CN1534142A - Underground continuous wall frozen construction method - Google Patents
Underground continuous wall frozen construction method Download PDFInfo
- Publication number
- CN1534142A CN1534142A CNA031131093A CN03113109A CN1534142A CN 1534142 A CN1534142 A CN 1534142A CN A031131093 A CNA031131093 A CN A031131093A CN 03113109 A CN03113109 A CN 03113109A CN 1534142 A CN1534142 A CN 1534142A
- Authority
- CN
- China
- Prior art keywords
- wall
- construction
- frozen
- diaphragm wall
- slotted eye
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
A freezing method for building the continuous underground wall suitable for deep fundation pit includes artifically freezing the ground layer to form a frozen ground wall, manually or mechanically digging slots under protection of said frozen ground wall, and casting concrete walls in said slots. Its advantages are simple technology, high speed, and no need of sludge to protect wall surface.
Description
One, technical field
The present invention relates to diaphragm wall frozen construction worker method, be particularly useful for dark, thick construction of continuous concrete wall such as heavy construction deep foundation ditch, large-scale bridge pier deep foundation ditch, also be applicable to other carrying in moisture or caving ground or the construction of water proof body of wall.
Two, background technology
Municipal administration, traffic at present, traditional construction of diaphragm wall in the fields such as construction work, be in the slotted eye digging process, to adopt mud off, under mud, carry out cast of wall section concrete and the construction of wall section joint, though can finish the excavation work of slotted eye, body of wall shape and physical dimension are prone to deviation, walls concrete is prone to nest mud, folder mud phenomenon, grooving equipment is poor to the adaptive capacity of complex geological condition, and the joint quality between each wall section also is difficult for guaranteeing; Then need large-scale or expensive plant equipment to finish for dark, thick construction of continuous concrete wall, its slurry coat method also causes environment pollution easily.
Three, technology contents
1. goal of the invention
In view of the deficiency that prior art exists, the purpose of this invention is to provide a kind of easy construction, diaphragm wall physique amount is easy to guarantee, and is free from environmental pollution, excavates effective diaphragm wall frozen construction worker method.
2. technical scheme
Diaphragm wall frozen construction worker method of the present invention is finished like this: at first adopt artificial stratum freezing process, a distance, the slotted eye outside in the diaphragm wall section of intending construction, freezing of certain density of constructing with boring, in these borings, frigo is installed, provide cold to frigo, make its Freezing stratum as rapid on every side, and form the frozen soil wall that reaches designing requirement, promptly artificial stratum freezing process forms frozen soil wall; Then under the protection of formation frozen soil wall, artificial or Mechanical Method construction slotted eye, last in the slotted eye that construction is finished concreting, and couple together with adjacent wall section.Drilling depth should surpass diaphragm wall design maximum degree of depth certain distance.
3. technique effect
Diaphragm wall frozen construction worker method of the present invention is best suited for dark, thick construction of continuous concrete wall such as heavy construction deep foundation ditch, large-scale bridge pier deep foundation ditch.Adopt artificial stratum freezing process to form frozen soil wall (comprise and freeze rock), under the protection that forms frozen soil wall, the slotted eye of artificial or mechanical means driving and masonry construction wall section, concreting wall section in slotted eye is then handled the joint of wall section simultaneously well.Compare with traditional construction, it is simple that this diaphragm wall frozen construction worker method has construction technology, construction equipment is easy, but multiple spot is constructed simultaneously, and speed of application is fast, the diaphragm wall of can construct under various the complex geological conditions various degree of depth and thickness, need not mud off, the mud-less pollution problem is dry operation, and wall construction quality and wall section joint construction quality are easy to control and guarantee.For dark, thick construction of continuous concrete wall, this method has special advantage, and has practicality widely.
Four, the specific embodiment
Diaphragm wall frozen construction worker method of the present invention, at first in a distance, diaphragm wall design attitude both sides, the usefulness of freezing of certain density of constructing is holed, and drilling depth should surpass diaphragm wall design maximum degree of depth certain distance; Drilling construction finishes, and frigo is installed in freezing hole, implements artificial Freezing stratum as rapid, promptly provides cold to frigo, makes its Freezing stratum as rapid on every side, and forms the frozen soil wall that reaches designing requirement.After frozen soil wall thickness and average temperature reach designing requirement, under the protection of frozen soil wall, adopt well worker or mechanical means to divide groove section cutting slots, and where necessary the slotted eye wall is carried out supporting; Slotted eye is handled wall section joint on earth and after the acceptance(check), then carries out the casting and constructing of steel concrete diaphragm wall body of wall.
