CN1485446A - Thermal state method for restoring branch pipe orifice of blast furnace bustle pipe - Google Patents

Thermal state method for restoring branch pipe orifice of blast furnace bustle pipe Download PDF

Info

Publication number
CN1485446A
CN1485446A CNA021372519A CN02137251A CN1485446A CN 1485446 A CN1485446 A CN 1485446A CN A021372519 A CNA021372519 A CN A021372519A CN 02137251 A CN02137251 A CN 02137251A CN 1485446 A CN1485446 A CN 1485446A
Authority
CN
China
Prior art keywords
ring
brick
refractory brick
branch pipe
pipe orifice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA021372519A
Other languages
Chinese (zh)
Other versions
CN1208474C (en
Inventor
王立辉
鲍戟
万强
张龙来
蒋基洪
关丕东
沈恒元
宋家齐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI BAOYE INDUSTRIAL FURNACE Co
Baoshan Iron and Steel Co Ltd
Original Assignee
SHANGHAI BAOYE INDUSTRIAL FURNACE Co
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI BAOYE INDUSTRIAL FURNACE Co, Baoshan Iron and Steel Co Ltd filed Critical SHANGHAI BAOYE INDUSTRIAL FURNACE Co
Priority to CN 02137251 priority Critical patent/CN1208474C/en
Publication of CN1485446A publication Critical patent/CN1485446A/en
Application granted granted Critical
Publication of CN1208474C publication Critical patent/CN1208474C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

A technology of repairing inner lining material of blast furnaces, especially thermally repairing bustle pipes. It comprises: a. clogging and insulating the ceramic fiber layer containing metallic framework ; b. dissembling the firebricks in inner walls; c. supporting and fixing flatiron onto iron housing of the pipe;d. selecting firebricks. The invention is mainly used to repair inner linings of blast furnaces.

