.01~0.5, water 30~60; Or form by gypsum, earth, flyash, vegetable fiber, fertilizer, water-loss reducer and water, it cooperates the percentage by weight of ratio to be: gypsum 5~40, earth 1~50, flyash 1~50, vegetable fiber 4~25, fertilizer 0.03~0.5, water-loss reducer 0.01~0.5, water 30~60.Gypsum in the base material is a semi-hydrated gypsum, because semi-hydrated gypsum is met behind the water will soon setting and harden, so the early strength of base material is higher, fast solidifying, make its can be fast, securely attached to soil property or rock domatic on, and be highly resistant to rain erosion and washing away, and therefore before construction, need not on domatic linked network and fix with anchor pole, after construction, also need not to cover with nonwoven etc.; Again because water-proof gypsum is relatively poor, and under the effect of later stage water seasoning and rainfall, the intensity on top layer decreases, help that grass seeds germinates and growth, so the seed germination rate height, emerge soon; Gypsum is a faintly acid, and formed substrate environment is fit to plant growing, and also contains plant growing, the required various trace elements of growth in the gypsum, and plant growing is fast, and grass can cover domatic fast.In base material, mix an amount of flyash, can save earth on the one hand, can utilize flyash to regulate the Acidity of Aikalinity of base material on the other hand, make base material be in faintly acid, be beneficial to growth and development of plants to neutral environment; In addition, flyash also contains plant growing, grows required various trace elements, helps the growth of plant.The flyash that the present invention adopts is the neutral or weakly alkaline flyash of faintly acid.Earth of the present invention is planting soil or the composite soil be made up of planting soil and humus soil, mud; Containing great number of organic matters in humus soil and the mud, is that growth and development of plants is needed.In base material, mix by crop stalk such as straw, wheat, corn or branch and pulverize the vegetable fiber that forms, help in base material, to form the space, make base material become loose porous, make plant be easy to obtain germinate, grow required light, air, moisture and fertilizer; Vegetable fiber can also replenish the organic matter in the base material after rotting.In base material, add the compound fertilizer of forming by nitrogen, phosphorus, potassium, provide plant growing required main nutrient and available nutrient; The required trace element of plant growing is then provided by gypsum and flyash.In base material, add water-loss reducer, be used for storing and slowly discharge the required moisture of plant growing, reduce the later stage maintenance costs; Water-loss reducer can adopt polyacrylamide, Sodium Polyacrylate, sodium carboxymethylcellulose, sodium carboxymethyl starch etc.Grass seeds of the present invention is single grass seeds or the grass seed mix be made up of multiple grass seeds.To grass seed mix, according to the difference of geographical position, natural environment and climate condition, based on warm-season turf grass seeds or cold-season type lawn grass seeds, also can add grass seeds respectively, as Bai Sanye, red clover grass seeds etc. with nitrogen fixation.Wherein Chang Yong cold-season type lawn grass seeds has Festuca Arundinacea, perennial ryegrass, kentucky blue grass, wheatgrass, awnless brome etc., and warm-season turf grass seeds commonly used has Bermuda grass, paspalum notatum, weeping love grass, centipede grass, carpetweed, buffalograss etc.
Construction method operation of the present invention is simple, easy construction, saving of work and time, and its construction procedure is as follows:
(1) at first in the cooperation ratio with earth or flyash or earth and flyash, vegetable fiber, fertilizer, water-loss reducer and water uniform mixing;
(2) in said mixture, add gypsum and grass seeds, uniform mixing then;
(3) at last by the concrete sprayer tool manually the mixture of Gypsisol vegetation construction material is sprayed or be laid in need the level land of protection and greening or domatic on.
After the present invention adopts technique scheme, mainly have following characteristics:
1, Gypsisol vegetation construction material of the present invention can form and be fit to the required soil environment of plant growing, and self has higher intensity again, can stick to firm stable various soil properties and rock domatic on.Therefore be a kind of afforestation vegetation material, certain bank protection function is arranged again.
2, the intensity height of base material, particularly early strength height, fast solidifying, can be fast, securely attached to soil property and rock domatic on, do not need linked network just to be highly resistant to rain erosion and wash away.
3, percentage of seedgermination height, it is fast to emerge, and plant can cover ground fast.
4, simple, the easy construction of working procedure.
5, the prices of raw and semifnished materials are cheap, and engineering cost is low.
The present invention both had been applicable to level land, hillside fields, riprap, mine, slag field, garbage disposal plant lawn planting and greening, also being applicable to various rocks, Protection of Soil Slope and greening, is to help beautifying the environment and practical the vegetation construction material and the construction method of water and soil conservation.
Embodiment
Below in conjunction with embodiment, further specify the present invention.
Embodiment 1:
Gypsisol vegetation construction material cooperates ratio (percentage by weight) as follows:
Base material 99.6
Grass seeds 0.4
Wherein base material cooperates ratio (percentage by weight) as follows:
Gypsum 12.5
Earth 31.25
Vegetable fiber 9.37
Fertilizer 0.4
Water-loss reducer 0.05
Water 46.43
Grass seeds is a Festuca Arundinacea, and gypsum is a semi-hydrated gypsum, and earth is planting soil, and vegetable fiber is pulverized by straw and formed, and fertilizer is nitrogen, phosphorus, K composite fertilizer, and water-loss reducer is a Sodium Polyacrylate.
At first earth, vegetable fiber, fertilizer, water-loss reducer, water are stirred, add gypsum and grass seeds then, the back that stirs is ejected into smooth soil surface by the concrete sprayer tool.Constructing, base material compression strength is more than 40kPa after 1 day, and grass seeds begins to germinate after 5 days, and after 1 month the complete mulching soil surface of grass, more than the careless growing height 12cm.
Embodiment 2:
Gypsisol vegetation construction material cooperates ratio (percentage by weight) as follows:
Base material 99
Grass seeds 1
Wherein base material cooperates ratio (percentage by weight) as follows:
Gypsum 18.92
Flyash 26.23
Vegetable fiber 8.1
Fertilizer 0.1
Water-loss reducer 0.05
Water 46.6
Gypsum is a semi-hydrated gypsum, and flyash is neutral flyash, and vegetable fiber is pulverized by straw and formed, and fertilizer is nitrogen, phosphorus, K composite fertilizer, and water-loss reducer is a Sodium Polyacrylate, and grass seeds is a grass seed mix, and its cooperation ratio (percentage by weight) is:
Festuca Arundinacea 60
Perennial ryegrass 15
Bai Sanye 10
Bermuda grass 15
At first flyash, vegetable fiber, fertilizer, water-loss reducer, water are stirred, add gypsum and grass seeds then, stir the back by the concrete sprayer tool be ejected into the gradient be 1: 0.5 rock domatic on.Constructing, base material compression strength is more than 100kPa after 1 day, and grass seeds begins to germinate after 5 days, and overlying rock is domatic fully for grass after 40 days, more than the careless growing height 10cm.