Claims (4)
1. diaphragm wall frozen construction worker method is characterized in that:
Step 1: adopt artificial stratum freezing process to form frozen soil wall;
Step 2: under the protection of formation frozen soil wall, artificial or Mechanical Method construction slotted eye, and where necessary the slotted eye wall is carried out supporting;
Step 3: concreting in the slotted eye that construction is finished, and couple together with adjacent wall section.
2. diaphragm wall frozen construction worker method according to claim 1, it is characterized in that: described artificial stratum freezing process is a distance, the slotted eye outside in the diaphragm wall section of intending construction, freezing of certain density of constructing with boring, in these borings, frigo is installed, provide cold to frigo, make its Freezing stratum as rapid on every side, and form the frozen soil wall (comprise and freeze rock) that reaches designing requirement.
3. diaphragm wall frozen construction worker method according to claim 1 and 2 is characterized in that: described drilling depth should surpass diaphragm wall design maximum degree of depth certain distance.
4. according to claim 1 or 2 or described diaphragm wall frozen construction worker method, it is characterized in that: described concreting is to carry out under the situation that does not have mud and water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03113109 CN1243162C (en) | 2003-04-01 | 2003-04-01 | Underground continuous wall frozen construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 03113109 CN1243162C (en) | 2003-04-01 | 2003-04-01 | Underground continuous wall frozen construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1534142A true CN1534142A (en) | 2004-10-06 |
CN1243162C CN1243162C (en) | 2006-02-22 |
Family
ID=34283725
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 03113109 Expired - Fee Related CN1243162C (en) | 2003-04-01 | 2003-04-01 | Underground continuous wall frozen construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1243162C (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102322068A (en) * | 2011-07-06 | 2012-01-18 | 上海地矿工程勘察有限公司 | Pressure reduction dewatering auxiliary trenching construction process |
CN103276720A (en) * | 2013-05-31 | 2013-09-04 | 中国矿业大学 | Soft soil subgrade freezing reinforcement method |
CN103850258A (en) * | 2014-03-24 | 2014-06-11 | 北京城建勘测设计研究院有限责任公司 | Natural freezing support method |
CN105239585A (en) * | 2015-10-31 | 2016-01-13 | 中国矿业大学(北京) | In-pile freezing structure of deep underground space and constructing method |
CN105297742A (en) * | 2015-10-22 | 2016-02-03 | 北京城建集团有限责任公司 | Structure and method of water stopping support of underground space |
CN106013166A (en) * | 2016-06-27 | 2016-10-12 | 中国矿业大学 | Construction method adopting spoke-type freezing and outwards expanded excavation for excavating ultra-deep foundation pit |
CN107165171A (en) * | 2015-08-31 | 2017-09-15 | 罗海军 | Basement supporting frozen construction method |
CN111101523A (en) * | 2020-01-17 | 2020-05-05 | 安徽理工大学 | Reinforced ice supporting device for foundation pit and supporting method adopting same |
CN111945704A (en) * | 2020-08-13 | 2020-11-17 | 中铁二十局集团第一工程有限公司 | Method for reinforcing water-rich silt stratum by obliquely arranging multiple rows of freezing pipes |
-
2003
- 2003-04-01 CN CN 03113109 patent/CN1243162C/en not_active Expired - Fee Related
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102322068B (en) * | 2011-07-06 | 2013-08-21 | 上海地矿工程勘察有限公司 | Pressure reduction dewatering auxiliary trenching construction process |
CN102322068A (en) * | 2011-07-06 | 2012-01-18 | 上海地矿工程勘察有限公司 | Pressure reduction dewatering auxiliary trenching construction process |
CN103276720A (en) * | 2013-05-31 | 2013-09-04 | 中国矿业大学 | Soft soil subgrade freezing reinforcement method |
CN103276720B (en) * | 2013-05-31 | 2015-12-02 | 中国矿业大学 | A kind of soft soil roadbed consolidation by freezing method |
CN103850258B (en) * | 2014-03-24 | 2016-06-29 | 北京城建勘测设计研究院有限责任公司 | A kind of weather freezing method for protecting support |