Description

Thermal state method for restoring branch pipe orifice of blast furnace bustle pipe
One, technical field
The present invention relates to the recovery technique of the anti-material of a kind of blast furnace lining, particularly a kind of thermal state method for restoring branch pipe orifice of blast furnace bustle pipe.
Two, background technology
Blowpipe is the Thermal Equipment that connects bustle pipe and blast-furnace tuyere, is to keep the required hot blast of blast furnace ordinary production to enter the interior unique passage of State of Blast Furnace, and bustle pipe is called Zhi Yuanguan with the intermediate location that is connected of arm.Zhi Yuanguan is an one with bustle pipe on inner lining structure, and its masonry way is to be built by laying bricks or stones to the bustle pipe center position by mouth of pipe brick.During blast furnace capital construction design, its life-span of Zhi Yuanguan and bustle pipe is and blast furnace generation stove labour synchronous (more than 10 years) that if do not take special measure, the Zhi Yuanguan liner is to overhaul under hot, otherwise will cause the integral body of Zhi Yuanguan and bustle pipe to be damaged.The damage at this position down carries out more hot that the actual achievement of changeable liner there is no report both at home and abroad, so all adopt the outside strap of metal flange, stops hot blast to leak generally speaking, keeps blast furnace production.But, owing to this method is not repaired liner, so only be the interim measure of curing the symptoms, not the disease.Any air leakage phenomena of blast furnace bustle pipe arm all directly influences the ordinary production of blast furnace, and blast furnace will be forced to damping down for this reason.Frequent damping down not only influences the direct motion of the working of a furnace, and influences output.
Three, summary of the invention
The technical issues that need to address of the present invention are: be damaged and when causing leaking out at blast furnace bustle pipe branch pipe orifice liner, providing a kind of can in time carry out the thermal state method for restoring branch pipe orifice of blast furnace bustle pipe that the branch pipe orifice liner is repaired down hot.
Technical scheme of the present invention is: thermal state method for restoring branch pipe orifice of blast furnace bustle pipe may further comprise the steps: a, branch pipe orifice shutoff are heat insulation: the position that will include the non-repairing of ceramic fiber bed course shutoff branch pipe orifice inner lining refractory block of metallic framework.B, interior ring refractory brick disintegrate: when the disintegration branch pipe orifice first ring refractory brick, 1-2 piece brick in this ring refractory brick of disintegration earlier, preferably select it to close tweel block, cut off earlier and close the corresponding body iron-clad of tweel block, will close tweel block with screw block along the radial direction of encircling brick in manage and eject.The support fixation of c, ring brick: at disintegration branch pipe orifice first ring refractory brick 1-2 piece, expose the root of the second ring refractory brick after, be close to the second ring fire brick surface welding band iron in the body iron-clad, continue other refractory brick of disintegration branch pipe orifice first ring then.The band iron of fixing the second ring refractory brick serves as easily with 3-6 point discrete distribution, also the arch tire can be set in Zhi Yuanguan.D, repair the door that closes of back refractory brick: the reparation of Zhi Yuanguan refractory brick finishes, refractory brick close door still in the former tweel block position of closing of the branch pipe orifice first ring refractory brick.Cut off the metal brick plate that closes the tweel block correspondence position earlier, close tweel block and will close tweel block with wooden mallet from outside to inside and squeeze into, close the gap plastic refractory filling of tweel block and body iron-clad along the axial direction due of ring brick.Close tweel block and build by laying bricks or stones and finish, again the welding of metal brick plate is restored and polish flat.
The invention has the beneficial effects as follows: when blast furnace bustle pipe branch pipe orifice liner is damaged and causes leaking out, can be in time under hot state the refractory brick of branch pipe orifice liner be carried out Replacement and Repair, reduced the damping down of blast furnace.
Four, description of drawings
Fig. 1 is Zhi Yuanguan of the present invention installation site figure
Fig. 2 is a shutoff ceramic fiber bed course positional structure synoptic diagram of the present invention
Fig. 3 is first tubular construction schematic front view for the present invention props up
Fig. 4 is first tubular construction signal right view for the present invention props up
Among the figure: 1-bustle pipe, 2-prop up unit's pipe, the 3-arm, and the 4-blast furnace, 5-ceramic fiber bed course, the 6-metal hook,
The 7-first ring refractory brick, the 8-second ring refractory brick, 9-metal brick plate, 10-band iron, 11-body iron
Shell, 12-closes tweel block.
Five, embodiment
Embodiment 1: with reference to Fig. 1, blowpipe 3 is the Thermal Equipments that connect bustle pipe 1 and blast furnace 4 air ports, is to keep the required hot blast of blast furnace ordinary production to enter the interior unique passage of blast furnace 4 stoves, and bustle pipe is called Zhi Yuanguan 2 with the intermediate location that is connected of 1 arm 3.Zhi Yuanguan 2 is an one with bustle pipe 1 on inner lining structure, and its masonry way is to be built by laying bricks or stones to the bustle pipe center position by mouth of pipe brick.When 2 mouthfuls of liners of Zhi Yuanguan are damaged the needs replacing, it is heat insulation at first to carry out 2 mouthfuls of shutoff of Zhi Yuanguan: with reference to Fig. 2, because the enforcement of this technology is to carry out under the hot state of blast furnace staying, so effectively shutoff is heat insulation is the prerequisite of this technology implementation, design and produce 2 mouthfuls of liners of ceramic fiber bed course 5 shutoff Zhi Yuanguan, the second ring refractory brick 8 that includes metallic framework.Ceramic fiber bed course inside comprises metal hook 6, and one side makes the shape of ceramic fiber bed course 5 be convenient to fix, shutoff, also is convenient on the other hand remove.With reference to Fig. 3,4, when the disintegration mouth of pipe first ring refractory brick 7, at first disintegrate and close tweel block 12, cut off earlier and close tweel block 12 corresponding body iron-clads 11, will close tweel block 12 with screw block along the radial direction of encircling brick in manage to eject, thereby be convenient to encircle the disintegration of brick.The cardinal principle of this technology be utilize the ring brick close tweel block 12 its integrally-built unstable of back of disintegrating.When disintegrating replacing in order to ensure Zhi Yuanguan 2 inner lining refractory blocks, whole Zhi Yuanguan 2 liner masonries are unlikely to whole to be destroyed, after closing tweel block 12 disintegration, after exposing the root of the second ring refractory brick, be close to 8 welding of second ring refractory brick band iron 10 in body iron-clad 11, continue other refractory brick of 2 mouthful of first ring of disintegration Zhi Yuanguan then.The band iron of fixing the second ring refractory brick is along the circumferential direction uniform with 4.The cardinal principle of this technology is to have utilized the ring brick structure through having relative independent stability behind the high temperature sintering.When Zhi Yuanguan 2 inner lining refractory block reparations finish, refractory brick close door still in former tweel block 12 positions of closing of the branch pipe orifice first ring refractory brick 7.Cut off the metal brick plate 9 that closes tweel block 12 correspondence positions earlier, the axial direction due that closes tweel block 12 edge ring bricks will close tweel block with wooden mallet from outside to inside and squeeze into, and close the gap plastic refractory filling of tweel block 12 and body iron-clad 11.Close tweel block 12 and build by laying bricks or stones and finish, again 9 welding of metal brick plate are restored and polish flat.
Embodiment 2: the arch tire is set in Zhi Yuanguan 2, band iron be distributed as 3 points, all the other are identical with embodiment 1.
Embodiment 3: band iron be distributed as 5 points, all the other are identical with embodiment 1.