Claims (4)

1, a kind of Gypsisol vegetation construction material is characterized in that being made up of base material and grass seeds two parts, and it cooperates the percentage by weight of ratio to be: base material 96~99.95, grass seeds 0.05~4.
2, according to the described Gypsisol vegetation of claim 1 construction material, it is characterized in that described base material is made up of gypsum, earth, vegetable fiber, fertilizer, water-loss reducer and water, it cooperates the percentage by weight of ratio to be:
Gypsum 5~40 earth 20~50
Vegetable fiber 4~25 fertilizer 0.03~0.5
Water-loss reducer 0.01~0.5 water 30~60
Or form by gypsum, flyash, vegetable fiber, fertilizer, water-loss reducer and water, it cooperates the percentage by weight of ratio to be:
Gypsum 5~40 flyash 18~50
Vegetable fiber 4~25 fertilizer 0.03~0.5
Water-loss reducer 0.01~0.5 water 30~60
Or form by gypsum, earth, flyash, vegetable fiber, fertilizer, water-loss reducer and water, it cooperates the percentage by weight of ratio to be:
Gypsum 5~40 earth 1~50
Flyash 1~50 vegetable fiber 4~25
Fertilizer 0.03~0.5 water-loss reducer 0.01~0.5
Water 30~60
3, according to claim 1 and 2 described Gypsisol vegetation construction materials, it is characterized in that described gypsum is a semi-hydrated gypsum; Described flyash is the neutral or weakly alkaline flyash of faintly acid.
4, a kind of construction method of Gypsisol vegetation construction material is characterized in that construction procedure is as follows:
(1) at first in the cooperation ratio with earth or flyash or earth and flyash, vegetable fiber, fertilizer, water-loss reducer and water uniform mixing;
(2) in said mixture, add gypsum and grass seeds, uniform mixing then;
(3) at last by the concrete sprayer tool manually the mixture of Gypsisol vegetation construction material is sprayed or be laid in need the level land of protection and greening or domatic on.
CN 200310111194 2003-12-11 2003-12-11 Gypsum earth vegetation constructional materials and construction method thereof Expired - Fee Related CN1263362C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200310111194 CN1263362C (en) 2003-12-11 2003-12-11 Gypsum earth vegetation constructional materials and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200310111194 CN1263362C (en) 2003-12-11 2003-12-11 Gypsum earth vegetation constructional materials and construction method thereof

Publications (2)

Publication Number Publication Date
CN1545837A true CN1545837A (en) 2004-11-17
CN1263362C CN1263362C (en) 2006-07-12

Family

ID=34335983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200310111194 Expired - Fee Related CN1263362C (en) 2003-12-11 2003-12-11 Gypsum earth vegetation constructional materials and construction method thereof

Country Status (1)