CN103850258A (en) * | 2014-03-24 | 2014-06-11 | 北京城建勘测设计研究院有限责任公司 | Natural freezing support method |
CN107165171A (en) * | 2015-08-31 | 2017-09-15 | 罗海军 | Basement supporting frozen construction method |
CN107165171B (en) * | 2015-08-31 | 2019-06-07 | 罗海军 | Basement supporting frozen construction method |
CN105297742A (en) * | 2015-10-22 | 2016-02-03 | 北京城建集团有限责任公司 | Structure and method of water stopping support of underground space |
CN105239585A (en) * | 2015-10-31 | 2016-01-13 | 中国矿业大学(北京) | In-pile freezing structure of deep underground space and constructing method |
CN106013166A (en) * | 2016-06-27 | 2016-10-12 | 中国矿业大学 | Construction method adopting spoke-type freezing and outwards expanded excavation for excavating ultra-deep foundation pit |
CN106013166B (en) * | 2016-06-27 | 2018-07-03 | 中国矿业大学 | Spoke type freezes to dig the construction method that formula excavates ultra-deep foundation pit outward |
CN111101523A (en) * | 2020-01-17 | 2020-05-05 | 安徽理工大学 | Reinforced ice supporting device for foundation pit and supporting method adopting same |
CN111945704A (en) * | 2020-08-13 | 2020-11-17 | 中铁二十局集团第一工程有限公司 | Method for reinforcing water-rich silt stratum by obliquely arranging multiple rows of freezing pipes |
Also Published As
Publication number | Publication date |
---|---|
CN1243162C (en) | 2006-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103195158B (en) | Municipal drainage pipeline slurry balance pipe-jacking construction method | |
CN101614020B (en) | Flexible bladder type anticorrosion device, anticorrosion pile and construction method using same | |
CN201089893Y (en) | Foundation pit circle shield prefabricated driven pile | |
CN106013171B (en) | A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall | |
CN105649012A (en) | Construction method for bored pile of subway station enclosure structure of upper-soft lower-hard ground | |
CN104775440A (en) | Mineshaft-type underground garage deep foundation pit supporting structure | |
CN108517877A (en) | Miscellaneous fill ultra-deep foundation pit consolidates slip casting combination double-row steel pipe stake supporting construction method | |
CN1265062C (en) | Construction for making piles and tools | |
CN104762955A (en) | Manually excavated pedestal pile construction method based on freezing process | |
CN1243162C (en) | Underground continuous wall frozen construction method | |
CN111501781A (en) | Supporting method and structure combining consolidation grouting of hybrid filling ultra-deep foundation pit with double rows of steel pipe piles | |
CN101768960B (en) | Bored concrete pile construction method of permafrost layer | |
CN105926626B (en) | Overlength pneumatic down hole hammer vibrates jet grouting pile construction technique | |
CN208152063U (en) | A kind of superelevation infiltration coefficient sand ovum stratum Groundwater Control system | |
CN110512594A (en) | The simple and easy method of churning driven opportunity cavity pore-forming | |
CN105002912A (en) | Construction method for splicing type caisson structure based on prefabricated hollow piles | |
CN105625299B (en) | A kind of wall board type Novel underground diaphragm wall and its construction method | |
CN205399401U (en) | Novel underground continuous wall of wallboard formula | |
CN112302678B (en) | Deformation control construction process for shallow tunnel of underpass building | |
CN101597903A (en) | A kind of construction method of cylindrical slurry core pile that is used for pattern foundation pit supporting structure | |
CN107476293A (en) | A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method | |
CN208294522U (en) | Waterproof of man in a kind of pilot tunnel of rich water sand-pebble layer | |
CN111980093A (en) | Groove grooving equipment | |
CN108019211B (en) | Water-intercepting curtain in pilot tunnel of water-rich sandy pebble stratum and construction method thereof | |
CN204753632U (en) | Underground parking garage is built to caisson structure based on prefabricated concatenation of stake on an empty stomach formula |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20060222 |
|
CF01 | Termination of patent right due to non-payment of annual fee |