Claims (3)

1, thermal state method for restoring branch pipe orifice of blast furnace bustle pipe is characterized in that may further comprise the steps:
A, branch pipe orifice shutoff are heat insulation: the position that will include the non-repairing of ceramic fiber bed course shutoff branch pipe orifice inner lining refractory block of metallic framework;
B, interior ring refractory brick disintegrate: when the disintegration branch pipe orifice first ring refractory brick, the 1-2 piece brick in this ring refractory brick that disintegrates earlier cuts the corresponding body iron-clad of this refractory brick earlier, with the radial direction of screw block along the ring brick this refractory brick is ejected in managing;
The support fixation of c, ring brick: at the disintegration branch pipe orifice first ring refractory brick 1-2 piece, after exposing the root of the second ring refractory brick, be close to the second ring fire brick surface welding band iron in the body iron-clad, continue other refractory brick of disintegration branch pipe orifice first ring then, the band iron of fixing the second ring refractory brick serves as easy with 3-6 point discrete distribution;
D, repair the door that closes of back refractory brick: the reparation of Zhi Yuanguan refractory brick finishes, refractory brick close door still in the former tweel block position of closing of branch pipe orifice first ring refractory brick, cut off the metal brick plate that closes the tweel block correspondence position earlier, closing tweel block will close tweel block with wooden mallet from outside to inside and squeeze into along the axial direction due of ring brick, close the gap plastic refractory filling of tweel block and body iron-clad, close tweel block and build by laying bricks or stones and finish, again the welding of metal brick plate is restored and polish flat.
2, thermal state method for restoring branch pipe orifice of blast furnace bustle pipe according to claim 1 is characterized in that: the first ring refractory brick that at first disintegrates is for closing tweel block.
3, thermal state method for restoring branch pipe orifice of blast furnace bustle pipe according to claim 1 is characterized in that: the arch tire is set in Zhi Yuanguan.
CN 02137251 2002-09-28 2002-09-28 Thermal state method for restoring branch pipe orifice of blast furnace bustle pipe Expired - Fee Related CN1208474C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02137251 CN1208474C (en) 2002-09-28 2002-09-28 Thermal state method for restoring branch pipe orifice of blast furnace bustle pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02137251 CN1208474C (en) 2002-09-28 2002-09-28 Thermal state method for restoring branch pipe orifice of blast furnace bustle pipe

Publications (2)

Publication Number Publication Date
CN1485446A true CN1485446A (en) 2004-03-31
CN1208474C CN1208474C (en) 2005-06-29

Family

ID=34146940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02137251 Expired - Fee Related CN1208474C (en) 2002-09-28 2002-09-28 Thermal state method for restoring branch pipe orifice of blast furnace bustle pipe

Country Status (1)

Country Link
CN (1) CN1208474C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100543397C (en) * 2007-11-27 2009-09-23 攀枝花新钢钒股份有限公司 Method for quickly repairing wall surface of furnace kiln in thermal state and special equipment thereof
CN101760576A (en) * 2010-02-26 2010-06-30 河北省首钢迁安钢铁有限责任公司 Repatching method for top liner of blast furnace hot-wind pipeline
WO2010076211A1 (en) * 2009-01-05 2010-07-08 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
WO2010076210A1 (en) * 2009-01-05 2010-07-08 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
CN102206722A (en) * 2011-05-11 2011-10-05 南通宝钢钢铁有限公司 Quick repair method for fallen hot air pipeline refractory

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100543397C (en) * 2007-11-27 2009-09-23 攀枝花新钢钒股份有限公司 Method for quickly repairing wall surface of furnace kiln in thermal state and special equipment thereof
CN102265107B (en) * 2009-01-05 2014-01-15 保尔伍斯耐火材料与工程有限责任公司 Bustle pipe arrangement
WO2010076211A1 (en) * 2009-01-05 2010-07-08 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
WO2010076210A1 (en) * 2009-01-05 2010-07-08 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
EP2208952A1 (en) * 2009-01-05 2010-07-21 Paul Wurth Refractory & Engineering GmbH Bustle pipe arrangement
EP2208953A1 (en) * 2009-01-05 2010-07-21 Paul Wurth Refractory & Engineering GmbH Bustle pipe arrangement
CN102272545A (en) * 2009-01-05 2011-12-07 保尔伍斯耐火材料与工程有限责任公司 Bustle pipe arrangement
US8808616B2 (en) 2009-01-05 2014-08-19 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
AU2009334940B2 (en) * 2009-01-05 2014-09-18 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
TWI475182B (en) * 2009-01-05 2015-03-01 保爾伍斯股份有限公司 Bustle pipe arrangement
US9028743B2 (en) 2009-01-05 2015-05-12 Paul Wurth Refractory & Engineering Gmbh Bustle pipe arrangement
CN101760576B (en) * 2010-02-26 2011-08-17 河北省首钢迁安钢铁有限责任公司 Repatching method for top liner of blast furnace hot-wind pipeline
CN101760576A (en) * 2010-02-26 2010-06-30 河北省首钢迁安钢铁有限责任公司 Repatching method for top liner of blast furnace hot-wind pipeline
CN102206722A (en) * 2011-05-11 2011-10-05 南通宝钢钢铁有限公司 Quick repair method for fallen hot air pipeline refractory

Also Published As

Publication number Publication date
CN1208474C (en) 2005-06-29

Similar Documents

Publication Publication Date Title
CN102504837B (en) Synchronous cutting-off and unroofing repair method for coke side oven head of large-scale coke oven machine
CN106435073A (en) Blast furnace liner overall pouring construction method for replacing spraying materials and refractory bricks
CN102399926B (en) Furnace halt residue iron outlet method for middle and large-sized blast furnaces
CN204174222U (en) The repair structure of iron-making heat wind furnace hot air duct and repairing mould thereof
CN102912051A (en) Method for exchanging cooling wall of blast furnace taphole online
CN112430699B (en) Long-service-life service method for synergistic hot replacement of bottom powder spraying converter bottom and bottom blowing brick
CN100595284C (en) Maintaining method for blast furnace
CN1208474C (en) Thermal state method for restoring branch pipe orifice of blast furnace bustle pipe
CN112123544A (en) Construction method of integrated full-cast refractory structure applied to blast furnace lining
CN110184412B (en) Method for replacing bottom blowing brick cup of converter
CN113088592A (en) Online grouting process for cold and hot surfaces of blast furnace
CN102134621B (en) Blast furnace iron notch patching method
CN204718409U (en) A kind of can the anode furnace of hot replacing redox mouth brick
CN1618991A (en) Exchange technology of hot air furnace hot air short pipe
JPS602607A (en) Repairing method of blast furnace wall
CN219689759U (en) Top combustion type hot air outlet damage repair structure of hot air furnace
CN113020582A (en) Ladle bottom structure, installation and maintenance process thereof
WO1996037632A1 (en) Nozzle for blowing gas into molten metal and usage thereof
CN106382821B (en) A kind of building method of reduction inner lining of furnace
CN2934937Y (en) Honeycomb heat-storage burning nozzle
CN113430314B (en) Long-life blast furnace bottom hearth refractory structure and maintenance method
CN110106306A (en) A kind of bottom-blowing air feed element installation method
CN114603128B (en) Ladle masonry and maintenance method capable of being used in short time
CN205061999U (en) Entrained flow gasifica tion furnace arch top refractory liner
CN2171830Y (en) Water cooled cupola without furnace liner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050629

Termination date: 20160928

CF01 Termination of patent right due to non-payment of annual fee