Country Link
CN (1) CN1263362C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100364383C (en) * 2005-03-21 2008-01-30 云南利鲁环境建设有限公司 Rock slope biological protection and greening base material
CN104170627A (en) * 2014-08-19 2014-12-03 张家港市绿岩生态技术有限公司 Biological anchoring protecting technology applicable to mountains
CN106613470A (en) * 2016-09-30 2017-05-10 山东农业大学 Alkalinity-substracting planting material applicable for vegetation-growing concrete and preparation method thereof
CN107614794A (en) * 2015-07-03 2018-01-19 株式会社库林卡 The domatic maintenance construction method of coal ash is used
CN109618874A (en) * 2019-01-31 2019-04-16 贵州汇筑佳环保科技有限责任公司 A kind of ardealite vegetation and preparation method thereof
CN112250402A (en) * 2020-09-18 2021-01-22 昆明理工大学 Preparation method of gypsum-based foam material integrating slope protection and vegetation restoration
CN115073113A (en) * 2022-06-14 2022-09-20 云南凝创环保科技有限公司 Method for preparing gypsum-based ecological dry-mixed pouring material by using phosphogypsum
CN115299295A (en) * 2022-07-15 2022-11-08 中交上海航道局有限公司 Construction method for ecological greening of bare rock slope

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100364383C (en) * 2005-03-21 2008-01-30 云南利鲁环境建设有限公司 Rock slope biological protection and greening base material
CN104170627A (en) * 2014-08-19 2014-12-03 张家港市绿岩生态技术有限公司 Biological anchoring protecting technology applicable to mountains
CN104170627B (en) * 2014-08-19 2016-08-17 张家港市绿岩生态技术有限公司 It is applicable to the biological anchoring guard technology of massif
CN107614794A (en) * 2015-07-03 2018-01-19 株式会社库林卡 The domatic maintenance construction method of coal ash is used
CN106613470A (en) * 2016-09-30 2017-05-10 山东农业大学 Alkalinity-substracting planting material applicable for vegetation-growing concrete and preparation method thereof
CN109618874A (en) * 2019-01-31 2019-04-16 贵州汇筑佳环保科技有限责任公司 A kind of ardealite vegetation and preparation method thereof
CN109618874B (en) * 2019-01-31 2021-05-14 石家庄筑佳节能产品科技有限责任公司 Phosphogypsum vegetation and preparation method thereof
CN112250402A (en) * 2020-09-18 2021-01-22 昆明理工大学 Preparation method of gypsum-based foam material integrating slope protection and vegetation restoration
CN115073113A (en) * 2022-06-14 2022-09-20 云南凝创环保科技有限公司 Method for preparing gypsum-based ecological dry-mixed pouring material by using phosphogypsum
CN115073113B (en) * 2022-06-14 2023-03-14 云南凝创环保科技有限公司 Method for preparing gypsum-based ecological dry-mixed pouring material by using phosphogypsum
CN115299295A (en) * 2022-07-15 2022-11-08 中交上海航道局有限公司 Construction method for ecological greening of bare rock slope

Also Published As

Publication number Publication date
CN1263362C (en) 2006-07-12

Similar Documents

Publication Publication Date Title
CN1182770C (en) Mixed planting material for rocky slope and its prepn and construction process
CN103265355B (en) Plant growth matrix with high water retention for spray seeding revegetation and preparation method thereof
CN103362132B (en) A kind of construction method of cast-in-place greening concrete protective slope
CN107963838B (en) Ecological spray anchor slope protection structure and method
CN108035363B (en) A kind of side slope ecological renovation method of breakage mountain body
CN102031786B (en) Greening vegetation concrete and construction method thereof
CN100529015C (en) Intensifier for side slope afforestation and preparation method
CN102986418B (en) Spray-seeding base material for southern side slope and preparation method of spray-seeding base material
CN101748719A (en) Method of vegetation restoration and reconstruction of bare rock slope in East China
CN1974497A (en) Sludge-spraying and seeding afforesting matrix
CN1810084A (en) Multifunctional plant growth bag for slop ecological protection and its technological scheme
CN110226446A (en) A kind of high steep naked rock slope surface plants green system and its construction method
CN1111344C (en) Bed for planting vegetation on rock slope to protect it
CN107700429A (en) The anti-runoff of side slope washes away erosion device and the anti-runoff of side slope washes away corrosion method
CN101289863A (en) Ecological slope protection biology bricks and preparation and construction method thereof
CN102060604B (en) Suitable material special for plant-growing type porous concrete and filling method
CN110506573A (en) A method of for slope ecological reparation
CN112456895B (en) Vegetation concrete and preparation method thereof
CN109626950A (en) Ecological slope protection concrete and its construction method
CN111955309A (en) Artificial sponge matrix for slope ecological restoration and construction method
CN1263362C (en) Gypsum earth vegetation constructional materials and construction method thereof
CN113396795B (en) Foreign soil and soil layer structure based on river and lake bottom mud and phosphorite solid waste and preparation method
CN1860843A (en) Substrate for grawing urban carpet sward and its prepn. method
CN107311688B (en) It is a kind of for porous vegetation concrete of Techniques of Ecological Protection in Expressway Side Slope and preparation method thereof
CN109618874B (en) Phosphogypsum vegetation and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee